A water pipe sealing structure

By using a combination of sealing walls, diversion pipes, and level gauges in municipal drainage pipes, the problem of low construction efficiency during the removal of sealing walls was solved, enabling rapid and convenient drainage of accumulated water and improving construction efficiency and safety.

CN224955217UActive Publication Date: 2026-11-10XIAN DRAINAGE GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522412133.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-13
Publication Date
2026-11-10
Estimated Expiration
2035-11-13

AI Technical Summary

Technical Problem

In existing technologies, the removal of sealing walls during the maintenance of municipal underground drainage pipes is subject to significant external interference and has low construction efficiency, especially when the working space in the well is confined. Traditional methods affect construction efficiency.

Method used

The system employs a water-sealed pipe structure, including a sealing wall, a drainage pipe, and a level gauge. The drainage pipe actively drains water from the pipe, and the level gauge monitors the water level to ensure safe removal of the sealing wall.

Benefits of technology

It enables the rapid and simple drainage of water from pipes without external interference, improving construction efficiency and convenience, avoiding underground drilling operations, and reducing construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224955217U_ABST
    Figure CN224955217U_ABST
Patent Text Reader

Abstract

This application provides a water-sealing structure for pipes, belonging to the technical field of pipe maintenance. Specifically, it includes: a sealing wall located inside one end of a drainage pipe, used to seal that end; a drainage pipe passing through the sealing wall, one end of which is inside the drainage pipe and the other end outside, with a drainage valve on the drainage pipe outside the pipe; the drainage pipe and the sealing wall are sealed together, and the drainage pipe is located at the bottom of the sealing wall; and a level pipe located on the side of the sealing wall opposite to the inside of the drainage pipe, with its top end connected to the outside and its bottom end connected to a water pipe, the end of which extends through the sealing wall into the pipe. This solution reduces the impact of external factors on construction and improves construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the field of pipeline maintenance, in particular to a water-carrying pipeline plugging structure. BACKGROUND

[0002] Generally, municipal underground drainage pipelines are connected to inspection wells, and personnel can maintain the drainage pipeline through the inspection well. In municipal pipeline maintenance operations, when the water level in the pipeline is low, a plugging wall is built, for example, at about 1:00 to 3:00 in the morning. The upstream is plugged by using the plugging wall, and then maintenance work is carried out downstream of the plugging wall. After the plugging is completed, the pipeline is in a running water state, and a large amount of water will accumulate in the plugged pipeline. Before the plugging wall is removed after the maintenance work is completed, the traditional water-carrying plugging needs to cut off the water source from the upstream or use a water pump to pump out the water. Then, the removal can be carried out in a dry water operation environment or at a low water level. The influence of external interference is large. In the prior art, the plugging wall is removed only after the water is discharged by manually opening a hole in the underground operation. However, the space for underground operation is small, and it is not convenient to open a hole for operation. Moreover, a long operation time is required for the opening operation, which affects the construction efficiency. CONTENT OF THE UTILITY MODEL

[0003] Therefore, the present application provides a water-carrying pipeline plugging structure, which solves the problems in the prior art, reduces the influence of external factors on construction, and improves the construction efficiency.

[0004] The water-carrying pipeline plugging structure provided by the present application adopts the following technical scheme:

[0005] A water-carrying pipeline plugging structure comprises:

[0006] A plugging wall is located inside one end of a drainage pipeline, and the plugging wall is used to plug one end of the drainage pipeline.

[0007] A drainage pipe is arranged on the plugging wall, one end of the drainage pipe is located inside the drainage pipeline, the other end of the drainage pipe is located outside the drainage pipeline, a drainage valve is arranged on the drainage pipe located outside the drainage pipeline, the drainage pipe and the plugging wall are sealingly arranged, and the drainage pipe is located at the bottom of the plugging wall.

[0008] A liquid level pipe is located on the side of the plugging wall opposite to the inside of the drainage pipeline, the top end of the liquid level pipe is connected to the outside, and the bottom end of the liquid level pipe is connected to a water passage, and the end of the water passage away from the liquid level pipe penetrates through the plugging wall and extends into the pipeline.

[0009] Optionally, the distance between the bottom of the drainage pipe and the bottom of the inner wall of the drainage pipeline is 8-12 cm.

[0010] Optionally, the line connecting the center of the drainage pipe and the center of the drainage pipeline is parallel to the vertical direction.

[0011] Optionally, the distance between the bottom wall of one end of the water pipe inside the drainage pipe and the top of the drain pipe is 8-12 cm.

[0012] Optionally, a vertically set scale is provided on the side of the sealing wall facing away from the inside of the drainage pipe.

[0013] Optionally, a baffle plate is provided at one end of the drainage pipe, the bottom edge of the baffle plate is in contact with the bottom inner wall of the drainage pipe, the baffle plate has a hollow structure aligned with the water inlet end of the drainage pipe, the edge of the hollow structure is connected to the drainage pipe, and a support block is provided at one end of the drainage pipe extending out of the drainage pipe. The support block and the baffle plate are used to support both ends of the drainage pipe so that the bottom of the drainage pipe and the bottom of the inner wall of the drainage pipe are kept apart. The height of the top of the baffle plate is greater than the center height of the drainage pipe and less than half of the internal height of the drainage pipe.

[0014] Optionally, the top of the baffle plate is 0-3 cm higher than the top of the drainage pipe.

[0015] Optionally, the baffle plate is provided with a connecting pipe that is fixedly connected to the edge of the hollow structure. The connecting pipe is inserted into the drainage pipe, and the outer wall of the connecting pipe matches the inner wall of the drainage pipe.

[0016] Optionally, a guide plate is provided at the bottom of the side of the baffle plate facing away from the sealing wall, and the bottom surface of the guide plate is in contact with the bottom wall of the drainage pipe.

[0017] In summary, this application includes the following beneficial technical effects:

[0018] This application utilizes a drainage pipe to actively drain water before removing the sealing wall, a simple and quick method that is unaffected by external interference. Furthermore, it eliminates the need for drilling holes in the sealing wall, thus improving drainage efficiency and convenience. Attached Figure Description

[0019] To more clearly illustrate the technical solutions of the embodiments of this application, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0020] Figure 1 This is a structural schematic diagram of the water-sealed pipeline in use according to this application;

[0021] Figure 2 for Figure 1 A magnified structural diagram of part A in the middle;

[0022] Figure 3 This is a schematic diagram showing the positions of the level tube and the drainage tube in this application;

[0023] Figure 4 This is a schematic diagram of the structure of the baffle plate, guide plate and diversion pipe of this application;

[0024] Figure 5 This is an exploded structural diagram of the baffle plate, guide plate, and diversion pipe of this application.

[0025] Explanation of reference numerals in the attached diagram: 1. Sealing wall; 2. Drainage pipe; 21. Valve; 3. Liquid level pipe; 31. Water pipe; 32. Scale; 4. Water baffle; 41. Hollow structure; 42. Connecting pipe; 5. Flow guide plate; 6. Drainage pipe; 7. Inspection well. Detailed Implementation

[0026] The embodiments of this application will now be described in detail with reference to the accompanying drawings.

[0027] The following specific examples illustrate the implementation of this application. Those skilled in the art can easily understand other advantages and effects of this application from the content disclosed in this specification. Obviously, the described embodiments are only a part of the embodiments of this application, and not all of them. This application can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of this application. It should be noted that, in the absence of conflict, the following embodiments and features in the embodiments can be combined with each other. Based on the embodiments in this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0028] It should be noted that various aspects of embodiments within the scope of the appended claims are described below. It will be apparent that the aspects described herein can be embodied in a wide variety of forms, and any particular structure and / or function described herein is merely illustrative. Based on this application, those skilled in the art will understand that one aspect described herein can be implemented independently of any other aspect, and two or more of these aspects can be combined in various ways. For example, any number of aspects set forth herein can be used to implement the device and / or practice the method. Additionally, this device and / or method can be implemented using structures and / or functionalities other than one or more of the aspects set forth herein.

[0029] It should also be noted that the illustrations provided in the following embodiments are only schematic representations of the basic concept of this application. The illustrations only show the components related to this application and are not drawn according to the number, shape and size of the components in actual implementation. In actual implementation, the form, quantity and proportion of each component can be arbitrarily changed, and the layout of the components may also be more complex.

[0030] Furthermore, specific details are provided in the following description to facilitate a thorough understanding of the examples. However, those skilled in the art will understand that the described aspects can be practiced without these specific details.

[0031] This application provides a water-sealing structure for pipes.

[0032] like Figures 1 to 3 As shown, a water-sealing structure for pipes includes:

[0033] The sealing wall 1 is located inside one end of the drainage pipe 6. The sealing wall 1 is used to seal one end of the drainage pipe 6 and is a brick wall.

[0034] A drainage pipe 2 is installed on the sealing wall 1. One end of the drainage pipe 2 is located inside the drainage pipe 6, and the other end of the drainage pipe 2 is located outside the drainage pipe 6. A drainage valve 21 is provided on the drainage pipe 2 located outside the drainage pipe 6. The drainage pipe 2 and the sealing wall 1 are sealed together. The drainage pipe 2 is located at the bottom of the sealing wall 1.

[0035] The liquid level pipe 3 is located on the side of the sealing wall 1 facing away from the drainage pipe 6. The top of the liquid level pipe 3 is connected to the outside, and the bottom of the liquid level pipe 3 is connected to a water pipe 31. The end of the water pipe 31 away from the liquid level pipe 3 passes through the sealing wall 1 and extends into the pipe.

[0036] In this application, the sealing wall 1 serves as the main component for blocking the drainage pipe 6. The sealing wall 1 is a brick structure. After blocking the drainage pipe 6 with the sealing wall 1, a dry or low-water-level working environment is created downstream of the sealing wall 1 via valve 21, facilitating maintenance work by personnel downstream of the sealing wall 1. After the maintenance work is completed, opening valve 21 allows the water in the blocked drainage pipe 6 to be discharged through the drainage pipe 2. The water level in the drainage pipe 6 is monitored by observing the level pipe 3. When the water level is lower than the sealing wall 1, the bricks of the sealing wall 1 can be gradually removed starting from the top. In this application, a water pipe can also be connected to the outlet of the drainage pipe 2 to guide the water outlet to a location away from the area where the sealing wall 1 is being removed, facilitating the removal of the sealing wall 1 while draining water. The specific point at which the water level drops to begin removing the sealing wall 1 can be determined based on the on-site construction conditions. The level pipe 3 in this application provides the water level as a reference for the workers.

[0037] This application provides a simple and quick way to actively drain water from the drainage pipe 6 before removing the sealing wall 1 by using the drainage pipe 2. This method is not affected by external factors and does not require drilling into the sealing wall 1, thus improving the efficiency and convenience of drainage.

[0038] In this embodiment, the height of the level gauge 3 is higher than the top height of the drainage pipe 6, and the level gauge 3 extends upward to the middle or top of the inspection well 7. In this application, the level gauge 3 is fixed to the well wall and well shaft by pipe clamps. When the drainage pipe 6 is filled with water, the water will accumulate in the upstream inspection well 7. This application uses the level gauge 3 to monitor the water level in the upstream pipe in real time to prevent the upstream water level from being too high and causing danger. In one embodiment, the level gauge 3 is a transparent plastic hose with an inner diameter of 12mm, and a float ball is installed inside the level gauge 3.

[0039] The distance between the bottom of the drainage pipe 2 and the bottom of the inner wall of the drainage pipe 6 is 8-12 cm. Placing the bottom of the drainage pipe 2 higher than the inner bottom wall of the drainage pipe 6 helps to increase drainage pressure and flow rate to remove upstream sludge.

[0040] In this embodiment, the line connecting the center of the drainage pipe 2 and the center of the drainage pipe 6 is parallel to the vertical direction.

[0041] The distance between the bottom wall of one end of the water pipe 31 inside the drainage pipe 6 and the top of the diversion pipe 2 is 8-12 cm, which can prevent the liquid level pipe 3 from being blocked by the deposited sludge.

[0042] A vertically arranged scale 32 is provided on the side of the sealing wall 1 facing away from the inside of the drainage pipe 6. The length of the scale 32 corresponds to the height of the liquid level pipe 3.

[0043] In this application, the sealing structure for the drainage tube 2 and the sealing wall 1 can be specifically as follows: First, clean the outer surface of the area of ​​the sealing wall 1 corresponding to the drainage tube 2 with a brush or cotton yarn, then evenly apply a layer of plastic adhesive, followed by sprinkling a layer of dry coarse sand on top, and allowing it to cure for 10-20 minutes to form a rough sealing intermediate layer. When the wall is built to the center height of the preset position of the drainage tube 2, a semi-circular groove for accommodating the drainage tube 2 is reserved in the wall. The drainage tube 2 is placed in the groove, and the thickness of the sealing intermediate layer and the sealing wall 1 are aligned. Then, the sealing wall 1 is continued to be built. In another embodiment, a sealing ring is provided on the outside of the drainage tube 2, the outer diameter of the ring being larger than the outer diameter of the drainage tube 2, and the sealing ring is embedded in the sealing wall 1.

[0044] like Figure 4 and Figure 5As shown, in one embodiment, a baffle plate 4 is provided at one end of the drainage pipe 2 located in the drainage pipe 6. The bottom edge of the baffle plate 4 is attached to the bottom inner wall of the drainage pipe 6. The baffle plate 4 has a hollow structure 41 aligned with the water inlet end of the drainage pipe 2. The edge of the hollow structure 41 is connected to the drainage pipe 2. A support block is provided at one end of the drainage pipe 2 extending out of the drainage pipe 6. The support block and the baffle plate 4 are used to support both ends of the drainage pipe 6 so that the bottom of the drainage pipe 2 and the bottom of the inner wall of the drainage pipe 6 are kept apart. The height of the top of the baffle plate 4 is greater than the center height of the drainage pipe 2 and less than half of the internal height of the drainage pipe 6. In this embodiment, the support block is located in the inspection well 7. The bottom of the support block is supported on the bottom surface of the inspection well 7. The support block can be a support structure fixed on the drainage pipe, or it can be a temporary support structure made of bricks or other objects. The support block can be removed after the sealing wall 1 is completed.

[0045] Before constructing the sealing wall 1, a drain pipe 2 with a water baffle 4 is placed into the pipeline. The water baffle 4 blocks the water flow in the drainage pipe 6. When the water level in the drainage pipe 6 is higher than the water baffle 4, the water will be discharged from the pipeline through the perforated structure 41 and the drain pipe 2. The water baffle 4 reduces water accumulation at the construction site of the sealing wall 1, reduces the impact of water flow in the drainage pipe 6 on the construction of the sealing wall 1, facilitates the construction of the sealing wall 1, broadens the time selection range for the construction of the sealing wall 1, and reduces the impact of external factors on the operation. In this embodiment, the water baffle 4 is vertically installed.

[0046] In one embodiment, the top height of the baffle plate 4 is 0-3 cm higher than the top of the drain pipe 2, and the hollow structure 41 is a through hole structure.

[0047] The baffle plate 4 is provided with a connecting pipe 42 that is fixedly connected to the edge of the hollow structure 41. The connecting pipe 42 is inserted into the drainage pipe 2, and the outer wall of the connecting pipe 42 matches the inner wall of the drainage pipe 2. In this application, the baffle plate 4 and the drainage pipe 2 adopt a detachable insertion method, which allows the baffle plate 4 to be removed when the height of the sealing wall 1 is higher than the drainage pipe 2, thus preventing water from accumulating between the baffle plate 4 and the sealing wall 1 after the sealing is completed.

[0048] A guide plate 5 is provided at the bottom of the side of the water baffle 4 facing away from the sealing wall 1. The bottom surface of the guide plate 5 is in contact with the bottom wall of the drainage pipe 6. The guide plate 5 covers the bottom wall of the drainage pipe 6. The water in the drainage pipe 6 flows to the top of the guide plate 5 and accumulates at the water baffle 4. The guide plate 5 can support the water baffle 4 and the drainage pipe 2. At the same time, the pressure of the water accumulated above the guide plate 5 can improve the stability of the water baffle 4 in the pipe, reduce the shaking of the water baffle 4, and reduce the water flow from the water baffle 4 to the construction position of the sealing wall 1.

[0049] In this embodiment, the drainage pipe 6 has a circular cross-section, the baffle plate 4 is an arc-shaped plate, the outer periphery of the baffle plate 4 is composed of arc segments and chords, the arc segments of the outer periphery of the baffle plate 4 match the inner diameter of the drainage pipe 6, and the chord of the baffle plate 4 is set horizontally; the guide plate 5 is an arc-shaped plate, the guide plate 5 is arc-shaped and matches the inner diameter of the drainage pipe 6, the lower surface of the guide plate 5 is attached to the bottom inner wall of the drainage pipe 6, and the height of the guide plate 5 is the same as the height of the baffle plate 4.

[0050] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.

Claims

1. A water-sealing structure for pipes, characterized in that, include: A sealing wall (1) is located inside one end of the drainage pipe (6), and the sealing wall (1) is used to seal one end of the drainage pipe (6); A drainage pipe (2) is installed on the sealing wall (1). One end of the drainage pipe (2) is located inside the drainage pipe (6), and the other end of the drainage pipe (2) is located outside the drainage pipe (6). A drainage valve (21) is provided on the drainage pipe (2) located outside the drainage pipe (6). The drainage pipe (2) and the sealing wall (1) are sealed together. The drainage pipe (2) is located at the bottom of the sealing wall (1). The liquid level pipe (3) is located on the side of the sealing wall (1) facing away from the drainage pipe (6). The top of the liquid level pipe (3) is connected to the outside, and the bottom of the liquid level pipe (3) is connected to a water pipe (31). The end of the water pipe (31) away from the liquid level pipe (3) passes through the sealing wall (1) and extends into the pipe.

2. The water-filled pipeline sealing structure according to claim 1, characterized in that, The distance between the bottom of the drainage pipe (2) and the bottom of the inner wall of the drainage pipe (6) is 8-12 cm.

3. The water-filled pipeline sealing structure according to claim 1, characterized in that, The line connecting the center of the drainage pipe (2) and the center of the drainage pipe (6) is parallel to the vertical direction.

4. The water-filled pipeline sealing structure according to claim 1, characterized in that, The distance between the bottom wall of one end of the water pipe (31) inside the drainage pipe (6) and the top of the drain pipe (2) is 8-12 cm.

5. The water-filled pipeline sealing structure according to claim 1, characterized in that, The sealing wall (1) has a vertically set scale (32) on the side facing away from the inside of the drainage pipe (6).

6. The water-filled pipeline sealing structure according to claim 2, characterized in that, The drain pipe (2) is provided with a baffle plate (4) at one end of the drain pipe (6). The bottom edge of the baffle plate (4) is attached to the bottom inner wall of the drain pipe (6). The baffle plate (4) is provided with a hollow structure (41) aligned with the water inlet end of the drain pipe (2). The edge of the hollow structure (41) is connected to the drain pipe (2). The end of the drain pipe (2) extending out of the drain pipe (6) is provided with a support block. The support block and the baffle plate (4) are used to support both ends of the drain pipe (6) so that the bottom of the drain pipe (2) and the bottom of the inner wall of the drain pipe (6) are kept apart. The height of the top of the baffle plate (4) is greater than the center height of the drain pipe (2) and less than half the internal height of the drain pipe (6).

7. The water-filled pipeline sealing structure according to claim 6, characterized in that, The top of the baffle plate (4) is 0-3 cm higher than the top of the drain pipe (2).

8. The water-filled pipeline sealing structure according to claim 7, characterized in that, The baffle plate (4) is provided with a connecting pipe (42) that is fixedly connected to the edge of the hollow structure (41). The connecting pipe (42) is inserted into the drainage pipe (2), and the outer wall of the connecting pipe (42) matches the inner wall of the drainage pipe (2).

9. The water-filled pipeline sealing structure according to claim 8, characterized in that, The bottom of the water baffle (4) on the side facing away from the sealing wall (1) is provided with a guide plate (5), and the bottom surface of the guide plate (5) is in contact with the bottom wall of the drainage pipe (6).