Railway communication integrated cabinet and system
By designing an integrated railway communication cabinet, using reinforced concrete foundations and integrated facilities, the problems of water seepage, corrosion, heat insulation, and intelligent operation and maintenance of base stations in high-speed railway communication sections have been solved. This has enabled rapid deployment and low-cost, high-efficiency management, and improved the security and intelligence level of the base stations.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- CHINA RAILWAY CONSTR ELECTRIFICATION BUREAU GRP CO LTD
- Filing Date
- 2025-07-02
- Publication Date
- 2026-06-30
AI Technical Summary
Existing high-speed railway communication base station equipment rooms suffer from problems such as water seepage and leakage, corrosion and rust, poor thermal insulation performance, unreasonable equipment layout, low level of intelligent operation and maintenance, and long construction period. Furthermore, they cannot be quickly deployed and used for emergency rescue during natural disasters.
Design an integrated railway communication cabinet with a reinforced concrete foundation, a drainage cap, thermal insulation layer, double doors and door magnetic sensors. Integrate power supply, air conditioning, lighting, monitoring and other facilities to achieve modular and intelligent management of the equipment. The cabinet is connected to the cable well and tower through pre-buried pipes to optimize the equipment layout.
It enables secure and reliable data centers, rapid deployment, low cost and high energy efficiency, and intelligent management, reducing construction and installation work, improving project construction efficiency, lowering the total life cycle cost, enhancing the level of intelligence, and supporting emergency rescue and rapid transformation.