A prestressed duct connection structure for segmental beams in high-speed railways
By using a two-layer fixing structure of plug-in columns and airbag components in the prestressed ducts of high-speed railway segmental beams, the problem of unstable prestressed duct connection was solved, achieving higher stability and durability.
Patent Information
- Application Number
- CN202522287225.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-29
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2035-10-29
AI Technical Summary
In existing technologies, the stability of prestressed duct connection structures for segmental beams in high-speed railways is insufficient, and heat shrink tubing is prone to damage, leading to duct separation.
The prestressed pipe is fixed by inserting a first plug and a second plug, and a two-layer fixation is formed by connecting components and an airbag. The airbag is pressed against the outer wall of the plug and the airbag is compressed by the inflation tube to enhance the stability of the connection.
It improves the stability of prestressed pipe connections, prevents pipe separation, and enhances the durability and stability of the connections.
Smart Images

Figure CN224983658U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of prestressed duct installation technology, and in particular to a prestressed duct connection structure for high-speed railway segmental beams. Background Technology
[0002] Segmental precasting and assembly is a construction method in which bridge beams are prefabricated in segments at a prefabrication yard and then assembled into a whole at the bridge site. It is widely used due to its advantages such as saving construction time, minimizing on-site interference, and ensuring beam quality. With the development of construction technology, the requirements for the stability of the installation between prestressed ducts in segmental beams are becoming increasingly stringent.
[0003] Existing technology CN219571221U discloses a sealing device for connecting prestressed ducts in bridges, comprising: a bracket, a rotating bracket, a hand crank, clamps, a hot air blower, and heat shrink tubing. The bracket consists of a base and two columns, which are vertically fixedly connected to the base. Two rotating brackets are symmetrically arranged on the two columns of the bracket. The tops of the two columns are fixedly connected to two clamps. The hand crank passes through the left rotating bracket and the hot air blower, then through the right rotating bracket and connects with it. A heat shrink tubing is located below the hot air blower, and its left and right ends are fixedly connected to two prestressed duct sections, respectively. The two prestressed ducts pass through the clamps on the left and right sides of the heat shrink tubing, respectively. However, this device relies solely on the force of the heat shrink tubing to connect the two prestressed ducts. Over time, the heat shrink tubing is prone to damage, leading to the separation of the two prestressed ducts.
[0004] Therefore, there is an urgent need to provide a prestressed duct connection structure for high-speed railway segmental beams, which improves the stability of the connection between prestressed ducts compared to existing technologies. Utility Model Content
[0005] This utility model solves the technical problems existing in the prior art and provides a prestressed pipe connection structure for high-speed railway segmental beams.
[0006] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A prestressed duct connection structure for segmental beams in high-speed railways includes a first prestressed duct, a second prestressed duct, a first insertion post, a second insertion post, a first airbag, and a connecting assembly. Both ends of the first prestressed duct are fixedly connected to the first insertion post, and both ends of the second prestressed duct are fixedly connected to the second insertion post. The first insertion post and the second insertion post are inserted into each other. The connecting assembly is sleeved on the outside of the connection point between the first and second prestressed ducts. The connecting assembly clamps the inserted first and second insertion posts. The first airbag is sleeved on the outside of both the first and second prestressed ducts. The connecting assembly presses the first airbag tightly against the outer walls of the first and second prestressed ducts.
[0007] Furthermore, the connecting assembly includes a first mounting part, a second mounting part, a second airbag, and a third airbag. The first mounting part and the second mounting part are rotatably connected at one end and connected at the other end by bolts and nuts. The inner wall of the first mounting part is connected to the second airbag, and the inner wall of the second mounting part is connected to the third airbag. The second airbag and the third airbag are configured to clamp the first insertion post and the second insertion post after they are inserted.
[0008] Furthermore, a first inflation tube is provided through the side wall of the first mounting part, with one end of the first inflation tube communicating with the outside of the first mounting part and the other end communicating with the inside of the second airbag.
[0009] Furthermore, a second inflation tube is provided through the side wall of the second mounting part, with one end of the second inflation tube communicating with the outside of the second mounting part and the other end communicating with the inside of the third airbag.
[0010] Furthermore, the first airbag is fixed to both ends of the first prestressed pipe and both ends of the second prestressed pipe by stainless steel cable ties.
[0011] Furthermore, a sealing ring is embedded in the inner wall of the first mounting part, and a sealing ring is also embedded in the inner wall of the second mounting part, with the sealing rings covering the stainless steel cable ties.
[0012] Furthermore, a first protruding edge is fixedly connected to the end of the first mounting part away from the rotatable connection with the second mounting part, and a second protruding edge is fixedly connected to the end of the second mounting part away from the rotatable connection with the first mounting part. The first protruding edge and the second protruding edge are connected by bolts and nuts.
[0013] Furthermore, the first protruding edge sidewall is provided with a snap-fit groove, and the second protruding edge sidewall is provided with a spring piece. After the spring piece extends into the snap-fit groove, the first protruding edge and the second protruding edge are engaged.
[0014] Furthermore, the inner wall of the first plug-in post is provided with a first mounting groove, the outer wall of the second plug-in post is provided with a third mounting groove, a spring is fixedly connected to the bottom of the third mounting groove, a mounting block is fixedly connected to the end of the spring away from the third mounting groove, and the mounting block extends into the first mounting groove.
[0015] Furthermore, the inner wall of the first plug-in post is provided with a second mounting groove, and the outer wall of the second plug-in post is provided with a fourth mounting groove. The second mounting groove and the fourth mounting groove are respectively provided. A sealing ring is fixedly connected to the bottom of the fourth mounting groove, and the sealing ring extends into the second mounting groove.
[0016] Compared with the prior art, the beneficial effects of this utility model are as follows: This invention first establishes a first insertion post and a second insertion post to achieve a first layer of fixation for the first and second prestressed ducts. Then, through the connection of the first and second mounting parts, a second airbag and a third airbag abut against the outer walls of the interlocking first and second insertion posts, forming a second layer of fixation. This two-layer fixation effectively improves the stability of the connection between adjacent prestressed ducts. Simultaneously, a first airbag is provided on the outside of both the first and second prestressed ducts, providing protection for them. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the overall structure of this utility model from the front.
[0018] Figure 2 yes Figure 1 Enlarged view of point A in the middle.
[0019] Figure 3 yes Figure 1 Enlarged view of point B in the middle.
[0020] Figure 4 This is a side view of the overall structure of this utility model.
[0021] Figure 5 yes Figure 4 A magnified view of point C in the middle.
[0022] Explanation of reference numerals in the attached figures: 1. First prestressed duct; 2. Second prestressed duct; 3. First insertion post; 31. First mounting groove; 32. Second mounting groove; 4. Second insertion post; 41. Third mounting groove; 42. Fourth mounting groove; 43. Spring; 44. Mounting block; 5. Sealing ring; 6. First airbag; 7. Stainless steel cable tie; 8. Connecting assembly; 81. First mounting part; 82. Second mounting part; 83. Sealing ring; 84. Second airbag; 85. Third airbag; 86. First inflation tube; 87. Second inflation tube; 88. First protrusion; 89. Second protrusion; 810. Bolt; 811. Nut; 812. Snap-fit groove; 813. Spring. Detailed Implementation
[0023] The technical solution of this utility model will be clearly described below with reference to the accompanying drawings. Obviously, the described embodiments are not all embodiments of this utility model. All other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model. It should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.
[0024] like Figure 1 As shown, this utility model provides a prestressed duct connection structure for high-speed railway segmental beams, including a first prestressed duct 1, a second prestressed duct 2, a first insertion post 3, a second insertion post 4, a first airbag 6, and a connecting component 8. The two ends of the first prestressed duct 1 are integrally connected to the first insertion post 3, and the two ends of the second prestressed duct 2 are integrally connected to the second insertion post 4. The first airbag 6 is sleeved on the outside of the first prestressed duct 1. The two ends of the first airbag 6 on the first prestressed duct 1 are respectively tied to the two ends of the first prestressed duct 1 by stainless steel cable ties 7. The second prestressed duct 2 is also sleeved on the outside of the first airbag 6. The two ends of the first airbag 6 on the second prestressed duct 2 are respectively tied to the two ends of the second prestressed duct 2 by stainless steel cable ties 7. The first insertion post 3 at one end of the first prestressed duct 1 is inserted into the second insertion post 4 at one end of the second prestressed duct 2. The connecting component 8 is sleeved on the outside of the connection between the first prestressed duct 1 and the second prestressed duct 2, and the connecting component 8 is set at the insertion points of the first insertion post 3 and the second insertion post 4.
[0025] like Figure 2As shown, the second insertion post 4 is inserted into the first insertion post 3. The inner wall of the first insertion post 3 has multiple first mounting slots 31 and multiple second mounting slots 32. The outer wall of the second insertion post 4 has multiple third mounting slots 41 and multiple fourth mounting slots 42. Each third mounting slot 41 corresponds to one first mounting slot 31, and the number of first mounting slots 31 is the same as the number of third mounting slots 41. Each fourth mounting slot 42 corresponds to one second mounting slot 32, and the number of second mounting slots 32 is the same as the number of fourth mounting slots 42. A spring 43 is fixedly connected to the bottom of the third mounting slot 41. The end of the spring 43 away from the bottom of the third mounting slot 41 is fixedly connected to a mounting block 44. The mounting block 44 is slidably connected inside the third mounting slot 41. When the spring 43 is in its normal state, the shape of the part of the mounting block 44 extending out of the third mounting slot 41 matches the shape of the first mounting slot 31. The upper wall of block 44 is set as an inclined surface. The height of the upper wall of the mounting block 44 near the second prestressed pipe 2 is greater than the height of the end away from the second prestressed pipe 2. The second mounting groove 32 and the fourth mounting groove 42 are both annular grooves. A sealing ring 5 is fitted inside the fourth mounting groove 42. During the process of the second plug-in post 4 extending into the first plug-in post 3, the inclined surface of the mounting block 44 first contacts the inner wall of the first plug-in post 3. The mounting block 44 compresses the spring 43 until all the mounting blocks 44 move to their corresponding first mounting groove 31. The spring 43 drives the mounting block 44 to extend into the corresponding first mounting groove 31. The sealing ring 5 is elastic. During the insertion of the second plug-in post 4, the sealing ring 5 is compressed until each fourth mounting groove 42 moves to the position of the corresponding second mounting groove 32. The sealing ring 5 extends into the corresponding second mounting groove 32 to achieve sealing, thereby completing the insertion of the first plug-in post 3 and the second plug-in post 4.
[0026] like Figure 3 , Figure 4 , Figure 5As shown, the connecting assembly 8 includes a first mounting portion 81, a second mounting portion 82, a first flange 88, and a second flange 89. The first mounting portion 81 and the second mounting portion 82 are rotatably connected at one end. The end of the first mounting portion 81 away from the second mounting portion 82 is fixedly connected to the first flange 88, which extends circumferentially along the first mounting portion 81. The length of the first flange 88 is the same as the axial length of the first mounting portion 81. The end of the second mounting portion 82 away from the first mounting portion 81 is fixedly connected to the second flange 89, which extends circumferentially along the second mounting portion 82. The length of the second flange 89 is the same as the axial length of the second mounting portion 82. The first and second protruding edges 88 and 89 are detachably connected by multiple sets of bolts 810 and nuts 811, having the same axial length. The first mounting part 81 and the second mounting part 82 form a hollow cylinder, and are fitted onto the connection between the first prestressed duct 1 and the second prestressed duct 2. Multiple sealing rings 83 are embedded along the axial direction on the inner wall of the first mounting part 81, and multiple sealing rings 83 are embedded along the axial direction on the inner wall of the second mounting part 82. The sealing rings 83 on the inner wall of the first mounting part 81 and the sealing rings 83 on the inner wall of the second mounting part 82 are arranged in a one-to-one correspondence. Each corresponding sealing ring 83 on the first mounting part 81... 3. A sealing ring 83, provided in the second mounting part 82, forms a circle and surrounds a stainless steel cable tie 7. The first mounting part 81 and the second mounting part 82 press and seal the stainless steel cable tie 7 through the sealing ring 83. The inner wall of the first mounting part 81 is also fixedly connected to the second airbag 84. The side wall of the first mounting part 81 passes through the first inflation tube 86. One end of the first inflation tube 86 communicates with the outside of the first mounting part 81, and the other end communicates with the inside of the second airbag 84. A valve is provided at the end of the first inflation tube 86 that communicates with the outside. The inner wall of the second mounting part 82 is also fixedly connected to the third airbag 85. The side wall of the second mounting part 82 passes through the second inflation tube 87. One end of the air tube 87 is connected to the outside of the second mounting part 82, and the other end is connected to the inside of the third airbag 85. A valve is provided at the end of the second inflation tube 87 that is connected to the outside. When the first mounting part 81 and the second mounting part 82 cover the first prestressed pipe 1 and the second prestressed pipe 2, each of the two corresponding sealing rings 83 covers a stainless steel cable tie 7. The second airbag 84 and the third airbag 85 are connected to the first insertion post 3 and the second insertion post 4 respectively. The second airbag 84 and the third airbag 85 are inflated by the first inflation tube 86 and the second inflation tube 87 respectively, so that the second airbag 84 and the third airbag 85 abut against the outer wall of the first insertion post 3.
[0027] The inner wall of the first protruding edge 88 is provided with a snap-fit groove 812, and the inner wall of the second protruding edge 89 is fixedly connected with a spring piece 813. When the first protruding edge 88 and the second protruding edge 89 are in contact, the spring piece 813 extends into the snap-fit groove 812 to achieve snap-fit, so that the first protruding edge 88 and the second protruding edge 89 are engaged, thereby improving the stability of the connection between the first mounting part 81 and the second mounting part 82.
[0028] The working principle of the prestressed duct connection structure for high-speed railway segmental beams provided by this utility model is as follows: The second insertion post 4 is inserted into the corresponding first insertion post 3, and then the first mounting part 81 and the second mounting part 82 are fitted onto the outside of the first prestressed duct 1 and the second prestressed duct 2, so that the corresponding two sealing rings 83 are fitted onto their corresponding stainless steel cable ties 7, and the second airbag 84 and the third airbag 85 are set on the outer wall of the first insertion post 3. The first mounting part 81 and the second mounting part 82 are fastened together and fixedly connected with multiple sets of bolts 810 and nuts 811. The second airbag 84 and the third airbag 85 are inflated through the first inflation pipe 86 and the second inflation pipe 87 respectively, so that the second airbag 84 and the third airbag 85 abut against the outer wall of the first insertion post 3, thus completing the connection of the first prestressed duct 1 and the second prestressed duct 2.
[0029] This invention first establishes the insertion of a first insertion post 3 and a second insertion post 4 to achieve a first layer of fixation for the first prestressed duct 1 and the second prestressed duct 2. Then, through the connection of a first mounting part 81 and a second mounting part 82, a second airbag 84 and a third airbag 85 abut against the outer walls of the interlocking first insertion post 3 and second insertion post 4 to form a second layer of fixation. This two-layer fixation effectively improves the stability of the connection between adjacent prestressed ducts. Simultaneously, a first airbag 6 is provided on the outside of both the first prestressed duct 1 and the second prestressed duct 2, providing protection for them. After the connection is completed, a fluid channel is formed inside the first prestressed duct 1, the first insertion post 3, the second insertion post 4, and the second prestressed duct 2.
[0030] Finally, it should be noted that the above content is only used to illustrate the technical solution of this utility model, and is not intended to limit the scope of protection of this utility model. Simple modifications or equivalent substitutions made by those skilled in the art to the technical solution of this utility model do not depart from the essence and scope of the technical solution of this utility model.
Claims
1. A prestressed duct connection structure for segmental beams in high-speed railways, characterized in that, The device includes a first prestressed duct, a second prestressed duct, a first insertion post, a second insertion post, a first airbag, and a connecting assembly. Both ends of the first prestressed duct are fixedly connected to the first insertion post, and both ends of the second prestressed duct are fixedly connected to the second insertion post. The first insertion post and the second insertion post are inserted into each other. The connecting assembly is sleeved on the outside of the connection between the first prestressed duct and the second prestressed duct. The connecting assembly clamps the inserted first insertion post and the second insertion post. The first airbag is sleeved on the outside of both the first prestressed duct and the second prestressed duct. The connecting assembly presses the first airbag against the outer wall of the first prestressed duct and the outer wall of the second prestressed duct.
2. The prestressed duct connection structure for high-speed railway segmental beams according to claim 1, characterized in that, The connecting assembly includes a first mounting part, a second mounting part, a second airbag, and a third airbag. The first mounting part and the second mounting part are rotatably connected at one end and connected at the other end by bolts and nuts. The inner wall of the first mounting part is connected to the second airbag, and the inner wall of the second mounting part is connected to the third airbag. The second airbag and the third airbag are configured to clamp the first insertion post and the second insertion post after they are inserted.
3. The prestressed duct connection structure for high-speed railway segmental beams according to claim 2, characterized in that, A first inflation tube is provided through the side wall of the first mounting part, with one end of the first inflation tube communicating with the outside of the first mounting part and the other end communicating with the inside of the second airbag.
4. The prestressed duct connection structure for high-speed railway segmental beams according to claim 2, characterized in that, A second inflation tube is provided through the side wall of the second mounting part. One end of the second inflation tube is connected to the outside of the second mounting part, and the other end is connected to the inside of the third airbag.
5. The prestressed duct connection structure for high-speed railway segmental beams according to claim 2, characterized in that, The first airbag is fixed to both ends of the first prestressed pipe and both ends of the second prestressed pipe by stainless steel cable ties.
6. The prestressed duct connection structure for high-speed railway segmental beams according to claim 5, characterized in that, A sealing ring is embedded in the inner wall of the first mounting part, and a sealing ring is also embedded in the inner wall of the second mounting part. The sealing ring is fitted around the stainless steel cable tie.
7. The prestressed duct connection structure for high-speed railway segmental beams according to claim 2, characterized in that, The first mounting part is fixedly connected to a first protruding edge at the end away from the rotatable connection with the second mounting part, and the second mounting part is fixedly connected to a second protruding edge at the end away from the rotatable connection with the first mounting part. The first protruding edge and the second protruding edge are connected by bolts and nuts.
8. The prestressed duct connection structure for high-speed railway segmental beams according to claim 7, characterized in that, The first protruding edge has a snap-fit groove on its side wall, and the second protruding edge has a spring piece on its side wall. The spring piece extends into the snap-fit groove to achieve the engagement of the first protruding edge and the second protruding edge.
9. The prestressed duct connection structure for high-speed railway segmental beams according to claim 1, characterized in that, The first plug-in post has a first mounting groove on its inner wall and the second plug-in post has a third mounting groove on its outer wall. A spring is fixedly connected to the bottom of the third mounting groove, and a mounting block is fixedly connected to the end of the spring away from the third mounting groove. The mounting block extends into the first mounting groove.
10. A prestressed duct connection structure for high-speed railway segmental beams according to claim 9, characterized in that, The inner wall of the first plug-in post is also provided with a second mounting groove, and the outer wall of the second plug-in post is also provided with a fourth mounting groove. The second mounting groove and the fourth mounting groove are respectively provided. A sealing ring is fixedly connected to the bottom of the fourth mounting groove, and the sealing ring extends into the second mounting groove.