Graphical user interface with safety training for electronic devices

CN309324316SActive Publication Date: 2025-06-06SHAANXI GAS GRP TRANSPORTATION ENERGY DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202430130797.1
Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2025-06-06
Estimated Expiration
2039-03-14

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. The name of this design product: Graphical user interface with safety training for electronic equipment. 2. Purpose of this design product: used for display and human-computer interaction of LNG filling station safety training system. 3. The design highlights of this appearance design product lie in the interface content of the graphical user interface. 4. The picture or photo that best illustrates the key points of the design: Main view of Design 1. 5. Designate Design 1 as the base design. 6. Purpose of the graphical user interface: The main view of Design 1 is an overview of the operation drill module of the LNG filling station three-dimensional simulation safety training system. The left side of the interface displays the options for filling operation and unloading operation. Click the filling operation option on the left side of the main view of Design 1 to enter the interface change status diagram of Design 1. The interface changes to the filling area screen of the LNG filling station, and the right side of the interface displays the specific steps of the filling operation; the main view of Design 2 is an overview of the emergency processing module of the LNG filling station three-dimensional simulation safety training system. The left side of the interface displays four emergency response contents for accidents, including gas gun leakage, vehicle gas cylinder filling port leakage, tank truck safety valve start-up leakage, and vehicle fire incidents. Click the gas gun leakage option on the left side of the main view of Design 2 to enter the interface change status diagram of Design 2. The interface changes to the filling area screen of the LNG filling station, and the right side of the interface displays the specific steps for emergency response to gas gun leakage. 7. Other situations that require explanation: The images in the interface are fixed contents of the graphical user interface and are not push content.
Need to check novelty before this filing date? Find Prior Art