Main transformer layout structure of the semi-underground powerhouse of the hydropower station

By arranging the main transformer on the roof of the semi-underground plant, combined with a reinforced beam structure and maintenance access, the problems of large workload and safety risks under the traditional layout method were solved, achieving the effects of saving investment and shortening the construction period.

CN224958490UActive Publication Date: 2026-11-10CHINA WATER RESOURCES BEIFANG INVESTIGATION DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522605242.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-09
Publication Date
2026-11-10
Estimated Expiration
2035-12-09

AI Technical Summary

Technical Problem

In water conservancy and hydropower projects, especially in mountainous or steep terrain areas, the traditional main transformer layout requires large-scale site excavation, which increases the amount of civil engineering work and investment costs. In addition, there are issues with slope stability and support safety, which affect the complexity of the project and the construction period.

Method used

The main transformer is placed on the roof of the semi-underground plant, using the roof concrete slab and reinforced beam structure as a load-bearing platform. Combined with the emergency oil tank, firewalls, and installation and maintenance access, a complete force transmission system is formed. The walkway excavated from the plant is used as a maintenance access, thus optimizing the layout.

Benefits of technology

It effectively saves on project investment, shortens the construction period, improves project safety and land resource utilization efficiency, optimizes the overall layout, and avoids the high risks of site excavation and slope protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224958490U_ABST
    Figure CN224958490U_ABST
Patent Text Reader

Abstract

This utility model belongs to the field of water conservancy and hydropower engineering technology, specifically relating to a main transformer layout structure in a semi-underground powerhouse of a hydropower station. It includes a concrete roof slab, a roof reinforcing beam structure, a main transformer foundation, and installation and maintenance access. The main transformer foundation is located on the concrete roof slab and supports the main transformer. The roof reinforcing beam structure is located at the lower part of the concrete roof slab and supports the loads transmitted by the roof slab and the main transformer foundation. The installation and maintenance access is located on one side of the roof, forming a passage for cranes to pass during the installation and maintenance of the main transformer. This utility model, by arranging the main transformer on the roof of the semi-underground powerhouse, fully utilizes the roof space and effectively avoids the high costs and slope protection risks associated with additional excavation and leveling in steep terrain or limited plant space.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to the technical field of water conservancy and hydropower engineering, and particularly relates to a main transformer arrangement structure of a semi-underground powerhouse of a hydropower station. BACKGROUND

[0002] In the water conservancy and hydropower engineering, the arrangement of the powerhouse of the hydropower station is often limited by the terrain, geology and site conditions, especially in mountainous or steep terrain areas, the space of the powerhouse area is extremely limited. The traditional semi-underground powerhouse of the hydropower station usually arranges the main transformer on the ground or platform near the main powerhouse, so as to facilitate the connection with the generator bus and operation and maintenance. However, this arrangement often needs a large area of flat site, and in the steep terrain conditions, large-scale excavation, slope cutting or filling is often needed, which not only increases the civil engineering quantity and investment cost, but also easily forms a high slope, causing problems of slope stability and support safety.

[0003] In addition, the main transformer has a large volume and heavy weight, and its foundation and installation and maintenance passage also need to occupy more space, which further aggravates the difficulty of the arrangement of the powerhouse area. In the prior art, in order to solve the problem of the arrangement of the main transformer, the overall layout of the powerhouse is often adjusted or a support structure is added, which leads to the increase of the complexity of the project, the extension of the construction period, and is not conducive to the compact arrangement of the overall hub. UTILITY MODEL CONTENT

[0004] The utility model aims at providing a main transformer arrangement structure of a semi-underground powerhouse of a hydropower station to solve the problems in the background art.

[0005] In order to achieve the above-mentioned purpose, the utility model provides the following technical scheme: a main transformer arrangement type of a semi-underground powerhouse of a hydropower station, comprising a powerhouse roof concrete slab, a roof reinforced beam system structure, a main transformer foundation and an installation and maintenance traffic; the main transformer foundation is arranged on the powerhouse roof concrete slab and is used for bearing the main transformer; the roof reinforced beam system structure is arranged at the lower part of the powerhouse roof concrete slab and is used for supporting the load transmitted by the powerhouse roof concrete slab and the main transformer foundation; the installation and maintenance traffic is arranged on one side of the powerhouse roof and forms a passage for the crane to pass through when the main transformer is installed and maintained.

[0006] Preferably, the main transformer foundation comprises an accident oil pool and a track for the installation and maintenance of the main transformer.

[0007] Preferably, the accident oil pool is connected with an oil discharge pipe for discharging the accident oil to an oil-water separation pit.

[0008] Preferably, the installation and maintenance traffic is arranged in combination with the horse path formed when the powerhouse is excavated.

[0009] Preferably, firewalls are arranged on both sides of the main transformer.

[0010] Preferably, the main transformer is an open-air structure or a closed structure.

[0011] Preferably, the finished roof of the factory building's concrete slab is provided with a drainage slope.

[0012] Preferably, a drainage ditch is provided on the mountainside where the maintenance and repair traffic is installed.

[0013] The beneficial effects of this utility model are as follows: By arranging the main transformer on the roof of the semi-underground factory building, this utility model makes full use of the roof space of the factory building, effectively avoiding the high costs and slope support risks caused by additional excavation and leveling of the site under conditions of steep terrain or limited factory space. It not only significantly saves project investment and shortens the construction period, but also optimizes the overall layout of the hub and improves project safety and land resource utilization efficiency. Attached Figure Description

[0014] Figure 1 This is a top view of the present invention; Figure 2 This is a cross-sectional view of the present invention. Detailed Implementation

[0015] In the description of this disclosure, it should be understood that the terms “center,” “upper,” “lower,” “front,” “rear,” “left,” “right,” “vertical,” “horizontal,” “top,” “bottom,” “inner,” and “outer,” etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this disclosure and simplifying the description, and are not intended to indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this disclosure.

[0016] The terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this disclosure, unless otherwise stated, "a plurality of" means two or more.

[0017] In the description of this disclosure, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," "linking," and "fixing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection, an electrical connection, or a communication connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. Those skilled in the art can understand the specific meaning of the above terms in this disclosure according to the specific circumstances.

[0018] The specific embodiments of this utility model are described in detail below with reference to the accompanying drawings and preferred embodiments.

[0019] like Figure 1 and Figure 2 As shown, this utility model provides a main transformer layout for a semi-underground powerhouse in a hydropower station, specifically implemented as follows: First, a horizontal concrete roof slab 1 is poured on top of the completed semi-underground powerhouse 7, which also serves as the load-bearing platform for the main transformer. To bear the concentrated load of the main transformer 5, a structurally reinforced roof beam system 2 is specially installed under the concrete roof slab 1. This beam system is connected to the frame 6 and foundation of the powerhouse, forming a complete force transmission system to ensure the safe transfer of the main transformer load to the foundation.

[0020] On the concrete slab 1 of the factory roof, the main transformer foundation 3 is poured. This foundation is not only used to fix the main transformer 5, but also integrates an emergency oil tank and has a pre-embedded oil drain pipe leading to the oil-water separation pit. At the same time, the top surface of the foundation is equipped with a track to facilitate the positioning and movement of the main transformer during maintenance.

[0021] After the main transformer 5 is in place, firewalls must be constructed on both sides of it in accordance with relevant safety regulations. The main transformer itself can be arranged in an open-air layout or a closed layout with an enclosure, depending on the climate and environmental conditions of the project site. If a closed layout is adopted, additional ventilation and heat dissipation facilities must be considered.

[0022] For the installation and maintenance of the main transformer, the walkway already formed during the factory excavation will be used as the installation and maintenance access road 4, leading to the factory roof. This access road must have sufficient width and load-bearing capacity to meet the passage requirements of vehicles transporting and hoisting the main transformer. In addition, a drainage slope will be set on the final finishing layer of the concrete slab 1 of the factory roof, and a drainage ditch will be constructed on the hillside of the installation and maintenance access road 4 to effectively drain water from the roof and slope, ensuring operational safety.

[0023] Through the above specific implementation, this utility model successfully arranges the main transformer on the roof of the factory building, effectively solving the technical problems of difficult main transformer placement and large amount of excavation work under steep terrain conditions.

[0024] It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principle of this utility model, and these improvements and modifications should also be considered within the scope of protection of this utility model.

Claims

1. A main transformer layout structure for a semi-underground powerhouse in a hydropower station, characterized in that: The facility includes a concrete roof slab (1), a roof reinforcing beam structure (2), a main transformer foundation (3), and an installation and maintenance access road (4). The main transformer foundation (3) is located on the concrete roof slab (1) and is used to support the main transformer (5). The roof reinforcing beam structure (2) is located at the lower part of the concrete roof slab (1) and is used to support the loads transmitted by the concrete roof slab (1) and the main transformer foundation (3). The installation and maintenance access road (4) is located on one side of the roof and forms a passage for cranes to pass through during the installation and maintenance of the main transformer (5).

2. The main transformer layout structure of a semi-underground powerhouse in a hydropower station according to claim 1, characterized in that: The main transformer foundation (3) includes an emergency oil tank and a track for installing and maintaining the main transformer (5).

3. The main transformer layout structure of a semi-underground powerhouse in a hydropower station according to claim 2, characterized in that: The accident oil pool is connected to an oil drain pipe for draining the accident oil into an oil-water separation pit.

4. The main transformer layout structure of a semi-underground powerhouse in a hydropower station according to claim 1, characterized in that: The installation and maintenance access road (4) is arranged in combination with the walkway formed during the excavation of the factory building.

5. The main transformer layout structure of a semi-underground powerhouse in a hydropower station according to claim 1, characterized in that: Firewalls are installed on both sides of the main transformer (5).

6. The main transformer layout structure of a semi-underground powerhouse in a hydropower station according to claim 1, characterized in that: The main transformer (5) is an open-air structure or a closed structure.

7. The main transformer layout structure of a semi-underground powerhouse in a hydropower station according to claim 1, characterized in that: The finished roof of the factory building's concrete slab (1) is provided with a drainage slope.

8. The main transformer layout structure of a semi-underground powerhouse in a hydropower station according to claim 1, characterized in that: A drainage ditch is provided on the mountainside of the installation and maintenance transportation (4).