A hoisting tool for a bulkhead

CN224930167UActive Publication Date: 2026-11-03SHANGHAI ZHENHUA HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522589950.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-05
Publication Date
2026-11-03
Estimated Expiration
2035-12-05

AI Technical Summary

Technical Problem

In existing technologies, the conversion of the partition from a horizontal to a vertical state requires a large amount of manual operation, resulting in high manpower consumption and high labor intensity.

Method used

A partition lifting fixture was designed, comprising a first lifting section and a second lifting section arranged in parallel to form a bayonet structure, and equipped with shackles and a pallet. The bayonet and shackle work together to achieve automatic lifting of the partition, reducing manual operation.

Benefits of technology

The automated lifting of the partitions has been achieved, reducing the time spent on manual turning and supporting, and lowering labor intensity and human resource consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224930167U_ABST
    Figure CN224930167U_ABST
Patent Text Reader

Abstract

The utility model relates to a kind of hoist tool of partition, including a hoist plate, hoist plate includes first hoist section and second hoist section, gap is left between first hoist section and second hoist section, the length of first hoist section is longer than the length of second hoist section, the side of first hoist section is connected with the side of second hoist section, to make the common cooperation between first hoist section and second hoist section form a side end of the partition inserted bayonet;Another side of first hoist section is also opened a hoist hole, setting has unhooking in hoist hole, first hoist section is located also set a supporting plate at bayonet, and supporting plate and first hoist section are T-shaped connection, the side wall of supporting plate and partition is in conformity with.The tool in the utility model, by the cooperation of first hoist section and second hoist section to form a partition bayonet, then by hoist hole and unhooking cooperation, to facilitate hoisting partition, without again by artificial carrying and erecting, greatly reduce the consumption of artificial pulling and human resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of tire cranes, and in particular to a diaphragm lifting fixture. Background Technology

[0002] Rubber-tired gantry cranes (LTGs) typically take the form of self-propelled trolleys with counterweight container spreaders, used for stacking operations in container yards. LTGs generally use diesel engines to drive generator sets, but can also be intelligently connected to a sliding rail system to draw power from the mains. They are primarily used for free movement within the container yard of a terminal, unaffected by towing cables or external power sources.

[0003] Because the span of a tire-mounted crane is tens of meters, the components such as the saddle beam and outriggers that form the crane are also quite large. The saddle beam and outriggers are all box girder structures, which generally consist of an outer rectangular frame and several partitions welded sequentially inside the frame. The partitions are U-shaped. During fabrication, the base plate of the outer frame must first be prepared, then each partition is welded sequentially onto the base plate, and finally the side and top plates of the outer frame are welded. Before welding, the partitions are laid flat. When welding the partitions, they need to be flipped upright. Traditionally, this is done manually. Since the partitions used in box girder structures are large in size and weight, it usually requires two or more people to lift them. After lifting, the partitions need to be held upright for a certain period until the partitions are welded to the base plate. This process is labor-intensive and consumes a large amount of manpower. Utility Model Content

[0004] The technical problem to be solved by this utility model is to provide a partition hoisting fixture that facilitates changing the partition from a horizontal state to a vertical state.

[0005] To solve the above-mentioned technical problems, the technical solution of this utility model is: a partition hoisting fixture, the innovation of which lies in: including A lifting plate is provided, comprising a first lifting section and a second lifting section arranged in parallel, with a gap between the first and second lifting sections. The length of the first lifting section is longer than that of the second lifting section. One side of the first lifting section is connected to one side of the second lifting section, so that the first and second lifting sections cooperate to form a bayonet into which the side end of the partition plate is embedded. On the other side of the first lifting section, there is a lifting hole with a shackle installed inside. A support plate is also installed at the bayonet of the first lifting section, and the support plate is connected to the first lifting section in a T-shape. The support plate is in contact with the side wall of the partition.

[0006] Furthermore, the size of the bayonet gradually increases from the connection point between the first lifting section and the second lifting section, thereby forming a V-shaped bayonet.

[0007] Furthermore, a reinforcing rib is provided between the pallet and the first lifting section. The reinforcing rib is L-shaped, with one side welded to the side wall of the first lifting section and the other side welded to the side wall of the pallet. There are two reinforcing ribs in total, located on both sides of the first lifting section.

[0008] Furthermore, an inclined guide ramp is provided on the side of the pallet near the lifting hole.

[0009] The advantages of this utility model are as follows: The tooling in this utility model forms a partition plate bayonet through the cooperation of the first lifting section and the second lifting section, and then facilitates the lifting of the partition plate through the cooperation of the lifting hole and the shackle, eliminating the need for manual handling and erection, greatly reducing the consumption of manual pulling and manpower. Furthermore, the cooperation of the support plate provides auxiliary support for the partition plate, ensuring that the partition plate can be lifted stably and avoiding adverse phenomena such as back-and-forth swaying and tilting during the lifting process.

[0010] The bayonet is designed with gradually increasing dimensions, which allows the side of the partition to be smoothly inserted into the bayonet and also limits the end of the partition after it is inserted, reducing the shaking of the partition during lifting.

[0011] The design of the reinforcing ribs is to strengthen the connection between the pallet and the first lifting section, providing a good foundation for the pallet to stably support the partition. Attached Figure Description

[0012] Figure 1 This is a schematic diagram of the partition hoisting fixture of this utility model.

[0013] Figure 2 This is a side view of the partition hoisting fixture of this utility model. Detailed Implementation

[0014] To further illustrate the technical means and effects adopted by this utility model in order to achieve the intended utility model purpose, the following detailed description of the specific implementation methods, structure, features and effects of this utility model is provided in conjunction with the accompanying drawings and preferred embodiments.

[0015] like Figure 1 , Figure 2 The illustrated partition hoisting fixture includes The lifting plate includes a first lifting section 1 and a second lifting section 2 arranged side by side. Both the first lifting section 1 and the second lifting section 2 are rectangular plates with a gap between them. The length of the first lifting section 1 is longer than the length of the second lifting section 2. One side of the first lifting section 1 is flush with one side of the second lifting section 2, and the flush side of the first lifting section 1 is connected to one side of the second lifting section 2. This allows the first lifting section 1 and the second lifting section 2 to cooperate to form a side-end insertion slot 3 of a partition plate. In this embodiment, the first lifting section 1 and the second lifting section 2 are directly integrally formed.

[0016] The size of the bayonet 3 gradually increases from the connection between the first lifting section 1 and the second lifting section 2, thus forming a V-shaped bayonet. The bayonet 3 is designed with a gradually increasing size, which allows the side end of the partition to be smoothly inserted into the bayonet 3. After being inserted, the gradually decreasing size design also serves to limit the end of the partition, reducing the swaying of the partition during lifting.

[0017] On the other side of the first lifting section 1, there is a lifting hole 11. A shackle is installed in the lifting hole 11. The shackle facilitates subsequent cooperation with the wire rope or hook of the crane to achieve lifting. A support plate 12 is also installed at the bayonet 3 of the first lifting section 1. The support plate 12 is connected to the first lifting section 1 in a T-shape and is attached to the side wall of the partition.

[0018] An inclined guide ramp is also provided on the side of the pallet 12 near the lifting hole 11. The purpose of this guide ramp is to allow the partition to be smoothly inserted into the bayonet 3, avoiding interference with the partition due to the presence of the pallet 12.

[0019] A reinforcing rib 13 is also provided between the pallet 12 and the first lifting section 1. The reinforcing rib 13 is L-shaped, with one side welded to the side wall of the first lifting section 1 and the other side welded to the side wall of the pallet 12. There are two reinforcing ribs 13, located on both sides of the first lifting section 1. The design of the reinforcing rib 13 is to strengthen the connection between the pallet 12 and the first lifting section 1, providing a good foundation for the pallet 12 to stably support the partition.

[0020] When using the hoisting fixture of this utility model to lift the partition, firstly, connect the wire rope of the crane to the shackle in the lifting hole 11, then insert the side end of the partition to be erected into the slot 3, and then the crane lifts the flat partition upwards to make it vertical. During this process, only one worker needs to support it. After the partition is erected, another worker welds the partition. The whole process can be completed by only two people, which greatly reduces the consumption of manpower and the labor intensity.

[0021] The above description is merely a preferred embodiment of the present utility model and is not intended to limit the present utility model in any way. Although the present utility model has been disclosed above with reference to a preferred embodiment, it is not intended to limit the present utility model. Any person skilled in the art can make some modifications or alterations to the above-disclosed technical content to create equivalent embodiments without departing from the scope of the present utility model. Any simple modifications, equivalent changes and alterations made to the above embodiments based on the technical essence of the present utility model without departing from the scope of the present utility model shall still fall within the scope of the present utility model.

Claims

1. A partition hoisting fixture, characterized in that: include A lifting plate is provided, comprising a first lifting section and a second lifting section arranged in parallel, with a gap between the first and second lifting sections. The length of the first lifting section is longer than that of the second lifting section. One side of the first lifting section is connected to one side of the second lifting section, so that the first and second lifting sections cooperate to form a bayonet into which the side end of the partition plate is embedded. On the other side of the first lifting section, there is a lifting hole with a shackle installed inside. A support plate is also installed at the bayonet of the first lifting section, and the support plate is connected to the first lifting section in a T-shape. The support plate is in contact with the side wall of the partition.

2. The partition hoisting fixture according to claim 1, characterized in that: The size of the bayonet gradually increases from the connection between the first lifting section and the second lifting section, thus forming a V-shaped bayonet.

3. The partition hoisting fixture according to claim 1, characterized in that: A reinforcing rib is also provided between the pallet and the first lifting section. The reinforcing rib is L-shaped, with one side of the reinforcing rib welded to the side wall of the first lifting section and the other side welded to the side wall of the pallet. There are two reinforcing ribs in total, located on both sides of the first lifting section.

4. The partition hoisting fixture according to claim 1, characterized in that: The pallet is also provided with an inclined guide ramp on the side near the lifting hole.