A telescopic passage and operating platform based on a lifting steel platform
By designing a retractable access road and operating platform on the jacking steel platform, including a retractable platform steel truss and foldable guardrails, the problem of time-consuming and labor-intensive installation and dismantling of the temporary operating platform of the jacking steel platform was solved, achieving the effect of simplifying operation and improving construction efficiency.
Patent Information
- Application Number
- CN202522722321.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-12-23
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-12-23
AI Technical Summary
The installation and dismantling of the existing temporary operating platform for lifting steel platforms is a large-scale undertaking, and it needs to be dismantled before lifting, which is time-consuming and labor-intensive.
Design a telescopic passage and operating platform based on a lifting steel platform, including a telescopic platform steel truss, a foldable guardrail and a hanging fixing frame, to realize the storage and protection functions of the telescopic passage and simplify the installation and disassembly process of the operating platform.
The design of the telescopic passage solves the problem of blind spots in the operation of the thick wall steel reinforcement of the core tube of super high-rise buildings, simplifies the installation and dismantling of temporary operation platforms, improves construction efficiency, and reduces manpower consumption.
Smart Images

Figure CN224982552U_ABST
Abstract
Description
Technical Field
[0001] This disclosure relates to the field of construction operation platform technology, and in particular to a telescopic channel and operation platform based on a lifting steel platform. Background Technology
[0002] The core tube of a super high-rise building is a crucial construction element, directly impacting the overall project's quality, schedule, and cost. Lifting steel platforms, with their high load-bearing capacity, fast construction speed, high safety performance, and high integration, have become the mainstream construction equipment for super high-rise building core tube construction. The inner and outer tube supports of the lifting steel platform serve as operating platforms for core tube rebar tying and steel structure construction. Due to the large wall thickness of the core tube in super high-rise buildings, tying the rebar at the connecting beam locations and the wall thickness direction rebar below the connecting beam openings cannot be performed while standing on the supports. Therefore, a temporary operating platform needs to be laid between the inner and outer supports, simultaneously serving as a personnel passage between them. This platform is dismantled before the lifting steel platform is fully lifted and then re-laid afterward. Currently, the temporary operating platform for lifting steel platforms is generally laid using steel planks or checkered steel plates, requiring a large workload and significant manpower for installation and subsequent dismantling. Therefore, the structure of the resulting operating platform needs optimization and improvement to address the aforementioned problems. Utility Model Content
[0003] In view of this, this disclosure proposes a telescopic channel and operating platform based on a lifting steel platform. The inner and outer brackets of the lifting steel platform are equipped with a telescopic channel platform as a temporary operating channel platform, which solves the problem of blind spots in the operation of thick wall steel reinforcement.
[0004] According to one aspect of this disclosure, a telescopic channel based on a lifting steel platform is provided. The lifting steel platform includes an inner hanging frame platform and an outer hanging frame platform. The telescopic channel is telescopically located at the bottom of the inner hanging frame platform of the lifting steel platform. The telescopic channel includes: The telescopic platform steel truss has inner and outer steel members arranged in parallel intervals on both sides along its length. Several first connecting beams are welded between the inner and outer steel members, and platform plates are provided on the inner and outer steel members. The foldable guardrail is folded 90 degrees and installed on the side of the steel truss of the telescopic platform near the outer steel member. The cantilever end connector is fixedly connected to one side of the external hanging frame platform and to the front end of the telescopic platform steel truss; The hanging and fixing frame is located at the bottom of the inner hanging platform and includes inner channel steel and outer channel steel with parallel spacing and opposite slots. The bottom of the inner channel steel and the outer channel steel is provided with several second connecting beams welded together. After the telescopic platform steel truss is separated from the cantilever end connector and the flip-up guardrail is flipped 90 degrees and stacked on the telescopic platform steel truss, the inner steel and the outer steel are respectively inserted into the slots of the inner channel steel and the outer channel steel to form a retracted and stored in the hanging and fixing frame.
[0005] In one embodiment, the foldable guardrail includes multiple evenly spaced first vertical railings and first horizontal railings located between the first vertical railings. The positions of the first connecting beams correspond one-to-one with the positions of the first vertical railings, and each first connecting beam has a guardrail connecting seat on the end near the outer steel member.
[0006] Furthermore, the guardrail connecting seat is a channel steel type connecting seat vertically welded to the first connecting beam. The slot of the channel steel type connecting seat faces the inner steel material. The slot wall of the channel steel type connecting seat is provided with a first hole group and a second hole group that are relatively through and arranged vertically. The lower end of the first vertical railing is vertically inserted into the slot of the channel steel type connecting seat. The lower end side wall of the first vertical railing is provided with a folding connecting hole and an unfolding fixing hole that are correspondingly connected to the first hole group and the second hole group. The first hole group and the folding connecting hole, the second hole group and the unfolding fixing hole are connected by bolts or pins.
[0007] In another embodiment, the foldable guardrail is a retractable structure. The foldable guardrail includes a first guardrail and a second guardrail. The first guardrail includes multiple evenly spaced first vertical rails connected by first horizontal rails. The second guardrail includes multiple evenly spaced second vertical rails connected by second horizontal rails. The first vertical rails are hollow and open at the top. The second vertical rails are inserted into the upper opening of the first vertical rails. The side walls of the first and second vertical rails are provided with limiting holes, which are connected to bolts or pins.
[0008] Furthermore, the cantilever end connector includes a steel crossbar, connecting positions at the left and right ends of the steel crossbar for connecting the front ends of the inner and outer steel members, and at least three evenly spaced steel connecting rods vertically upward on the steel crossbar between the connecting positions. The lower ends of the steel connecting rods are fixedly welded to the steel crossbar, and the upper ends of the steel connecting rods are provided with bolt holes. The steel connecting rods are connected to the horizontal beam of the outer hanging frame platform of the lifting steel platform by bolts and nuts. The connecting positions are provided with limiting stop structures to restrict the inner and outer steel members erected on the steel crossbar from moving inward and outward. The limiting stop structures are provided with limiting bolts, and the side walls of the inner and outer steel members are provided with limiting bolt holes that connect with the limiting bolts.
[0009] Preferably, the limiting stop structure is an inverted "L" shaped plate or an inverted "C" shaped plate welded to the left and right ends of the steel crossbar. The limiting bolt is screwed into the inverted "L" shaped plate or the inverted "C" shaped plate with the top facing downwards. The "L" shaped plate and the steel crossbar form a "C" shaped opening. The inverted "C" shaped plate and the steel crossbar form a closed square opening. The front ends of the inner and outer steel members are inserted into the "C" shaped opening or the closed square opening.
[0010] Furthermore, the rear ends of the inner and outer steel members are provided with holes corresponding to the front ends of the inner and outer channel steels. After the telescopic platform steel truss extends from the hanging and fixing frame, bolts and nuts are installed in the holes to lock the rear ends of the inner and outer steel members to the front ends of the inner and outer channel steels.
[0011] In one preferred embodiment, the inner and outer steel members are provided with a plurality of vertically protruding shaft connection ends evenly distributed along the length direction on the outer side. Rolling pulleys are provided at the shaft connection ends. When the inner and outer steel members are respectively inserted into the inner and outer channel steel, the rolling pulleys contact the bottom of the inner and outer channel steel, thereby realizing the sliding expansion and contraction of the inner and outer steel members.
[0012] In one preferred embodiment, the inner and outer channel steels are provided with a fixed hanging connecting rod and a movable hanging connecting rod that are connected to the horizontal beam of the inner hanging frame platform. The upper end of both the fixed hanging connecting rod and the movable hanging connecting rod is provided with a connecting hole, which is used to fix the rod to the horizontal beam of the inner hanging frame platform through the connecting hole by bolts and nuts. A movable rod is vertically welded to the bottom of the movable hanging connecting rod. A first limiting sleeve and a second limiting sleeve are welded to the outer side of the inner and outer channel steels near the rear end. The front and rear ends of the movable rod are respectively inserted into the first limiting sleeve and the second limiting sleeve. The side walls of the first and second limiting sleeves are provided with fastening bolts, which are screwed into the outer wall of the movable rod inside to achieve tight sealing.
[0013] According to one aspect of this disclosure, an operating platform based on a lifting steel platform is provided, which includes the telescopic channel based on the lifting steel platform described above.
[0014] Compared with the prior art, the present invention has the following beneficial effects: This solution utilizes a retractable access road based on a lifting steel platform. This retractable access road is located at the bottom of the inner frame platform of the lifting steel platform. A connecting hanging frame is installed on the horizontal beam of the inner frame platform to house the retractable access road structure. During construction, when encountering problems such as the thick core wall of a high-rise building, making it impossible to operate from the hanging frame for binding the reinforcing bars at the connecting beam positions and the wall thickness direction below the connecting beam openings, the retractable access road can be extended from the hanging frame and fixed via cantilevered connectors. It also features a foldable guardrail structure, solving the problem of the difficulty in temporarily constructing access road operation platforms. When not in use, it can be retracted into the hanging frame, eliminating the need for disassembly when the lifting steel platform is raised. This overcomes the time-consuming and labor-intensive problem of traditional temporary access road operation platforms requiring disassembly before the lifting steel platform is raised.
[0015] The telescopic channel designed in this technical solution is also equipped with a foldable protective railing structure. The foldable protective railing makes it easy for the telescopic channel platform, which serves as a temporary operating platform, to have a protective railing. It is also simple to operate and does not require complicated installation.
[0016] The suspended fixing frame designed in this scheme has a suspension fixing connecting rod and a suspension movable connecting rod to connect and fix the horizontal beam at the bottom of the inner hanging frame platform with different width intervals, which is highly practical. Attached Figure Description
[0017] The accompanying drawings, which are included in and form part of this specification, illustrate exemplary embodiments, features, and aspects of this disclosure together with the specification and serve to explain the principles of this disclosure.
[0018] Figure 1 This is a partial schematic diagram of the lifting steel platform with telescopic channels disclosed in this utility model.
[0019] Figure 2 for Figure 1 Enlarged schematic diagram of the structure at point A in the middle.
[0020] Figure 3 This is a schematic diagram of the retractable platform steel truss and the foldable guardrail of the retractable passage disclosed in this utility model.
[0021] Figure 4 This is a schematic diagram of an embodiment of a cantilever end connector disclosed in this utility model.
[0022] Figure 5 This is a schematic diagram of another embodiment of the cantilever end connector disclosed in this utility model.
[0023] Figure 6 This is a partial schematic diagram showing the connection between the steel truss of the telescopic platform disclosed in this utility model and the cantilever end connector and the horizontal beam of the inner hanging frame platform.
[0024] Figure 7 This is a schematic diagram of the hanging and fixing frame structure disclosed in this utility model.
[0025] Figure 8 This is a schematic diagram of the structure of the telescopic platform steel truss and the foldable guardrail that are folded and retracted into the hanging and fixing frame disclosed in this utility model. Detailed Implementation
[0026] The technical solutions in the embodiments of this disclosure will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this disclosure, and not all embodiments. Based on the embodiments of this disclosure, all other embodiments obtained by those skilled in the art without creative effort are also within the scope of protection of this disclosure.
[0027] Please refer to Figures 1 to 8 This technical solution discloses a telescopic channel and operating platform based on a lifting steel platform. The lifting steel platform includes an inner hanging frame platform 1 and an outer hanging frame platform 2. The telescopic channel is telescopically located at the bottom of the inner hanging frame platform 1 of the lifting steel platform. Specifically, the telescopic channel includes: The telescopic platform steel truss 3 has inner steel 31 and outer steel 32 arranged in parallel on both sides along its length direction. Several first connecting beams 33 are welded between the inner steel 31 and the outer steel 32. Platform plates are provided on the inner steel 31 and the outer steel 32. The foldable guardrail 4 is folded 90 degrees and installed on the side of the steel truss 3 of the telescopic platform near the outer steel member 32; The cantilever end connector 5 is fixedly connected to one side of the external hanging frame platform 2 and fixedly connected to the front end of the telescopic platform steel truss 3; The hanging and fixing frame 6 is located at the bottom of the inner hanging platform 1. It includes inner channel steel 61 and outer channel steel 62 with parallel spacing and opposite slots. The bottom of the inner channel steel 61 and outer channel steel 62 is provided with several second connecting beams 63 welded together. After the telescopic platform steel truss 3 is separated from the cantilever end connector 5, and when the flip-up guardrail is flipped 90 degrees and stacked on the telescopic platform steel truss 3, the inner steel 31 and outer steel 32 are respectively inserted into the slots of the inner channel steel 61 and outer channel steel 62 to form a retracted and stored in the hanging and fixing frame 6.
[0028] In one preferred embodiment, the foldable guardrail 4 includes a first guardrail and a second guardrail. The first guardrail includes a plurality of evenly spaced first vertical railings 41, with first horizontal railings 42 connecting the first vertical railings 41. The second guardrail includes a plurality of evenly spaced second vertical railings 43, with second horizontal railings 44 connecting the second vertical railings 43. The first vertical railings 41 are hollow and open at the top. The second vertical railings 43 are inserted into the upper opening of the first vertical railings 41. Limiting holes are provided on the side walls of the first vertical railings 41 and 43, and bolts or pins are connected to the limiting holes. The positions of the first connecting beams 33 correspond one-to-one with the positions of the first vertical railings 41. Each first connecting beam 33 has a guardrail connecting seat 34 on the end near the outer steel member 32. The guardrail connecting seat 34 is a channel steel type connecting seat vertically welded to the first connecting beam 33. The slot of the channel steel type connecting seat faces the inner steel material 31. The slot wall of the channel steel type connecting seat is provided with a first hole group 341 and a second hole group 342 that are relatively through and arranged vertically. The lower end of the first vertical railing 41 is vertically inserted into the slot of the channel steel type connecting seat. The lower side wall of the first vertical railing 41 is provided with a folding connecting hole and an unfolding fixing hole that are correspondingly connected to the first hole group 341 and the second hole group 342. The first hole group 341 and the folding connecting hole, and the second hole group 342 and the unfolding fixing hole are connected by bolts or pins.
[0029] Please refer to Figure 1 , Figures 4 to 6 The cantilever end connector 5 includes a steel crossbar 51, connecting positions at both ends of the steel crossbar 51 for connecting the front ends of the inner steel 31 and the outer steel 32, and at least three evenly spaced steel connecting rods 53 vertically upward on the steel crossbar 51 between the connecting positions. The lower end of the steel connecting rod 53 is fixedly welded to the steel crossbar 51, and the upper end of the steel connecting rod 53 is provided with bolt holes 531. The steel connecting rod 53 is connected to the horizontal beam of the outer hanging frame platform 2 of the lifting steel platform by bolts and nuts. The connecting position is provided with a limiting stop structure 52 to restrict the inner steel 31 and outer steel 32 mounted on the steel crossbar 51 from moving inward and outward. The limiting stop structure 52 is provided with limiting bolts, and the side walls of the inner steel 31 and outer steel 32 are provided with limiting bolt holes 531 that are connected to the limiting bolts. When the telescopic platform steel truss 3 is stretched out from the hanging fixed frame 6, the limiting bolt holes at the front ends of the inner steel 31 and outer steel 32 of the telescopic platform steel truss 3 are connected to the limiting bolts on the limiting stop structure 52, which plays a limiting role.
[0030] Furthermore, the limiting stop structure 52 is an inverted "L" shaped plate 52-1 or an inverted "C" shaped plate 52-2 welded to the left and right ends of the steel crossbar 51. The limiting bolt is screwed into the inverted "L" shaped plate 52-1 or the inverted "C" shaped plate 52-2 with the top facing downwards. The "L" shaped plate and the steel crossbar 51 form a "C" shaped opening. The inverted "C" shaped plate 52-2 and the steel crossbar 51 form a closed square opening. The front ends of the inner steel 31 and the outer steel 32 are inserted into the "C" shaped opening or the closed square opening.
[0031] Reference Figure 3 The rear ends of the inner steel 31 and the outer steel 32 are provided with holes that correspond to the front ends of the inner channel steel 61 and the outer channel steel 62. After the telescopic platform steel truss 3 extends from the hanging and fixing frame 6, the holes are equipped with bolts and nuts to lock the rear ends of the inner steel 31 and the outer steel 32 to the front ends of the inner channel steel 61 and the outer channel steel 62.
[0032] In a preferred embodiment, the inner steel member 31 and the outer steel member 32 are uniformly provided with multiple vertically protruding shaft connection ends along their length. Rolling pulleys are provided at these shaft connection ends. When the inner steel member 31 and the outer steel member 32 are respectively inserted into the inner channel steel 61 and the outer channel steel 62, the rolling pulleys contact the bottom of the channels of the inner channel steel 61 and the outer channel steel 62, realizing the sliding extension and retraction of the inner steel member 31 and the outer steel member 32. The rolling pulleys make the movement of the telescopic platform steel truss 3 smoother and facilitate single-person operation. When the telescopic platform steel truss 3 is not in use, the inner channel steel 61 and the outer channel steel 62 of the hanging and fixing frame 6 can be pushed forward without disassembly, overcoming the traditional method of building a temporary operating platform, which requires disassembly of the temporary operating platform when the lifting steel platform needs to be raised, consuming manpower.
[0033] In a preferred embodiment, the inner channel steel 61 and the outer channel steel 62 are provided with a fixed hanging connecting rod 64 and a movable hanging connecting rod 65 that are connected to the horizontal beam of the inner hanging frame platform 1. The upper end of the fixed hanging connecting rod 64 and the movable hanging connecting rod 65 is provided with a connecting hole, which is fixedly connected to the horizontal beam of the inner hanging frame platform 1 by bolts and nuts through the connecting hole. A movable rod 67 is vertically welded to the bottom of the movable hanging connecting rod 65. A first limiting sleeve 68 and a second limiting sleeve 69 are welded to the outer side of the inner channel steel 61 and the outer channel steel 62 near the rear end. The front and rear ends of the movable rod 67 are respectively inserted into the first limiting sleeve 68 and the second limiting sleeve 69. The side walls of the first limiting sleeve 68 and the second limiting sleeve 69 are provided with fastening bolts, which are screwed into the fastening bolts to achieve tight sealing with the outer wall of the movable rod 67 inside. The design incorporates a fixed hanging connecting rod 64 and a movable hanging connecting rod 65 to connect and fix the horizontal beam at the bottom of the inner hanging frame platform 1, which accommodates different width intervals, making it highly practical.
[0034] According to another aspect of this disclosure, an operating platform based on a lifting steel platform is provided, which includes the telescopic channel based on the lifting steel platform described above.
[0035] The inner hanging platform 1 and outer hanging platform 2 shown in the accompanying drawings of this embodiment are merely illustrative of the technical solution of this embodiment and do not limit the specific structure of the inner hanging platform 1 and outer hanging platform 2. The inner hanging platform 1 and outer hanging platform 2 in reality may differ, but this does not affect the description of the structural scheme of the telescopic platform steel truss 3, the foldable guardrail 4, the cantilever end connector 5, and the hanging and fixing frame 6.
[0036] The parts not described in detail in this technical solution specification are obvious to those skilled in the art and can be supplemented and improved based on existing technical knowledge. At the same time, those skilled in the art should understand that the above embodiments are merely preferred embodiments of this utility model. For those skilled in the art, several improvements and modifications can be made without departing from the principle of this utility model, and these improvements and modifications should also be considered within the protection scope of this utility model.
Claims
1. A telescopic passage based on a jacking steel platform, the jacking steel platform comprising an inner hanger platform (1) and an outer hanger platform (2), the telescopic passage being telescopically arranged at the bottom of the inner hanger platform (1) of the jacking steel platform, characterized in that, include: The telescopic platform steel truss (3) has inner steel (31) and outer steel (32) arranged in parallel intervals on both sides along its length direction. Several first connecting beams (33) are welded between the inner steel (31) and the outer steel (32). Platform plates are provided on the inner steel (31) and the outer steel (32). A foldable guardrail (4) is folded at 90 degrees and installed on the side of the steel truss (3) of the telescopic platform near the outer steel (32); The cantilever end connector (5) is fixedly connected to one side of the external hanging frame platform (2) and fixedly connected to the front end of the telescopic platform steel truss (3); The hanging and fixing frame (6) is located at the bottom of the inner hanging frame platform (1), including inner channel steel (61) and outer channel steel (62) with parallel spacing and opposite slots. The bottom of the inner channel steel (61) and outer channel steel (62) is provided with several second connecting beams (63) welded together. After the telescopic platform steel truss (3) is separated from the cantilever end connector (5), and when the flip-up guardrail is flipped 90 degrees and stacked on the telescopic platform steel truss (3), the inner steel (31) and outer steel (32) are respectively inserted into the slots of the inner channel steel (61) and outer channel steel (62) to form a retracted and stored in the hanging and fixing frame (6).
2. A telescoping passageway based on jacking steel platforms according to claim 1, characterized in that, The foldable guardrail (4) includes a plurality of evenly spaced first vertical railings (41) and a first horizontal railing (42) between the first vertical railings (41). The position of the first connecting beam (33) corresponds one-to-one with the position of the first vertical railing (41). Each first connecting beam (33) is provided with a guardrail connecting seat (34) at one end near the outer steel (32).
3. A telescoping passageway based on jacking steel platforms according to claim 2, characterized in that, The guardrail connecting seat (34) is a channel steel type connecting seat vertically welded to the first connecting beam (33). The slot of the channel steel type connecting seat faces the inner steel material (31). The slot wall of the channel steel type connecting seat is provided with a first hole group (341) and a second hole group (342) that are relatively through and arranged vertically. The lower end of the first vertical railing (41) is vertically inserted into the slot of the channel steel type connecting seat. The lower side wall of the first vertical railing (41) is provided with a folding connecting hole and an unfolding fixing hole that are corresponding to the first hole group (341) and the second hole group (342). The first hole group (341) and the folding connecting hole, and the second hole group (342) and the unfolding fixing hole are connected by bolts or pins.
4. The telescoping accessway based on jacking steel platforms according to claim 1, characterized in that, The foldable guardrail (4) includes a first guardrail and a second guardrail. The first guardrail includes a plurality of evenly spaced first vertical rails (41), and a first horizontal rail (42) is connected between the first vertical rails (41). The second guardrail includes a plurality of evenly spaced second vertical rails (43), and a second horizontal rail (44) is connected between the second vertical rails (43). The first vertical rails (41) are hollow and open at the top. The second vertical rails (43) are inserted into the upper opening of the first vertical rails (41). The side walls of the first vertical rails (41) and the second vertical rails (43) are provided with limiting holes, and bolts or pins are connected to the limiting holes.
5. The telescoping passageway based on jacking steel platform according to claim 1, characterized in that, The cantilever end connector (5) includes a steel crossbar (51), connecting positions at the left and right ends of the steel crossbar (51) for connecting the front ends of the inner steel (31) and the outer steel (32), and at least three evenly spaced steel connecting rods (53) vertically upward on the steel crossbar (51) between the connecting positions. The lower end of the steel connecting rod (53) is fixedly welded to the steel crossbar (51), and the upper end of the steel connecting rod (53) is provided with bolt holes (53). 1) The steel connecting rod (53) is connected to the horizontal beam of the outer frame platform (2) of the lifting steel platform by bolts and nuts. The connecting position is provided with a limiting stop structure (52) to restrict the inner steel (31) and outer steel (32) mounted on the steel crossbar (51) from moving inward and outward. The limiting stop structure (52) is provided with limiting bolts, and the side walls of the inner steel (31) and outer steel (32) are provided with limiting bolt holes (531) connected to the limiting bolts.
6. A telescoping passageway based on jacking steel platforms according to claim 5, characterized in that, The limiting stop structure (52) is an inverted "L" shaped plate (52-1) or an inverted "C" shaped plate (52-2) welded to the left and right ends of the steel crossbar (51). The limiting bolt is set on the top of the inverted "L" shaped plate (52-1) or the inverted "C" shaped plate (52-2) and screwed in downwards. The "L" shaped plate and the steel crossbar (51) form a "C" shaped opening. The inverted "C" shaped plate (52-2) and the steel crossbar (51) form a closed square opening. The front ends of the inner steel (31) and the outer steel (32) are inserted into the "C" shaped opening or the closed square opening.
7. The telescoping accessway based on jacking steel platforms according to claim 1, characterized in that, The rear ends of the inner steel (31) and outer steel (32) are provided with holes corresponding to the front ends of the inner channel steel (61) and outer channel steel (62). After the telescopic platform steel truss (3) extends from the hanging fixing frame (6), the holes are equipped with bolts and nuts to lock the rear ends of the inner steel (31) and outer steel (32) with the front ends of the inner channel steel (61) and outer channel steel (62).
8. The telescoping accessway based on jacking steel platforms according to claim 1, characterized in that, The inner steel (31) and outer steel (32) are provided with a plurality of vertically protruding shaft connection ends evenly distributed along the length direction. Rolling pulleys are provided at the shaft connection ends. When the inner steel (31) and outer steel (32) are respectively inserted into the inner channel steel (61) and outer channel steel (62), the rolling pulleys contact the bottom of the grooves of the inner channel steel (61) and outer channel steel (62) to realize the sliding extension and retraction of the inner steel (31) and outer steel (32).
9. The telescoping accessway based on jacking steel platforms according to claim 1, characterized in that, The inner channel steel (61) and outer channel steel (62) are provided with a hanging fixed connecting rod (64) and a hanging movable connecting rod (65) that are connected to the horizontal beam of the inner hanging frame platform (1). The upper end of the hanging fixed connecting rod (64) and the hanging movable connecting rod (65) are provided with a connecting hole. They are fixedly connected to the horizontal beam of the inner hanging frame platform (1) through the connecting hole by bolts and nuts. The bottom of the hanging movable connecting rod (65) is vertically welded with a movable rod (67). The outer side of the inner channel steel (61) and outer channel steel (62) near the rear end are both welded with a first limiting sleeve (68) and a second limiting sleeve (69). The front and rear ends of the movable rod (67) are respectively inserted into the first limiting sleeve (68) and the second limiting sleeve (69). The side walls of the first limiting sleeve (68) and the second limiting sleeve (69) are provided with fastening bolts. The fastening bolts are screwed into the outer wall of the movable rod (67) inside to achieve tight positioning.
10. A jacking steel platform based operating platform, characterized in that, The telescopic channel based on the lifting steel platform as described in any one of claims 1-9.