Modular housing connection structure

By using fixed bolts and nuts to connect the structure in modular housing, the problem of complex construction of the upper-level housing is solved, which simplifies construction and improves installation stability.

CN224549737UActive Publication Date: 2026-07-24五矿二十三冶建设集团有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
五矿二十三冶建设集团有限公司
Filing Date
2025-06-13
Publication Date
2026-07-24

AI Technical Summary

Technical Problem

When building existing modular houses, construction workers need to assemble the upper floors step by step on the sides of the lower floor's roof panels, which makes the construction complex and the work at heights time-consuming.

Method used

The upper building is constructed by first building the lower building in the area below the lower building, and then hoisting and fixing the bolts and nuts to achieve stable installation of the upper building.

Benefits of technology

It reduces the time construction workers spend working at heights, simplifies the construction process, and improves the stability and efficiency of installing upper-level buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224549737U_ABST
    Figure CN224549737U_ABST
Patent Text Reader

Abstract

The utility model discloses a modular house's connecting structure relates to house construction technical field, wherein, modular house's connecting structure includes lower house, upper house and fixed nut. The lower house has first roof, and first roof is equipped with fixed bolt, and the threaded end of fixed bolt projects on the upside of first roof. The upper house is located on the upside of lower house, and the upper house has first bottom plate, and first bottom plate has perforation corresponding fixed bolt. The threaded end of fixed bolt passes through perforation and is connected with fixed nut threadedly. By hoisting the upper house on the lower house, the threaded end of the fixed bolt is passed through the perforation, and then the fixed nut is installed on the fixed bolt, which reduces the construction operation time of the construction personnel at high place as a whole, and improves the problem that construction is more complex.
Need to check novelty before this filing date? Find Prior Art