A prefabricated building curtain wall

CN224314435UActive Publication Date: 2026-06-02XIANTONG (LANGFANG) ENGINEERING PROJECT MANAGEMENT CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
XIANTONG (LANGFANG) ENGINEERING PROJECT MANAGEMENT CO LTD
Filing Date
2025-07-16
Publication Date
2026-06-02

AI Technical Summary

Technical Problem

The installation of existing prefabricated building curtain walls is inconvenient and poses safety hazards; insecure installation may affect safety during use.

Method used

The prefabricated modular building curtain wall design utilizes a combination of limiting rods, snap-fit ​​plates, nuts, and threaded rods to achieve a fast and stable installation. A wear-resistant material coating and a protective frame are applied to the main body of the curtain wall to enhance its protective performance.

Benefits of technology

It simplifies the construction process, shortens the construction cycle, improves the stability and safety of the installation, extends the service life of the curtain wall, reduces maintenance costs, and meets the needs for convenient and reliable installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224314435U_ABST
    Figure CN224314435U_ABST
Patent Text Reader

Abstract

This utility model discloses a prefabricated assembled building curtain wall, belonging to the field of building curtain walls. It includes a building curtain wall body, with a limiting rod fixedly connected to one side of the body. Through the coordinated use of these devices, it can be conveniently and quickly fixed to the building body using bolts and other fasteners, providing a stable foundation for subsequent installation of the curtain wall body. The curtain wall body is initially movably connected to the limiting rod on one side of the curtain wall body via a snap-fit ​​opening on a snap-fit ​​plate. Then, by rotating a threaded rod movably connected to a nut, the threaded rod moves towards the building curtain wall body using threaded transmission, applying a pushing force to the snap-fit ​​plate, thereby firmly fixing the curtain wall body. This installation method is simple to operate, requires no complex construction processes, greatly shortens the construction cycle, and ensures the stability and reliability of the curtain wall body installation, reducing safety hazards caused by insecure installation.
Need to check novelty before this filing date? Find Prior Art