By designing a dual-machine synchronous intelligent hoisting equipment for large-segment steel box girders, the problems of large-scale high-altitude operations, difficulty in controlling welding deformation, long construction period, and high safety risks in traditional hoisting methods have been solved, achieving efficient and safe steel box girder installation and extending the service life of the equipment.

CN224954282UActive Publication Date: 2026-11-10ANHUI HIGHWAY BRIDGE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522760303.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-26
Publication Date
2026-11-10
Estimated Expiration
2035-12-26

AI Technical Summary

Technical Problem

Traditional methods of installing individual components or hoisting small segments in the construction of steel box girders for long-span cable-stayed bridges have problems such as a large amount of work at height, difficulty in controlling welding deformation, long construction period, and high safety risks. In addition, the wire ropes of the winches are prone to wear and corrosion, resulting in a large amount of maintenance work.

Method used

Design a dual-machine synchronous intelligent hoisting equipment for large-segment steel box girders. Through the cooperation between components, lubrication of the steel cables is achieved, reducing friction between steel wires and between the rope and the wheel groove, and preventing internal corrosion.

Benefits of technology

It improved construction accuracy and safety, reduced the amount of high-altitude work, shortened the construction cycle, reduced maintenance workload, and extended the service life of equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224954282U_ABST
    Figure CN224954282U_ABST
Patent Text Reader

Abstract

This utility model relates to a dual-machine synchronous intelligent hoisting device for large-segment steel box girders, including an installation plate and a beam segment. Two support frames are installed on the top of the beam segment, and the two support frames are arranged symmetrically from left to right. The installation plate is installed on the top of the support frames, and a fixing plate is fixedly connected to the top of the installation plate. Both the fixing plate and the installation plate have openings in their inner cavities. A gearbox is fixedly connected to the top of the fixing plate near the left side, and a winch is rotatably connected to the front of the gearbox. Through the mutual cooperation of components such as the component placement plate, vertical block, hinge block, spiral rod, rotating gear, L-shaped connecting plate, positioning block, first sliding plate, second sliding plate, movable block, spring, movable plate, fitting rod, L-shaped flipping plate, and insertion rod, lubrication of the steel cable on the outside of the winding wheel can be achieved. Lubrication not only reduces friction between steel wires and between the rope and the wheel groove, but also prevents internal corrosion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of engineering construction technology, and in particular to a dual-machine synchronous intelligent hoisting equipment for large-segment steel box girders. Background Technology

[0002] With the rapid advancement of transportation infrastructure construction in my country, long-span cable-stayed bridges have been widely used due to their superior spanning capacity and good economic efficiency. As the core load-bearing component of such bridges, the precision, efficiency, and safety of steel box girders directly determine the overall engineering quality of the bridge. However, traditional methods of installing individual components or hoisting small segments generally suffer from significant challenges, including large-scale high-altitude operations, difficulty in controlling welding deformation, lengthy construction periods, and high safety risks, thus hindering further improvements in engineering quality and efficiency.

[0003] As one of the most classic and widely used lifting equipment, winches are indispensable in bridge construction, building construction, ports, mines and other fields. However, they do have some inherent defects and limitations in actual use. The wire rope is repeatedly bent and rubbed on the drum and pulley, which can easily cause wire breakage, wear and corrosion. Regular inspection and replacement are required, resulting in a large amount of maintenance work. Utility Model Content

[0004] The purpose of this utility model is to provide a dual-machine synchronous intelligent hoisting equipment for large-segment steel box girders to solve the problems mentioned in the background art.

[0005] The technical solution of this utility model is a dual-machine synchronous intelligent hoisting equipment for large-segment steel box girders, including an installation plate and a beam segment. Two support frames are installed on the top of the beam segment, and the two support frames are arranged symmetrically from left to right. The installation plate is installed on the top of the support frames, and a fixing plate is fixedly connected to the top of the installation plate. Both the fixing plate and the installation plate have openings in their inner cavities. A gearbox is fixedly connected to the top of the fixing plate near the left side. A winch is rotatably connected to the front of the gearbox. A transmission rod is fixedly connected to the power output shaft of the gearbox. Two fixing frames are sleeved on the outside of the transmission rod, and the two fixing frames are arranged symmetrically from left to right. The bottom of the fixing frames is fixedly connected to the top of the fixing plate.

[0006] In one embodiment, two winding wheels are fixedly sleeved on the outside of the transmission rod, and steel cables are wound around the outside of both winding wheels.

[0007] In one embodiment, a placement plate is provided at the top of the mounting plate near the rear side, and vertical blocks are fixedly connected to the bottom of the placement plate near the four corners. The bottoms of several vertical blocks are fixedly connected to the placement plate, and two L-shaped connecting plates are fixedly connected to the top of the placement plate. The two L-shaped connecting plates are arranged symmetrically from left to right.

[0008] In one embodiment, a second slide plate is fixedly connected to the front side of the two L-shaped connecting plates, a first slide plate is fixedly connected to the front side of the second slide plate, and a storage box is fixedly connected to the rear side of the two L-shaped connecting plates. A feed pipe is inserted into the front side of the storage box.

[0009] In one embodiment, the top of the placement plate is provided with two spiral rods, which are arranged symmetrically front to back. Each spiral rod is hinged to a hinge block at both ends, and the bottom of the hinge block is fixedly connected to the placement plate. Each spiral rod is fixedly connected to a rotating gear at its right end, and the two rotating gears are meshed with each other.

[0010] In one embodiment, two positioning blocks are fixedly connected to the top of the second slide plate, and the two positioning blocks are arranged symmetrically from left to right. A movable block is slidably connected to the front side of the first slide plate. A plug rod is fixedly connected to the left side of the movable block. A swing plate is sleeved on the outside of the plug rod. A locking rod is fixedly connected to the top of the swing plate. Engaging blocks are fixedly connected to both the front and rear sides of the swing plate. The other end of the feed pipe passes through the inner cavity of the swing plate.

[0011] In one embodiment, a connecting rod is fixedly connected to the top of the movable block, a movable plate is sleeved on the outside of the connecting rod, an L-shaped flip plate is sleeved on the outside of the connecting rod, a spring is fixedly connected to the top of the L-shaped flip plate and the movable plate, a U-shaped groove is opened on the top of the L-shaped flip plate, the connecting rod fits into the U-shaped groove, two fitting rods are fixedly connected to the top of the movable block, and the movable plate is located between the two fitting rods.

[0012] The beneficial effects provided by this utility model are: 1. By cooperating with each other, such as the component placement plate, vertical block, hinge block, spiral rod, rotating gear, L-shaped connecting plate, positioning block, first sliding plate, second sliding plate, movable block, spring, movable plate, fitting rod, L-shaped flip plate, and insert rod, the outer steel cable of the winding wheel can be lubricated. Lubrication can not only reduce the friction between steel wires and between the rope and the wheel groove, but also prevent internal corrosion. Attached Figure Description

[0013] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the mounting plate structure of this utility model; Figure 3 This is a schematic diagram of the winch structure of this utility model; Figure 4 This is a schematic diagram of the placement plate structure of this utility model; Figure 5 This is a right view of the winch structure of this utility model; Figure 6 This is a bottom view of the material storage box structure of this utility model; Figure 7 This is a schematic diagram of the movable block structure of this utility model.

[0014] In the attached diagram: 1. Mounting plate; 2. Support frame; 3. Beam segment; 4. Fixing plate; 5. Gearbox; 6. Winch; 7. Winding reel; 8. Transmission rod; 9. Fixing frame; 10. Placement plate; 11. Vertical block; 12. Rotating gear; 13. Helical rod; 14. Storage box; 15. L-shaped connecting plate; 16. Positioning block; 17. First sliding plate; 18. Hinge block; 19. Feed pipe; 20. Swing plate; 21. Engaging block; 22. Movable block; 23. Adhesive rod; 24. Spring; 25. Movable plate; 26. L-shaped flipping plate; 27. Insert rod; 28. Second sliding plate. Detailed Implementation

[0015] It should be noted that, unless otherwise specified, the embodiments and features described in these embodiments of the present invention can be combined with each other. The technical solutions of the present invention will be further described below with reference to the accompanying drawings of the embodiments. The present invention is not limited to the specific embodiments described below.

[0016] It should be understood that the same or similar reference numerals in the accompanying drawings of the embodiments correspond to the same or similar components. In the description of this utility model, it should be understood that if terms such as "upper," "lower," "front," "rear," "left," "right," "top," and "bottom" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, they are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or component referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, the terms describing positional relationships in the accompanying drawings are for illustrative purposes only and should not be construed as limiting this patent. Those skilled in the art can understand the specific meaning of the above terms according to the specific circumstances.

[0017] In one embodiment, such as Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6 As shown, A dual-machine synchronous intelligent hoisting device for large-segment steel box girders includes an installation plate 1 and a beam segment 3. Two support frames 2 are installed on the top of the beam segment 3, and the two support frames 2 are arranged symmetrically from left to right. The installation plate 1 is installed on the top of the support frames 2. A fixing plate 4 is fixedly connected to the top of the installation plate 1. Both the fixing plate 4 and the installation plate 1 have openings in their inner cavities. A gearbox 5 is fixedly connected to the top of the fixing plate 4 near the left side. A winch 6 is rotatably connected to the front of the gearbox 5. A transmission rod 8 is fixedly connected to the power output shaft of the gearbox 5. Two fixing frames 9 are sleeved on the outside of the transmission rod 8, and the two fixing frames 9 are arranged symmetrically from left to right. The bottom of the fixing frames 9 is fixedly connected to the top of the fixing plate 4. Two winding wheels 7 are fixedly sleeved on the outside of the transmission rod 8, and steel cables are wound on the outside of both winding wheels 7.

[0018] A placement plate 10 is located near the rear of the top of the mounting plate 1. Vertical blocks 11 are fixedly connected to the bottom of the placement plate 10 near its four corners. Several vertical blocks 11 are fixedly connected to the bottom of the placement plate 10. Two L-shaped connecting plates 15 are fixedly connected to the top of the placement plate 10, arranged symmetrically from left to right. A second sliding plate 28 is fixedly connected to the front of both L-shaped connecting plates 15. A first sliding plate 17 is fixedly connected to the front of the second sliding plate 28. A storage bin 14 is fixedly connected to the rear of both L-shaped connecting plates 15. A feed pipe 19 is inserted into the front of the storage bin 14. Two spiral rods 13 are located at the top of the placement plate 10, arranged symmetrically from front to back. Hinges 18 are hinged to both ends of each spiral rod 13, with the bottom of the hinge blocks 18 fixedly connected to the placement plate 10. Rotating gears 12 are fixedly connected to the right ends of both spiral rods 13. 12 are designed for mutual engagement. The top of the second slide plate 28 is fixedly connected to two positioning blocks 16, which are symmetrically arranged on the left and right. The front side of the first slide plate 17 is slidably connected to a movable block 22. The left side of the movable block 22 is fixedly connected to an insertion rod 27. The outside of the insertion rod 27 is sleeved with a swing plate 20. The top of the swing plate 20 is fixedly connected to a locking rod. The front and rear sides of the swing plate 20 are fixedly connected to meshing blocks 21. The other end of the feed pipe 19 passes through the inner cavity of the swing plate 20. The top of the movable block 22 is fixedly connected to a connecting rod. The outside of the connecting rod is sleeved with a movable plate 25. The outside of the connecting rod is sleeved with an L-shaped flip plate 26. The top of the L-shaped flip plate 26 and the movable plate 25 are both fixedly connected to a spring 24. The top of the L-shaped flip plate 26 has a U-shaped groove. The connecting rod fits into the U-shaped groove. The top of the movable block 22 is fixedly connected to two fitting rods 23. The movable plate 25 is located between the two fitting rods 23.

[0019] Working principle: First, when the winch 6 starts, it drives the reduction gear inside the gearbox 5 to rotate via the power output shaft. The reduction gear drives the transmission rod 8 to rotate, which in turn drives the two winding wheels 7 to rotate. The rotation of the winding wheels 7 drives the steel cable to move. When the rotating gear 12 rotates, it drives another rotating gear 12 to rotate. The rotation of the two rotating gears 12 drives the adjacent auger 13 to rotate. When the auger 13 rotates, it engages with the meshing block 21, thereby driving the swing plate 20 to move. When the swing plate 20 moves, it drives the movable... The movable block 22 moves to the right. When the movable block 22 moves, it can drive the movable plate 25 to move. When the movable plate 25 is in contact with the positioning block 16 located on the right, it can flip over. When the movable plate 25 flips over, the spring 24 can drive the L-shaped flip plate 26 to swing. The L-shaped flip plate 26 is in contact with the locking rod, thereby driving the swing plate 20 to swing around the center of the insertion rod 27, so that the meshing block 21 is in contact with the spiral rod 13 located on the front side, realizing the movement to the left. When the swing plate 20 moves back and forth, it can drive the feed pipe 19 to move, so as to spray lubricating oil onto the steel cable.

[0020] The technical features of the above embodiments can be combined in any way. For the sake of brevity, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0021] The embodiments described above are merely illustrative of several implementations of this utility model, and while the descriptions are relatively specific and detailed, they should not be construed as limiting the scope of the utility model patent. It should be noted that those skilled in the art can make various modifications and improvements without departing from the concept of this utility model, and these all fall within the protection scope of this utility model. Therefore, the protection scope of this utility model patent should be determined by the appended claims.

Claims

1. A large-section steel box girder double-machine synchronous intelligent hoisting equipment, characterized in that, The assembly includes a mounting plate (1) and a beam segment (3). Two support frames (2) are installed on the top of the beam segment (3). The two support frames (2) are arranged symmetrically on the left and right. The mounting plate (1) is installed on the top of the support frame (2). A fixing plate (4) is fixedly connected to the top of the mounting plate (1). Both the fixing plate (4) and the mounting plate (1) have openings in their inner cavities. A gearbox (5) is fixedly connected to the top of the fixing plate (4) near the left side. A winch (6) is rotatably connected to the front side of the gearbox (5). A transmission rod (8) is fixedly connected to the power output shaft of the gearbox (5). Two fixing frames (9) are sleeved on the outside of the transmission rod (8). The two fixing frames (9) are arranged symmetrically on the left and right. The bottom of the fixing frame (9) is fixedly connected to the top of the fixing plate (4).

2. The double-machine synchronous intelligent hoisting equipment for large-section steel box girder according to claim 1, characterized in that, Two winding wheels (7) are fixedly sleeved on the outside of the transmission rod (8), and steel cables are wound on the outside of both winding wheels (7).

3. The double-machine synchronous intelligent hoisting equipment for large-section steel box girder according to claim 2, characterized in that, The mounting plate (1) has a placement plate (10) at the top near the rear side. The placement plate (10) has vertical blocks (11) fixedly connected to the bottom near the four corners. The bottom of several vertical blocks (11) is fixedly connected to the placement plate (10). The top of the placement plate (10) has two L-shaped connecting plates (15) fixedly connected. The two L-shaped connecting plates (15) are arranged symmetrically on the left and right.

4. The double-machine synchronous intelligent hoisting equipment for large-section steel box girder of claim 3, characterized in that, The front sides of the two L-shaped connecting plates (15) are fixedly connected to a second sliding plate (28), the front side of the second sliding plate (28) is fixedly connected to a first sliding plate (17), the rear sides of the two L-shaped connecting plates (15) are fixedly connected to a storage box (14), and the front side of the storage box (14) is connected to a feed pipe (19).

5. The double-machine synchronous intelligent hoisting equipment for large-segment steel box girder of claim 4, characterized in that, The top of the placement plate (10) is provided with two spiral rods (13), which are arranged symmetrically front and back. Both ends of the spiral rods (13) are hinged with hinge blocks (18), and the bottom of the hinge blocks (18) are fixedly connected to the placement plate (10). Both ends of the spiral rods (13) are fixedly connected with rotating gears (12), which are meshed with each other.

6. The intelligent dual-machine synchronous hoisting equipment for large-segment steel box girders according to claim 5, characterized in that, The top of the second slide plate (28) is fixedly connected to two positioning blocks (16), which are symmetrically arranged on the left and right. The front side of the first slide plate (17) is slidably connected to a movable block (22), and the left side of the movable block (22) is fixedly connected to a plug rod (27). A swing plate (20) is sleeved on the outside of the plug rod (27). A locking rod is fixedly connected to the top of the swing plate (20). Engaging blocks (21) are fixedly connected to both the front and rear sides of the swing plate (20). The other end of the feed pipe (19) passes through the inner cavity of the swing plate (20).

7. The intelligent dual-machine synchronous hoisting equipment for large-segment steel box girders according to claim 6, characterized in that, The top of the movable block (22) is fixedly connected to a connecting rod, and a movable plate (25) is sleeved on the outside of the connecting rod. An L-shaped flip plate (26) is sleeved on the outside of the connecting rod. A spring (24) is fixedly connected to the top of the L-shaped flip plate (26) and the movable plate (25). A U-shaped groove is opened on the top of the L-shaped flip plate (26). The connecting rod fits into the U-shaped groove. Two fitting rods (23) are fixedly connected to the top of the movable block (22). The movable plate (25) is located between the two fitting rods (23).