A prefabricated floor slab and prefabricated beam assembly construction structure
By setting up quick-connection structures on precast floor slabs and precast beams, and combining mechanical and wet connections, the problems of low construction efficiency and easy connection failure in existing technologies are solved, and the rapid installation of high-efficiency and high-strength precast floor slabs and precast beams is achieved.
Patent Information
- Application Number
- CN202522595766.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-08
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2035-12-08
AI Technical Summary
The existing wet method for connecting precast floor slabs and precast beams has low construction efficiency, and the dry mechanical connection is prone to failure.
A quick-connection structure is set on the precast floor slabs and precast beams, combining mechanical and wet connections. By filling the installation grooves of the precast floor slabs with mortar, the precast floor slabs and precast beams can be quickly fixed.
It improves the strength and efficiency of the connection, enhances the anti-overturning and anti-pull-out properties, and meets the requirements for rapid installation.
Smart Images

Figure CN224955259U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of prefabricated building construction technology. Background Technology
[0002] Regarding the installation of precast floor slabs, the first installation method is wet connection, which involves overlapping both ends of the precast floor slab onto a precast beam and installing it using wet grouting. For example, patent document CN 218622630U discloses a connection structure between a precast floor slab and a precast beam, which includes a fully precast floor slab and a precast concrete beam. A reserved overlapping layer is provided at the connection between the fully precast floor slab and the precast beam; this reserved overlapping layer is a reserved concrete post-pouring strip. The shape of the joint between the fully precast floor slab and the concrete post-pouring strip is adapted to each other and is stepped. This technology achieves the connection between the precast floor slab and the precast beam through the post-pouring strip.
[0003] Regarding the installation of precast floor slabs, the second method is dry mechanical assembly connection, such as bolted connections. CN202121984471.2 discloses a connection node between a precast floor slab and a precast beam, including a precast floor slab and a precast beam. Multiple fourth connection holes are pre-drilled at the ends of the precast floor slabs. Two rows of protruding reinforcing bars are embedded on the beam surface corresponding to the fourth connection holes on the precast floor slabs. The ends of two adjacent precast floor slabs overlap the precast beam, and the fourth connection holes of the two precast floor slabs are respectively fitted onto an adjacent row of protruding reinforcing bars on the precast beam. Mortar is filled into each of the fourth connection holes and the first joint between the two precast floor slabs. The advantage of this method is its speed and efficiency, but the disadvantage is that bolted connections are prone to failure. Utility Model Content
[0004] To address the shortcomings of existing technologies, this utility model provides an assembled construction structure for precast floor slabs and precast beams, which solves the problem of low construction efficiency caused by the large area of post-pouring strips in existing wet connection technologies.
[0005] The technical solution adopted by this utility model to solve its technical problem is as follows: A prefabricated floor slab and prefabricated beam assembly construction structure includes a prefabricated floor slab and a prefabricated beam, characterized in that: a connecting unit with an upward protrusion is provided at intervals on the prefabricated beam; a conical installation groove is provided in the prefabricated floor slab; the prefabricated floor slab is placed on the prefabricated beam; the connecting unit passes through the installation groove from bottom to top and installs a fixing component; the edge of the fixing component is pressed against the wedge-shaped surface of the installation groove and tightened by a nut; and mortar is filled in the interlocking installation groove.
[0006] Furthermore, the mounting groove is located at the edge and / or center of the precast floor slab.
[0007] Furthermore, the connecting unit consists of multiple connecting bolts.
[0008] Furthermore, the precast beam has a rectangular or I-shaped cross-section.
[0009] Furthermore, the fixing component is a steel plate stamping part with bolt holes.
[0010] Furthermore, the ends of the precast floor slabs are provided with connecting parts and clearance parts, and the connecting parts and clearance parts of two adjacent precast floor slabs are assembled in a Z-shape.
[0011] A prefabricated floor slab and prefabricated beam assembly construction structure includes prefabricated floor slabs and prefabricated beams, characterized in that: a square pyramidal boss protruding upwards is provided on the prefabricated beam at intervals; a square pyramidal mounting groove is provided in the prefabricated floor slab in the opposite direction; the prefabricated floor slab is placed on the prefabricated beam; the square pyramidal mounting groove and the square pyramidal boss are interlocked and fitted, and mortar is filled in the interlocking square pyramidal mounting groove.
[0012] Furthermore, the mortar is a micro-expansion mortar.
[0013] Furthermore, the ends of the precast floor slabs are provided with connecting parts and clearance parts, and the connecting parts and clearance parts of two adjacent precast floor slabs are assembled in a Z-shape.
[0014] Furthermore, the precast floor slabs are assembled using a tongue-and-groove joint.
[0015] The beneficial effects of this utility model are: This technology improves the strength and efficiency of connections by setting up quick-connect structures on precast floor slabs and precast beams, and by combining mechanical and wet connections. The implementation effect of this technology will be further explained below with reference to the embodiments. Attached Figure Description
[0016] Figure 1 This is a construction structure diagram of Example 1.
[0017] Figure 2 This is a floor plan view of Example 1.
[0018] Figure 3 This is a partial sectional view of the edge beam.
[0019] Figure 4 This is a partial sectional view of the central beam.
[0020] Figure 5 This is a three-dimensional view of the fixed component.
[0021] Figure 6 This is a 3D view of a precast beam.
[0022] Figure 7 This is a 3D view of a precast floor slab.
[0023] Figure 8 This is a construction structure diagram for Example 2.
[0024] Figure 9 This is a plan view of Example 2.
[0025] Figure 10 This is a 3D view of a precast floor slab.
[0026] Figure 11 This is a construction structure diagram for Example 3.
[0027] In the picture: 10 Precast floor slab, 11 Installation groove, 12 Square pyramidal installation groove, 13 Connection part, 14 Clearance part, 20 Precast beam, 21 Connection unit, 22 Square pyramidal boss. 30 Fixing components, 31 Nuts, 40 Mortar. Detailed Implementation
[0028] A prefabricated floor slab and prefabricated beam assembly construction structure includes a prefabricated floor slab 10 and a prefabricated beam 20, which are rapidly constructed using an assembly construction process.
[0029] In this embodiment, both the precast floor slab 10 and the precast beam 20 are precast reinforced concrete components, which are precast in the factory and transported to the construction site for construction.
[0030] Example 1 refer to Figures 1 to 7 The precast beam 20 has a rectangular or I-shaped cross section. Inside the precast beam 20, there is a tied steel cage, and at the top of the precast beam 20, there is an upwardly protruding connecting unit 21. The connecting unit 21 is composed of an array of multiple connecting bolts, which are used for installation and connection with the precast floor slab 10.
[0031] Furthermore, the spacing between the multiple connection units 21 mentioned above is set at about 1 meter, that is, there is sufficient spacing to achieve rapid connection.
[0032] The precast floor slab 10 has a steel mesh inside and an installation groove 11 is provided at the edge of the precast floor slab 10. The installation groove 11 is a C-shaped groove that opens to the side and has a conical structure, that is, the side of the installation groove 11 is wedge-shaped. This structure is conducive to the rapid fixing of the precast floor slab 10.
[0033] The installation method is as follows: The edges of the precast floor slab 10 are overlapped onto the precast beam 20. Specifically, two adjacent precast floor slabs 10 are spliced on the same precast beam 20, so that two mounting grooves 11 surround the connecting unit 21 and form a square or rectangular insertion cavity. After installation, a fixing member 30 is inserted into the insertion cavity. The fixing member 30 passes through the connecting bolt. Under the action of gravity, the fixing member 30 falls and is locked onto the side (wedge-shaped surface) of the mounting groove 11. After tightening with nuts 31, the precast floor slab 10 is initially fixed. Finally, micro-expansion mortar 40 is applied to the insertion cavity. After the mortar 40 solidifies, the above-mentioned prefabricated construction is completed. This embodiment combines mechanical connection and wet local construction to achieve small-area connection and rapid installation of precast floor slabs 10.
[0034] The innovative design in this embodiment, through the mechanical connection and grouting connection of the mounting groove 11, the fixing component 30 and the connecting bolts and nuts 31, has a stronger anti-overturning ability.
[0035] Furthermore, in order to solve the installation problem of the precast floor slab 10 in the large-span precast beam 20, it is necessary to extend the length of the precast floor slab 10. The design scheme is to add a square or rectangular installation groove 11 in the middle of the precast floor slab 10. The installation groove 11 is used to plug and connect with the connection unit 21 in the middle of the precast beam 20 to improve the installation strength.
[0036] Furthermore, the aforementioned fixing member 30 is preferably a steel plate stamping part, and the bolt holes are formed in one piece for mating with the connecting bolts.
[0037] Example 2 refer to Figures 8 to 10 In this embodiment, the precast floor slab 10 has a connecting portion 13 and a clearance portion 14 at both ends. The connecting portion has an outward extension structure compared to the clearance portion. The connecting portion is used to overlap the precast beam 20, and a square or rectangular mounting groove 11 is provided at the connecting portion. Rapid installation is achieved through fixing components 30 and grouting. The clearance portion avoids the precast beam 20 and forms a Z-shaped assembly with the connecting portion on another adjacent precast floor slab 10. This connection also enables rapid installation of the precast floor slab 10.
[0038] Furthermore, a tongue-and-groove design is provided on the side of the precast floor slab 10, that is, at the assembly point, so that two adjacent precast floor slabs 10 can form a tongue-and-groove fit during installation.
[0039] Example 3 In this embodiment, reference Figure 11A square pyramidal boss 22 is prefabricated on the precast beam, and a square pyramidal mounting groove 12 is set in the opposite direction on the precast floor slab 10. The size of the square pyramidal boss 22 is smaller than the size of the square pyramidal mounting groove 12, which makes the insertion smooth. This construction structure uses the square pyramidal mounting groove 12 prefabricated on the precast floor slab 10 and the square pyramidal boss 22 prefabricated in the opposite direction on the precast beam 20 for insertion and connection. The formed insertion gap is filled with compliant micro-expansion mortar 40 for secondary grouting connection. The grouting volume is small. After hardening, it forms a wedge-shaped filling connection block with a wedge-shaped locking effect, which can prevent the precast floor slab 10 and the precast beam 20 from falling off. It has tensile strength in the vertical direction and higher connection strength.
[0040] Another advantage of this structure is that there is a large space between the square pyramidal mounting groove and the square pyramidal boss, which does not require high assembly precision and meets the requirements for rapid assembly on the construction site.
[0041] The embodiments described above are merely preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model. Without departing from the spirit of the present utility model, all modifications and improvements to the present utility model by those skilled in the art should fall within the protection scope defined by the claims of the present utility model.
Claims
1. A prefabricated floor slab and prefabricated beam assembly construction structure, comprising prefabricated floor slabs and prefabricated beams, characterized in that: A connecting unit that protrudes upwards is provided at intervals on the precast beam; The precast floor slab is provided with a conical installation groove. The precast floor slab is placed on the precast beam. The connecting unit passes through the installation groove from bottom to top and installs a fixing component. The edge of the fixing component is pressed against the wedge-shaped surface of the installation groove and is tightened by a nut. Mortar is filled in the installation groove where the connection is made.
2. The precast floor slab and precast beam assembly construction structure according to claim 1, characterized in that, The mounting groove is located at the edge and / or center of the precast floor slab.
3. The precast floor slab and precast beam assembly construction structure according to claim 1, characterized in that, The connecting unit consists of multiple connecting bolts.
4. The precast floor slab and precast beam assembly construction structure according to claim 1, characterized in that, The precast beam has a rectangular or I-shaped cross-section.
5. The precast floor slab and precast beam assembly construction structure according to claim 1, characterized in that, The fixing component is a steel plate stamping part with bolt holes.
6. The precast floor slab and precast beam assembly construction structure according to claim 1, characterized in that, The ends of the precast floor slabs are provided with connecting parts and clearance parts, and the connecting parts and clearance parts of two adjacent precast floor slabs are assembled in a Z-shape.
7. A prefabricated floor slab and prefabricated beam assembly construction structure, comprising prefabricated floor slabs and prefabricated beams, characterized in that: A square pyramidal boss protruding upwards is provided on the precast beam at intervals; The precast floor slab is provided with a square pyramidal mounting groove arranged in the opposite direction. The precast floor slab is placed on the precast beam. The square pyramidal mounting groove and the square pyramidal boss are interlocked and fitted, and mortar is filled in the interlocking square pyramidal mounting groove.
8. The precast floor slab and precast beam assembly construction structure according to claim 7, characterized in that, The mortar is a micro-expansion mortar.
9. The precast floor slab and precast beam assembly construction structure according to claim 7, characterized in that, The ends of the precast floor slabs are provided with connecting parts and clearance parts, and the connecting parts and clearance parts of two adjacent precast floor slabs are assembled in a Z-shape.
10. The precast floor slab and precast beam assembly construction structure according to claim 7, characterized in that, The precast floor slabs are assembled using a tongue-and-groove joint.
Citation Information
Patent Citations
Connecting joint of prefabricated floor slab and prefabricated beam
CN216075579U
Connecting structure for reserved laminated post-cast strip fully-prefabricated floor slab and prefabricated beam
CN218622630U