Temporary slot type fixed fence structure for road
By using a triangular support structure consisting of vertical supports, diagonal supports, and a bottom horizontal support, combined with the design of connecting grooves and inclined ropes, the problems of traditional fencing that easily damage the road surface and have poor stability are solved, achieving both stability and convenient turnover.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU
- Filing Date
- 2025-08-12
- Publication Date
- 2026-08-04
AI Technical Summary
Traditional methods of erecting construction fences can easily damage the road surface, have poor stability, are immovable, and have poor turnover.
The triangular support structure, consisting of vertical support rods, diagonal support rods, and horizontal support rods, combined with the design of connecting grooves on the upper and lower panels, and the installation of counterweights and diagonal ropes, ensures the stability and anti-overturning ability of the enclosure panel assembly without damaging the road surface.
It improves the stability and anti-overturning ability of the fencing, enables convenient turnover of the fencing, reduces damage to the road surface, and enhances the safety and flexibility of construction.
Smart Images

Figure CN224591907U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of road enclosure technology, and specifically relates to a temporary road enclosure structure with a slotted design. Background Technology
[0002] During road maintenance construction, the erection of fencing is inevitable. The erection method and quality control of the fencing are particularly important. The traditional open technology involves driving anchor bolts into the road surface to erect the fencing, and then using square steel welded together on the inside. This technology is prone to damaging the road surface, is difficult to control, and is prone to continuous tilting of the fencing in strong winds. It has poor stability, is immobile, and has poor turnover. Therefore, it is necessary to design a technical solution that is easy to turnover, has good stability, and causes little damage to the road surface. Utility Model Content
[0003] This utility model provides a temporary roadside barrier structure with slot-type fixing to solve technical problems such as the reusability of roadside barriers, non-damage to the road surface, and enhanced stability.
[0004] To achieve the above objectives, the present invention adopts the following technical solution:
[0005] A temporary road access panel structure includes a road surface, a curbstone set on one side of the road surface, a temporary access panel assembly set on the road surface, a support vertical rod connected to the back of the access panel assembly, a support diagonal rod connected between the support vertical rod and the curbstone, a support bottom horizontal rod connected between the bottom of the support diagonal rod and the bottom of the support vertical rod, a counterweight pressed onto the bottom horizontal rod, upper connecting grooves and lower connecting grooves respectively set at the top and bottom of the joint of adjacent access panel assemblies, and a diagonal rope connecting the access panel assembly and the fixing member on the ground outside the curbstone.
[0006] The supporting vertical rod is installed along its entire length within the height range of the enclosure panel assembly, and its two ends are fixedly connected to the upper connecting groove and the lower connecting groove, respectively.
[0007] Furthermore, the hoarding assembly includes a hoarding main board, a hoarding vertical frame disposed on the side of the hoarding main board, a hoarding horizontal frame disposed on the top and bottom of the hoarding main board, and hoarding back ribs disposed at intervals in the height direction of the hoarding main board; the hoarding vertical frame and the hoarding horizontal frame together form a rectangular frame.
[0008] Furthermore, the connecting groove on the plate is an inverted U-shaped part, and the connecting groove on the plate is snapped into the splicing point of the horizontal frame of the fence at the top of the adjacent fence main plate.
[0009] Furthermore, the under-plate connecting groove is a U-shaped part, which is snapped into the joint of the horizontal frame of the enclosure at the bottom of the adjacent enclosure main plate;
[0010] The connecting groove under the plate can also be detached and connected to an anti-slip and shock-absorbing pad.
[0011] Furthermore, the supporting vertical rods, supporting diagonal rods, and supporting bottom horizontal rods are all angle steel pieces, and the joints are welded together; the supporting vertical rods, supporting diagonal rods, and supporting bottom horizontal rods are set one by one at the splicing points of the enclosure panel assembly, and the top and bottom of the supporting vertical rods are pre-welded with connecting grooves on the upper plate and connecting grooves on the lower plate, respectively.
[0012] Furthermore, the supporting diagonal rod is connected to the upper part of the supporting vertical rod; the length of the bottom horizontal rod is adapted to the distance between the supporting vertical rod and the side of the curb.
[0013] Furthermore, the counterweight is a sandbag, a concrete block, or a brick block.
[0014] Furthermore, the inclined ropes are installed in the middle and upper part of the enclosure, and are correspondingly installed at intervals along the length of the road; the inclined ropes on the same or adjacent sections share a single fixing member.
[0015] Furthermore, the fixing component is a steel component, and the diagonal cable is threaded and connected to the fixing component; the fixing component is inserted into the ground or pre-embedded in the fixing base; the fixing base is a concrete block or a steel block.
[0016] Furthermore, the top of the guy rope is tied to the supporting vertical rod, or a through hole is provided on the supporting vertical rod for threading the guy rope.
[0017] The beneficial effects of this utility model are reflected in:
[0018] This invention utilizes a triangular support structure composed of a vertical support rod, a diagonal support rod, and a horizontal support rod at the bottom. This structure greatly ensures the stability of the fencing assembly, and the addition of counterweights further enhances its stability. The triangular support structure also allows the fencing assembly to be installed on the road surface without damaging the road surface. The upper and lower connecting grooves facilitate the connection of the vertical support rods and effectively connect adjacent fencing assemblies without disrupting the road surface at the bottom. The addition of diagonal tie ropes further strengthens the anti-overturning capability of the fencing assembly.
[0019] Other features and advantages of this invention will be set forth in the description which follows, and will be apparent in part from the description, or may be learned by practicing the invention; the main objectives and other advantages of this invention may be realized and obtained by means of the methods particularly pointed out in the description. Attached Figure Description
[0020] Figure 1 This is a side view of a temporary road access barrier structure.
[0021] Figure 2 This is a front view of a temporary road access barrier structure.
[0022] Figure 3 This is a partial schematic diagram of a temporary road access barrier structure.
[0023] Attached reference numerals: 1-Road surface, 2-Curve stone, 3-Ground, 4-Fence panel assembly, 41-Fence main board, 42-Fence vertical frame, 43-Fence horizontal frame, 44-Fence back rib, 5-Upper plate connecting groove, 6-Lower plate connecting groove, 7-Supporting vertical rod, 8-Supporting diagonal rod, 9-Supporting bottom horizontal rod, 10-Counterweight, 11-Diagonal rope, 12-Fixing component, 13-Fixing base, 14-Anti-slip and shock-absorbing pad. Detailed Implementation
[0024] Taking temporary road barriers as an example, such as Figures 1 to 3 As shown, the temporary road access bar structure includes a road surface 1, a curbstone 2 set on one side of the road surface 1, a temporary barrier panel assembly 4 set on the road surface 1, a support vertical rod 7 connected to the back of the barrier panel assembly 4, a support diagonal rod 8 connected between the support vertical rod 7 and the curbstone 2, a support bottom horizontal rod 9 connected between the bottom of the support diagonal rod 8 and the bottom of the support vertical rod 7, a counterweight 10 pressed onto the bottom horizontal rod, a plate connecting groove 5 and a plate bottom connecting groove 6 respectively set at the top and bottom of the joint of adjacent barrier panel assemblies 4, and a diagonal rope 11 connecting the barrier panel assembly 4 and the fixing member 12 on the ground 3 outside the curbstone 2.
[0025] In this embodiment, the fence panel assembly 4 includes a fence main board 41, a fence vertical frame 42 disposed on the side of the fence main board 41, a fence horizontal frame 43 disposed on the top and bottom of the fence main board 41, and fence back ribs 44 disposed at intervals in the height direction of the fence main board 41; the fence vertical frame 42 and the fence horizontal frame 43 together form a rectangular frame.
[0026] The main frame 41 of the enclosure is made of corrugated steel sheet and connected by self-tapping dovetail screws. Its surface is uneven and divided into upper and lower parts; the upper part is green, and the lower part is a warning yellow and black stripe. The self-tapping dovetail screws are used to connect the corrugated steel sheet and angle steel, and to connect the overlapping parts of the corrugated steel sheet. The vertical frame 42 and horizontal frame 43 of the enclosure are both made of 30×30×2mm angle steel and welded to the corrugated steel sheet to form the main body of the enclosure. The enclosure dimensions are 2m×1.92m. The back ribs 44 are made of 40×20mm square steel tubing, with distances from the bottom of the ribs being 270mm and 1140mm respectively.
[0027] In this embodiment, the upper connecting groove 5 is an inverted U-shaped part, which is snapped into the splicing point of the horizontal frame 43 of the adjacent main fence 41. The lower connecting groove 6 is a U-shaped part, which is snapped into the splicing point of the horizontal frame 43 of the adjacent main fence 41 at the bottom; the lower connecting groove 6 can also be detachably connected to an anti-slip and shock-absorbing pad 14.
[0028] Among them, the plate connecting groove 5 and the bottom connecting groove 6 are both made of 5# channel steel with a length of 100mm and a diameter of 50×30mm, and are pre-welded to the top and bottom of the supporting vertical rod 7.
[0029] In this embodiment, the supporting vertical rod 7, supporting diagonal rod 8, and supporting bottom horizontal rod 9 are all angle steel components, welded together at the joints. The supporting vertical rod 7, supporting diagonal rod 8, and supporting bottom horizontal rod 9 are installed one by one at the splicing points of the enclosure panel assembly 4, and the top and bottom of the supporting vertical rod 7 are pre-welded with the upper connecting groove 5 and the lower connecting groove 6, respectively. The supporting diagonal rod 8 is connected to the upper middle part of the supporting vertical rod 7; the length of the supporting bottom horizontal rod is adapted to the distance between the supporting vertical rod 7 and the side of the curbstone 2. The counterweight 10 is a sandbag, concrete block, or brick block. The supporting vertical rod 7 is installed along its entire length within the height range of the enclosure panel assembly 4, and both ends are fixedly connected to the upper connecting groove 5 and the lower connecting groove 6, respectively. The supporting vertical rod 7, supporting diagonal rod 8, and supporting bottom horizontal rod 9 are all made of 30×30×2mm angle steel and welded together to form a triangular support structure, serving as internal diagonal bracing.
[0030] In this embodiment, the inclined ropes 11 are installed in the middle and upper part of the enclosure, and are correspondingly installed at intervals along the length of the road; the inclined ropes 11 on the same or adjacent cross-sections share a common fixing member 12. The fixing member 12 is a steel component, and the inclined ropes 11 are threaded and connected to the fixing member 12; the fixing member 12 is inserted into the ground 3 or pre-embedded in the fixing base 13; the fixing base 13 is a concrete block or a steel block. The top of the inclined rope 11 is tied and connected to the supporting vertical rod 7, or a through hole is provided on the supporting vertical rod 7 for threading the inclined rope 11.
[0031] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any changes or substitutions that can be conceived by those skilled in the art within the technical scope disclosed in the present utility model should be included within the protection scope of the present utility model.
Claims
1. A temporary road slot-and-post fence structure, characterized by, Includes a road surface (1), a curbstone (2) set on one side of the road surface (1), a temporary enclosure assembly (4) set on the road surface (1), a support vertical rod (7) connected to the back of the enclosure assembly (4), a support diagonal rod (8) connected between the support vertical rod (7) and the curbstone (2), a support bottom horizontal rod (9) connected between the bottom of the support diagonal rod (8) and the bottom of the support vertical rod (7), a counterweight (10) pressed onto the bottom horizontal rod, a plate connecting groove (5) and a plate bottom connecting groove (6) respectively set at the top and bottom of the splice joint of adjacent enclosure assemblies (4), and a diagonal rope (11) connected between the fixing member (12) on the ground (3) outside the enclosure assembly (4) and the curbstone (2); The supporting vertical rod (7) is set along the entire length of the enclosure panel assembly (4) and its two ends are fixedly connected to the upper connecting groove (5) and the lower connecting groove (6) respectively.
2. A temporary road slot-type fixed fence structure according to claim 1, characterized in that, The enclosure panel assembly (4) includes an enclosure main board (41), an enclosure vertical frame (42) disposed on the side of the enclosure main board (41), an enclosure horizontal frame (43) disposed on the top and bottom of the enclosure main board (41), and enclosure back ribs (44) spaced apart in the height direction of the enclosure main board (41); the enclosure vertical frame (42) and the enclosure horizontal frame (43) together form a rectangular frame.
3. A temporary road channel type fixed fence structure according to claim 2, wherein The connecting groove (5) on the plate is an inverted U-shaped part, and the connecting groove (5) on the plate is snapped to the splicing point of the horizontal frame (43) of the adjacent main plate (41).
4. A temporary road channel type fixed fence structure according to claim 3, wherein The under-plate connecting groove (6) is a U-shaped part, and the under-plate connecting groove (6) is snapped to the splicing point of the horizontal frame (43) at the bottom of the adjacent main plate (41); The underside connecting groove (6) can also be detachably connected to an anti-slip and shock-absorbing pad (14).
5. A temporary road slot-type fixed fence structure according to claim 1, wherein The supporting vertical rod (7), supporting diagonal rod (8) and supporting bottom horizontal rod (9) are all angle steel parts, and the connection is welded together. The supporting vertical rod (7), supporting diagonal rod (8) and supporting bottom horizontal rod (9) are set at the splicing of the enclosure panel assembly (4), and the top and bottom of the supporting vertical rod (7) are pre-welded with the connecting groove part (5) on the upper plate and the connecting groove part (6) on the lower plate.
6. A temporary road channel type fixed fence structure according to claim 5, wherein The supporting diagonal rod (8) is connected to the upper part of the supporting vertical rod (7); the length of the bottom horizontal rod is adapted to the distance between the supporting vertical rod (7) and the side of the curbstone (2).
7. A temporary road channel type fixed fence structure according to claim 1, wherein The counterweight (10) is a sandbag, a concrete block, or a brick block.
8. A temporary road slot-type fixed fence structure according to claim 1, wherein The inclined ropes (11) are set in the middle and upper part of the fence and are set at intervals along the road length; the inclined ropes (11) on the same or adjacent sections share a fixing member (12).
9. A temporary road channel type fixed fence structure according to claim 8, characterized in that, The fixing component (12) is a steel component, and the inclined rope (11) is threaded and connected to the fixing component (12); the fixing component (12) is inserted into the ground (3) or pre-embedded in the fixing base (13); the fixing base (13) is a concrete block or a steel block.
10. A temporary road channel type fixed fence structure according to claim 9, wherein The top end of the inclined rope (11) is tied to the support vertical rod (7), or a through hole is provided on the support vertical rod (7) for threading the inclined rope (11).