A riveting device for the inner wall guide rail of a power distribution equipment cabinet

CN224737663UActive Publication Date: 2026-09-11HUBEI CHUYUN ELECTRIC POWER TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521931658.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-09
Publication Date
2026-09-11
Estimated Expiration
2035-09-09

AI Technical Summary

Technical Problem

[0003]在加工过程中,作业人员需手动抓取导轨部件,将其定位至压铆机的压头下方,并对齐压铆螺帽待压入的通孔与压铆机的定位机构,压铆过程中,需持续手持导轨以保持稳定,直至完成单个压铆螺帽的压入,若导轨需加工多个压铆螺帽,则需人工多次移动、翻转导轨,重复定位操作,人工定位精度受操作经验影响较大,易出现压铆螺帽压偏、倾斜等问题,导致废品率升高,同时,单次仅能加工单个压铆螺帽,且移动、定位耗时较长,难以适配批量生产需求,压铆机工作时,压头以较大压力完成压铆螺帽压入,作业人员手部需靠近压铆区域以固定导轨,若因疲劳、操作失误或设备突发故障,易造成手部挤压伤害,存在严重的安全风险

Benefits of technology

[0011] The riveting device for the guide rails inside the power distribution cabinet uses a positioning cylinder to drive a positioning rod to press down into the hole of the guide rail for calibration. The clamping part uses V-shaped plates to symmetrically clamp the guide rail to prevent displacement. The guide rail is then automatically transferred by the conveying part to the guide plate opposite the pressure head. The feeding component uses a vibrating material tray and a multi-channel guide plate to batch convey the riveting nuts. Combined with the precise feeding of the pushing part, the processing time per cycle is greatly shortened, making it suitable for mass production. Multiple sets of pressure cylinders can simultaneously complete the riveting of multiple riveting nuts. The entire process is automated, reducing contact between the operator and the riveting area, avoiding the risk of hand crushing, and improving operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224737663U_ABST
    Figure CN224737663U_ABST
Patent Text Reader

Abstract

The utility model relates to power distribution box processing technical field, concretely is a kind of power distribution equipment cabinet inner wall guide rail's riveting device, including operation platform and fixed on operation platform's rack, rack is equipped with multiple sets of pressure cylinder, and the piston rod of pressure cylinder is equipped with pressure head.The power distribution equipment cabinet inner wall guide rail's riveting device, by positioning cylinder drive positioning rod press down to the hole in guide rail play to calibrate position, and the compacting portion is symmetrically clamped guide rail by V-shaped plate, avoids displacement, and realizes the automatic transfer of guide rail by transfer part, is transferred to the opposite guide vane on pressure head, and feeding assembly realizes the batch delivery of riveting nut by vibrating material disc, multichannel guide plate, and accurate feeding is realized by cooperation pusher, greatly shorten single processing time, adapt batch production, and multiple pressure cylinders can be completed simultaneously riveting of multiple riveting nuts, full-automatic operation, reduce the contact of artificial and riveting area, avoid hand extrusion risk, improve operation safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of power distribution box processing technology, specifically a riveting device for the inner wall guide rail of a power distribution equipment cabinet. Background Technology

[0002] In the production and processing of distribution box guide rails, in order to meet the subsequent fixed assembly requirements with the inner wall clips and mounting plates of the distribution box, it is necessary to press in the through holes at the preset positions of the guide rails to form a stable integrated connection between the press infeed nuts and the guide rails, so that the installation of the guide rails and distribution boxes can be quickly completed by screws.

[0003] During the processing, operators need to manually grasp the guide rail components, position them under the pressure head of the riveting machine, and align the through hole to be pressed into the riveting nut with the positioning mechanism of the riveting machine. During the riveting process, the operator must continuously hold the guide rail to maintain stability until a single riveting nut is pressed in. If multiple riveting nuts need to be processed on the guide rail, the operator must manually move and flip the guide rail multiple times and repeat the positioning operation. The accuracy of manual positioning is greatly affected by the operator's experience, and problems such as the riveting nut being pressed off-center or tilted are prone to occur, leading to an increased scrap rate. At the same time, only one riveting nut can be processed at a time, and the movement and positioning are time-consuming, making it difficult to adapt to the needs of mass production. When the riveting machine is working, the pressure head presses in the riveting nut with a large pressure, and the operator's hands need to be close to the riveting area to fix the guide rail. If fatigue, operational errors, or sudden equipment failure occur, it is easy to cause hand crushing injuries, posing a serious safety risk. Utility Model Content

[0004] To achieve the above objectives, this utility model provides the following technical solution: a riveting device for the inner wall guide rail of a power distribution equipment cabinet, comprising an operating table and a frame fixed on the operating table, multiple sets of pressure cylinders installed on the frame, and a pressure head installed on the piston rod of the pressure cylinders; a feeding assembly and a loading assembly are also installed on the operating table; the feeding assembly includes multiple support plates installed on the operating table, and a transfer part installed between the support plates, with multiple upper plates installed at the transfer end of the transfer part, and a pressing part installed on the upper plate; the loading assembly includes multiple top plates fixed on the operating table, with guide plates fixed on the top plates, and a pushing part installed on the guide plates; a feeding part connected to the multiple guide plates is also installed on the operating table.

[0005] Furthermore, a plurality of side plates are fixed on one side of the platform, and a plurality of guide rods and a positioning cylinder located between the guide rods are provided on the side plates. The piston rod of the positioning cylinder is fixed with a guide block connected to the guide rod, and a positioning rod located above the support plate is installed at the bottom of the guide block.

[0006] Furthermore, the transfer unit includes a push plate that slides with the operating table, and a push cylinder mounted on the operating table to drive the push plate to move, with the upper plate mounted on the push plate.

[0007] Furthermore, the clamping part includes an upper cylinder installed at the bottom of the upper plate and a protrusion fixed at the top. Both sides of the protrusion are hinged with V-shaped plates through hinge plates. One end of the V-shaped plate is hinged to the piston rod of the upper cylinder, and a rubber head is installed at the other end of the V-shaped plate.

[0008] Furthermore, the feeding unit includes a vibrating feed pan installed on the operating table, wherein the sides of the two sets of guide plates are fixed with guide blocks that communicate with the flow channel, and a three-port double-track guide plate that is inclinedly installed between the guide blocks and is opposite to the vibrating feed pan, and a double-port single-track guide plate that is connected between the middle guide block and the tail guide plate is fixed, one of the three-port double-track guide plates is connected to the first guide block, and its two tracks are opposite to the double-port single-track guide plate, and one of the double-port single-track guide plates is connected to the middle guide block.

[0009] Furthermore, the pushing part includes a pushing cylinder mounted on the guide plate and a guide post passing through it. The piston rod of the pushing cylinder is fixed with a top block connected to the guide post, and a push rod that slides in the corresponding guide plate channel is fixed on the top block.

[0010] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0011] The riveting device for the guide rails inside the power distribution cabinet uses a positioning cylinder to drive a positioning rod to press down into the hole of the guide rail for calibration. The clamping part uses V-shaped plates to symmetrically clamp the guide rail to prevent displacement. The guide rail is then automatically transferred by the conveying part to the guide plate opposite the pressure head. The feeding component uses a vibrating material tray and a multi-channel guide plate to batch convey the riveting nuts. Combined with the precise feeding of the pushing part, the processing time per cycle is greatly shortened, making it suitable for mass production. Multiple sets of pressure cylinders can simultaneously complete the riveting of multiple riveting nuts. The entire process is automated, reducing contact between the operator and the riveting area, avoiding the risk of hand crushing, and improving operational safety. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the structure of this utility model;

[0013] Figure 2 This is a rear-view three-dimensional structural schematic diagram of the present invention;

[0014] Figure 3 This is a three-dimensional schematic diagram of the push plate connection structure in this utility model;

[0015] Figure 4 This is a three-dimensional schematic diagram of the top plate connection structure in this utility model;

[0016] Figure 5 This utility model Figure 4 A schematic diagram of the three-dimensional structure from the left view;

[0017] Figure 6 This utility model Figure 5 A three-dimensional structural diagram of the central guide block without its cover plate.

[0018] In the diagram: 1. Operating platform; 2. Support plate; 3. Pushing cylinder; 4. Pushing plate; 5. Upper plate; 6. Top cylinder; 7. Protrusion; 8. V-shaped plate; 9. Hinge plate; 10. Rubber head; 11. Frame; 12. Side plate; 13. Positioning cylinder; 14. Guide rod; 15. Guide block; 16. Positioning rod; 17. Pressure cylinder; 18. Pressure head; 19. Top plate; 20. Guide plate; 21. Pushing cylinder; 22. Guide column; 23. Top block; 24. Push rod; 25. Vibrating feed pan; 26. Guide block; 27. Three-port double-track guide plate; 28. Double-port single-track guide plate. Detailed Implementation

[0019] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0020] Please see Figure 1-6 In this embodiment, a riveting device for the inner wall guide rail of a power distribution equipment cabinet includes an operating table 1 and a frame 11 fixed on the operating table 1. Three sets of pressure cylinders 17 are installed on the frame 11. A pressure head 18 is installed at the lower end of the piston rod of the pressure cylinder 17 for pressing the riveting nut into the through hole of the guide rail. A feeding assembly is installed on the operating table 1 for transferring and fixing the guide rail and a feeding assembly for conveying the riveting nut.

[0021] like Figure 1 and 3 The feeding assembly includes two symmetrically distributed support plates 2 mounted on the operating table 1 to support the guide rail, and a transfer part installed between the support plates 2. The transfer part includes a push plate 4 slidably connected to the operating table 1, and a push cylinder 3 mounted on the operating table 1. The piston rod of the push cylinder 3 is fixedly connected to the push plate 4 and can drive the push plate 4 to move along the operating table 1. Two upper plates 5 are mounted on the top of the push plate 4. The upper plates 5 are Z-shaped, and the upper plate 5 has a protrusion on the upper plate. The protrusion can extend into the guide rail and also play the role of supporting the guide rail. A clamping part is installed on the upper plate 5. When the guide rail is placed, the clamping part can clamp the guide rail to prevent it from shifting during the transfer process and affecting the subsequent riveting process.

[0022] The platform 11 has two sets of side plates 12 fixed to its front. Two guide rods 14 are installed on the side plates 12, and positioning cylinders 13 are installed between the guide rods 14. The piston rod of the positioning cylinder 13 is fixed with a guide block 15. The guide block 15 is fixedly connected to the guide rod 14 to improve stability. The bottom of the guide block 15 is equipped with a positioning rod 16. The two sets of positioning rods 16 are on the same axis as the two sets of pressure heads 18. Therefore, when the guide rail is placed on the two sets of support plates, the positioning cylinder drives the positioning rod to insert into the through hole of the guide rail to achieve precise positioning of the guide rail, so that it can accurately connect with the feeding component during the transfer process.

[0023] In addition, the clamping part includes an upper cylinder 6 fixed to the bottom of the upper plate 5. A protrusion 7 is fixed to the top of the upper plate 5. V-shaped plates 8 are hinged to both sides of the protrusion 7 through hinge plates 9. The bend of the V-shaped plate 8 is hinged to the hinge plate 9, and the head end is hinged to the piston rod of the upper cylinder 6. A rubber head 10 is installed at the tail end to avoid damaging the guide rail. When the piston rod of the upper cylinder 6 extends, it pushes the V-shaped plate 8 to rotate around the hinge plate 9. The rubber head 10 approaches and clamps the guide rail, completing the fixing operation of the guide rail.

[0024] like Figure 2 , 4 -6. The feeding assembly includes three top plates 19 fixed on the operating table 1. Each of the three top plates corresponds to a pressure cylinder 17. A guide plate 20 is fixed on the top plate 19. The guide plate has a flow channel inside for conveying the crimping nut. A pushing part is installed on the guide plate 20. The pushing part includes a pushing cylinder 21 fixed on the side of the guide plate 20. A guide post 22 passes through the guide plate 20. The piston rod of the pushing cylinder 21 is fixed with a top block 23 connected to the guide post 22. A push rod 24 is fixed on the top block 23. The push rod 24 is located in the flow channel of the guide plate 20. The pushing cylinder 21 can drive the push rod 24 to push the crimping nut in the flow channel to a designated position on the guide plate and located directly below the guide rail through hole.

[0025] The operating platform 1 is also equipped with a feeding section connected to three sets of guide plates 20. The feeding section includes a vibrating feeder 25 installed in the corner of the operating platform 1, which is used to store and sort the riveting nuts. Guide blocks 26 are fixed to the sides of the guide plates 20 at the beginning and middle ends. The guide blocks 26 have S-shaped flow channels inside that are connected to the flow channels of the corresponding guide plates 20. A three-port double-channel guide plate 27 is installed obliquely between the tops of the guide blocks 26 at the beginning and middle ends. The feed inlet of the three-port double-channel guide plate 27 is connected to the vibrating feeder 20. The discharge port of the moving material tray 25 is connected; the middle guide block 26 and the tail guide plate 20 are fixed and connected by a double-port single-channel guide plate 28. One outlet of the three-port double-channel guide plate 27 is connected to the S-shaped flow channel of the first guide block 26, and the other two channels are connected to the inlet of the double-port single-channel guide plate 28. One outlet of the double-port single-channel guide plate 28 is connected to the S-shaped flow channel of the middle guide block 26, and the single channel is connected to the flow channel of the tail guide plate 20, so as to realize the diversion of the press-fit nut to the three guide plates 20 to complete the feeding.

[0026] The working principle of this embodiment:

[0027] The rivet nuts are poured into the vibrating feed pan. The vibrating feed pan guides the rivet nuts into the three-way double-channel guide plate, the guide block, and the double-way single-channel guide plate. After being diverted, they enter the flow channels of the three guide plates. The push cylinder drives the push rod through the top block to push the rivet nuts to the designated position on the guide plate, opposite the pressure head. The guide rail is placed on the support plate and fitted onto the upper plate protrusion. The positioning cylinder drives the positioning rod to move down and insert it into the guide rail through hole to achieve positioning. The upper push cylinder drives the V-shaped plate to clamp the guide rail with the rubber head to prevent movement. The positioning cylinder retracts. When the push cylinder drives the push plate to move, it moves the guide rail to the rivet area and fits onto the head end of the guide plate, so that the rivet nuts are below the guide rail through hole. The pressure cylinder drives the pressure head to move down, pressing the rivet nuts into the guide rail through hole.

[0028] The entire workflow is now complete, and anything not described in detail in this specification is existing technology known to those skilled in the art.

[0029] It should be noted that in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such a process, method, article, or apparatus. Without further limitations, an element defined by the phrase "comprising one..." does not exclude the presence of other identical elements in the process, method, article, or apparatus that includes said element.

[0030] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A riveting device for the inner wall guide rail of a power distribution equipment cabinet, comprising an operating table (1) and a frame (11) fixed on the operating table (1), wherein multiple sets of pressure cylinders (17) are installed on the frame (11), and the piston rod of the pressure cylinder (17) is equipped with a pressure head (18), characterized in that: The operating table (1) is also equipped with a feeding assembly and a loading assembly; The feeding assembly includes multiple support plates (2) installed on the operating table (1), and a transfer unit installed between the support plates (2). Multiple upper plates (5) are installed on the transfer end of the transfer unit, and a pressing part is installed on the upper plate (5). The feeding assembly includes multiple top plates (19) fixed on the operating table (1), with guide plates (20) fixed on the top plates (19) and pushers installed on the guide plates (20). The operating table (1) is also equipped with a feeding unit that communicates with the multiple guide plates (20).

2. The riveting device for the inner wall guide rail of a power distribution equipment cabinet according to claim 1, characterized in that: Multiple side plates (12) are fixed on one side of the platform (11). Multiple guide rods (14) are passed through the side plate (12) and a positioning cylinder (13) is installed between the guide rods (14). The piston rod of the positioning cylinder (13) is fixed with a guide block (15) connected to the guide rod (14). A positioning rod (16) located above the support plate (2) is installed at the bottom of the guide block (15).

3. The riveting device for the inner wall guide rail of a power distribution equipment cabinet according to claim 2, characterized in that: The transfer unit includes a push plate (4) that slides with the operating table (1) and a push cylinder (3) that is mounted on the operating table (1) to drive the push plate (4) to move. The upper plate (5) is mounted on the push plate (4).

4. The riveting device for the inner wall guide rail of a power distribution equipment cabinet according to claim 3, characterized in that: The pressing part includes an upper cylinder (6) installed at the bottom of the upper plate (5) and a protrusion (7) fixed at the top. Both sides of the protrusion (7) are hinged to V-shaped plates (8) by hinge plates (9). One end of the V-shaped plate (8) is hinged to the piston rod of the upper cylinder (6), and the other end of the V-shaped plate (8) is equipped with a rubber head (10).

5. The riveting device for the inner wall guide rail of a power distribution equipment cabinet according to claim 1, characterized in that: The feeding unit includes a vibrating feed plate (25) installed on the operating table (1). The sides of the two sets of guide plates (20) are fixed with guide blocks (26) that are connected to the flow channel. Three-port double-track guide plates (27) that are connected to the vibrating feed plate (25) are installed at an angle between the guide blocks (26). A double-port single-track guide plate (28) is fixed between the middle guide block (26) and the tail guide plate (20). One of the three-port double-track guide plates (27) is connected to the first guide block (26), and its two tracks are connected to the double-port single-track guide plate (28). One of the double-port single-track guide plates (28) is connected to the middle guide block (26).

6. The riveting device for the inner wall guide rail of a power distribution equipment cabinet according to claim 5, characterized in that: The pushing part includes a pushing cylinder (21) mounted on the guide plate (20) and a guide post (22) passing through it. The piston rod of the pushing cylinder (21) is fixed with a top block (23) connected to the guide post (22). A push rod (24) is fixed on the top block (23) and slides in the flow channel of the corresponding guide plate (20).