A feeding fixture for busbar conductors in GIS equipment

By designing a feeding fixture for busbar conductors in GIS equipment, the feeding process is simplified by using rollers and support structures, solving the problems of frequent disassembly and assembly steps and safety hazards, and achieving efficient conductor installation.

CN224986962UActive Publication Date: 2026-11-17HENAN PINGZHI HIGH VOLTAGE SWITCHGEAR +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522443327.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-18
Publication Date
2026-11-17
Estimated Expiration
2035-11-18

AI Technical Summary

Technical Problem

The current process of feeding the busbar conductors into GIS equipment involves numerous disassembly and assembly steps, resulting in low operational efficiency and potential safety hazards.

Method used

Design a feeding fixture that includes a chassis, support rod, support base and detachable support shaft. Utilize rollers passing through the absorbent port of the short housing to provide smooth support and a sliding track, simplifying the conductor feeding process.

Benefits of technology

It reduces frequent disassembly and assembly steps, lowers the risk of quality accidents, avoids the safety hazards of manual lifting at heights, and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224986962U_ABST
    Figure CN224986962U_ABST
Patent Text Reader

Abstract

This utility model discloses a feeding fixture for busbar conductors of GIS equipment, relating to the field of GIS equipment technology. It includes a chassis; a support rod fixedly connected to the upper surface of the chassis; a support base fixedly connected to the top of the support rod; and a support shaft detachably connected to the support base, with rollers rotatably mounted at both ends of the support shaft. The support rod and rollers can pass through an adsorbent port at the bottom of the short housing of the GIS equipment. The chassis is located outside the adsorbent port and is detachably connected to the end face of the adsorbent port via locking bolts. This feeding fixture for busbar conductors of GIS equipment solves the technical problems of frequent disassembly and assembly and low operational efficiency in existing methods.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of GIS equipment technology, and in particular to a feeding tool for busbar conductors of GIS equipment. Background Technology

[0002] GIS (Gas Insulated Switchgear) is an important set of equipment that seals high-voltage electrical components such as circuit breakers, disconnectors, instrument transformers, and busbars in a grounded metal casing filled with insulating gas.

[0003] For example, the 800kV current transformer (CT) busbar developed by Pingzhi Company, namely the CT busbar, has the following structure: Figure 1 As shown, it mainly consists of two parts: the "shell" and the conductor. The "shell" comprises three parts: the CT body 01, the short shell 02, and the corrugated pipe 03. The conductor consists of three parts: the straight conductor 04, the electrical connection conductor 05, and the contacts 06. In the production and installation process of 800kV circuit breakers, the CT busbar undergoes multiple stages: "factory assembly - withstand voltage test - unpacking - on-site reassembly." After the circuit breaker is assembled in the factory, the CT busbar is used to connect the left-side circuit breaker to the right-side withstand voltage port to conduct a withstand voltage test and verify the insulation performance of the product. After the withstand voltage test, the conductor is removed from the "shell" and packaged separately for shipment. After the circuit breaker and disconnector switches are transported to the site, the conductor is reinstalled into the "shell" to achieve circuit connection of the circuit breaker, disconnector, CT, and other equipment, forming a complete GIS operating unit. Therefore, the conductor of the CT busbar must undergo three key operational stages throughout the entire product lifecycle: "installation - removal - reinstallation."

[0004] However, due to the uneven inner wall of the bellows 03, a smooth feeding channel for the conductor cannot be provided; on the other hand, the lower part of the middle short shell 02 has an adsorbent port 021, and the inner diameter of the CT body 01 is relatively large, making it impossible for the traditional tooling trolley to extend from the right side of the bellows 03 and stably feed the conductor into the "shell". Therefore, the existing operation adopts a complex process of "disassembly-hoisting-connection", and the specific operation is as follows: First, the connection between the short shell 02 and the CT body 01 is disassembled (e.g., Figure 2 As shown), the approximately 50kg conductor is lifted using a crane and slowly inserted into the corresponding connecting conductor in the "shell" from the left docking end; subsequently, the conductor support plate 07 is installed to temporarily support and fix the conductor (as shown). Figure 3(As shown); After the conductor is fixed, the short housing 02 and the bellows 03 are lifted together by a crane and docked with the CT body 01. When the short housing 02 is about 100mm away from the end face of the CT body 01, the temporary conductor support plate 07 must be removed first. Before removing the support plate, an employee must lift the conductor at the end with both hands (e.g., Figure 4 As shown in the diagram, the conductor must be kept strictly level during the lifting process to prevent it from swaying and colliding with the inner wall of the "shell" and causing damage. Furthermore, the conductor's center is approximately 1850mm from the ground, the lifting position is relatively high, and the conductor's end is almost flush with the right flange face of the corrugated pipe 03, leaving very little operational space, further increasing the difficulty and risk of the lift. Only after the short shell 02 is fully aligned with the CT body 01, and another type of conductor support plate 07 is fixed to the right end face of the corrugated pipe 03 for secondary securing of the conductor, can the lifting personnel release their hands to complete the single conductor insertion and alignment with the "shell". During the conductor removal stage after the pressure test, the reverse procedure must be followed to remove the conductor from the "shell," and this process must be repeated during on-site reinstallation.

[0005] In summary, the existing operating method requires disassembling and reconnecting the short shell 02 to the CT body, which increases the number of operating steps and workload. Frequent disassembly and reassembly can easily lead to quality accidents. The conductor weighs about 50kg and needs to be manually lifted at height during installation, which poses a safety hazard of personnel injury and equipment damage. The entire process requires multiple people to work together, resulting in high manpower input and low operating efficiency.

[0006] Therefore, how to provide an adjustable diamond pen angle for a diamond dressing device in a slicing machine is a technical problem that needs to be solved by those skilled in the art. Utility Model Content

[0007] The purpose of this invention is to provide a feeding fixture for busbar conductors in GIS equipment, which solves the technical problems of frequent disassembly and assembly and low work efficiency in existing operation methods.

[0008] To achieve the above objectives, this utility model provides a feeding fixture for busbar conductors in GIS equipment, comprising:

[0009] Chassis;

[0010] A support rod is fixedly connected to the upper end face of the chassis;

[0011] A support base is fixedly connected to the top of the support rod;

[0012] A support shaft is detachably connected to the support base, and rollers are rotatably provided at both ends of the support shaft;

[0013] The support rod and the roller can pass through the adsorbent port at the bottom of the short housing of the GIS equipment. The chassis is located outside the adsorbent port and is detachably connected to the end face of the adsorbent port by locking bolts.

[0014] Preferably, the support base is provided with a U-shaped groove, the support shaft is placed in the U-shaped groove, and is fixedly connected to the support base by an internal hex bolt.

[0015] Preferably, the roller is mounted on the support shaft via a bearing.

[0016] Preferably, the two ends of the support shaft are provided with limiting structures for restricting the axial displacement of the roller.

[0017] Preferably, the limiting structure is a C-shaped retaining ring that is fitted into the groove at the end of the support shaft.

[0018] Preferably, the chassis, the support rod, and the support base are welded together to form an integrated structure.

[0019] Preferably, the chassis is an aluminum alloy chassis, the support rod is an aluminum alloy support rod, and the support base is an aluminum alloy support base.

[0020] Preferably, the support shaft is an alloy steel support shaft.

[0021] Preferably, the roller is a nylon roller.

[0022] Preferably, the chassis has a plurality of mounting holes along its circumference, each mounting hole corresponding to a threaded hole on the adsorbent port end face, and is connected by the locking bolts to detachably fix the chassis to the adsorbent port end face.

[0023] Compared with the above-mentioned background technology, the present invention provides a feeding fixture for busbar conductors of GIS equipment, which reduces frequent disassembly and assembly, reduces the risk of quality accidents caused by improper operation, avoids the safety hazards caused by manual lifting at height, reduces the physical requirements of operators, and improves overall work efficiency. Attached Figure Description

[0024] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on the provided drawings without creative effort.

[0025] Figure 1 This is a schematic diagram of the CT busbar structure;

[0026] Figure 2 This is a schematic diagram showing the separation of the casing and conductor;

[0027] Figure 3 This is a schematic diagram of the conductor support plate structure;

[0028] Figure 4 This is a schematic diagram showing the docking of the existing short housing with the CT housing;

[0029] Figure 5 A schematic diagram of an isometric projection of a tooling for feeding busbar conductors of GIS equipment, provided for an embodiment of this utility model;

[0030] Figure 6 for Figure 5 A sectional view;

[0031] Figure 7 This is a schematic diagram of the chassis and support rod assembly provided in an embodiment of the present utility model;

[0032] Figure 8 This is a schematic diagram of the roller structure provided in an embodiment of the present utility model;

[0033] Figure 9 This is a schematic diagram of the support shaft mechanism provided in an embodiment of the present utility model;

[0034] Figure 10 A schematic diagram of the installation of a feeding fixture for a busbar conductor in a GIS device, provided for an embodiment of this utility model;

[0035] Figure 11 A schematic diagram of a feeding fixture for a busbar conductor in a GIS device provided in an embodiment of this utility model;

[0036] Figure 12 This is a schematic diagram of conductor placement provided in an embodiment of the present utility model;

[0037] Figure 13 This is a schematic diagram of conductor installation provided for an embodiment of the present utility model;

[0038] Figure 14 This is a schematic diagram showing the completed conductor installation according to an embodiment of the present invention.

[0039] in:

[0040] 01-CT body, 02-short shell, 021-adsorbent port, 03-bellows, 04-straight conductor, 05-electrical connection conductor, 06-contact, 07-conductor support plate;

[0041] 1-Chassis, 2-Support rod, 3-Support base, 31-U-groove, 32-Hex socket head cap screw, 4-Support shaft, 5-Roller, 6-Bearing, 7-C-type retaining ring. Detailed Implementation

[0042] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0043] To enable those skilled in the art to better understand the present invention, the present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0044] See Figures 5-6 , Figures 10-14 This application provides a feeding fixture for busbar conductors of GIS equipment, including a chassis 1, a support rod 2 fixedly connected to the upper end face of the chassis 1; a support base 3 fixedly connected to the top of the support rod 2; and a support shaft 4 detachably connected to the support base 3, with rollers 5 rotatably mounted at both ends of the support shaft 4. The support rod 2 and rollers 5 can pass through the adsorbent port 021 at the bottom of the short housing 02 of the GIS equipment. The chassis 1 is located outside the adsorbent port 021 and is detachably connected to the end face of the adsorbent port 021 by locking bolts.

[0045] Specifically, the support rod 2 is fixedly connected to the upper end face of the chassis 1, serving to support and transmit force. The support base 3 is fixedly connected to the top of the support rod 2, providing an installation position for the support shaft 4. The support shaft 4 is detachably connected to the support base 3. Rollers 5 are installed at both ends of the support shaft 4, allowing free rotation and providing a low-friction sliding surface for the conductor. The support rod 2 and rollers 5 can pass through the adsorbent port 021 at the bottom of the short housing 02 of the GIS equipment. The chassis 1 is located outside the adsorbent port 021 and is detachably connected to the end face of the adsorbent port 021 by locking bolts. The above-mentioned fixture facilitates entry through the narrow adsorbent port 021, and the rollers 5 provide stable support and a sliding track for the bus conductor with a diameter of about 180 mm and a weight of about 50 kg.

[0046] The workflow of a feeding fixture for busbar conductors in GIS equipment is as follows:

[0047] The employee holds the lower part of the chassis 1 and slowly passes the support rod 2 and roller 5 through the adsorbent inlet 021 (e.g. Figure 10 As shown), ensure the tooling extends vertically to avoid collision with the inner wall of the adsorbent port 021; after the base plate 1 is in contact with the end face of the adsorbent port, secure the base plate 1 to the end face of the adsorbent port 021 with the locking bolts (as shown). Figure 11 (As shown).

[0048] The GIS busbar conductor, weighing approximately 50 kg, is lifted using an overhead crane. The crane's lifting point is point A in the diagram (e.g., ...). Figure 12 (As shown), adjust the crane position so that one end of the conductor is aligned with the top of the tooling roller 5, keeping the conductor horizontal. Slowly lower the crane and place one end of the conductor smoothly on the roller 5, ensuring that the center of the conductor is roughly aligned with the center of the roller 5 to avoid conductor misalignment. At this time, the crane maintains a slight lifting force to prevent the tooling from tilting due to excessive weight on one end of the conductor. Then, hold the end of the conductor with both hands and slowly push the conductor into the housing (as shown). Figure 13 (As shown); after the conductor is pushed to the fixed position, start the crane again and slightly lift the end of the conductor (height controlled at 5-10mm) to detach the conductor from roller 5; quickly install the conductor support plate 07 (as shown). Figure 14 As shown, the conductor support is fixed inside the housing to ensure the conductor position is stable. After the conductor support plate 07 is installed, the locking bolts on the chassis 1 are loosened. The employee holds the lower part of the chassis 1 and slowly pulls the support rod 2 and roller 5 out of the adsorbent port 021 to complete the tooling removal for future use. The inspection personnel use the adsorbent port 021 to check the conductor installation position inside the housing, the gap between the conductor and the housing, etc., to ensure that the conductor is installed properly and without damage, that there are no foreign objects inside the housing, and that the product quality meets the requirements.

[0049] In summary, the feeding fixture for busbar conductors of GIS equipment provided in this application, compared with the prior art, reduces frequent disassembly and assembly steps, lowers the risk of quality accidents caused by improper operation, avoids safety hazards caused by manual lifting at height, reduces the physical requirements of operators, and improves overall work efficiency.

[0050] Based on the above embodiments, such as Figure 7 As shown, the support base 3 is provided with a U-shaped groove 31, the support shaft 4 is horizontally mounted in the U-shaped groove 31, and rollers 5 are rotatably connected to both ends of the support shaft 4. The support shaft 4 is detachably fixed to the support base 3 by means of hexagonal bolts 32 to prevent it from jumping up and down or shifting during operation.

[0051] Based on the above embodiments, such as Figures 6-9 As shown, the roller 5 is mounted on the support shaft 4 via the bearing 6. The two ends of the support shaft 4 are provided with limiting structures for restricting the axial displacement of the roller 5. The limiting structures are C-shaped retaining rings 7 that are locked in the grooves at the ends of the support shaft 4.

[0052] Specifically, slots are provided on the outer circumferential surfaces at both ends of the support shaft 4. C-shaped retaining rings 7 are fitted into these slots, with their ends abutting against the outer ring end face of the bearing 6. This axially fixes the bearing 6 and the roller 5 onto the support shaft 4, allowing the roller 5 to rotate freely via the bearing 6 and reducing the frictional resistance when the conductor slides on the tooling. Simultaneously, the C-shaped retaining rings 7, as reliable axial limiting elements, effectively prevent the roller 5 from falling off due to vibration or thrust during use, ensuring operational stability and safety.

[0053] Based on the above embodiment, the two rollers 5 are configured with tapered inclined surfaces on one side facing each other, so that a V-shaped guide groove structure that narrows downward in the middle is formed between the two rollers 5. When the GIS bus conductor is placed on the V-shaped guide groove, its outer circular surface contacts the tapered inclined surfaces on both sides, and automatically centers and is constrained to the center position of the guide groove under the action of gravity, thereby effectively preventing the conductor from shifting left or right or sliding laterally during pushing or resting.

[0054] Based on the above embodiments, the chassis 1, support rod 2 and support base 3 are welded to form an integrated structure. The chassis 1 is an aluminum alloy chassis, the support rod 2 is an aluminum alloy support rod, the support base 3 is an aluminum alloy support base, the support shaft 4 is an alloy steel support shaft, and the roller 5 is a nylon roller.

[0055] Specifically, the lower end of the support rod 2 is welded and fixed to the upper end face of the aluminum alloy chassis 1, and the bottom of the support base 3 is welded and fixed to the top of the support rod 2. The integrated welded structure has high structural strength and overall rigidity, which can effectively bear the weight of the conductor and various loads during operation, ensuring the stability and reliability of the tooling during use.

[0056] Furthermore, the support shaft 4 is made of high-strength alloy steel, preferably 35CrMo, to meet its requirements for mechanical strength and fatigue resistance as a core component for load bearing and rotation, and to prevent deformation or breakage due to long-term frequent use.

[0057] Roller 5 is made of nylon material, which has excellent wear resistance, self-lubrication and impact resistance. On the one hand, it can avoid scratches or damage to the surface of the conductor during sliding; on the other hand, it ensures the durability of the roller itself and extends the service life of the tooling.

[0058] Based on the above embodiments, a plurality of mounting holes 11 are provided on the chassis 1 along the circumferential direction. Each mounting hole 11 corresponds to the threaded hole on the end face of the adsorbent port 021 and is connected by locking bolts to detachably fix the chassis 1 to the end face of the adsorbent port 021.

[0059] After the tooling is installed in place, the position of each mounting hole 11 corresponds one-to-one with the threaded hole on the end face of the adsorbent port 021 at the bottom of the short housing 02 of the GIS equipment. By passing the locking bolt through the mounting hole 11 in sequence and screwing it into the threaded hole on the end face of the adsorbent port 021, the chassis 1 can be firmly and detachably fixed to the end face of the adsorbent port 021.

[0060] Preferably, the number of mounting holes 11 is six, evenly distributed at 60°, to achieve balanced force distribution and stable fixation of the chassis 1.

[0061] It should be noted that in this specification, relational terms such as first and second are used only to distinguish one entity from several other entities, and do not necessarily require or imply any such actual relationship or order between these entities.

[0062] This article uses specific examples to illustrate the principles and implementation methods of this utility model. The descriptions of the above embodiments are only for the purpose of helping to understand the method and core ideas of this utility model. It should be noted that for those skilled in the art, several improvements and modifications can be made to this utility model without departing from the principles of this utility model, and these improvements and modifications also fall within the protection scope of the claims of this utility model.

Claims

1. An insertion tool for a GIS device bus conductor, characterized by, include: Chassis (1); The support rod (2) is fixedly connected to the upper end face of the chassis (1); The support base (3) is fixedly connected to the top of the support rod (2); The support shaft (4) is detachably connected to the support base (3), and rollers (5) are rotatably provided at both ends of the support shaft (4). The support rod (2) and the roller (5) can pass through the adsorbent port (021) at the bottom of the short housing (02) of the GIS equipment. The chassis (1) is located outside the adsorbent port (021) and is detachably connected to the end face of the adsorbent port (021) by locking bolts.

2. The feeding fixture for busbar conductors of GIS equipment according to claim 1, characterized in that, The support base (3) is provided with a U-shaped groove (31), and the support shaft (4) is placed in the U-shaped groove (31) and fixedly connected to the support base (3) by an internal hex bolt (32).

3. The feeding fixture for busbar conductors of GIS equipment according to claim 1, characterized in that, The roller (5) is mounted on the support shaft (4) via a bearing (6).

4. The feeding fixture for busbar conductors of GIS equipment according to claim 3, characterized in that, The two ends of the support shaft (4) are provided with limiting structures for restricting the axial displacement of the roller (5).

5. The feeding fixture for busbar conductors of GIS equipment according to claim 4, characterized in that, The limiting structure is a C-shaped retaining ring (7) that is fitted into the end groove of the support shaft (4).

6. The feeding fixture for busbar conductors of GIS equipment according to claim 1, characterized in that, The chassis (1), the support rod (2), and the support base (3) are welded together to form an integrated structure.

7. The feeding fixture for busbar conductors of GIS equipment according to claim 6, characterized in that, The chassis (1) is an aluminum alloy chassis, the support rod (2) is an aluminum alloy support rod, and the support seat (3) is an aluminum alloy support seat.

8. The feeding fixture for busbar conductors of GIS equipment according to claim 1, characterized in that, The support shaft (4) is an alloy steel support shaft.

9. The feeding fixture for busbar conductors of GIS equipment according to claim 1, characterized in that, The roller (5) is a nylon roller.

10. The feeding fixture for busbar conductors of GIS equipment according to claim 1, characterized in that, The chassis (1) is provided with a plurality of mounting holes (11) along the circumferential direction. Each mounting hole (11) corresponds to a threaded hole on the end face of the adsorbent port (021) and is connected by the locking bolt to detachably fix the chassis (1) to the end face of the adsorbent port (021).