PC with GUI for video analysis and historical query

CN309092779SActive Publication Date: 2025-01-28NANJING SAC RAIL TRAFFIC ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430196893.6
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2025-01-28
Estimated Expiration
2039-04-10

Smart Images

  • Figure 000005_ABST
    Figure 000005_ABST
Patent Text Reader

Abstract

1. The name of the product of this design: Computer with a graphical user interface for video analysis and history query. 2. Purpose of the product of this appearance design: To realize the historical query function of video analysis results through the interface, including retrieving data according to time, viewing video analysis alarm pictures, viewing historical videos of the alarm time period, viewing real-time images and confirming alarms. 3. The design highlights of this appearance design product are the graphical user interface on the screen. 4. The picture or photo that best illustrates the key points of the design: main view. 5. Because the computer is of conventional design, the rear view is omitted; because the computer is of conventional design, the left view is omitted; because the computer is of conventional design, the right view is omitted; because the computer is of conventional design, the top view is omitted; because the computer is of conventional design, the bottom view is omitted; because the computer is of conventional design, the stereoscopic view is omitted. 6. Purpose of the graphical user interface: video analysis results search and display interface. 7. Human-computer interaction mode of the graphical user interface: Main view: display of the video analysis result interface. After entering the system, the first thing displayed is the interface change status diagram 1. In the interface change status diagram 1, click the first icon from the left in any of the right operation column to enter the interface change status diagram 2. In the interface change status diagram 2, click the fourth icon from the left in the first row of the right operation column to enter the interface change status diagram 3 (the "No" in the first row of the confirmation column on the left side of the interface will become "Yes"), and in the interface change status diagram 3, click the "Show more video analysis alarms" button in the upper left corner to enter the interface change status diagram 4.
Need to check novelty before this filing date? Find Prior Art