Graphical user interface for wastewater outfall monitoring and control of electronic equipment

CN309114632SActive Publication Date: 2025-02-14BEIJING LONGTAO ENVIRONMENTAL REMEDIATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430235896.6
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2025-02-14
Estimated Expiration
2039-04-24

Smart Images

  • Figure 000002_ABST
    Figure 000002_ABST
Patent Text Reader

Abstract

1. Name of the product of this design: Graphical user interface for monitoring and managing sewage outlets of electronic equipment. 2. Purpose of the product of this design: an electronic device. 3. The design highlights of this appearance design product are the graphical interface on the screen. 4. The picture or photo that best illustrates the key points of the design: Design 1 interface change state diagram. 5. Conventional design, other views omitted. 6. Designate Design 1 as the base design. 7.Purpose of the graphical user interface: used for real-time / historical data of sewage outlet monitoring and management indicators, early warning units, plane layout of monitoring points and real-time early warning, and presentation of monitoring indicator early warning ranking data. 8. Human-computer interaction mode of the graphical user interface: The main view of Design 1 is the basic interface, in which the basic menu bar includes four major parts: regional overview, monitoring points, data management, and settings; click "Regional Overview" in the main view of Design 1 and select "Hydrology and Water System" to enter the design 1 interface change status diagram, where you can further query the hydrology and water system, geographical location, climatic conditions, topography, etc.; the main view of Design 2 is the basic interface, in which the basic menu bar includes four major parts: regional overview, monitoring points, data management, and settings. Click the "Monitoring Points" button in the main view interface of Design 2 and select "Point List" to enter the design 2 interface change status diagram, where you can further monitor point information, statistical analysis data, report export, point editing, real-time / historical data, etc.
Need to check novelty before this filing date? Find Prior Art