Full-cycle strict hole sealing structure of gob-side entry extraction drilling hole
CN224693362UActive Publication Date: 2026-08-28SHANXI GAOHE ENERGY +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202522737290.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-24
- Publication Date
- 2026-08-28
- Estimated Expiration
- 2035-12-24
AI Technical Summary
Technical Problem
[0016]本实用新型的目的在于提供一种能够通过避让沿空巷道应力峰值区与卸压裂隙区、结合单通道二次精准注浆及后期补强,实现全周期可靠密封的抽采钻孔封孔结构,以克服现有技术中因封孔段布置于高应力剪切与破碎变形区域、且缺乏动态维护机制而导致的密封失效缺陷
Benefits of technology
一、主动避让高应力区,实现源头防失效。
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN224693362U_ABST
Abstract
The utility model discloses a kind of along empty roadway extraction borehole full cycle strict hole sealing structure, belong to coal mine gas extraction engineering technical field.Aiming at the problems such as insufficient shallow grouting pressure, hole sealing section is vulnerable to stress shear damage, pipe bottom hole collapse plugging and lack of failure remedial measures in existing two-plugging one-injection hole sealing structure in along empty roadway, full cycle sealing scheme is proposed.The structure divides extraction borehole into pressure-relief section and primary hole sealing section, pressure-relief section is left empty as deformation buffer, primary hole sealing section is deeply placed at more than 11 meters from roadway coal wall to avoid stress peak area, and forms grouting area by two hole sealing capsules;It is also provided with secondary grouting precision plugging area and later three-plugging two-injection reinforcing structure.The structure can actively avoid harmful stress area, realize mid-term dynamic maintenance and later whole-hole strengthening, significantly improve hole sealing reliability and extraction concentration, prolong borehole life and reduce hole repair cost.
Need to check novelty before this filing date? Find Prior Art