An auxiliary device for applying non-curing waterproof coating to basement exterior walls
By improving the connection and clamping components, the problems of structural instability and uneven reference surface in the construction of waterproof coatings for basement exterior walls have been solved, thus achieving uniformity of the coating and safety of construction.
Patent Information
- Application Number
- CN202522320331.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-01
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-11-01
AI Technical Summary
In the existing technology, the structural connection reliability of the auxiliary device for the construction of non-curing waterproof coatings on the exterior walls of basements is low, which causes shaking during construction, fails to provide a flat working reference surface, affects the uniformity of coating spraying or scraping, and poses material waste and waterproofing risks.
The connection and clamping components employ a double-locking structure, including a connection method of initial bolt fixing and secondary locking through wedge block engagement. Combined with the screw-driven clamping components, this ensures a stable connection between the uprights and crossbars, and the clamping components tension the wire mesh to form a flat working surface.
It improves the overall structural stability of construction auxiliary devices, ensures the uniformity of coating thickness, enhances construction quality and safety, and avoids material waste and waterproofing risks.
Smart Images

Figure CN224982546U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of auxiliary equipment for building waterproofing construction, and in particular to an auxiliary device for the construction of non-curing waterproof coatings for basement exterior walls. Background Technology
[0002] Waterproofing of basement exterior walls is a crucial aspect of building quality control. Non-curing waterproof coatings are widely used due to their excellent creep resistance and self-healing properties. To ensure waterproofing effectiveness, the application of these coatings typically requires a uniform, continuous, and flawless coating thickness. In actual construction, workers often need to utilize scaffolding and other auxiliary equipment for working at heights.
[0003] Currently, traditional coupler-type steel pipe scaffolding is commonly used as an auxiliary platform on construction sites. This type of scaffolding uses the friction of couplers to secure the uprights and horizontal bars, and its connection method is relatively simple. During construction, due to the continuous action of dynamic loads such as personnel movement, equipment operation, and high-pressure spraying, the coupler connection points are prone to slight loosening or displacement, causing the entire scaffolding frame to sway and lack stability. This unstable working environment directly affects the workers' operational precision and makes it difficult to ensure the uniformity of paint spraying or scraping.
[0004] To further control coating thickness, some processes attempt to lay wire mesh on scaffolding as a reference surface for construction. However, due to the inherent instability of the scaffolding structure, simply hanging or binding the wire mesh to it will also result in uneven stress and sagging, failing to create a truly flat and taut reference plane. Ultimately, this leads to localized areas of excessively thick or thin coating on the wall surface, affecting not only the overall quality of the waterproofing layer but also potentially causing material waste or waterproofing hazards. This has become a core technical challenge in improving the construction quality of non-curing waterproof coatings.
[0005] Therefore, this utility model proposes an auxiliary device for the construction of non-curing waterproof coatings for basement exterior walls to address the shortcomings of existing technologies. Utility Model Content
[0006] To overcome the above shortcomings, this utility model provides an auxiliary device for the construction of non-curing waterproof coatings on basement exterior walls. It aims to improve the problems of low structural connection reliability leading to shaking during construction and the inability to provide a flat and taut working reference surface for the wire mesh in auxiliary devices used for the construction of non-curing waterproof coatings on basement exterior walls. This utility model aims to provide an auxiliary device for the construction of non-curing waterproof coatings on basement exterior walls with an improved structure that can effectively solve the above problems.
[0007] To achieve the above objectives, this utility model provides the following technical solution: an auxiliary device for the construction of non-curing waterproof coating on the exterior wall of a basement, comprising: a vertical pole, a connecting component, and a horizontal bar; the connecting component includes a first connecting block and a second connecting block, and one end of the horizontal bar is fixedly connected to the second connecting block; the device further includes a clamping component.
[0008] The connecting assembly achieves ultra-high stability through a double locking structure. The first connecting block and the second connecting block are initially threaded together by a second bolt. A wedge block is slidably arranged inside the first connecting block, and a third bolt for driving the wedge block to slide is rotatably arranged inside the wedge block. The sliding of the wedge block can drive the locking block at its bottom to engage and lock with the second connecting block, completing the secondary fixation.
[0009] The clamping assembly is used to precisely tension the wire mesh. The clamping assembly includes a first fixing block fixed to the upper surface of the crossbar, a second fixing block fixed to the lower surface of the first fixing block, a second slider sliding on the second fixing block, a clamping block fixed to one side of the second slider, and a lead screw threadedly connected to the second slider and used to drive the second slider to slide.
[0010] Preferably, the second connecting block is also fixedly connected to the end of a diagonal brace to form a more stable triangular support structure.
[0011] Preferably, a first slider is fixedly connected to both sides of the wedge block, and the inner wall of the first connecting block is provided with a sliding groove that slides with the first slider to ensure the smoothness of the movement of the wedge block during secondary locking.
[0012] Preferably, a third slider is fixedly connected to both sides of the clamping block, and a guide groove is provided on the inner wall of the first fixed block to slide with the third slider, so as to provide precise guidance for the linear movement of the clamping block during the tensioning process.
[0013] Preferably, the second connecting block has a slot that matches the locking block to ensure the reliability of the secondary locking engagement.
[0014] Preferably, the device further includes a flange and a first bolt, the flange being fixedly connected to the bottom of the upright, and the first bolt passing through the flange to fix the device to the ground, thereby enhancing the overall anti-overturning capability.
[0015] Preferably, both ends of the lead screw are rotatably supported on the first fixed block to ensure the smoothness of the lead screw rotation and the transmission efficiency.
[0016] Preferably, the clamping block is used to conveniently and quickly clamp or release the edge of the wire mesh.
[0017] This utility model has the following beneficial effects:
[0018] 1. In this utility model, by setting up a double-fixed connection component that is initially fixed by bolts and then locked a second time by wedge blocks engaging with slots, the problem of the existing scaffold connection structure being simple and unreliable, and prone to shaking during construction, resulting in an unstable overall frame, is solved. This achieves the technical effect of greatly improving the overall structural rigidity and stability of the device, and provides a safe and reliable working platform for subsequent construction.
[0019] 2. This utility model solves the problem in the prior art where relying on manual binding or simple hanging to fix the wire mesh results in loose wire mesh, uneven surface, and inability to provide a flat working reference surface for coating construction. By setting a clamping component driven by a lead screw and guided by a slider and guide groove, it achieves the technical effect of tensioning the wire mesh into a flat and taut working support surface, thereby effectively ensuring the uniform thickness of the waterproof coating and improving the construction quality. Attached Figure Description
[0020] Figure 1 This is a three-dimensional structural diagram of an auxiliary device for the construction of non-curing waterproof coating on basement exterior walls, as proposed in this utility model.
[0021] Figure 2 This is a schematic diagram of the upright section of an auxiliary device for the construction of non-curing waterproof coating on basement exterior walls, as proposed in this utility model.
[0022] Figure 3 This is a schematic diagram of the card block structure of an auxiliary device for the construction of non-curing waterproof coating on basement exterior walls proposed in this utility model;
[0023] Figure 4 This is a schematic diagram of the clamping block structure of an auxiliary device for the construction of non-curing waterproof coating on basement exterior walls, as proposed in this utility model.
[0024] Legend:
[0025] 1. Upright pole; 2. Diagonal brace; 3. Horizontal bar; 4. Flange; 5. First bolt; 6. Connecting assembly; 601. First connecting block; 602. Second bolt; 603. Second connecting block; 604. Wedge block; 605. Third bolt; 606. First slider; 607. Clamping block; 7. Clamping assembly; 701. First fixing block; 702. Clamping block; 703. Second fixing block; 704. Second slider; 705. Lead screw; 706. Third slider. Detailed Implementation
[0026] Please refer to Figures 1 to 4This utility model provides an auxiliary device for the construction of non-curing waterproof coating on the exterior wall of a basement. The device aims to solve the problems in the prior art where the scaffolding structure connection is not reliable enough, causing shaking during construction, and cannot provide a flat working reference surface for coating construction.
[0027] The auxiliary device for the construction of non-curing waterproof coating on the basement exterior wall includes a pole 1 and a horizontal bar 3 connected to the pole 1 via a connecting component 6. The pole 1 and the horizontal bar 3 together form the grid-like base frame of the device. To ensure the stability of the entire device, a flange 4 is fixedly connected to the bottom of the pole 1. A through hole is opened on the flange 4, and the first bolt 5 passes through the through hole to fix the flange 4 to the ground.
[0028] The connecting component 6 includes a first connecting block 601 and a second connecting block 603. During installation, the first connecting block 601 and the second connecting block 603 are detachably mounted on opposite sides of the upright 1 and initially fixed by a second bolt 602. The shank of the second bolt 602 passes through the first connecting block 601 and the upright 1 in sequence, and the threaded end of the second bolt 602 is threadedly connected to the second connecting block 603 to complete the initial locking. One end of the crossbar 3 and the end of the diagonal brace 2 are both fixedly connected to the second connecting block 603, thereby firmly connecting the upright 1, the crossbar 3 and the diagonal brace 2 into one unit.
[0029] To achieve double locking, a wedge block 604 is slidably disposed inside the first connecting block 601. A third bolt 605 for driving the wedge block 604 to slide is rotatably disposed inside the wedge block 604. A locking block 607 is fixedly connected to the bottom of the wedge block 604. A slot adapted to the locking block 607 is opened on the second connecting block 603. After the initial fixing is completed, the third bolt 605 is rotated, and the third bolt 605 drives the wedge block 604 to slide inside the first connecting block 601, thereby driving the locking block 607 to precisely engage and lock with the slot of the second connecting block 603, completing the secondary fixing. To ensure the stability of the sliding process of the wedge block 604, a first slider 606 is also fixedly connected to both sides of the wedge block 604. A groove for sliding cooperation with the first slider 606 is opened on the inner wall of the first connecting block 601.
[0030] On the grid-like base frame, a clamping assembly 7 is fixed on the upper surface of the crossbar 3. The clamping assembly 7 is used to tension and fix the wire mesh to form a flat working support surface. Specifically, the clamping assembly 7 includes a first fixing block 701 fixed to the upper surface of the crossbar 3. The first fixing block 701 provides a stable installation base for other moving parts of the clamping assembly 7.
[0031] A second fixed block 703 is fixed to the lower surface of the first fixed block 701. A second slider 704 slides on the second fixed block 703. A clamping block 702 for clamping the wire mesh is fixed to one side of the second slider 704. A lead screw 705 is threadedly connected to the second slider 704. The two ends of the lead screw 705 are rotatably supported on the first fixed block 701. By rotating the lead screw 705, the second slider 704 together with the clamping block 702 can be driven to slide precisely linearly, thereby generating a tensile force on the clamped wire mesh.
[0032] Meanwhile, to ensure that the clamping block 702 remains stable and does not deflect during the stretching process, a third slider 706 is fixedly connected to both sides of the clamping block 702. The inner wall of the first fixed block 701 is correspondingly provided with a guide groove that slides with the third slider 706. The sliding fit structure between the third slider 706 and the guide groove provides reliable guidance and limitation for the linear movement of the clamping block 702.
[0033] As a preferred embodiment, in order to further enhance the triangular stability of the entire frame, the end of the diagonal brace 2 is also fixedly connected to the second connecting block 603, and the other end of the diagonal brace 2 is connected to the adjacent upright 1 or horizontal bar 3 to form a stable triangular support structure.
[0034] As another preferred embodiment, in order to ensure the reliability of the engagement between the locking block 607 and the second connecting block 603, a slot adapted to the shape and size of the locking block 607 is provided on the second connecting block 603. The engagement between the locking block 607 and the slot is a tight fit to eliminate any connection gap after engagement.
[0035] As another preferred embodiment, in order to securely install the device on the construction ground, a flange 4 is fixedly connected to the bottom of the upright 1. The flange 4 has multiple through holes for the first bolts 5 to pass through. The flange 4 is fastened to the ground by the multiple first bolts 5, which increases the contact area between the device and the ground and improves the anti-overturning ability.
[0036] As another preferred embodiment, in order to ensure the smooth rotation of the lead screw 705 and the accuracy of transmission, the two ends of the lead screw 705 are rotatably supported on the first fixed block 701 by bearings, so that the lead screw 705 has low frictional resistance and high transmission efficiency when driving the second slider 704 to move.
[0037] Working principle: When constructing the frame and double locking, the first bolt 5 is used to firmly connect the upright 1 with the flange 4 to the ground. Then, the second connecting block 603 with the crossbar 3 and diagonal brace 2 is aligned with the upright 1, and the second bolt 602 is used to pass through the first connecting block 601 and the upright 1 and screwed into the second connecting block 603 to complete the initial fixation. After that, the operator rotates the third bolt 605 set in the wedge block 604. The third bolt 605 drives the wedge block 604 to slide stably in the internal groove of the first connecting block 601. The sliding of the wedge block 604 causes the locking block 607 at its bottom to engage precisely with the locking groove on the second connecting block 603. This double fixing method, which combines the axial pre-tightening of the bolts with the lateral locking of the wedge block 604, can completely eliminate the gaps and misalignments at the connection points, forming a grid frame with extremely high rigidity that does not shake during construction.
[0038] When tensioning the wire mesh, the edge of the wire mesh is placed into the clamping block 702 and clamped. Then, the lead screw 705 is rotated. Since the lead screw 705 and the second slider 704 are connected by a threaded transmission, the rotation of the lead screw 705 will drive the second slider 704 to slide on the second fixed block 703. The clamping block 702, which is fixed to one side of the second slider 704, will then produce a smooth linear movement, thereby applying a tensile force to the wire mesh. During the entire tensioning process, the third slider 706, which is fixed on both sides of the clamping block 702, slides in the guide groove of the first fixed block 701, providing precise guidance for the movement of the clamping block 702 and preventing deflection. By operating the clamping components 7 around the perimeter, the wire mesh is finally tensioned into a flat working surface, providing a reliable structural guarantee for the uniformity of subsequent coating construction.
Claims
1. A basement exterior wall non-curing waterproof coating construction auxiliary device, comprising: Pole (1); The connecting assembly (6) includes a first connecting block (601) detachably connected to the upright (1) and a second connecting block (603) disposed on the opposite side of the upright (1). The first connecting block (601) is threadedly connected to the second connecting block (603) by a second bolt (602) passing through the first connecting block (601) and the upright (1) in sequence. A wedge block (604) is slidably disposed inside the first connecting block (601), and a locking block (607) is fixedly connected to the bottom of the wedge block (604). A crossbar (3), one end of which is fixedly connected to the second connecting block (603), characterized in that, The wedge block (604) is rotatably provided with a third bolt (605) for driving the wedge block (604) to slide. The sliding of the wedge block (604) can drive the locking block (607) to engage and lock with the second connecting block (603). The device further includes a clamping assembly (7), which includes a first fixing block (701) fixed to the upper surface of the crossbar (3), a second fixing block (703) fixed to the lower surface of the first fixing block (701), and the clamping assembly (7) further includes a second slider (704) sliding on the second fixing block (703), a clamping block (702) fixed to one side of the second slider (704), and a lead screw (705) threadedly connected to the second slider (704) and used to drive the second slider (704) to slide.
2. The auxiliary device for constructing non-curing waterproof coating on basement exterior walls according to claim 1, characterized in that, The end of the diagonal brace (2) is also fixedly connected to the second connecting block (603).
3. The auxiliary device for constructing non-curing waterproof coating on basement exterior walls according to claim 1, characterized in that, The wedge block (604) is fixedly connected to the two sides of the first slider (606), and the inner wall of the first connecting block (601) is provided with a sliding groove that slides and engages with the first slider (606).
4. The auxiliary device for constructing non-curing waterproof coating on basement exterior walls according to claim 1, characterized in that, The clamping block (702) is fixedly connected to the two sides of the third slider (706), and the inner wall of the first fixing block (701) is provided with a guide groove that slides with the third slider (706).
5. The auxiliary device for constructing non-curing waterproof coating on basement exterior walls according to claim 1, characterized in that, The second connecting block (603) has a slot that is compatible with the card block (607).
6. The auxiliary device for constructing non-curing waterproof coating on basement exterior walls according to claim 1, characterized in that, The bottom of the upright (1) is fixedly connected to a flange (4), and the flange (4) has a through hole for the first bolt (5) to pass through.
7. The auxiliary device for constructing non-curing waterproof coating on basement exterior walls according to claim 1, characterized in that, The lower surface of the first fixing block (701) is fixed with a second fixing block (703), and the second slider (704) is slidably engaged with the upper surface of the second fixing block (703).
8. The auxiliary device for constructing non-curing waterproof coating on basement exterior walls according to claim 7, characterized in that, The two ends of the lead screw (705) are rotatably supported on the structure formed by the first fixing block (701) and the second fixing block (703).
