A structure for pre-embedded water and electricity pipelines without drilling

By using a hole-free pre-embedded water and electricity pipeline structure, and utilizing components such as installation pipes and clamping blocks to achieve stable fixation of water and electricity pipelines, the problems of template damage, construction pollution and low efficiency in traditional pre-embedding processes are solved, thereby improving construction quality and efficiency.

CN224983605UActive Publication Date: 2026-11-17武汉华发置业有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522241489.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-23
Publication Date
2026-11-17
Estimated Expiration
2035-10-23

AI Technical Summary

Technical Problem

Traditional water and electricity pipeline pre-embedding processes require drilling holes in the template, which leads to template damage, construction pollution, low construction efficiency, and quality defects.

Method used

The structure adopts a hole-free pre-embedded water and electricity pipeline structure. The pipeline is stably fixed by components such as installation pipe, clamping block, bidirectional screw rod and limit gear, avoiding the need for template opening. The slide rail and slider provide a stable sliding path to ensure the stability and durability of the structure.

Benefits of technology

To avoid damage to the formwork, reduce construction pollution, improve construction efficiency and quality, extend the service life of the formwork, and ensure the stable fixing of pipelines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224983605U_ABST
    Figure CN224983605U_ABST
Patent Text Reader

Abstract

This utility model discloses a hole-free pre-embedded water and electricity pipeline structure, including an installation pipe. Installation ears are fixedly installed on both sides of the installation pipe, and installation blocks are fixedly installed on the installation pipe. Each installation ear has a threaded installation hole. Two fixing brackets are fixedly installed inside the installation pipe. A bidirectional lead screw is rotatably installed within each of the two fixing brackets. Two lead screw guide sleeves are threaded onto each of the two bidirectional lead screws, and a rotating shaft located within the installation block is fixedly sleeved at one end of each of the two bidirectional lead screws. A knob is fixedly sleeved at one end of each of the two rotating shafts, and a limit gear is fixedly sleeved on each of the two rotating shafts. This hole-free pre-embedded water and electricity pipeline structure of this utility model achieves hole-free pre-embedding of water and electricity pipelines, avoiding problems such as template damage, construction pollution, and quality defects caused by traditional hole-drilling methods, and improving construction efficiency and pipeline fixing stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of water and electricity pipeline installation technology, specifically a structure for pre-embedded water and electricity pipelines without drilling. Background Technology

[0002] In the construction industry, the pre-installation of water and electricity pipelines is a crucial step in the construction process. Traditional pipeline pre-installation typically involves drilling holes in the bottom formwork of beams or slabs for positioning, and then passing the pipelines through these holes for fixation. However, this traditional pre-installation method has several problems: Template damage and shortened lifespan: Drilling holes in the template can cause localized damage, reducing its strength and integrity. Over time, this damage worsens, shortening its lifespan, increasing the frequency of replacement, and resulting in material waste.

[0003] Construction pollution and quality defects: The drilling process generates a large amount of sawdust and noise, which not only pollutes the construction environment but also affects the health of construction workers. In addition, abandoned holes may cause concrete leakage, leading to quality defects such as honeycomb, pitting, bulging, grout leakage, and crusting, which seriously affect the quality and appearance of the building structure.

[0004] Low construction efficiency: The need to drill holes in the formwork increases the number of construction steps and time. Furthermore, damage to the formwork and repair of conduits further prolong the construction period, reducing efficiency.

[0005] Based on this, this solution proposes a structure for pre-embedded water and electricity pipelines without drilling holes. Utility Model Content

[0006] The purpose of this utility model is to provide a structure for pre-embedded water and electricity pipelines without drilling holes, so as to solve the problems mentioned in the background art.

[0007] To achieve the above objectives, this utility model provides the following technical solution: a hole-free pre-embedded water and electricity pipeline structure, comprising an installation pipe, on both sides of which are fixedly installed mounting ears and a first installation block is fixedly installed on the installation pipe. Each mounting ear has a threaded mounting hole. Two fixing brackets are fixedly installed inside the installation pipe, and a bidirectional lead screw is rotatably installed within each of the two fixing brackets. Two lead screw guide sleeves are threaded onto each of the two bidirectional lead screws, and a rotating shaft located within the first installation block is fixedly sleeved at one end of each of the two bidirectional lead screws. A knob is fixedly sleeved at one end of each of the two rotating shafts, and a limiting device is fixedly sleeved on each of the two rotating shafts. The gear has a clamping block fixedly installed on each lead screw guide sleeve. Two second mounting blocks are fixedly installed on the first mounting block, and a locking bolt is threaded onto the first mounting block. Each of the two second mounting blocks has two through holes, and a crossbar is slidably installed in each of the two through holes. A movable block and a limiting rack are fixedly installed at both ends of each of the two crossbars. Each of the two movable blocks has a sliding hole, and a sliding block is slidably installed in each of the two sliding holes. A movable block is rotatably installed at one end of the locking bolt, and a connecting rod is rotatably installed between each of the two sliding blocks and the movable block. A knob is fixedly sleeved on the other end of the locking bolt.

[0008] Preferably, the two clamping blocks located on the same side are symmetrically arranged.

[0009] By adopting the above technical solution, the symmetrically arranged clamping blocks can evenly distribute the clamping force on the water and electricity pipelines, avoiding deformation or damage to the pipelines due to uneven force.

[0010] Preferably, two first slide rails are fixedly installed on the bottom inner wall of the mounting tube, and two first sliders are slidably installed on each of the two first slide rails. The two first sliders are respectively fixedly connected to the corresponding lead screw guide sleeves.

[0011] By adopting the above technical solution, the combination of the first slide rail and the first slider provides a stable sliding path for the lead screw guide sleeve, ensuring that the lead screw guide sleeve can move smoothly when the lead screw rotates in both directions. This design enhances the stability and durability of the structure and reduces installation problems caused by poor sliding or jamming.

[0012] Preferably, both knobs have anti-slip textures.

[0013] By adopting the above technical solution, the anti-slip texture increases the friction on the knob surface, making it easier for construction workers to apply force when rotating the knob and preventing the knob from slipping. This not only improves the convenience of operation, but also ensures the stability and accuracy of the knob during rotation.

[0014] Preferably, a second slide rail is fixedly installed on the bottom inner wall of the first mounting block, and a second slider is slidably installed on the second slide rail, with the second slider being fixedly connected to the movable block.

[0015] By adopting the above technical solution, the combination of the second slide rail and the second slider provides a stable sliding path for the movable block, so that the movable block can move smoothly when the locking bolt rotates. This design ensures that the limiting rack can accurately engage or disengage with the limiting gear, thereby realizing the locking or releasing function of the bidirectional lead screw.

[0016] Preferably, a return spring is sleeved on each of the two crossbars, one end of the two return springs is fixed on the corresponding crossbar, and the other end of the two return springs is fixed on the inner wall of the corresponding through hole.

[0017] Using the above technical solution, the return spring provides elastic support for the crossbar, enabling the crossbar to automatically return to its initial position when the locking bolt is released.

[0018] Compared with the prior art, the beneficial effects of this utility model are: I. Avoiding Template Damage and Extending Service Life: This utility model avoids the localized damage to the template caused by traditional electric drilling by using a pre-embedded method without drilling holes, thus maintaining the strength and integrity of the template. This not only reduces the degree of template damage but also significantly extends the template's service life, reducing the frequency of template replacement and material waste.

[0019] II. Reducing Construction Pollution and Improving Construction Quality: The sawdust and noise generated during traditional hole-drilling processes pollute the construction environment and affect the health of construction workers. Furthermore, abandoned holes may lead to concrete leakage, causing various quality defects. This invention, however, eliminates the need for hole drilling, effectively avoiding these construction pollution and quality problems, and improving the quality and aesthetics of the building structure.

[0020] 3. Improved construction efficiency: This utility model can clamp and fix water and electricity pipelines through a simple rotation operation, without the need for additional procedures such as template hole opening and pipeline repair; this not only simplifies the construction process, but also shortens the construction cycle and significantly improves construction efficiency; at the same time, the stability and durability of the structure also ensure the smooth progress of the construction process and the long-term stable operation of the pipelines. Attached Figure Description

[0021] Figure 1 This is a perspective view of the present utility model; Figure 2 This is a top view of the present invention; Figure 3 This is a perspective view of the internal structure of the first mounting block of this utility model; Figure 4 This is an enlarged view of part A of the structure of this utility model.

[0022] In the diagram: 1. Mounting tube; 2. Threaded mounting hole; 3. First mounting block; 4. Knob; 5. Rotary knob; 6. Mounting ear; 7. Lead screw guide sleeve; 8. Clamping block; 9. Fixing bracket; 10. Double-acting lead screw; 11. Limiting gear; 12. Locking bolt; 13. Connecting rod; 14. Connecting block; 15. Rotating shaft; 16. Movable block; 17. Return spring; 18. Second mounting block; 19. Crossbar; 20. Sliding block; 21. Limiting rack. Detailed Implementation

[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0024] Please see Figure 1-4 This utility model provides a technical solution: a pre-embedded water and electricity pipeline structure without drilling, including an installation pipe 1. Installation ears 6 are fixedly installed on both sides of the installation pipe 1, and a first installation block 3 is fixedly installed on the installation pipe 1. Each of the two installation ears 6 has a threaded installation hole 2. Two fixing brackets 9 are fixedly installed inside the installation pipe 1. A bidirectional lead screw 10 is rotatably installed inside each of the two fixing brackets 9. Two lead screw guide sleeves 7 are threaded onto each of the two bidirectional lead screws 10, and a rotating shaft 15 located inside the first installation block 3 is fixedly sleeved at one end of each of the two bidirectional lead screws 10. A knob 5 is fixedly sleeved at one end of each of the two rotating shafts 15, and a limit gear 11 is fixedly sleeved on each of the two rotating shafts 15. A clamping block 8 is fixedly installed on any one of the lead screw guide sleeves 7. The two clamping blocks 8 on the same side are symmetrically arranged. Two first slide rails are fixedly installed on the bottom inner wall of the installation pipe 1. Two first sliders are slidably installed on each of the two first slide rails. The two first sliders are respectively fixedly connected to the corresponding lead screw guide sleeves 7. Anti-slip textures are provided on both knobs 5.

[0025] In this embodiment, the entire structure can be easily fixed to the building template or other predetermined position through the threaded mounting hole 2 on the mounting ear 6; the setting of the first slide rail and the first slider ensures the stability of the lead screw guide sleeve 7 and the movable block 16 during the movement process; rotating the knob 5 drives the rotating shaft 15 and the bidirectional lead screw 10 to rotate, so that the lead screw guide sleeve 7 moves on the lead screw, thereby adjusting the position of the clamping block 8, realizing the clamping and fixing of water and electricity pipelines of different diameters. The two clamping blocks 8 located on the same side are symmetrically arranged to ensure the stable clamping of the pipeline.

[0026] Combination Figure 1-4As shown, in this embodiment, two second mounting blocks 18 are fixedly mounted on the first mounting block 3, and a locking bolt 12 is threaded onto the first mounting block 3. Each of the two second mounting blocks 18 has two through holes, and a crossbar 19 is slidably mounted in each of the two through holes. A movable block 16 and a limiting rack 21 are fixedly mounted at both ends of each of the two crossbars 19. Each of the two movable blocks 16 has a sliding hole, and a sliding block 20 is slidably mounted in each of the two sliding holes. A movable block 16 is rotatably mounted on one end of the locking bolt 12. A connecting rod 13 is rotatably mounted between each of the two sliding blocks 20 and the movable block 16. A knob 4 is fixedly sleeved on the other end of the locking bolt 12. A second slide rail is fixedly mounted on the bottom inner wall of the first mounting block 3. A second slider is slidably mounted on the second slide rail. The second slider is fixedly connected to the movable block 16. A return spring 17 is sleeved on each of the two crossbars 19. One end of each return spring 17 is fixed to the corresponding crossbar 19, and the other end of each return spring 17 is fixed to the inner wall of the corresponding through hole.

[0027] In this embodiment, when the locking bolt 12 rotates, the connecting rod 13 pushes the sliding block 20 to move within the sliding hole, thereby driving the movable block 16 and the crossbar 19 to move, thus locking or releasing the limiting rack 21. The limiting rack 21 cooperates with the limiting gear 11 on the bidirectional lead screw 10. When the limiting gear 11 is locked, the rotation of the bidirectional lead screw 10 is restricted by the gear meshing, thereby fixing the position of the clamping block 8 and ensuring the stable fixation of the pipeline. The return spring 17 sleeved on the crossbar 19 provides elasticity to reset the crossbar 19 and the limiting rack 21 when the locking bolt 12 is released, facilitating subsequent adjustment and operation.

[0028] The working principle of this utility model is as follows: The installation pipe 1 serves as the main structure. Through the threaded mounting holes 2 on the mounting ears 6 fixed on both sides, it can be easily fixed to the building template or other predetermined positions. Inside the installation pipe 1, two bidirectional lead screws 10 are installed through the fixing bracket 9. The lead screws are threaded with lead screw guide sleeves 7. By rotating the knob 5, the rotating shaft 15 and the bidirectional lead screws 10 are rotated, causing the lead screw guide sleeves 7 to move on the lead screws, thereby adjusting the position of the clamping blocks 8 to achieve clamping and fixing of water and electricity pipelines. The two clamping blocks 8 located on the same side are symmetrically arranged to ensure stable clamping of pipelines. The first slide rail and the first slider inside the installation pipe 1, as well as the second slide rail and the second slider on the first mounting block 3, together provide a stable sliding path for the lead screw guide sleeves 7 and the movable block 16, enhancing the stability and durability of the structure.

[0029] The connecting rod 13 on the first mounting block 3, connected by the locking bolt 12, is connected to the movable block 16 and the sliding block 20. When the locking bolt 12 rotates, the connecting rod 13 pushes the sliding block 20 to move in the sliding hole, thereby driving the movable block 16 and the crossbar 19 to move, thereby locking or releasing the limiting rack 21. The limiting rack 21 cooperates with the limiting gear 11 on the bidirectional screw 10. When the limiting gear 11 is locked, the rotation of the bidirectional screw 10 is restricted by the gear meshing, thereby fixing the position of the clamping block 8 and ensuring the stable fixation of the pipeline. The return spring 17 sleeved on the crossbar 19 provides elastic force to reset the crossbar 19 and the limiting rack 21 when the locking bolt 12 is released, which facilitates subsequent adjustment and operation.

[0030] The contents not described in detail in this specification are prior art known to those skilled in the art. Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pre-embedded water and electricity pipeline structure without drilling, comprising an installation pipe (1), characterized in that: Mounting ears (6) are fixedly installed on both sides of the mounting tube (1), and a first mounting block (3) is fixedly installed on the mounting tube (1). Threaded mounting holes (2) are opened on both mounting ears (6). Two fixing brackets (9) are fixedly installed inside the mounting tube (1). Two bidirectional lead screws (10) are rotatably installed inside the two fixing brackets (9). Two lead screw guide sleeves (7) are threaded onto the two bidirectional lead screws (10), and a rotating shaft (15) located inside the first mounting block (3) is fixedly sleeved at one end of each of the two bidirectional lead screws (10). A knob (5) is fixedly sleeved at one end of each of the two rotating shafts (15), and a limit gear (11) is fixedly sleeved on each of the two rotating shafts (15). A clamping block (8) is fixedly installed on any one of the lead screw guide sleeves (7). Two second mounting blocks (18) are fixedly mounted on the first mounting block (3), and a locking bolt (12) is threaded on the first mounting block (3). Two through holes are opened on each of the two second mounting blocks (18), and a crossbar (19) is slidably installed in each of the two through holes. A movable block (16) and a limiting rack (21) are fixedly installed at both ends of the two crossbars (19). A sliding hole is opened on each of the two movable blocks (16), and a sliding block (20) is slidably installed in each of the two sliding holes. A movable block (16) is rotatably installed on one end of the locking bolt (12), and a connecting rod (13) is rotatably installed between each of the two sliding blocks (20) and the movable block (16). A knob (4) is fixedly sleeved on the other end of the locking bolt (12).

2. The structure for pre-embedded water and electricity pipelines without drilling as described in claim 1, characterized in that: The two clamping blocks (8) located on the same side are symmetrically arranged.

3. The structure for pre-embedded water and electricity pipelines without drilling as described in claim 1, characterized in that: Two first slide rails are fixedly installed on the bottom inner wall of the mounting tube (1). Two first sliders are slidably installed on each of the two first slide rails. The two first sliders are fixedly connected to the corresponding lead screw guide sleeves (7).

4. The structure for pre-embedded water and electricity pipelines without drilling as described in claim 1, characterized in that: Both knobs (5) have anti-slip textures.

5. The structure for pre-embedded water and electricity pipelines without drilling as described in claim 1, characterized in that: A second slide rail is fixedly installed on the bottom inner wall of the first mounting block (3), and a second slider is slidably installed on the second slide rail. The second slider is fixedly connected to the movable block (16).

6. The structure for pre-embedded water and electricity pipelines without drilling as described in claim 1, characterized in that: Two return springs (17) are fitted on each of the two crossbars (19). One end of each return spring (17) is fixed on the corresponding crossbar (19), and the other end of each return spring (17) is fixed on the inner wall of the corresponding through hole.