Improved waste incineration power plant

By optimizing the functional layout and structural design of waste-to-energy plants and eliminating unnecessary design units, the problems of large land area and high cost have been solved, making the construction of waste-to-energy plants in small and medium-sized towns and underdeveloped areas feasible.

CN224534282UActive Publication Date: 2026-07-21HUNAN JUNXIN ENVIRONMENTAL PROTECTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
HUNAN JUNXIN ENVIRONMENTAL PROTECTION CO LTD
Filing Date
2025-07-30
Publication Date
2026-07-21

AI Technical Summary

Technical Problem

Existing waste-to-energy plants are characterized by large land areas, long construction periods, and high costs, and their incinerators have limited fuel options, making them difficult to build and operate in small and medium-sized towns and underdeveloped areas.

Method used

The functional layout was optimized by eliminating the unloading hall and garbage pit area, setting up garbage transportation channels and loading and unloading areas, eliminating the three-story reinforced concrete frame of the ash and slag storage, and adopting enclosed channels and remote-controlled loaders to reduce the height of the plant and construction costs.

Benefits of technology

It has proven feasible in small and medium-sized towns and underdeveloped areas, reduced investment and shortened construction period, and is adapted to the actual situation of small waste volume in small and medium-sized towns.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224534282U_ABST
    Figure CN224534282U_ABST
Patent Text Reader

Abstract

The utility model discloses an improved garbage incineration power plant, including the garbage transport passage that sets gradually, garbage loading and unloading area, boiler area and new flue gas area, be equipped with the unloading door between garbage loading and unloading area and garbage transport passage, when unloading door opens, garbage transport car is transported to garbage loading and unloading area in garbage transport passage with garbage, be equipped with remote control loader and feeding mechanism in garbage loading and unloading area, feeding mechanism is connected with boiler area, remote control loader is used to load garbage to feeding mechanism, feeding mechanism is used to transport garbage to boiler area and carries out incineration, the incineration flue gas of boiler area generation is discharged through new flue gas area. The utility model has the characteristics such as function optimization, small floor space, low building cost, fully considers the small tonnage of garbage of small town and underdeveloped area, realizes the maximum limit that small town, underdeveloped area can build garbage incineration power plant.
Need to check novelty before this filing date? Find Prior Art