Wet calcium desulfurization tower

By coordinating the design of the cyclone pipe network assembly and the slurry circulation assembly, the problem of sedimentation at the bottom of the wet calcium desulfurization tower was solved, achieving full-domain cyclone disturbance and efficient desulfurization, thus improving system stability and equipment operational reliability.

CN224331875UActive Publication Date: 2026-06-09ZHONGKE HEFEI COAL GASIFICATION TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ZHONGKE HEFEI COAL GASIFICATION TECH CO LTD
Filing Date
2025-07-02
Publication Date
2026-06-09

AI Technical Summary

Technical Problem

Traditional wet calcium desulfurization towers suffer from bottom sedimentation problems during operation, including dead zones in the stirring, slurry sedimentation, and particulate matter deposition, which leads to reduced desulfurization efficiency, equipment failure, and increased maintenance costs.

Method used

The design employs a synergistic approach of cyclone pipe network components and slurry circulation components. The cyclone pipe network components create full-area cyclone disturbance through nested annular cyclone branch pipes, while the slurry circulation components ensure high-concentration slurry circulation. Combined with the control components for real-time monitoring and adjustment, the design eliminates dead zones in the stirring process and breaks up sediments.

Benefits of technology

It achieves full-area, dead-angle-free swirling disturbance in the bottom area of ​​the wet calcium desulfurization tower, improving desulfurization efficiency, reducing equipment maintenance frequency and cost, and lowering the risk of equipment failure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224331875U_ABST
    Figure CN224331875U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of wet calcium desulfurization tower, comprising: wet calcium desulfurization tower main body, cyclone pipe network component, slurry circulation component;The wet calcium desulfurization tower main body is divided into absorption section and desulfurization slurry section, the absorption section is located above the desulfurization slurry section;The cyclone pipe network component includes cyclone main pipe and at least one annular cyclone branch pipe, the cyclone main pipe is worn on the inner wall of the wet calcium desulfurization tower main body, the annular cyclone branch pipe is communicated with the cyclone main pipe;The slurry circulation component is connected with the desulfurization slurry section and the cyclone main pipe.Cyclone pipe network component can form full domain no dead angle cyclone disturbance in desulfurization slurry section, eliminate the center dead zone of traditional side-in type stirring, ensure that desulfurization tower bottom area can be cyclone fully agitated, the slurry circulation component takes liquid from desulfurization slurry section, ensure that the temperature and pH of the slurry of injection are unified, shorten circulation path and slurry solid concentration is high.