Graphical User Interface (Performance Evaluation Indicator) for Water Resources Business Analysis and Management System for Electronic Devices

CN309927584SActive Publication Date: 2026-04-17CHINA YANGTZE POWER
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Designs(China)
Current Assignee / Owner
CHINA YANGTZE POWER
Filing Date
2025-04-17
Publication Date
2026-04-17

Smart Images

  • Figure 000001_ABST
    Figure 000001_ABST
Patent Text Reader

Abstract

1. Name of the product in this design: Graphical User Interface (Performance Evaluation Indicator) for Water Resources Business Analysis and Management System for Electronic Equipment. 2. Purpose of this design: An electronic device. 3. The key design feature of this product is its graphical user interface. 4. The image or photograph that best illustrates the design's key features: the front view. 5. Purpose of the graphical user interface: To realize the statistics and display of some evaluative indicators for the performance assessment of participating companies or centers in the operation and scheduling process of cascade reservoirs related to the project. 6. Human-computer interaction method of graphical user interface: Click on "Performance evaluation indicators" in the upper left corner of the main view to reach the interface change state diagram 1. This interface can view the accuracy of flow forecast, the accuracy of power output forecast, the power generation completion status, the water-saving and power generation status, the flood season water level and water abandonment status, etc. Clicking on "Flow Forecast Accuracy" in the upper left corner of Interface Change Status Figure 1 will take you to Interface Change Status Figure 2, which can display the short-term flow forecast accuracy for different power plants at 12h / 24h / 36h. Clicking on "Output Forecast Accuracy" in the upper left corner of Interface Change Status Figure 2 will take you to Interface Change Status Figure 3, which can statistically analyze the output forecast accuracy of different power plants under different statistical scales. Clicking on "Power Generation Completion Status" in the upper left corner of Interface Change Status Figure 3 will take you to Interface Change Status Figure 4, which displays the power generation completion status of different power plants in different years. Clicking on "Water Conservation and Power Generation" in the upper left corner of the interface change status diagram 4 will take you to interface change status diagram 5, which displays the water conservation and power generation of different power plants compared over many years. Clicking the "Flood Season Water Level" button on the upper left of the interface change status diagram 5 will take you to the interface change status diagram 6, which displays the multi-year average water level of the Xiluodu Hydropower Station during the flood season. Clicking on "Water Abandonment Status" in the upper left of the interface change status diagram 6 will take you to the interface change status diagram 7, which can display the water abandonment power loss situation of different power stations in each month of each year. In the interface, "XXX" represents text, numbers, letters, or symbols.
Need to check novelty before this filing date? Find Prior Art