A decorative plate dry hanging construction device

By pre-embedding plate components in the concrete siding and connecting them with rectangular steel pipes, the problem of damage to the siding caused by bolt connections was solved, thus improving the integrity and strength of the siding and saving construction costs.

CN224431890UActive Publication Date: 2026-06-30SHANXI CONSTR ENG CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANXI CONSTR ENG CO LTD
Filing Date
2025-07-07
Publication Date
2026-06-30

Smart Images

  • Figure CN224431890U_ABST
    Figure CN224431890U_ABST
Patent Text Reader

Abstract

This utility model discloses a dry-hanging construction device for decorative panels, relating to the field of fair-faced concrete panels. The device includes several concrete panel bodies, with an installation unit on the back of each panel body. During the pouring of the concrete panel body, the device pre-embeds the panel components within the panel body in a single process, ensuring the integrity of the embedded panel and the concrete, guaranteeing the stability of the embedded components, and avoiding the need for subsequent installation, thus saving on installation costs. By pre-embedding the panel components and connectors, the device ensures the integrity of the panel components and connectors with the concrete panel body, changing the traditional bolt-connected method and eliminating the need for subsequent bolt-connection of the concrete panel body, resulting in a more secure and stable connection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of fair-faced concrete cladding technology, specifically a dry-hanging construction device for decorative panels. Background Technology

[0002] Fair-faced concrete cladding is a new type of building material with natural texture and environmental protection characteristics as its core, and it is widely used in the interior and exterior wall decoration of modern buildings.

[0003] In modern construction projects, high quality requirements are placed on cladding panels, as the appearance quality of the facade affects the overall image. Exterior wall fair-faced concrete cladding panels are usually prefabricated in factories. After the main structure is completed, the prefabricated cladding panels are transported to the site, and then bolted fasteners are used to install the fasteners onto the fair-faced concrete cladding panels. However, the installation process can damage the cladding panels, affecting their quality. Therefore, we propose a dry-hanging construction device for decorative panels. Utility Model Content

[0004] To address the shortcomings of existing technologies, this utility model provides a dry-hanging construction device for decorative panels. This device solves the problem that transporting prefabricated panels to the site and then using bolted connections to install the panels onto the fair-faced concrete panels can damage the panels and affect their quality.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a dry-hanging construction device for decorative panels, comprising several concrete hanging panel bodies, with an installation unit provided on the back of each concrete hanging panel body, the installation unit being installed with a rectangular steel pipe, the installation unit comprising:

[0006] Embedded components for the plate are embedded in the main body of the concrete cladding panel;

[0007] Two connectors are fixedly connected to the embedded parts of the plate, and the rectangular steel pipe is located between the two embedded parts of the plate.

[0008] Insert bolts are inserted into rectangular steel pipes and connectors, and are used to install the rectangular steel pipes and connectors.

[0009] Preferably, the rectangular steel pipe has an adjustment hole, and the rectangular steel pipe is installed with the installation unit through the adjustment hole.

[0010] Preferably, the connector has mounting holes on its side.

[0011] Preferably, the outer peripheral wall of the plug bolt is threaded with a compression bolt, and the compression bolt is in contact with one of the connecting parts.

[0012] Preferably, one end of the plug bolt is fixedly connected to a compression seat, and the compression seat is in contact with another connector.

[0013] Preferably, a hoisting frame is pre-embedded above the main body of the concrete hanging panel, and the hoisting frame has hoisting holes.

[0014] Preferably, a connecting frame is provided below the main body of the concrete hanging panel, and the connecting frame is provided corresponding to the hoisting frame.

[0015] This utility model discloses a dry-hanging construction device for decorative panels, which has the following beneficial effects:

[0016] After the main structure of this decorative panel dry-hanging construction device is completed, the embedded parts of the main structure are measured. The position of the embedded parts of the panel is determined by the measurement data. When the concrete panel is poured, the embedded parts of the panel are embedded in the concrete panel body in one go, which ensures the integrity of the embedded plate and the concrete, ensures the firmness of the embedded parts of the concrete panel body, avoids the need for later installation of embedded plates, and saves the cost of later installation of embedded plates.

[0017] During the dry-hanging construction of the concrete cladding panel, the installation units on the back of the concrete cladding panel are inserted into the corresponding rectangular steel pipes. Then, the insertion bolts are inserted into the connectors and rectangular steel pipes to complete the installation of the rectangular steel pipes and connectors. Subsequently, the concrete cladding panel is installed with the rectangular steel pipes. By pre-embedding the panel and connectors, the integrity of the panel and connectors with the concrete cladding panel is ensured. This changes the traditional bolt connection method for embedded parts, eliminating the need for subsequent bolt connection of the concrete cladding panel, making the connection of the concrete cladding panel more secure and stable. Attached Figure Description

[0018] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0019] Figure 1 This is a schematic diagram of the overall structure of this embodiment;

[0020] Figure 2 This is a schematic diagram of the rear structure of this embodiment;

[0021] Figure 3 This is a schematic diagram of the main connection of the concrete hanging panel in this embodiment;

[0022] Figure 4 This is a schematic diagram of the installation unit structure in this embodiment.

[0023] In the diagram: 1. Concrete panel main body; 2. Lifting frame; 21. Connecting frame; 3. Rectangular steel pipe; 31. Adjustment hole; 4. Installation unit; 41. Embedded parts of the panel; 42. Connecting parts; 43. Insert bolts; 44. Extrusion seat; 45. Extrusion bolts. Detailed Implementation

[0024] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions in the embodiments of this utility model are described clearly and completely. Obviously, the described embodiments are only some embodiments of this utility model, not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.

[0025] This application provides a dry-hanging construction device for decorative panels, which solves the problem that transporting prefabricated panels to the site and then using bolted connections to install the panels onto the fair-faced concrete panels can damage the panels and affect their quality. The device allows for the measurement of the embedded parts after the main structure is completed. The position of the embedded parts 41 is determined based on the measurement data. During the pouring of the concrete panel body 1, the embedded parts 41 are pre-embedded in the concrete panel body 1, completing the process in one step. This ensures the integrity of the embedded parts and the concrete, guarantees the firmness of the embedded parts in the concrete panel body 1, avoids the need for later installation of embedded parts, and saves on the cost of later installation.

[0026] During the dry-hanging construction of the concrete panel body 1, the installation unit 4 on the back of the concrete panel body 1 is inserted into the rectangular steel pipe 3, and then the insertion bolt 43 is inserted into the connector 42 and the rectangular steel pipe 3 to complete the installation of the rectangular steel pipe 3 and the connector 42. Then, the concrete panel body 1 is installed with the rectangular steel pipe 3. By pre-embedding the panel embedded parts 41 and the connector 42 in advance, the integrity of the panel embedded parts 41 and the connector 42 with the concrete panel body 1 is ensured. This changes the traditional method of using bolted connection for embedded parts, eliminating the need for subsequent bolted connection of the concrete panel body 1, making the connection of the concrete panel body 1 more firm and stable.

[0027] To better understand the above technical solutions, the following will provide a detailed explanation of the technical solutions in conjunction with the accompanying drawings and specific implementation methods.

[0028] This utility model discloses a device for dry-hanging decorative panels.

[0029] Example 1: According to the appendix Figure 1-4As shown, the system includes several concrete panel bodies 1. An installation unit 4 is provided on the back of each concrete panel body 1. The installation unit 4 is installed with a rectangular steel pipe 3. The installation unit 4 includes:

[0030] The plate pre-embedded part 41 is embedded in the concrete hanging plate body 1;

[0031] After the main structure is completed, the embedded parts of the main structure are measured. The position of the embedded part 41 of the plate is determined by the measurement data. When the concrete hanging plate main body 1 is poured, the embedded part 41 of the plate is embedded in the concrete hanging plate main body 1. This is done in one go, ensuring the integrity of the embedded plate and the concrete, ensuring the firmness of the embedded parts of the concrete hanging plate main body 1, avoiding the need for later installation of the embedded plate, and saving the cost of later installation.

[0032] Two connectors 42 are fixedly connected to the plate embedded parts 41, and the rectangular steel pipe 3 is located between the two plate embedded parts 41.

[0033] Insert bolt 43 is inserted into the rectangular steel pipe 3 and the connector 42. Insert bolt 43 is used to install the rectangular steel pipe 3 and the connector 42.

[0034] During the dry-hanging construction of the concrete panel body 1, the installation unit 4 on the back of the concrete panel body 1 is inserted into the rectangular steel pipe 3, and then the insertion bolt 43 is inserted into the connector 42 and the rectangular steel pipe 3 to complete the installation of the rectangular steel pipe 3 and the connector 42. Then, the concrete panel body 1 is installed with the rectangular steel pipe 3. By pre-embedding the panel embedded parts 41 and the connector 42 in advance, the integrity of the panel embedded parts 41 and the connector 42 with the concrete panel body 1 is ensured. This changes the traditional method of using bolted connection for embedded parts, eliminating the need for subsequent bolted connection of the concrete panel body 1, making the connection of the concrete panel body 1 more firm and stable.

[0035] The rectangular steel pipe 3 is provided with an adjustment hole 31, and the rectangular steel pipe 3 is installed with the installation unit 4 through the adjustment hole 31.

[0036] When inserting the bolt 43, the bolt 43 is inserted into the adjusting hole 31 and the connector 42 to complete the initial installation of the connector 42 and the rectangular steel pipe 3. The concrete hanging plate body 1 is slid by adjusting, which drives the installation unit 4 to move on the rectangular steel pipe 3. At this time, the bolt 43 slides in the adjusting hole 31, thereby adjusting the installation position of the concrete hanging plate body 1, which facilitates the subsequent adjustment of the installation position of adjacent concrete hanging plate bodies 1.

[0037] The side of the connector 42 has a mounting hole.

[0038] After the concrete panel body 1 is installed in position, the connector 42 is installed to the wall using expansion bolts to further fix the concrete panel body 1.

[0039] The outer peripheral wall of the plug bolt 43 is threaded with a compression bolt 45, which is in contact with one of the connecting parts 42.

[0040] One end of the plug bolt 43 is fixedly connected to the compression seat 44, and the compression seat 44 is in contact with another connector 42.

[0041] When the extrusion bolt 45 is inserted into the connector 42 and the rectangular steel pipe 3, the extrusion seat 44 is in contact with one of the connectors 42. By rotating the extrusion bolt 45, the extrusion bolt 45 rotates along the insertion bolt 43 until the extrusion bolt 45 is pressed against the other connector 42. At this time, the extrusion seat 44 is made to fit against the inner wall of the rectangular steel pipe 3. With the cooperation of the extrusion bolt 45 and the connector 42, the connector 42 and the rectangular steel pipe 3 are fixed, ensuring the stability of the installation of the connector 42 and the rectangular steel pipe 3.

[0042] Example 2: According to the appendix Figure 1-4 As shown, the system includes several concrete panel bodies 1. An installation unit 4 is provided on the back of each concrete panel body 1. The installation unit 4 is installed with a rectangular steel pipe 3. The installation unit 4 includes:

[0043] The plate pre-embedded part 41 is embedded in the concrete hanging plate body 1;

[0044] Two connectors 42 are fixedly connected to the plate embedded parts 41, and the rectangular steel pipe 3 is located between the two plate embedded parts 41.

[0045] Insert bolt 43 is inserted into the rectangular steel pipe 3 and the connector 42. Insert bolt 43 is used to install the rectangular steel pipe 3 and the connector 42.

[0046] A hoisting frame 2 is pre-embedded above the concrete panel body 1. The hoisting frame 2 has hoisting holes, which facilitate the installation of the concrete panel body 1.

[0047] A connecting frame 21 is provided below the concrete panel body 1. The connecting frame 21 is set to correspond to the hoisting frame 2. The connecting frame 21 and the hoisting frame 2 are connected to each other to facilitate the quick splicing of the concrete panel body 1.

[0048] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claims. The scope of protection of this utility model is defined by the appended claims and their equivalents.

Claims

1. A dry-hanging construction device for decorative panels, characterized in that, The system includes several concrete panel bodies (1), and an installation unit (4) is provided on the back of each concrete panel body (1). The installation unit (4) is installed with a rectangular steel pipe (3). The installation unit (4) includes: The plate is embedded in the concrete hanging plate body (1); Two connectors (42) are fixedly connected to the plate pre-embedded parts (41), and the rectangular steel pipe (3) is located between the two plate pre-embedded parts (41); Insert bolts (43) are inserted into the rectangular steel pipe (3) and the connector (42), the insert bolts (43) being used to install the rectangular steel pipe (3) and the connector (42).

2. The decorative panel dry-hanging construction device according to claim 1, characterized in that, The rectangular steel pipe (3) is provided with an adjustment hole (31), and the rectangular steel pipe (3) is installed with the installation unit (4) through the adjustment hole (31).

3. The decorative panel dry-hanging construction device according to claim 1, characterized in that, The connector (42) has mounting holes on its side.

4. The dry-hanging construction device for decorative panels according to claim 1, characterized in that, The outer peripheral wall of the plug bolt (43) is threaded with a pressing bolt (45), which is in contact with one of the connectors (42).

5. A dry-hanging construction device for decorative panels according to claim 1, characterized in that, One end of the plug bolt (43) is fixedly connected to a compression seat (44), and the compression seat (44) is in contact with another connector (42).

6. A dry-hanging construction device for decorative panels according to claim 1, characterized in that, A hoisting frame (2) is pre-embedded above the concrete hanging panel body (1), and a hoisting hole is provided on the hoisting frame (2).

7. A dry-hanging construction device for decorative panels according to claim 6, characterized in that, A connecting frame (21) is provided below the concrete hanging panel body (1), and the connecting frame (21) is provided corresponding to the hoisting frame (2).