By using collection devices and suspended platforms during the renovation of building exterior walls, the problems of dust and safety hazards caused by falling wall plaster have been solved, achieving efficient and safe exterior wall renovation operations.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- 宁波威士伯建设有限公司
- Filing Date
- 2025-06-30
- Publication Date
- 2026-06-16
Smart Images

Figure CN224363673U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of construction equipment, and in particular to a device for collecting debris from building exterior walls and a construction scaffolding device. Background Technology
[0002] A construction suspended platform is a temporary suspended device used for high-altitude operations, typically for the construction, cleaning, maintenance, or repair of building exteriors. It is suspended from the top of the building by wire ropes or chains and its lifting is controlled by an electric or manual drive system, providing a safe working platform for personnel.
[0003] In related technologies, construction suspended platforms typically include a lifting mechanism located at the top of the building and a suspended platform connected to the lifting mechanism and suspended outside the building. When renovating the exterior walls of old residential buildings, operators usually stand on the suspended platform to first remove all the plaster from the exterior walls before carrying out unified repairs. The lifting mechanism allows the suspended platform to be raised and lowered, enabling operators to work at different heights on the exterior walls.
[0004] Regarding the aforementioned technologies, the inventors believe that when removing wall plaster, the plaster will fall directly from a height to the ground, causing severe dust and posing safety hazards. Utility Model Content
[0005] To reduce the risk of wall plaster falling directly during construction, this application provides a building exterior wall debris collection device and a building suspended platform device.
[0006] In a first aspect, this application provides a device for collecting debris from building exterior walls, employing the following technical solution:
[0007] A device for collecting debris from building exterior walls includes a collection bracket installed on one side of a suspended platform, a collection bag installed on the collection bracket, and a gathering component for gathering the lower part of the collection bag; the collection bracket includes a first mounting part installed on the suspended platform and a support frame installed at the opening of the collection bag for opening the opening of the collection bag; the bottom end of the collection bag has a discharge port.
[0008] By adopting the above technical solution, when renovating the exterior walls of old residential areas, operators use a scraper to remove the wall plaster from the building's exterior walls. The scraped-off wall fragments fall from the support frame of the collection bracket into the collection bag and reach the discharge port along the arrangement direction of the collection bag. This reduces the dust generated when the wall fragments fall and helps to reduce the risk of the wall plaster falling directly during the construction process.
[0009] Optionally, the gathering assembly includes a gathering rope fixed to the body of the collection bag and a shoulder strap buckle disposed on the gathering rope; the shoulder strap buckle includes a snap-fit seat installed at one end of the gathering rope and a snap-fit connector installed at the other end of the gathering rope and cooperating with the snap-fit seat to gather the body of the collection bag.
[0010] By adopting the above technical solution, the specific structure of the gathering component is disclosed. The gathering rope is provided with strap buckles at both ends, and by inserting the snap connector at one end of the gathering rope into the snap seat at the other end, the gathering component can gather the middle and lower section of the collection bag, which helps to improve the collection efficiency of the collection device for external wall debris.
[0011] Optionally, the collecting assembly has a support column on the side facing the building exterior wall, which is supported between the side of the collection bag and the building exterior wall. The head of the support column is provided with a damping element that abuts against the building exterior wall, and the tail end of the support column is detachably installed on the collecting assembly.
[0012] By adopting the above technical solution, the setting of the support column helps to keep the collection bag arranged vertically, so that the debris from the exterior wall can pass through the collection bag quickly, which helps to improve the collection efficiency of the collection device for debris from the exterior wall.
[0013] Optionally, the tail end of the support column is provided with a first arrangement groove and a first magnetic sheet is installed in the first arrangement groove, and the gathering assembly has a second mounting part for attracting the tail end of the support column.
[0014] By adopting the above technical solution, a first magnetic sheet is provided at the tail end of the support column, and a second mounting part is provided in the retracting assembly for the first magnetic sheet to be attracted, thus realizing the detachable installation of the support column and the retracting assembly.
[0015] Optionally, at least two of the gathering components are evenly spaced along the length of the collection bag, and each of the gathering components is provided with a support column.
[0016] By adopting the above technical solution, at least two gathering components are set in the lower part of the collection bag and supported by columns, which helps to improve the support strength between the collection bag and the wall, and keeps the lower part of the collection bag vertically arranged, which helps to further improve the collection efficiency of the collection device for debris from the outer wall.
[0017] Optionally, a collection trolley is also included at the output end of the collection bag. The collection trolley has a collection box for receiving the external wall debris output by the collection bag, and the collection box has a collection opening at the top for the discharge port to be arranged.
[0018] By adopting the above technical solution, a collection trolley is set at the output end of the collection bag, and a collection opening for the arrangement of the material outlet is opened at the top of the collection box of the collection trolley. This helps to collect and centrally transfer the debris from the exterior wall while reducing the dust generated during the collection process.
[0019] Secondly, this application provides a building suspended platform device, which adopts the following technical solution:
[0020] A building suspended platform device includes a suspended platform and a lifting mechanism for driving the suspended platform to rise and fall, characterized in that the suspended platform is further equipped with the aforementioned building exterior wall debris collection device.
[0021] By adopting the above technical solution, when renovating the exterior walls of old residential areas, operators stand on a suspended platform to remove the outer wall plaster and then repair the exterior walls. By controlling the lifting mechanism, the height of the suspended platform above the ground can be adjusted to achieve renovation work at different heights, thereby helping to improve the efficiency of exterior wall renovation.
[0022] Optionally, the suspended platform includes a base plate and side supports vertically fixed around the base plate. The side supports are provided with linear grooves in the vertical direction for the first mounting part of the collection bracket to slide along. The first mounting part has a linear slider that cooperates with the linear groove.
[0023] By adopting the above technical solution, a cooperative structure between the suspended platform and the collection device is disclosed. A linear slide groove is set on the side support and a linear slider adapted to it is set on the collection support, so as to realize the detachable installation of the collection support and the side support.
[0024] Optionally, the linear slider has a first arrangement hole and a ball-head spring plunger is installed therein, and the bottom of the linear groove has a snap-fit hole for the ball-head spring plunger to snap into.
[0025] By adopting the above technical solution, a ball-head spring plunger is set on the linear slider and a snap-fit hole adapted to the ball-head spring plunger is opened at the bottom of the linear slide groove, which realizes the snap-fit of the first mounting part into the linear slide groove, which helps to improve the installation stability of the collection bracket and the side bracket.
[0026] In summary, this application includes at least one of the following beneficial technical effects:
[0027] 1. A building exterior wall debris collection device, comprising a collection bracket, a collection bag installed on the collection bracket, and a collection component for gathering the lower part of the collection bag. When renovating the exterior walls of old residential areas, operators use a scraper to remove the wall plaster from the building exterior walls. The scraped exterior wall debris will fall from the support frame of the collection bracket into the collection bag and reach the discharge port along the arrangement direction of the collection bag, thereby reducing the dust generated when the exterior wall debris falls and helping to reduce the risk of wall plaster falling directly during construction.
[0028] 2. A building suspended platform device, comprising a suspended platform platform and a lifting mechanism for driving the suspended platform platform to rise and fall. When renovating the exterior walls of old residential areas, operators stand on the suspended platform platform to remove the wall plaster from the exterior walls. The lifting mechanism can adjust the height between the suspended platform platform and the ground, thereby realizing renovation work at different heights and helping to improve the efficiency of exterior wall renovation.
[0029] 3. By setting strap buckles at both ends of the gathering rope and inserting the snap connector at one end of the gathering rope into the snap seat at the other end, the gathering component can gather the lower part of the collection bag, which helps to improve the collection efficiency of the collection device for debris from the outer wall. Attached Figure Description
[0030] Figure 1 This is a schematic diagram of the building exterior wall debris collection device in this embodiment.
[0031] Figure 2 This is a cross-sectional schematic diagram of the collection bracket in this embodiment.
[0032] Figure 3 This is a schematic diagram of the engagement between the card holder and the card slot in this embodiment.
[0033] Figure 4 This is a cross-sectional schematic diagram of the support column in this embodiment.
[0034] Figure 5 yes Figure 4 A schematic diagram showing the connection between the support column at point A and the second mounting part.
[0035] Figure 6 This is a schematic diagram of the structure of the collection vehicle in this embodiment.
[0036] Figure 7 yes Figure 6 A schematic diagram showing the combination of the collection bag and the dust cover at point B.
[0037] Figure 8 This is a schematic diagram of the building suspended platform device in this embodiment.
[0038] Figure 9 yes Figure 2 A schematic diagram showing the connection between the side support and the collection support at point C.
[0039] Explanation of reference numerals in the attached drawings: 1. Collection bracket; 11. First mounting part; 111. Linear slider; 112. First arrangement hole; 113. Ball spring plunger; 1131. Plunger housing; 1132. Plunger spring; 1133. Plunger ball; 12. Support frame; 2. Collection bag; 21. Discharge port; 3. Gathering assembly; 31. Gathering rope; 32. Shoulder strap buckle; 321. Snap-fit seat; 3211. Snap-fit groove; 322. Snap-fit connector; 3221. Snap-fit buckle; 33. Second mounting part; 331. 2. Arrangement slot; 332. Second magnetic sheet; 4. Collection trolley; 41. Collection box; 411. Collection chamber; 412. Top cover; 413. Dustproof cloth cover; 414. Collection opening; 415. Binding rope; 5. Support column; 51. Damping component; 52. First arrangement slot; 53. First magnetic sheet; 6. Suspended platform; 61. Base plate; 62. Side bracket; 621. Straight slide; 622. Snap-fit hole; 7. Lifting mechanism; 71. Traction rope; 72. Winch; 73. Connecting part; 74. Support wheel. Detailed Implementation
[0040] The following is in conjunction with the appendix Figure 1-8 This application will be described in further detail.
[0041] This application discloses a device for collecting debris from building exterior walls. (Refer to...) Figure 1 The building exterior wall debris collection device includes a collection bracket 1, a collection bag 2 installed on the collection bracket 1, two collection components 3 for gathering the lower part of the collection bag 2, and a collection trolley 4 arranged at the output end of the collection bag 2. The two collection components 3 are arranged at intervals along the length of the collection bag 2 on the bag body.
[0042] Reference Figure 2 The collection bracket 1 includes a first mounting part 11 installed on the suspended platform 6 and a support frame 12 installed at the opening of the collection bag 2 and used to open the opening of the collection bag 2. In this embodiment, the opening of the collection bag 2 is fitted onto the outside of the support frame 12 and is close to the building's exterior wall, so that falling debris from the exterior wall can smoothly enter the collection bag 2.
[0043] Reference Figure 1 and Figure 3The gathering assembly 3 includes a gathering rope 31 fixed to the body of the collection bag 2 and a shoulder strap buckle 32 disposed on the gathering rope 31. The shoulder strap buckle 32 includes a locking seat 321 installed at one end of the gathering rope 31 and a locking connector 322 installed at the other end of the gathering rope 31 and cooperating with the locking seat 321 to gather the body of the collection bag 2. The locking seat 321 has a locking groove 3211 for accommodating the locking connector 322, and locking buckles 3221 are provided on both sides of the locking connector 322 for locking the locking connector 322 into the locking groove 3211. In this embodiment, the gathering rope 31 is made of high-strength nylon rope, so that the gathering rope 31 is not easy to break when the gathering assembly 3 fixes the body of the collection bag 2.
[0044] Reference Figure 4 and Figure 5 The collecting assembly 3 has a support column 5 on the side facing the building's exterior wall, supporting the collection bag 2 between the side and the building's exterior wall. The head of the support column 5 has a damping element 51 that abuts against the building's exterior wall, and the tail end of the support column 5 is detachably mounted to the front end of the collecting assembly 3. The tail end of the support column 5 has a first arrangement groove 52, and a first magnetic sheet 53 is installed within the first arrangement groove 52. The front of the snap-fit base 321 has a second mounting portion 33 for mounting the support column 5. The second mounting portion 33 has a second arrangement groove 331 at one end facing the support column 5 for inserting the support column 5, and a second magnetic sheet 332 for engaging with the first magnetic sheet 53 is located at the bottom of the second arrangement groove 331. In this embodiment, the damping element 51 is a square rubber pad.
[0045] Reference Figure 6 and Figure 7 The collection bag 2 has a discharge port 21 at its bottom end, and the collection trolley 4 has a collection box 41 for receiving the external wall debris output by the collection bag 2. The collection box 41 has a collection chamber 411 for containing the external wall debris. The collection box 41 has a cover 412 at the top. The cover 412 has a dust cover 413 for engaging with the discharge port 21 at the tail end of the collection bag 2, and the dust cover 413 has a collection opening 414 for inserting the tail end of the collection bag 2. A drawstring 415 is provided at the dust cover 413 and the collection opening 414, so that when the tail end of the collection bag 2 is inserted into the collection box 41 through the collection opening 414, the drawstring 415 can clamp the dust cover 413.
[0046] This application also discloses a building suspended platform device. (See attached embodiments.) Figure 8The building suspended platform device includes a suspended platform 6, a lifting mechanism 7 for driving the suspended platform 6 to rise and fall, and the aforementioned building exterior wall debris collection device. The suspended platform 6 includes a base plate 61 and side supports 62 vertically fixed around the base plate 61. The lifting mechanism 7 includes a traction rope 71, a winch 72 located on the top of the building for winding the traction rope 71, a connecting part 73 installed on the side supports 62 for arranging the traction rope 71, and a support pulley 74 installed on the top of the building for arranging the traction rope 71.
[0047] Reference Figure 2 and Figure 9 The side bracket 62 has a linear groove 621 in the vertical direction for the first mounting part 11 to slide. The first mounting part 11 of the collecting bracket 1 has a linear slider 111 that mates with the linear groove 621. The linear slider 111 has a first arrangement hole 112 and a ball spring plunger 113 is fitted therein. The ball spring plunger 113 includes a plunger housing 1131, a plunger spring 1132, and a plunger ball 1133. One end of the plunger spring 1132 abuts against the bottom of the inner cavity of the plunger housing 1131, and the other end abuts against the plunger ball 1133, so that the plunger ball 1133 always tends to abut against the opening of the plunger housing 1131. The bottom of the linear groove 621 has a snap-fit hole 622 for the plunger ball 1133 of the ball spring plunger 113 to snap into. In this embodiment, the linear groove 621 is a T-shaped groove, and the linear slider 111 is a T-shaped slider adapted to it.
[0048] The implementation principle of a building suspended platform device in this application embodiment is as follows: When renovating the exterior wall of an old residential area, the operator stands on the suspended platform 6 and uses a scraper to remove the wall plaster from the exterior wall. The scraped-off wall fragments fall from the support frame 12 of the collection bracket 1 into the collection bag 2 and enter the collection trolley 4 through the discharge port 21 along the arrangement direction of the collection bag 2. Since the collection trolley 4 is equipped with a top cover 412 and a dustproof cloth cover 413 at the collection opening 414, the falling wall fragments are less likely to generate dust and help reduce the risk of the wall plaster falling directly during construction. The lifting mechanism 7 can adjust the height between the suspended platform 6 and the ground, so that the operator can carry out renovation work on walls at different heights, thereby helping to improve the efficiency of exterior wall renovation.
[0049] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.
Claims
1. A device for collecting debris from building exterior walls, characterized in that, It includes a collection bracket (1) installed on one side of the suspended platform (6), a collection bag (2) installed on the collection bracket (1), and a gathering component (3) for gathering the lower part of the collection bag (2); the collection bracket (1) includes a first mounting part (11) installed on the suspended platform (6) and a support frame (12) installed at the bag opening of the collection bag (2) and used to open the bag opening of the collection bag (2); the bottom end of the collection bag (2) is provided with a discharge port (21).
2. The building exterior wall debris collection device according to claim 1, characterized in that, The gathering assembly (3) includes a gathering rope (31) fixed to the body of the collection bag (2) and a shoulder strap buckle (32) provided on the gathering rope (31); the shoulder strap buckle (32) includes a snap-fit seat (321) installed at one end of the gathering rope (31) and a snap-fit connector (322) installed at the other end of the gathering rope (31) and cooperating with the snap-fit seat (321) to gather the body of the collection bag (2).
3. A building exterior wall debris collection device according to claim 2, characterized in that, The gathering assembly (3) has a support column (5) on the side facing the building exterior wall, which supports the side of the collection bag (2) between the building exterior wall and the building exterior wall. The head of the support column (5) is provided with a damping element (51) that abuts against the building exterior wall. The tail end of the support column (5) is detachably installed on the gathering assembly (3).
4. A building exterior wall debris collection device according to claim 3, characterized in that, The tail end of the support column (5) is provided with a first arrangement groove (52) and a first magnetic sheet (53) is installed in the first arrangement groove (52). The gathering assembly (3) has a second mounting part (33) for attracting the tail end of the support column (5).
5. A building exterior wall debris collection device according to claim 4, characterized in that, The collection bag (2) is evenly spaced with at least two of the gathering components (3) along its length, and each of the gathering components (3) is provided with a support column (5).
6. A building exterior wall debris collection device according to claim 1, characterized in that, It also includes a collection trolley (4) arranged at the output end of the collection bag (2), the collection trolley (4) having a collection box (41) for receiving the external wall fragments output by the collection bag (2), the collection box (41) having a collection opening (414) at the top for the discharge port (21) to be arranged.
7. A building suspended platform device, comprising a suspended platform platform (6) and a lifting mechanism (7) for driving the suspended platform platform (6) to rise and fall, characterized in that, The suspended platform (6) is also equipped with a building exterior wall debris collection device as described in any one of claims 1-6.
8. A building suspended platform device according to claim 7, characterized in that, The suspended platform (6) includes a base plate (61) and side supports (62) vertically fixed around the base plate (61). The side supports (62) are provided with a linear groove (621) in the vertical direction for the first mounting part (11) of the collection bracket (1) to slide. The first mounting part (11) has a linear slider (111) that cooperates with the linear groove (621).
9. A building suspended platform device according to claim 8, characterized in that, The linear slider (111) has a first arrangement hole (112) and a ball spring plunger (113) is installed in cooperation. The bottom of the linear slide groove (621) has a snap-fit hole (622) for the ball spring plunger (113) to snap into.