A mine assembled steel pipe arch shed
By using the insertion hole design of the support pillars and outer frame, as well as the snap-fit components, the problem of inconvenient installation of steel pipe arch sheds caused by the height difference in the mine was solved, achieving rapid installation and improved stability.
CN224315004UActive Publication Date: 2026-06-02SHANDONG SHENBO ROADWAY SUPPORTING TECH CO LTD
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SHANDONG SHENBO ROADWAY SUPPORTING TECH CO LTD
- Filing Date
- 2025-07-17
- Publication Date
- 2026-06-02
Smart Images

Figure CN224315004U_ABST
Abstract
This utility model relates to the field of mine safety facilities technology and discloses a prefabricated steel pipe arch shed for mining, including a support column, an outer frame, and a sleeve. A top beam is slidably connected to the middle of the support column, and a connecting assembly is installed between the support column and the top beam. The support column is slidably connected to the middle of the outer frame, and multiple insertion holes are evenly spaced in the middle of the support column and the outer frame. A locking assembly is installed between the support column and the outer frame, and the locking assembly includes a pin. The pin is inserted into the middle of the insertion hole, and a locking rod is slidably connected to the middle of the pin. A fixing block is fixedly connected to the middle of the sleeve. In this utility model, after the steel pipe arch shed is erected, the insertion rod is slidably pushed towards the middle of the sleeve and then aligned with the slot and released. When a strong spring pushes the insertion rod back to its original position, the insertion rod can be inserted into the slot, thereby connecting adjacent outer frames into a whole and improving overall stability.