A kind of LNG storage tank cooling system of gas station based on liquid nitrogen tank car

By combining liquid nitrogen tank trucks with existing equipment at LNG refueling stations, LNG storage tanks can be cooled, solving the problems of high cost and poor flexibility of BOG processing equipment, reducing initial investment and energy waste, and adapting to the needs of different sites.

CN224983907UActive Publication Date: 2026-11-17CHONGQING ENDURANCE ENERGY EQUIP INTEGRATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522468278.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-21
Publication Date
2026-11-17
Estimated Expiration
2035-11-21

AI Technical Summary

Technical Problem

Existing LNG refueling station BOG processing equipment has high investment costs and poor operational flexibility, resulting in energy waste and environmental impact, as well as problems of equipment idleness or mismatch between demand and supply.

Method used

A liquid nitrogen tank truck-based LNG storage tank cooling system is adopted at the gas station. This system utilizes existing LNG submerged pumps and gas dispensers to exchange heat with the cooling coils of the liquid nitrogen tank truck, thereby cooling the LNG storage tank and preventing BOG (Boiled Air Glow) generation.

Benefits of technology

No additional fixed equipment for BOG processing is required, reducing initial investment costs. Liquid nitrogen tank trucks can flexibly serve multiple sites to adapt to different needs, enabling accurate metering and settlement of cold energy, and reducing energy waste and environmental impact.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224983907U_ABST
    Figure CN224983907U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of LNG storage tank cooling system of gas station based on liquid nitrogen tank car, including LNG storage tank, LNG immersion pump, LNG dispenser, liquid nitrogen tank car and control unit, cooling coil is provided in the liquid storage cavity of liquid nitrogen tank car, the liquid outlet of LNG storage tank is communicated with the liquid inlet of LNG immersion pump, the liquid outlet of LNG immersion pump is communicated with the medium inlet of the liquid inlet channel of LNG dispenser, the medium outlet of the liquid inlet channel of LNG dispenser is communicated with the medium inlet of cooling coil in liquid nitrogen tank car by gas filling hose;The medium outlet of cooling coil is communicated with the medium inlet of the liquid return channel of LNG dispenser by back gas hose, the medium outlet of liquid return channel is communicated with the liquid inlet of LNG storage tank;Control unit is electrically connected with LNG immersion pump, LNG dispenser respectively.The utility model can be cooperated with liquid nitrogen tank car to realize cooling by only using existing LNG immersion pump, LNG dispenser, LNG gas station does not need additional construction BOG processing fixed equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of LNG storage and BOG processing technology, and in particular to a cooling system for LNG storage tanks in gas stations based on liquid nitrogen tank trucks. Background Technology

[0002] LNG (Liquefied Natural Gas) refueling stations, serving as refueling points for LNG vehicles, require LNG storage tanks for storing LNG. Because LNG's normal storage temperature is extremely low (down to -162°C), LNG storage tanks inevitably absorb heat from the surrounding environment during operation, causing some of the LNG inside the tank to vaporize and form BOG (Boil-Off Gas). As BOG accumulates in the LNG storage tank, the pressure gradually increases. When the pressure reaches the tank's maximum operating pressure, the LNG storage tank will release gas to ensure equipment safety.

[0003] Currently, some LNG refueling stations lack BOG (Boiled Air Gaseous) recovery equipment, resulting in the direct emission of BOG into the atmosphere. For stations with low refueling volumes, BOG emissions can account for up to 50%, leading to energy waste and environmental impact. Existing BOG treatment methods (such as BOG recycling for fuel or BOG liquefaction) require specialized equipment with significant initial investment. Furthermore, the BOG generation at LNG refueling stations is unpredictable. During normal operation (high daily refueling volume), BOG treatment is often unnecessary, only required during the initial construction phase (few vehicles, low refueling volume) or when road conditions cause fluctuations in refueling demand. This makes it difficult to plan and construct BOG treatment equipment in advance, potentially leading to equipment idleness or mismatch between equipment and demand.

[0004] Therefore, there is an urgent need for a BOG processing solution that does not require additional fixed equipment investment in LNG refueling stations and is flexible in use, in order to overcome the shortcomings of existing technologies. Utility Model Content

[0005] The purpose of this invention is to provide a cooling system for LNG storage tanks at gas stations based on liquid nitrogen tank trucks, in order to solve the problems of high investment costs and poor flexibility in the use of existing BOG processing equipment at LNG gas stations.

[0006] To achieve the above objectives, the present invention adopts the following technical solution:

[0007] A cooling system for LNG storage tanks at a gas station based on a liquid nitrogen tanker includes an LNG storage tank, an LNG submersible pump, an LNG dispenser, a liquid nitrogen tanker, and a control unit. The liquid nitrogen tanker is equipped with a cooling coil inside its storage chamber, and the LNG dispenser is equipped with an inlet channel and a return channel.

[0008] The outlet of the LNG storage tank is connected to the inlet of the LNG submersible pump via a pipeline. The outlet of the LNG submersible pump is connected to the medium inlet of the LNG refueling machine via a pipeline. The medium outlet of the LNG refueling machine's inlet channel is connected to the medium inlet of the cooling coil inside the liquid nitrogen tanker via a refueling hose.

[0009] The medium outlet of the cooling coil is connected to the medium inlet of the liquid return channel of the LNG dispenser via a return gas hose, and the medium outlet of the liquid return channel is connected to the liquid inlet of the LNG storage tank via a pipeline.

[0010] The control unit is electrically connected to the LNG submersible pump and the LNG refueling machine respectively to control the operating status of the LNG submersible pump and the LNG refueling machine.

[0011] Preferably, the medium outlet of the gas filling hose is provided with a first liquid filling gun, and the medium inlet of the cooling coil is provided with a first liquid filling gun seat, wherein the first liquid filling gun and the first liquid filling gun seat are detachably connected.

[0012] The return gas hose is equipped with a second liquid filling gun at its medium outlet, and the LNG dispenser is equipped with a second liquid filling gun seat at its medium inlet of the return liquid channel. The second liquid filling gun and the second liquid filling gun seat are detachably connected.

[0013] Preferably, a predetermined distance is left between the outer wall of the cooling coil and the inner wall of the liquid nitrogen tanker's storage chamber.

[0014] Preferably, the cooling coil is a spiral coil, and the spiral coil is made of stainless steel.

[0015] Preferably, the LNG storage tank has a bottom inlet and a top inlet, which are respectively connected to the medium outlet of the return channel of the LNG dispenser via pipelines.

[0016] Preferably, the LNG storage tank is equipped with a first shut-off valve, a second shut-off valve, and a third shut-off valve at its outlet, bottom inlet, and top inlet, respectively.

[0017] Preferably, the first shut-off valve, the second shut-off valve, and the third shut-off valve are all automatic control valves, and the first shut-off valve, the second shut-off valve, and the third shut-off valve are electrically connected to the control unit.

[0018] Preferably, a mass flow meter is installed on the inlet channel of the LNG dispenser. The mass flow meter is electrically connected to the control unit. The mass flow meter is used to collect the mass of the high-temperature LNG flowing into the cooling coil and transmit the collected mass data to the control unit.

[0019] Preferably, the LNG dispenser's inlet channel is further equipped with a first pressure transmitter and a first temperature transmitter. The first pressure transmitter is located on the outlet side of the mass flow meter, and the first temperature transmitter is arranged adjacent to the first pressure transmitter. The first pressure transmitter and the first temperature transmitter are respectively electrically connected to the control unit.

[0020] The first pressure transmitter is used to collect the pressure of the high-temperature LNG flowing into the cooling coil and transmit the collected pressure data to the control unit.

[0021] The first temperature transmitter is used to collect the temperature of the high-temperature LNG flowing into the cooling coil and transmit the collected temperature data to the control unit;

[0022] The LNG refueling unit is equipped with a second pressure transmitter and a second temperature transmitter on its return liquid channel. The second pressure transmitter is located near the outlet of the cooling coil, and the second temperature transmitter is located adjacent to the second pressure transmitter. Both the second pressure transmitter and the second temperature transmitter are electrically connected to the control unit.

[0023] The second pressure transmitter is used to acquire the pressure of the cryogenic LNG flowing out of the cooling coil and transmit the acquired pressure data to the control unit.

[0024] The second temperature transmitter is used to acquire the temperature of the cryogenic LNG flowing out of the cooling coil and transmit the acquired temperature data to the control unit.

[0025] Preferably, the LNG storage tank cooling system of the gas station further includes a human-machine interface module, which is electrically connected to the control unit. The human-machine interface module is used to display the data collected by the mass flow meter, the first pressure transmitter, the first temperature transmitter, the second pressure transmitter, and the second temperature transmitter, as well as the output cooling energy calculated by the control unit, and to accept control commands input by the user.

[0026] Compared with the prior art, this utility model has the following advantages:

[0027] 1. LNG refueling stations do not require additional fixed equipment for BOG processing. They can use existing LNG submersible pumps and LNG dispensers in conjunction with liquid nitrogen tank trucks to achieve cooling, which greatly reduces the initial investment cost of the station.

[0028] 2. Liquid nitrogen tank trucks can flexibly serve multiple LNG refueling stations. When idle, they can be used normally for liquid nitrogen transportation, avoiding equipment idleness and waste, and adapting to the fluctuations in BOG processing demand of different stations.

[0029] 3. By collecting key parameters through mass flow meters, pressure transmitters, and temperature transmitters, and combining them with the built-in thermodynamic database, cold energy can be calculated and output, enabling accurate measurement and settlement of cold energy and protecting the interests of both supply and demand parties. Attached Figure Description

[0030] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0031] Figure 1 This is a schematic diagram of the structure of an LNG storage tank cooling system for a gas station based on a liquid nitrogen tanker, according to one embodiment of the present invention.

[0032] Figure 2 This is a circuit diagram of a cooling system for an LNG storage tank at a gas station based on a liquid nitrogen tanker, according to one embodiment of the present invention. Detailed Implementation

[0033] To enable those skilled in the art to better understand the technical solutions of this utility model, the technical solutions in the embodiments of this utility model will be clearly and completely described below. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.

[0034] In the embodiments provided by this utility model, it should be understood that the disclosed methods and systems can be implemented in other ways. The system embodiments described below are merely illustrative. For example, the division of units and modules is only a logical functional division, and in actual implementation, there may be other division methods, such as: multiple units or modules can be combined, or integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the various components shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or modules, and can be electrical, mechanical, or other forms.

[0035] In addition, each functional unit in the various embodiments of this utility model can be integrated into a single processor, or each unit can be a separate device, or two or more units can be integrated into a single device; each functional unit in the various embodiments of this utility model can be implemented in hardware or in the form of hardware plus software functional units.

[0036] Those skilled in the art will understand that all or part of the steps of the following method embodiments can be implemented by program instructions and related hardware. The aforementioned program instructions can be stored in a computer-readable storage medium. When the program instructions are executed, they perform the steps of the following method embodiments. The aforementioned storage medium includes various media capable of storing program code, such as mobile storage devices, read-only memory (ROM), magnetic disks, or optical disks.

[0037] Furthermore, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this utility model, "a plurality of" or "several" means two or more, unless otherwise explicitly specified.

[0038] like Figure 1 , Figure 2 As shown, this utility model embodiment provides a cooling system for an LNG storage tank 1 in a gas station based on a liquid nitrogen tanker 4. The system includes an LNG storage tank 1, an LNG submersible pump 2, an LNG dispenser 3, a liquid nitrogen tanker 4, and a control unit 7. The liquid storage chamber 41 of the liquid nitrogen tanker 4 is equipped with a cooling coil 42, and the LNG dispenser 3 is equipped with an inlet channel 31 and a return channel 32.

[0039] The outlet of LNG storage tank 1 is connected to the inlet of LNG submersible pump 2 through a pipeline. The outlet of LNG submersible pump 2 is connected to the medium inlet of the inlet channel 31 of LNG dispenser 3 through a pipeline. The medium outlet of the inlet channel 31 of LNG dispenser 3 is connected to the medium inlet of the cooling coil 42 in liquid nitrogen tank truck 4 through the refueling hose 5.

[0040] The medium outlet of the cooling coil 42 is connected to the medium inlet of the liquid return channel 32 of the LNG dispenser 3 via the return gas hose 6, and the medium outlet of the liquid return channel 32 is connected to the liquid inlet of the LNG storage tank 1 via a pipeline.

[0041] The control unit 7 is electrically connected to the LNG submersible pump 2 and the LNG refueling machine 3 respectively to control the operating status of the LNG submersible pump 2 and the LNG refueling machine 3.

[0042] The working principle of the LNG storage tank 1 cooling system based on liquid nitrogen tanker truck 4 in this embodiment is as follows:

[0043] After the system is powered on, the control unit 7 controls the LNG submersible pump 2 and the LNG dispenser 3 to start. The high-temperature LNG in the LNG storage tank 1 enters the LNG submersible pump 2 through the outlet, is pressurized and delivered to the inlet channel 31 of the LNG dispenser 3, and then flows into the cooling coil 42 in the storage chamber 41 of the liquid nitrogen tanker 4 through the refueling hose 5. After the high-temperature LNG exchanges heat with the liquid nitrogen in the cooling coil 42 and is cooled down, it enters the return channel 32 of the LNG dispenser 3 through the return hose 6 and finally flows back to the LNG storage tank 1 to complete the cycle. The control unit 7 controls the operation status of the LNG submersible pump 2 and the LNG dispenser 3 throughout the process, thereby cooling the LNG in the LNG storage tank 1 and preventing the LNG in the LNG storage tank 1 from vaporizing and forming BOG due to excessive temperature.

[0044] Specifically, in this embodiment, the control unit 7 can be a PLC controller or an MCU controller.

[0045] The LNG storage tank 1 cooling system based on the liquid nitrogen tanker 4 in this embodiment does not require additional fixed BOG processing equipment. It directly reuses the existing submersible pumps and dispensers at the gas station, significantly reducing the initial investment of the site. The liquid nitrogen tanker 4 provides a cold source, and cooling coils 42 installed inside the liquid nitrogen tanker 4 achieve efficient cooling of LNG, reducing BOG generation at the source and avoiding energy waste and environmental impact.

[0046] In one embodiment, the medium outlet of the gas filling hose 5 is provided with a first liquid filling gun 8, and the medium inlet of the cooling coil 42 is provided with a first liquid filling gun seat 9. The first liquid filling gun 8 and the first liquid filling gun seat 9 are detachably connected.

[0047] The return gas hose 6 is equipped with a second liquid filling gun 10 at the medium outlet, and the LNG dispenser 3 is equipped with a second liquid filling gun seat 11 at the medium inlet of the return liquid channel 32. The second liquid filling gun 10 and the second liquid filling gun seat 11 are detachably connected.

[0048] In this embodiment, the first liquid filling gun 8 is detachably connected to the first liquid filling gun seat 9 of the cooling coil 42, enabling rapid connection between the gas filling hose 5 and the cooling coil 42; the second liquid filling gun 10 is detachably connected to the second liquid filling gun seat 11 of the return liquid channel 32, completing the connection between the return gas hose 6 and the LNG refueling machine. The disassembly and assembly process requires no complex tools. This detachable gun seat connection structure simplifies the docking process between the liquid nitrogen tanker 4 and the refueling station equipment, improves operational efficiency, and facilitates flexible switching of the liquid nitrogen tanker 4 between work sites or its conversion to liquid nitrogen transport functions, enhancing the equipment's operational flexibility.

[0049] In one embodiment, a predetermined distance is left between the outer wall of the cooling coil 42 and the inner wall of the liquid storage chamber 41 of the liquid nitrogen tanker 4.

[0050] In this embodiment, a preset distance is maintained between the outer wall of the cooling coil 42 and the inner wall of the liquid nitrogen tanker 4's storage chamber 41. This ensures that the liquid nitrogen is evenly distributed within the chamber, avoids direct contact between the coil and the chamber wall, which could lead to poor local cold energy transfer, and guarantees the heat exchange area and efficiency between the liquid nitrogen and the LNG in the cooling coil 42. This also prevents uneven local heat exchange from affecting the cooling effect, while reducing mechanical friction between the cooling coil 42 and the chamber wall, reducing equipment wear, and extending the service life of the cooling coil 42.

[0051] In one embodiment, the cooling coil 42 is a spiral coil made of stainless steel.

[0052] In this embodiment, the spiral coil design increases the residence path and time of LNG in the liquid nitrogen environment, improves heat exchange efficiency, and makes the LNG cool more fully and evenly. The stainless steel material ensures that the cooling coil 42 does not become brittle and is corrosion-resistant in low-temperature environments, ensuring long-term stable operation of the system. In addition, the stainless steel material has good thermal conductivity and low-temperature resistance, and can be adapted to extreme conditions of -196℃.

[0053] In one embodiment, the inlet of the LNG storage tank 1 includes a bottom inlet and a top inlet, which are respectively connected to the medium outlet of the return channel 32 of the LNG dispenser 3 via pipelines.

[0054] In this embodiment, the cooled cryogenic LNG can be directly injected into the bottom of LNG storage tank 1 through the bottom inlet, or it can be sprayed back through the top inlet. The injection method can be flexibly selected according to the LNG level and temperature distribution in LNG storage tank 1. The dual inlet design adapts to different operating conditions. Bottom injection allows the cooled cryogenic liquid to be fully mixed with the high-temperature liquid in the LNG storage tank to achieve cooling, while top injection can reduce the temperature of BOG at the top of the LNG storage tank or even reliquefy it to reduce the tank pressure, further improving the cooling effect and optimizing the LNG storage state in LNG storage tank 1.

[0055] In one embodiment, the LNG storage tank is provided with a first shut-off valve 12, a second shut-off valve 13, and a third shut-off valve 14 at its outlet, bottom inlet, and top inlet, respectively.

[0056] In this embodiment, the first shut-off valve 12 controls the opening and closing of the LNG storage tank 1's outlet channel, while the second and third shut-off valves respectively regulate the opening and closing of the bottom and top inlet channels 31. Different circulation paths are switched through the combination of valve opening and closing. The shut-off valves precisely control the flow direction of the medium, preventing backflow or mixing within the pipeline and ensuring system operational stability. Users can flexibly close idle channels according to cooling requirements, reducing energy consumption and medium loss.

[0057] In one embodiment, the first shut-off valve 12, the second shut-off valve 13, and the third shut-off valve 14 are all automatic control valves, and the first shut-off valve 12, the second shut-off valve 13, and the third shut-off valve 14 are electrically connected to the control unit 7.

[0058] In this embodiment, the automatic control valve is electrically connected to the control unit 7, and receives control commands to achieve precise opening and closing. No manual on-site operation is required, which reduces human intervention, lowers the risk of operational errors, and improves operational safety. It is especially suitable for unmanned operation in low-temperature environments, improves overall operation efficiency, and can automatically switch valve states in conjunction with the system's cyclic process.

[0059] In one embodiment, a mass flow meter 15 is provided on the inlet channel 31 of the LNG dispenser 3. The mass flow meter 15 is electrically connected to the control unit 7. The mass flow meter 15 is used to collect the mass of the high-temperature LNG flowing into the cooling coil 42 and transmit the collected mass data to the control unit 7.

[0060] In this embodiment, the mass flow meter 15 collects the high-temperature LNG mass data flowing into the cooling coil 42 in real time and transmits it to the control unit 7 to provide data support for cold energy calculation and ensure the accuracy of cold energy settlement.

[0061] In one embodiment, the LNG dispenser 3 is further provided with a first pressure transmitter 16 and a first temperature transmitter 18 on the inlet channel 31. The first pressure transmitter 16 is located on the outlet side of the mass flow meter 15, and the first temperature transmitter 18 is arranged adjacent to the first pressure transmitter 16. The first pressure transmitter 16 and the first temperature transmitter 18 are respectively electrically connected to the control unit 7.

[0062] The first pressure transmitter 16 is used to collect the pressure of the high-temperature LNG flowing into the cooling coil 42 and transmit the collected pressure data to the control unit 7.

[0063] The first temperature transmitter 18 is used to collect the temperature of the high-temperature LNG flowing into the cooling coil 42 and transmit the collected temperature data to the control unit 7.

[0064] The LNG refueling machine 3 has a second pressure transmitter 17 and a second temperature transmitter 19 installed on its return liquid channel 32. The second pressure transmitter 17 is located near the outlet of the cooling coil 42, and the second temperature transmitter 19 is located adjacent to the second pressure transmitter 17. The second pressure transmitter 17 and the second temperature transmitter 19 are electrically connected to the control unit 7.

[0065] The second pressure transmitter 17 is used to acquire the pressure of the cryogenic LNG flowing out of the cooling coil 42 and transmit the acquired pressure data to the control unit 7.

[0066] The second temperature transmitter 19 is used to acquire the temperature of the cryogenic LNG flowing out of the cooling coil 42 and transmit the acquired temperature data to the control unit 7.

[0067] In this embodiment, the first pressure transmitter 16 and the first temperature transmitter 18 collect the LNG pressure (P) flowing into the cooling coil 42. in ) and temperature (T) in The second pressure transmitter 17 and the second temperature transmitter 19 collect the LNG pressure (P) flowing out of the cooling coil 42. out ) and temperature (T) out All data is transmitted to control unit 7 in real time. By comprehensively acquiring key thermodynamic parameters before and after LNG heat exchange, a complete data chain is provided for specific enthalpy lookup and cold energy calculation. At the same time, real-time parameter monitoring can promptly detect system anomalies and ensure operational safety.

[0068] Specifically, in this embodiment, the control unit 7 can be pre-loaded with a table of thermodynamic properties of LNG / natural gas (referencing the CoolProp database), including specific enthalpy h at different pressures and temperatures. in The calculation process for the output cooling energy of the L liquid nitrogen tanker truck is as follows:

[0069] 1. By reading T in and P in Obtain the specific enthalpy h under this condition. in ;

[0070] 2. By reading T out and P out Obtain the specific enthalpy h under this condition. out ;

[0071] 3, T in and T out The reading time is kept at a certain time difference, and the time difference Δt is the total time from when the medium flows into liquid nitrogen tanker 4 to when it flows out of liquid nitrogen tanker 4.

[0072] 4. By reading the parameter h in h out The output cold energy is calculated using the enthalpy difference Δh, and the basic formula is as follows:

[0073] Output cold energy W=m*△h=m*(h) out -h in )

[0074] Where m is the mass of LNG flowing into the cooling coil 42 during the time period when Δh is constant, as read by mass flow meter 15. When Δh changes, W1 is calculated; and W2, W3, ... are recalculated according to the above rules until cooling is completed.

[0075] The final output W = W1 + W2 + W3 + ...

[0076] In one embodiment, the cooling system for the LNG storage tank 1 at the gas station also includes a human-machine interface module 20, which is electrically connected to the control unit 7. The human-machine interface module 20 is used to display the data collected by the mass flow meter 15, the first pressure transmitter 16, the first temperature transmitter 18, the second pressure transmitter 17, and the second temperature transmitter 19, as well as the output cooling energy calculated by the control unit 7, and to accept control commands input by the user.

[0077] In this embodiment, the human-machine interaction module 20 receives and displays the collected data and calculated cold energy value transmitted by the control unit 7, and at the same time feeds back the start, stop and other control commands input by the user to the control unit 7, realizing two-way human-machine interaction, intuitively presenting the system operation status and key data, facilitating users to monitor the operation process in real time, simplifying the operation process, and allowing users to complete system control without professional technology, thus improving the ease of use of the equipment.

[0078] Figure 1 The workflow of the LNG storage tank 1 cooling system based on liquid nitrogen tanker 4 in the embodiment of this application is as follows:

[0079] 1. System connection: Park the liquid nitrogen tanker 4 at the designated location of the LNG refueling station, connect the medium outlet of the liquid inlet channel 31 of the LNG refueling machine 3 to the medium inlet of the cooling coil 42 through the refueling hose 5, and connect the medium outlet of the cooling coil 42 to the medium inlet of the liquid return channel 32 of the LNG refueling machine 3 through the return hose 6, ensuring that the pipeline is well sealed.

[0080] 2. Equipment Start-up: The user sends a start command to the control unit 7 through the human-machine interaction module 20. The control unit 7 controls the LNG submersible pump 2 to start, and at the same time opens the first shut-off valve 12, as well as the second shut-off valve 13 / third shut-off valve 14.

[0081] 3. LNG Circulation and Cooling: High-temperature LNG in LNG storage tank 1 enters LNG submersible pump 2 through the outlet, and is pressurized by LNG submersible pump 2 before being transported to LNG dispenser 3; the high-temperature LNG is metered by mass flow meter 15 (collecting mass m) and the first pressure transmitter 16 (collecting pressure P) in ) and the first temperature transmitter 18 (collecting Ti) n After collecting parameters, the gas enters the cooling coil 42 through the gas refueling hose 5; inside the cooling coil 42, the high-temperature LNG exchanges heat with the liquid nitrogen in the liquid nitrogen tanker 4, and the temperature decreases.

[0082] 4. Cryogenic LNG reflux: The cooled LNG flows out from the medium outlet of the cooling coil 42, and passes through the second temperature transmitter 19 (which collects T data). out), Second pressure transmitter 17 (acquiring P) out After collecting parameters, the gas flows back to the return liquid channel 32 of the LNG dispenser 3 through the return gas hose 6, and then enters the LNG storage tank 1 through the bottom liquid inlet or top liquid inlet to complete one cycle.

[0083] 5. System shutdown: After cooling is completed, a stop command is sent through the human-machine interaction module 20. The control unit 7 shuts down the LNG submersible pump 2, the first shut-off valve 12, the second shut-off valve 13 / the third shut-off valve 14, and disconnects the connecting pipeline. The liquid nitrogen tanker 4 can then be transferred to other stations or used for regular liquid nitrogen transportation.

[0084] 6. Cold energy calculation and settlement: The control unit 7 calculates and settles the cold energy based on the collected T... in P in Adjust specific enthalpy h in According to T out P out Adjust specific enthalpy h out The system calculates and outputs the cooling energy W based on the mass m, and displays it through the human-computer interaction module 20. Users can then calculate the cooling energy based on W.

[0085] The various embodiments in this specification are described in a progressive manner, with each embodiment focusing on its differences from other embodiments. Similar or identical parts between embodiments can be referred to interchangeably. For the apparatus disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple; relevant parts can be referred to the method section.

[0086] Those skilled in the art will further recognize that the units and algorithm steps of the various examples described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of both. To clearly illustrate the interchangeability of hardware and software, the components and steps of the various examples have been generally described in terms of functionality in the foregoing description. Whether these functions are implemented in hardware or software depends on the specific application and design constraints of the technical solution. Those skilled in the art can use different methods to implement the described functions for each specific application, but such implementation should not be considered beyond the scope of this invention.

[0087] The steps of the methods or algorithms described in conjunction with the embodiments disclosed herein can be implemented directly by hardware, a software module executed by a processor, or a combination of both. The software module can be located in random access memory (RAM), main memory, read-only memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, hard disk, removable disk, CD-ROM, or any other form of storage medium known in the art.

[0088] The above description of the disclosed embodiments enables those skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention is not to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A liquid nitrogen tank car-based gas filling station LNG tank cooling system, characterized in that, It includes an LNG storage tank, an LNG submersible pump, an LNG dispenser, a liquid nitrogen tanker, and a control unit. The liquid nitrogen tanker is equipped with a cooling coil in its storage chamber, and the LNG dispenser is equipped with an inlet channel and a return channel. The outlet of the LNG storage tank is connected to the inlet of the LNG submersible pump via a pipeline. The outlet of the LNG submersible pump is connected to the medium inlet of the LNG refueling machine via a pipeline. The medium outlet of the LNG refueling machine's inlet channel is connected to the medium inlet of the cooling coil inside the liquid nitrogen tanker via a refueling hose. The medium outlet of the cooling coil is connected to the medium inlet of the liquid return channel of the LNG dispenser via a return gas hose, and the medium outlet of the liquid return channel is connected to the liquid inlet of the LNG storage tank via a pipeline. The control unit is electrically connected to the LNG submersible pump and the LNG refueling machine respectively to control the operating status of the LNG submersible pump and the LNG refueling machine.

2. The gas station LNG tank cooling system of claim 1, wherein, The gas filling hose has a first liquid filling gun at its medium outlet, and the cooling coil has a first liquid filling gun seat at its medium inlet. The first liquid filling gun and the first liquid filling gun seat are detachably connected. The return gas hose is equipped with a second liquid filling gun at its medium outlet, and the LNG dispenser is equipped with a second liquid filling gun seat at its medium inlet of the return liquid channel. The second liquid filling gun and the second liquid filling gun seat are detachably connected.

3. The vaporization system for a gas station LNG tank according to claim 1, wherein A predetermined distance is maintained between the outer wall of the cooling coil and the inner wall of the liquid nitrogen tanker's storage chamber.

4. The gas station LNG tank cooling system of claim 3, wherein, The cooling coil is a spiral coil, and the spiral coil is made of stainless steel.

5. The vaporization system for a LNG tank of a gas station according to any one of claims 1 to 4, characterized in that, The LNG storage tank has a bottom inlet and a top inlet, which are connected to the medium outlet of the return channel of the LNG dispenser via pipelines.

6. The gas station LNG tank cooling system of claim 5, wherein, The LNG storage tank is equipped with a first shut-off valve, a second shut-off valve, and a third shut-off valve at its outlet, bottom inlet, and top inlet, respectively.

7. The vaporization station LNG tank cooling system of claim 6, wherein, The first shut-off valve, the second shut-off valve, and the third shut-off valve are all automatic control valves, and the first shut-off valve, the second shut-off valve, and the third shut-off valve are electrically connected to the control unit.

8. The gas station LNG tank cooling system of claims 1, 2, 3, 4, 6 or 7, wherein, The LNG dispenser is equipped with a mass flow meter in its inlet channel. The mass flow meter is electrically connected to the control unit. The mass flow meter is used to collect the mass of the high-temperature LNG flowing into the cooling coil and transmit the collected mass data to the control unit.

9. The LNG storage tank cooling system for gas stations according to claim 8, characterized in that, The LNG dispenser is also equipped with a first pressure transmitter and a first temperature transmitter on its inlet channel. The first pressure transmitter is located on the outlet side of the mass flow meter, and the first temperature transmitter is arranged adjacent to the first pressure transmitter. The first pressure transmitter and the first temperature transmitter are electrically connected to the control unit. The first pressure transmitter is used to collect the pressure of the high-temperature LNG flowing into the cooling coil and transmit the collected pressure data to the control unit. The first temperature transmitter is used to collect the temperature of the high-temperature LNG flowing into the cooling coil and transmit the collected temperature data to the control unit; The LNG refueling unit is equipped with a second pressure transmitter and a second temperature transmitter on its return liquid channel. The second pressure transmitter is located near the outlet of the cooling coil, and the second temperature transmitter is located adjacent to the second pressure transmitter. Both the second pressure transmitter and the second temperature transmitter are electrically connected to the control unit. The second pressure transmitter is used to acquire the pressure of the cryogenic LNG flowing out of the cooling coil and transmit the acquired pressure data to the control unit. The second temperature transmitter is used to acquire the temperature of the cryogenic LNG flowing out of the cooling coil and transmit the acquired temperature data to the control unit.

10. The LNG storage tank cooling system for gas stations according to claim 9, characterized in that, It also includes a human-machine interface module, which is electrically connected to the control unit. The human-machine interface module is used to display the data collected by the mass flow meter, the first pressure transmitter, the first temperature transmitter, the second pressure transmitter, and the second temperature transmitter, as well as the output cold energy calculated by the control unit, and to accept control commands input by the user.