Refrigeration circuit device, refrigeration circuit control system and refrigeration circuit control method

The refrigeration cycle device with a control system addresses the risk of remote operation accidents by reducing power consumption and staggered startup, ensuring safe and energy-efficient operation.

DE112019007352B4Active Publication Date: 2024-12-05MITSUBISHI ELECTRIC CORP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
DE112019007352
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Filing Date
2019-05-23
Publication Date
2024-12-05
Estimated Expiration
2039-05-23

AI Technical Summary

Technical Problem

Air conditioners using refrigeration cycles pose a high risk of accidents during startup when operated remotely due to increased power consumption and the use of flammable refrigerants, especially when no one is present to monitor or intervene.

Method used

A refrigeration cycle device with a control system that reduces operation power and staggered startup times to prevent accidents, using wireless communication for remote operation and integrating a detection unit to manage power consumption based on the user's lifestyle and environmental conditions.

Benefits of technology

Reduces the risk of accidents and energy consumption by controlling the refrigeration cycle device to a target state with lower operating power, ensuring safe and energy-efficient operation even when operated remotely.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

Refrigeration circuit device (100), comprising: several refrigeration circuit units (110) each with a refrigeration circuit in which a refrigerant is compressed in a compressor (32) and circulated, and in which heat is absorbed from a low-temperature heat source and transferred to a high-temperature heat source via a heat exchanger (34, 36); and a control unit (120) for controlling the operation of the several refrigeration circuit units (110), the control unit (120) comprises: a detection unit (121) to obtain an operating request for a plant (63) that controls the several refrigeration circuit units (110) arranged inside a building towards a target state, and an operating control unit (122) to control the multiple refrigeration circuit units (110) towards the target state with a lower operating power than the operating power of the multiple refrigeration circuit units (110) in a case where the operating request for operation (63) is transmitted from the outside (91), and wherein the operating control unit (122), when the operating request for operation (63) is transmitted from the outside (91), staggers the operating start points of at least some of the multiple refrigeration circuit units (110).
Need to check novelty before this filing date? Find Prior Art

Description

Technical area

[0001] The present invention relates to a refrigeration cycle device, a refrigeration cycle control system and a refrigeration cycle control method. Technological background

[0002] In recent years, the trend of nuclear families and dual-income families is increasing in people's daily lives, and air conditioners are often turned off in homes when they leave the house during the day. When a family member comes home, a room is humid and hot in summer and cold in winter, which means that the family member returns to an uncomfortable house. Consequently, there is an increasing demand for operating the air conditioner from a place where they left before returning home. In addition, there are cases where the air conditioner should be operated from a place where they left to protect the health of family members who are unable to operate electrical appliances, such as a person being cared for at home or a pet.There are also cases where the operation of an air conditioner is required from a location to which one has moved in order to prevent the deterioration of a house, for example a holiday home that is normally empty.

[0003] Patent Literature 1 discloses a technology for operating an air conditioner from a place where one has left by an information terminal such as a mobile phone, a smartphone, or a tablet computer that wirelessly uses Wi-Fi (registered trademark). Citation listPatent literature

[0004] Patent Document 1: JP 2015- 010 769 A Brief description of the inventionTechnical problem

[0005] Because air conditioning systems using a refrigeration cycle do not use fire, they have a higher degree of safety than other air conditioning systems, such as combustion heaters. However, even air conditioning systems using a refrigeration cycle can experience accidents due to factors such as faulty design, a power line contact failure, a power line outage for various reasons, or when the equipment becomes too old to operate.

[0006] It is well known that air conditioning systems using refrigeration cycles consume a large percentage of the electrical energy in a home. Especially when operating an air conditioner using an inverter-controlled refrigeration cycle, the power (capacity) required to heat or cool a room—that is, the air conditioning load—is large. Consequently, operation must be performed at high cooling or heating power, and more electricity is consumed. As described above, if a problem occurs in an electrical system during operation of an air conditioner using refrigeration cycle, the probability of an accident is high.

[0007] As disclosed in Patent Literature 1, in a case where an air conditioner is to be operated from a place where one has left, there is a problem that a risk of an accident at start-up is high because a possibility that a person operating the air conditioner is not present is high.

[0008] The present invention is directed to preventing an accident occurring during start-up even when a refrigeration cycle device such as an air conditioner is operated from a place to which one has left. Solution to the problem

[0009] A refrigeration cycle device according to the present invention comprises: a refrigeration cycle device having a refrigeration cycle in which a refrigerant is compressed and circulated in a compressor, and in which heat is absorbed from a low-temperature heat source and released to a high-temperature heat source by a heat exchanger; and a control unit for controlling the operation of the refrigeration cycle device, the control unit comprising a detection unit for receiving an operation request for an operation that controls the refrigeration cycle device arranged inside a building toward a target state, and an operation control unit for controlling the refrigeration cycle unit, when the operation request for operation transmitted from the outside is received, toward the target state with a lower operation capacity (operation capacity) than the operation capacity of the refrigeration cycle unit in a case where the operation request for operation is transmitted from the building interior. Advantageous effects of the invention

[0010] In a refrigeration cycle device according to the present invention, in a case where a refrigeration cycle device is to be operated from the outside, the occurrence of an accident during operation can be prevented because the refrigeration cycle device is controlled toward a target state with low operating power. Brief description of the drawings Fig. 1 is an overall configuration diagram including a refrigeration cycle device according to Embodiment 1. Fig. 2 is a refrigerant cycle during cooling operation in a case where a refrigeration cycle device is an air conditioner. Fig. 3 is a refrigerant cycle during heating operation in a case where a refrigeration cycle device is an air conditioner. Fig. 4 is a configuration diagram of a control device according to Embodiment 1. Fig. 5 is a flowchart illustrating the operation of the control device according to Embodiment 1. Fig. 6 is a configuration diagram of a control device according to a variant of Embodiment 1. Fig. 7 is a configuration diagram of a refrigeration cycle control system according to Embodiment 2. Fig. 8 is a configuration diagram of a control device according to Embodiment 2. Fig. 9 is a diagram illustrating an example of a lifestyle protocol according to Embodiment 2. Fig. 10 is a flowchart illustrating the operation of the control device according to Embodiment 2. Description of embodiments

[0011] The present embodiments will be described below with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference numerals. In the description of the embodiments, a description of the same or corresponding parts will be omitted or simplified as appropriate. It should be noted that the embodiments are not limited to the embodiments described below, and various modifications are possible if necessary. In particular, two or more embodiments of the embodiments described below may be implemented in combination. Alternatively, one embodiment or a combination of two or more embodiments of the embodiments described below may be only partially implemented. Embodiment 1.

[0012] The present embodiment is described with reference to Fig. 1 to Fig. 6 described. *** Description of the configuration ***

[0013] Fig. 1 is an overall configuration diagram including a refrigeration cycle device according to Embodiment 1.

[0014] The refrigeration cycle device 100 is arranged in the building interior 90. The building interior 90 is the interior of a building, such as a house, a structure, or a factory, in which a refrigeration cycle device 110 is arranged.

[0015] The refrigeration cycle device 100 includes the refrigeration cycle device 110 and a control device 120.

[0016] The refrigeration cycle device 110 is a device with a refrigeration cycle in which a refrigerant is compressed and circulated in a compressor, and in which heat is absorbed from a low-temperature heat source and transferred to a high-temperature heat source through a heat exchanger. In particular, a device such as an air conditioner, underfloor heating, or hot water supply is included in the refrigeration cycle device 110.

[0017] The control unit 120 controls the operation of the refrigeration cycle device 110. In a case where the refrigeration cycle device 110 consists of multiple devices, the control unit 120 controls the operation of multiple refrigeration cycle devices 110.

[0018] In the configuration of Fig. 1, a refrigeration cycle device of a plurality of refrigeration cycle devices 110 is provided, but the present embodiment is also applicable when there is only one refrigeration cycle device.

[0019] The control unit 120 is a microcomputer. The control unit 120 controls the refrigeration cycle unit 110 based on an operation request 63 transmitted from a first control unit 40. The control unit 120 controls the refrigeration cycle unit 110 based on an operation request 63 transmitted from a second control unit 50.

[0020] The operating request for operation 63 is a command requesting that the refrigeration cycle unit 110 located inside the building 90 be controlled toward a target state. The target state is a state of the refrigeration cycle unit 110 desired by a user 80. In the case of an air conditioning system, these states are, in particular, the temperature, the airflow rate, the airflow direction, and the air conditioning type. In the case of underfloor heating, these states are the temperature, the heating surface, and the heating type. In the case of a hot water supply, these states include the temperature and quantity of hot water.

[0021] The first operating device 40 transmits the operating request for operation 63 to the control unit 120 via wireless short-range communication 13, such as infrared communication or Bluetooth (registered trademark). The first operating device 40 is, in particular, a remote control. However, the first operating device 40 can also be an operating device, such as a switch, provided on the control unit 120.

[0022] The first operating device 40 is used by the user 80 inside the building 90. This means that the operating request for the operation 63 of the first operating device 40 is transmitted from inside the building 90.

[0023] The second operating device 50 communicates with the control unit 120 via a wireless LAN 12, such as Wi-Fi (registered trademark). The second operating device 50 is, in particular, a personal computer, a smartphone, a mobile phone, or a tablet computer. The second operating device 50 is a communication terminal that is more sophisticated than the first operating device 40. The second operating device 50 transmits the operation request for operation 63 to the control unit 120 via the wireless LAN 12.

[0024] The second operation device 50 is used by the user 80 inside the building 90 and outside (exterior) 91. That is, there is a case where the operation request for operation 63 is transmitted from the second operation device 50 from inside the building 90, and a case where the operation request for operation 63 is transmitted from outside (exterior) 91. In a case where the operation request for operation 63 is to be transmitted from the second operation device 50 from outside (exterior) 91, the second operation device 50 connects to the wireless LAN 12 inside the building 90 via a network 11 such as the Internet. That is, the second operation device 50 outside (exterior 91) transmits the operation request for operation 63 to the control device 120 via the network 11 and the wireless LAN 12.

[0025] A configuration of the refrigeration cycle device 100 according to the present embodiment will be described with reference to Fig. 2 and Fig. 3 described. Fig. 2 illustrates a refrigerant cycle 31 during cooling operation in a case where the refrigeration cycle device 110 is an air conditioner. Fig. 3 illustrates a refrigerant cycle 31 during heating operation in a case where the refrigeration cycle device 110 is an air conditioner.

[0026] The refrigeration cycle unit 110 includes the refrigerant circuit 31 in which the refrigerant circulates. The refrigeration cycle unit 110 further includes a compressor 32, a four-way valve 33, a first heat exchanger 34, which is an outdoor heat exchanger, an expansion mechanism 35, which is an expansion valve, and a second heat exchanger 36, which is an indoor heat exchanger. The compressor 32, the four-way valve 33, the first heat exchanger 34, the expansion mechanism 35, and the second heat exchanger 36 are connected to the refrigerant circuit 31.

[0027] The compressor 32 compresses the refrigerant. The four-way valve 33 switches a flow direction of the refrigerant between cooling operation and heating operation. In cooling operation, the first heat exchanger 34 functions as a condenser to dissipate the heat of the refrigerant compressed by the compressor 32. That is, the first heat exchanger 34 performs heat exchange with the refrigerant compressed by the compressor 32. In heating operation, the first heat exchanger 34 functions as an evaporator to heat the refrigerant through heat exchange between outside air and the refrigerant expanded by the expansion mechanism 35. The expansion mechanism 35 expands the refrigerant discharged at the condenser. In heating operation, the second heat exchanger 36 functions as a condenser to dissipate the heat of the refrigerant compressed by the compressor 32. That is, the second heat exchanger 36 performs heat exchange with the refrigerant compressed by the compressor 32.In cooling mode, the second heat exchanger 36 operates as an evaporator to heat the refrigerant by performing heat exchange between room air and the refrigerant expanded by the expansion mechanism 35.

[0028] Here, the refrigerant used in the refrigeration cycle unit 110 is a highly flammable refrigerant or a flammable refrigerant. Many of the refrigerants primarily used in air conditioning systems are R410A, a non-flammable refrigerant. However, to reduce the GWP (Global Warming Potential), a highly flammable HFO-based refrigerant, such as R32 or HFO1234ze, is preferable. To reduce the GWP, a flammable refrigerant such as R290 can also be used.

[0029] Compressor 32 is a variable speed type that is inverter controlled.

[0030] A motor of the compressor is, in particular, a brushless direct current (DC) motor driven by an inverter-controlled device. The heat exchanger has a fan and a fan motor, with a DC motor being used in at least one location.

[0031] The refrigeration cycle device 100 also includes the control unit 120, which controls the refrigeration cycle of the refrigeration cycle device 110.

[0032] Although in Fig. 2 and Fig. 3 only shows a connection between the control unit 120 and the compressor 32, the control unit 120 can be connected not only to the compressor 32, but also to another element connected to the refrigerant circuit 31 other than the compressor 32. The control unit 120 monitors and controls the state of each element connected to the control unit 120.

[0033] Fig. 4 is a diagram showing a configuration of the control device 120 according to the present embodiment.

[0034] The control unit 120 is a computer. The control unit 120 includes a processor 910 and other hardware such as a memory 921 and a communication device 950. The processor 910 is connected to other hardware via signal lines and controls this other hardware. Although not shown, the control unit 120 may include an input interface, an output interface, and an additional storage device as additional hardware.

[0035] The control unit 120 comprises a detection unit 121 and an operation control unit 122 as functional elements. A limit number 123 is stored in the memory 921.

[0036] The functions of the detection unit 121 and the operation control unit 122 are realized by software.

[0037] The processor 910 is a device that executes a refrigeration cycle control program. The refrigeration cycle control program is a program that performs the functions of the detection unit 121 and the operation control unit 122.

[0038] The processor 910 is an integrated circuit (IC) that performs a computational process. Specific examples of the processor 910 include a CPU (central processing unit), a DSP (digital signal processor), and a GPU (graphics processing unit).

[0039] Memory 921 is a storage device that temporarily stores data. A specific example of memory 921 is SRAM (Static Random Access Memory) or DRAM (Dynamic Random Access Memory).

[0040] An additional storage device is a storage device that stores data. A specific example of an additional storage device is an HDD. The additional storage device can be a storage medium such as an SD memory card (registered trademark), a CF, a NAND flash, a flexible disc, an optical disc, a compact disc, a Blu-ray disc (registered trademark), or a DVD. HDD is an abbreviation for Hard Disk Drive. SD (registered trademark) is an abbreviation for Secure Digital. CF is an abbreviation for CompactFlash (registered trademark). DVD is an abbreviation for Digital Versatile Disk.

[0041] The input interface is a port connected to an input device such as a mouse, keyboard, or touch panel. The input interface is typically a USB (Universal Serial Bus) port. The input interface can be a port connected to a LAN (Local Area Network).

[0042] The output interface is a port to which a cable from an output device, such as a monitor, is connected. The output interface is typically a USB port or an HDMI (registered trademark) port (High Definition Multimedia Interface). The display is typically an LCD (liquid crystal display).

[0043] A communication device has a receiver and a transmitter. The communication device is connected to the LAN, the Internet, or a communication network such as a telephone line. The communication device is typically a communication chip or a NIC (Network Interface Card).

[0044] The refrigeration cycle control program is executed in the control unit 120. The refrigeration cycle control program is read into the processor 910 and executed by the processor 910. The memory 921 stores not only the refrigeration cycle control program but also an OS (Operating System). The processor 910 executes the refrigeration cycle control program while executing the operating system. The refrigeration cycle control program and the operating system may be stored in the additional storage device. The refrigeration cycle control program and the operating system stored in the additional storage device are loaded into the memory 921 and executed by the processor 910. The refrigeration cycle control program may be integrated into the operating system in whole or in part.

[0045] Control unit 120 may include multiple processors that replace processor 910. These multiple processors share the execution of the refrigeration cycle control program. Each processor, like processor 910, is a device that executes the refrigeration cycle control program.

[0046] Data, information, signal values, and variable values ​​used, processed, or output by the refrigeration cycle control program are stored in memory 921, the additional storage device, or a register or cache memory in processor 910.

[0047] "Unit" of each unit of the control unit 120 may be replaced by "process," "procedure," or "step." "Process" replacing "unit" of each unit of the control unit 120 may be replaced by "program," "program product," "computer-readable storage medium on which a program is recorded," or "computer-readable recording medium on which a program is recorded."

[0048] The refrigeration cycle control program causes a computer to execute each process, procedure, or step, where "process," "procedure," or "step" is replaced by the "unit" of each unit described above. A refrigeration cycle control method is a method executed by the controller 120 that executes the refrigeration cycle control program.

[0049] The refrigeration cycle control program may be stored on a computer-readable recording medium. The refrigeration cycle control program may be provided as a program product. *** Description of how it works ***

[0050] Fig. 5 is a flowchart illustrating the operation of the control device 120 according to the present embodiment. < Acquisition process: Step S101>

[0051] In step S101, the detection unit 121 detects the operation request 63 for operation, which controls the refrigeration cycle unit 110 arranged in the building interior 90 to the target state. In a case where there are multiple refrigeration cycle units 110, the detection unit 121 detects the operation request 63 for operation, which controls the multiple refrigeration cycle units 110 to the target state. In a case where the refrigeration cycle unit 110 consists of multiple refrigeration cycle units 110, the operation request 63 may specify a target state individually for each of the multiple refrigeration cycle units 110, or it may specify a target state collectively for all of the multiple refrigeration cycle units 110. < Operation control process: Step S102, Step S103, Step S104>

[0052] When the operation control unit 122 receives the operation request for the operation 63 transmitted from the outside (exterior) 91, the operation control unit 122 controls the refrigeration cycle device 110 to the target state with a lower operation power (operation capacity) than the operation power of the refrigeration cycle device 110 in a case where the operation request for the operation 63 is transmitted from the building interior 90.

[0053] In detail, the business tax process is as follows.

[0054] In step S102, the operation control unit 122 determines whether a transmission source of the operation request for operation 63 is located inside the building 90 or outside (exterior) 91. Specifically, in a case where the operation control unit 122 has received the operation request for operation 63 via the short-range wireless communication 13 such as infrared communication or Bluetooth (registered trademark), the operation control unit 122 determines that the transmission source of the operation request for operation 63 is located inside the building 90. In a case where the operation control unit 122 has received the operation request for operation 63 via the wireless LAN 12 such as Wi-Fi (registered trademark), the operation control unit 122 determines whether or not the operation request for operation 63 is received via an external network 11.The operation control unit 122 determines whether or not the operation request for the operation 63 is received via the external network 11 by using information included in the operation request for the operation 63, such as a MAC (Media Access Control) address and an IP (Internet Protocol) address of a destination and a MAC address and an IP address of the transmission source.

[0055] In a case where the operation request for the operation 63 is not received via the network 11, the operation control unit 122 determines whether the transmission source of the operation request for the operation 63 is located inside the building 90. In a case where the operation request for the operation 63 is received via the network 11, the operation control unit 122 determines that the transmission source of the operation request for the operation 63 is located outside (in the exterior) 91.

[0056] If the transmission source of the operation request for operation 63 is located inside the building 90, the process proceeds to step S103. If the transmission source of the operation request for operation 63 is located outside (exterior) 91, the process proceeds to step S104. The above-described method for checking the transmission source of the operation request for operation 63 is an example, and whether the transmission source of the operation request for operation 63 is located inside the building 90 or outside (exterior) 91 can be checked by other methods.

[0057] In step S103, the operation control unit 122 controls the refrigeration cycle device 110 to the target state based on the operation request 63. Specifically, the operation control unit 122 generates an operation control instruction 64 such that the refrigeration cycle device 110 quickly enters the target state and transmits the operation control instruction 64 to the refrigeration cycle device 110.

[0058] In step S104, the operation control unit 122 controls the refrigeration cycle unit 110 to the target state with a lower operating power than the operating power of the refrigeration cycle unit 110 in a case where the operation request for operation 63 is transmitted from the building interior 90. The operation control unit 122 generates the operation control instruction 64 such that the refrigeration cycle unit 110 enters the target state with a lower operating power than the operating power of the refrigeration cycle unit 110 in a case where the operation request for operation 63 is transmitted from the building interior 90, and transmits the operation control instruction 64 to the refrigeration cycle unit 110.

[0059] Specifically, the operation control unit 122 controls the operation capacity of the refrigeration cycle device 110 to be lower than the operation capacity in a case where the operation request for the operation 63 is transmitted from the building interior 90, as explained below.

[0060] When the operation control unit 122 receives the operation request for operation 63 transmitted from the outside (exterior) 91, the operation control unit 122 controls the operation performance of the refrigeration cycle to be lower than the operation performance in a case where the operation request for operation 63 is transmitted from the building interior, so that the time to reach the target state is long. When the operation request for operation 63 is given to the refrigeration cycle device 100 from the outside (exterior) 91, the operation control unit 122 performs an operation in which the operation performance of a device is reduced compared to a case where an operation request for operation is given to the refrigeration cycle device 100 from the building interior 90, even if the operation of the operation is for a same temperature setting.As described, the operation control unit 122 performs the operation so that the time until a set temperature is reached takes a long time.

[0061] When the operation control unit 122 receives the operation request for the operation 63 transmitted from the outside (from the exterior) 91, the operation control unit 122 can control the operation power of the refrigeration cycle to be low by limiting the maximum power consumption of the refrigeration cycle to be equal to or lower than the rated electric power consumption.

[0062] The control unit 120 can obtain information about the electric power usable in a house in which the refrigeration cycle unit 110 is installed as usable electric power information. The control unit 120 can obtain information about the electric power of electrical appliances, including the refrigeration cycle unit 110, where the electrical appliances are the electrical appliances used in the house, as information about the electric power of the electrical appliances. When the operation control unit 122 receives the operation request for operation 63 transmitted from the outside (from the exterior) 91, the operation control unit 122 checks whether or not the total electric power of the electrical appliances exceeds the usable electric power in the house based on the usable electric power information and the electric power information of the electrical appliances.If the total electrical power of the electrical appliances does not exceed the usable electrical power in the house, the operation control unit 122 can start the operation of the refrigeration cycle device.

[0063] When the refrigeration cycle device 110 is in a plurality, the operation control unit 122 controls the operation capacity of the refrigeration cycle device 110 to be lower than the operation capacity in a case where the operation request for the operation 63 is transmitted from the building interior 90, as explained below.

[0064] When the operation control unit 122 receives the operation request for operation 63 transmitted from the outside (from the exterior) 91, the operation control unit 122 controls the operating power of each of the plurality of refrigeration cycle devices 110 to be lower than the operating power in a case where the operation of a single refrigeration cycle device is to be performed. When the operation control unit 122 receives the operation request for operation 63 transmitted from the outside (from the exterior) 91, the operation control unit 122 can stagger the operation start points of at least some of the plurality of refrigeration cycle devices 110.That is, in a case where the operation to start the operation of the plurality of refrigeration cycle devices 110 is performed from the outside (from the exterior) 91, the operation control unit 122 performs the operation to delay the operation start time and not start the operation of the refrigeration cycle devices 110 that are in the plurality at the same time.

[0065] The control unit 120 includes the memory 921 for storing, as the limit number 123, the number of refrigeration cycle units 110 that start operation at the same time in a case where the control unit 120 receives the operation request for operation 63 transmitted from the outside (exterior) 91. When the operation control unit 122 receives the operation request for operation 63 transmitted from the outside (exterior) 91, the operation control unit 122 starts operating the limit number 123 of refrigeration cycle units 110 among the plurality of refrigeration cycle units 110. As described, in a case where a plurality of refrigeration cycle units 110 are to be operated from the outside (exterior) 91, a limit on the number of refrigeration cycle units 110 that can be operated can be set in advance.

[0066] Next, using the example of an air conditioner, a lower limit of the power is described, which is required if the maximum power is to be reduced during operation from outside (from the outside) 91.

[0067] For an inverter-controlled air conditioner, the COP (Coefficient of Performance) generally improves when the operating power is reduced. Conversely, the COP decreases if the power is reduced too much. Consequently, the COP is highest at a medium power level that is approximately half of the rated power level. Therefore, in a case where energy savings are important, the highest energy-saving operation is achieved when the air conditioner is operated at its highest power level during startup.

[0068] Next, we investigate whether or not there is a problem with the air conditioning performance when the power is reduced to approximately half of the rated power at start-up.

[0069] In recent years, houses have become increasingly airtight due to increasing energy savings. Specifically, the thermal transmittance Q of a house in the Tokyo area is 5.2 W / m according to an energy-saving standard from the 1980s. 2 .K, while the thermal transmittance Q according to a new energy saving standard from 1999 is 2.7 W / m 2 ·K. As described, the thermal transmittance of a house as a whole has been roughly halved, and energy savings in houses have continued to increase in recent years. The thermal transmittance (Q-value) indicates the amount of heat required to transfer 1 degree of temperature change per 1 m 2 floor space of a house.

[0070] For an average house, including resale houses, the air conditioning load of the house is calculated based on the thermal transmittance of a house built in the 1980s. Specifically: To achieve the room temperature of a room of eight mats (13 m 2 To increase the room temperature (e.g., floor area) in a wooden house to 20 degrees, a heat output of 1350 W must be supplied at an outside temperature of 0 degrees. In contrast, when selecting a device for air conditioning a room of eight mats in a wooden house, a device with a nominal heat output of approximately 3600 W is selected, which is more than double this output.

[0071] Since the thermal transmittance of a house represents the heat loss of the entire house, the air conditioning performance calculated here differs from the performance required for actual air conditioning operation. A key factor in the above is that, in winter, a large amount of heat is added to heat a wall surface that has become cold, or in summer, a large amount of heat is added to cool a wall surface that has become warm. This amount of heat is referred to as the heat storage load of a house. In addition, there is heat loss to an adjacent room, heat for ventilation, and latent heat for removing moisture from the building's interior in summer.Since there is usually a resident present at the time the air conditioner is turned on, the air conditioner must be operated at a high power that has sufficient margin in terms of air conditioning performance so that even with an air conditioning load such as the heat storage load of a house, there will be no problems in quickly bringing the temperature close to the set temperature.

[0072] However, in a case where an air conditioner is to be operated from the outside (from the outside), there is no need to quickly reach the set temperature when the air conditioner is started, so the effect of the house's heat storage load is mitigated and the air conditioning performance is close to the air conditioner's performance, which is determined by the house's heat transfer coefficient. Consequently, in many cases, the temperature will be close to the set temperature even if the highest power is reduced to about half of the rated power. Of course, there may be times when the temperature does not reach the set temperature depending on an environmental factor such as the outside temperature or a temperature setting, but the goal of alleviating discomfort upon returning home can be achieved.

[0073] Next, an example of a simple control method for reducing the power to about half of the rated power is described.

[0074] In a typical air conditioning system, there are many cases where the device itself does not detect air conditioning performance during operation. Since control based on air conditioning performance is difficult, control is facilitated by detecting and controlling the speed of the driven compressor, power consumption, or electric current during operation.

[0075] This means that in a case where control is to be easily performed using an electric power consumption that is approximately half of the rated electric power consumption as a standard, the control can be easily performed if the control is performed in such a way that ensures minimum power at a time of operation when the air conditioner is powered from the outside. Or, in a case where control is to be performed during operation by an electric current, with the electric current that is half of the electric current during operation, using the rated electric power consumption as a standard, the control can be easily performed if the control is performed in such a way that ensures minimum power at a time of operation when the air conditioner is powered from the outside.Or, if about half of the compressor speed is used as a standard during operation at rated power, the control can be easily performed by performing the control in a way that ensures the minimum power when the air conditioner is operated from the outside.

[0076] Based on the above, in a case where the air conditioner is to be operated from the outside and operated at reduced power, the air conditioner is controlled so that the highest power ranges from approximately the rated power to approximately half the rated power. That is, in a case where the air conditioner is to be controlled simply, the air conditioner is controlled so that an upper limit of the maximum power consumption of the air conditioner lies between approximately the rated power consumption and half the rated power consumption. Or, in a case where the air conditioner is to be controlled by the speed of the compressor, the air conditioner is controlled so that an upper limit of an approximate speed of the air conditioner lies between the speed of the compressor at the rated power and half the speed of the compressor at the rated power. *** Other configurations ***<Variation 1>

[0077] In the present embodiment, the functions of the detection unit 121 and the operation control unit 122 are implemented by software. Alternatively, the functions of the detection unit 121 and the operation control unit 122 can also be implemented by hardware.

[0078] Fig. 6 is a configuration diagram of a control device 120 according to the variant of the present embodiment.

[0079] The control unit 120 includes an electrical circuit 909, the memory 921 and the communication device 950.

[0080] The electrical circuit 909 is a dedicated electrical circuit for realizing the functions of the detection unit 121 and the operation control unit 122.

[0081] The electrical circuit 909 is, in particular, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, a logic IC, a GA, an ASIC, or an FPGA. GA is an abbreviation for gate array. ASIC is an abbreviation for application-specific integrated circuit. FPGA is an abbreviation for field-programmable gate array.

[0082] The functions of the detection unit 121 and the operation control unit 122 can be realized by a single electrical circuit or by distribution to several electrical circuits.

[0083] As a further variant, part of the functions of the detection unit 121 and the operation control unit 122 can be realized by the electrical circuit and the rest of the functions by software.

[0084] As a further variant, some or all of the functions of the detection unit 121 and the operation control unit 122 can be implemented by firmware.

[0085] Both the processor and the electrical circuit are also referred to as processing circuitry. That is, in the control unit 120, the functions of the detection unit 121 and the operation control unit 122 are implemented by the processing circuitry. *** Description of the effect of the embodiment ***

[0086] Using the example of an air conditioning system as a refrigeration cycle device, the differences between the case where the air conditioning system is operated from outside (from the exterior) and the case where the air conditioning system is operated from inside the building, where the air conditioning system is usually used, are described.

[0087] When the operation of the air conditioner is performed from inside the building, there are generally many cases in which a way of using the air conditioner is performed when there is a occupant. Therefore, when operating the device, a user usually performs the operation after checking whether there is any object placed around the device that interferes with the operation or whether there is any unsafe object placed in the vicinity of the device or not. When an abnormality occurs in an electrical system or in the device, the user will notice the abnormality through an odor developing before a fire or smoke and take safety measures for unusual events such as stopping the device. Suppose a fire breaks out, an extinguishing measure is taken to prevent the disaster from spreading.Consequently, it was difficult for the anomaly to develop into a serious accident and lead to a major disaster such as a fatal accident.

[0088] On the other hand, in the indoor environment, when a person living in the house is not at home or an elderly person is bedridden and needs care, in a case where the operation of the air conditioner must be carried out from the outside, no safety check can be carried out before operating a device or an avoidance measure can be taken during an abnormality (malfunction) when an abnormality occurs, thus increasing the risk that the above-mentioned will lead to serious accidents.

[0089] When the air conditioner is operated from inside the building, it is usually typical to air condition only one room with one occupant. However, when the air conditioner is operated from outside (from the outside), there is a case where every room a person may stay in after returning home is air-conditioned. Since in such a case, the air conditioners in multiple rooms are operated simultaneously, extremely high electrical power is consumed compared to a case where the air conditioner is operated from inside the building in daily life. Consequently, the risk of an accident becomes even greater.

[0090] In addition to the problem of an air conditioner malfunction, in daily life, even if the power consumption is within the agreed upon limit with the power company, in the case of an air conditioner operated from outside, the simultaneous operation of devices such as multiple air conditioners may cause the power consumption to exceed the agreed limit. This may cause a problem in which a house's circuit breaker (fuse) is turned off, making it impossible to use power in the house, and of course, Wi-Fi (registered trademark) may no longer be available. In particular, when elderly people in need of care use medical devices that consume power, there is a risk of a serious accident affecting people's lives.

[0091] Next, a risk associated with an air conditioning system from previous years is described.

[0092] For the refrigerant used in the air conditioning system's refrigeration cycle, it was common to use a non-flammable refrigerant such as R22 or R410A. However, in recent years, to prevent global warming or promote energy savings, the use of a flammable refrigerant such as R32 Freon has become common.

[0093] In addition, the use of a more flammable refrigerant, such as a flammable HFO-based refrigerant like HFO1234ze, which is believed to be more effective at preventing global warming than R32 refrigerant, or a natural refrigerant like R290, which is highly flammable, is expected to become more common from now on. This means that if these flammable refrigerants are used, the accident is likely to be more severe.

[0094] Consequently, reducing the risk of accidents will become increasingly important from now on. Consequently, when operating the air conditioning system from outside, it will become increasingly important to further reduce the risks that can lead to accidents.

[0095] In the above description, the air conditioner that uses the refrigeration cycle was taken as an example, but the floor heating or hot water supply that uses the refrigeration cycle is also each a device that uses the Carnot cycle, and the principle is the same as the air conditioner, and each is a device that requires a large amount of electricity like the air conditioner, and it can be said that the same problem exists.

[0096] Next, an effect of a refrigeration cycle device according to the present embodiment will be described.

[0097] In the refrigeration cycle device according to the present embodiment, in a case where the refrigeration cycle device is to be operated from the outside, the occurrence of an accident during operation can be prevented because the refrigeration cycle device is controlled to a target state with low operating power.

[0098] The effect of the embodiment on a device that uses the refrigeration cycle is described below using the example of an air conditioning system.

[0099] For an air conditioner that uses an inverter-driven refrigeration cycle, the upper limit of the cooling or heating capacity that the air conditioner can achieve is typically higher than the rated power used at the time the air conditioner is specified for the applicable number of mats, i.e., the applicable floor area. The upper limit of the cooling or heating capacity that the air conditioner can achieve is called the maximum power. The power consumption during this time is called the maximum power consumption.

[0100] Maximum power is used to quickly bring a room temperature to the set temperature when the air conditioner is started and is an important feature of inverter control. However, power consumption is higher at maximum power than at normal rated power.

[0101] During normal use of the air conditioner, where the air conditioner is turned on when a family member comes home, the room temperature will quickly reach the set temperature as described, making the room very comfortable. However, if the air conditioner is operated from outside, it is not necessary to quickly adjust the room temperature to the set temperature.

[0102] In addition, the energy efficiency of an air conditioner is generally indicated by the COP (Coefficient of Performance), which is calculated based on the ratio of air conditioning power (W) to electricity consumption during air conditioning (W). The higher the COP value, the more efficient the operation.

[0103] Consider a typical air conditioner currently on the market as an example. For a wall-mounted household air conditioner with a rated power of 2.8 kW, for example, the COP of the unit during heating operation at rated power is 4.0, while the COP of the unit during heating operation at maximum power is 3.2. As described, the COP of an inverter-controlled air conditioner when operating at maximum power is generally lower than the COP when operating at rated power. This means that in a case where the air conditioner is to be operated from a location where one has just left, it is not necessary to quickly bring the room temperature to the set temperature because there is initially no one in the room. Consequently, energy efficiency is higher and energy-saving operation is possible when operating at lower power.

[0104] Utilizing the above features, for an air conditioner capable of wireless operation from the outside, such as from a location where one has left, via Wi-Fi (registered trademark), in a case where an operation instruction is to be given to the refrigeration cycle device from the outside, it is not necessary for the air conditioner to quickly bring the temperature close to the set temperature by exhibiting maximum performance. Therefore, even when operating for the same temperature setting, by performing an operation that lowers the operating performance of a device, power consumption can be reduced and the risk of an accident can be reduced compared to a case where the operation instruction for the refrigeration cycle device is given from inside the building.In addition, this operation enables energy-efficient operation, which in turn contributes to energy savings.

[0105] Similarly, in a case where the operation to start the operation of multiple refrigeration cycle units is performed from the outside, due to the large amount of suddenly consumed electrical power, the electrical power will exceed the contracted electrical capacity of a house, and the risk of a switchboard breaker tripping increases. The sudden increase in power consumption increases the heat generation of a power line in a house, and the risk of an accident increases.

[0106] To reduce this risk, when multiple refrigeration cycle units are to be operated simultaneously, the operation, which reduces the power of a unit, is performed automatically, compared to a case where an operation command is given to a single refrigeration cycle unit. This reduces power consumption, which in turn reduces the risk of a switchboard circuit breaker tripping or an accident. It enables energy-efficient operation, which in turn contributes to energy savings.

[0107] Next, another system for reducing the risk in a case where the operation or commissioning of the multiple refrigeration cycle units is carried out from the outside (from the exterior) is described.

[0108] In a case where the operation of the multiple refrigeration cycle units is performed from the outside, a user sets a sequence of when the refrigeration cycle units start up in advance. This allows the multiple refrigeration cycle units to start operation as needed, with each refrigeration cycle unit running at certain regular intervals according to the operation start sequence. If the refrigeration cycle unit is an air conditioner, it is possible to regulate the high power consumption that occurs at operation start because multiple air conditioners do not operate at the same time. Consequently, the risk of an accident or the switchboard breaker tripping can be prevented.

[0109] Next, a standard for reducing the capacity of a unit is specified in a case where the refrigeration cycle unit is operated from the outside. Generally, in the case of an air conditioner, the floor area of ​​a house where the air conditioner can be installed is adjusted according to the rated capacity.

[0110] For a domestic air conditioner, a nominal power of 275 W / m 2 required to heat a south-facing, single-story, wooden house. In a room with eight mats, which has a floor area of ​​approximately 13 m 2 An air conditioner with a rated heating output of 3575 W (approximately 3600 W) is selected. If a device is selected as described, the room can be heated to approximately 20 degrees Celsius even at an outside temperature of 0 degrees Celsius.

[0111] An inverter-controlled air conditioner can achieve a maximum power that exceeds this rated power, but this is the power required to quickly bring a room temperature to a set temperature. This means that the higher the maximum power, the faster the room temperature will reach the set temperature. However, in a case where the air conditioner is to be operated from the outside, it is not necessary for the room temperature to quickly reach the set temperature once the air conditioner has finished operating; instead, it is preferable to reduce the maximum power to a power lower than the rated power.By following this procedure, the power consumption during start-up of the air conditioner can be reduced to approximately the rated power consumption, reducing the risk of an accident or the risk of the electrical panel breaker being tripped. Furthermore, energy efficiency and energy savings in the air conditioner are increased. Embodiment 2.

[0112] In the present embodiment, parts different from those of Embodiment 1 are mainly described. There are cases where the same configurations as in Embodiment 1 are denoted by the same reference numerals and the descriptions are omitted. *** Description of the configuration ***

[0113] Fig. 7 is a diagram showing a configuration of a refrigeration cycle control system 500 according to the present embodiment.

[0114] The Refrigeration Cycle Control System 500 from Fig. 7 contains in addition to the configuration of Fig. 1 a file server 20 which communicates with the refrigeration cycle device 100 via the network 11.

[0115] The refrigeration cycle control system 500 is composed of the file server 20 and the refrigeration cycle device 100, which includes the refrigeration cycle device 110 and the control device 120.

[0116] The file server 20 is capable of communicating with the control unit 120 via the network 11. The file server 20 is, in particular, a cloud server belonging to a cloud system.

[0117] A lifestyle log 21 is stored on the file server 20, which describes a lifestyle of the user 80 of the refrigeration cycle device 110.

[0118] Fig. 8 is a diagram showing a configuration of a control device 120 according to the present embodiment.

[0119] In the present embodiment, the operation control unit 122 receives the lifestyle protocol 21 via the communication device 950.

[0120] The detection unit 121 receives the operation request for operation 63, which requests that the refrigeration cycle unit 110 arranged inside the building 90 be controlled to the target state.

[0121] When the operation control unit 122 receives the operation request for the operation 63 transmitted from the outside (exterior) 91, the operation control unit 122 controls the refrigeration cycle device 110 to the target state based on the lifestyle protocol 21 with a lower operation performance than the operation performance of the refrigeration cycle device 110 in a case where the operation request for the operation 63 is transmitted from the building interior 90.

[0122] Fig. 9 is a diagram showing an example of the lifestyle protocol 21 according to the present embodiment.

[0123] The lifestyle log 21 shows the lifestyle of the user 80. A lifestyle 521 showing the lifestyle of the user 80 is entered in the lifestyle log 21. Information such as a living area 522 showing an area in which a user lives can be entered in the lifestyle log 21.

[0124] Information specifying the lifestyle of the user 80 is entered into the lifestyle log 21. In the present embodiment, for example, information such as season, weather, daily attributes, and daily living situation are set. Furthermore, it is desirable to enter various information for specifying a lifestyle. In particular, it is desirable to record information such as gender, age, family structure, employment status, behavior patterns, preferences, or information about the home of the user 80. Vital signs of a human body such as blood pressure, heart rate, and respiration should preferably also be recorded. Based on these lifestyles 521, the lifestyle itself is recognized as an attribute of the user.A concrete example: If user 80 is a family of two, a man in his 30s and a woman in her 30s, it is desirable to detect whether this is a dual-income family with no children. Behavior patterns, such as the time user 80 gets up, leaves the house, returns home, bathes, and goes to bed, should be detected as attributes. Preferences, such as whether user 80 is sensitive to heat or cold, can be detected as attributes. Information regarding the house in which refrigeration cycle device 110 is located can be detected. *** Description of the business ***

[0125] Fig. 10 is a flowchart showing the operation of the control device 120 according to the present embodiment.

[0126] Step S101 and step S102 are the same as the steps in Embodiment 1.

[0127] In step S103a and step S104a, the operation control unit 122 performs operation control of the refrigeration cycle device 110 based on the lifestyle protocol 21 in addition to the functions that match the functions in Embodiment 1.

[0128] In step S103a, the operation control unit 122 controls the refrigeration cycle device 110 to the target state based on the lifestyle protocol 21 and the operation request 63. Specifically, the operation control unit 122 generates the operation control instruction 64 in a manner that quickly transitions the refrigeration cycle device 110 to the target state, taking the lifestyle protocol 21 into account, and sends the operation control instruction 64 to the refrigeration cycle device 110.

[0129] In step S104a, the operation control unit 122, based on the lifestyle protocol 21 and the operation request 63, controls the refrigeration cycle unit 110 to the target state with an operating power lower than the operating power of the refrigeration cycle unit 110 in a case where the operation request 63 is transmitted from the building interior 90. The operation control unit 122 generates the operation control instruction 64 such that the refrigeration cycle unit 110 enters the target state with an operating power lower than the operating power of the refrigeration cycle unit 110 in a case where the operation request 63 is transmitted from the building interior 90, taking the lifestyle protocol 21 into consideration, and transmits the operation control instruction 64 to the refrigeration cycle unit 110.

[0130] That is, in addition to the same functions as in Embodiment 1, the operation control unit 122 adjusts the target state of the refrigeration cycle device 110 according to the preference of the user 80 according to the lifestyle of the user 80. In particular, when the user 80 performs the operation of the refrigeration cycle device 110 from a location to which the user 80 has left, the operation control unit 122 can set an appropriate target state based on the lifestyle log 21 without the user 80 specifically specifying the target state. *** Description of the effect of the present embodiment ***

[0131] According to a refrigeration cycle control system of the present embodiment, in a case where the refrigeration cycle device is to be operated from the outside, the occurrence of an accident during operation can be prevented, energy saving can be realized, and operation control suitable for the user can be realized.

[0132] In Embodiments 1 to 2 above, each unit of the control device is described as an independent functional block. However, the configuration of the control device does not have to be the configuration described in the above-described embodiments. The functional block of the control device can have any configuration as long as the functions described in the above-described embodiments are realized. The control device may be a system composed of a plurality of devices, not just a single device.

[0133] In Embodiments 1 to 2, multiple parts may be combined and implemented. Or, only a part of these embodiments may be implemented. Furthermore, these embodiments may be combined and implemented in any manner, either completely or partially.

[0134] That is, in Embodiments 1 to 2, a free combination of each embodiment, a variation of each element in each embodiment, or the omission of each element in each embodiment is possible.

[0135] The above-described embodiments are essentially preferred examples and are not intended to limit the scope of the present invention, the range of application of the present invention, or the scope of use of the present invention. Various modifications may be made to the above-described embodiments as necessary. List of reference symbols 11 Network; 12 wireless LAN; 13 short-range wireless communication; 20 file servers; 21 Lifestyle Protocol; 31 Refrigerant circuit; 32 compressor; 33 four-way valve; 34 first heat exchanger; 35 expansion mechanism; 36 second heat exchanger; 40 first control device; 50 second control device; 63 operating requirement; 64 Operating control instruction; 80 users; 90 building interior; 91 outside / exterior; 100 refrigeration cycle device; 110 refrigeration cycle unit; 120 control unit; 121 recording unit; 122 operating control unit; 123 limit number; 500 Refrigeration cycle control system; 521 Lifestyle; 522 living area; 909 Electrical circuit; 910 processor; 921 storage; 950 communication device.

Claims

[1] Refrigeration cycle device (100), comprising: a plurality of refrigeration cycle devices (110), each having a refrigeration circuit in which a refrigerant is compressed and circulated in a compressor (32), and in which heat is absorbed from a low-temperature heat source and released to a high-temperature heat source by a heat exchanger (34, 36); and a control device (120) for controlling the operation of the plurality of refrigeration cycle devices (110), wherein the control device (120) comprises: a detection unit (121) for receiving an operation request for an operation (63) which controls the plurality of refrigeration cycle devices (110) arranged in a building interior towards a target state, and an operation control unit (122) for controlling the plurality of refrigeration cycle devices (110) toward the target state with a lower operating power than the operating power of the plurality of refrigeration cycle devices (110) in a case where the operation request for the operation (63) is transmitted from the outside (91), when an operation request for the operation (63) transmitted from the outside (91) is received, and wherein the operation control unit (122) staggers the operation start points of at least some of the plurality of refrigeration cycle devices (110) when the operation request for the operation (63) transmitted from the outside (91) is received. [2] The refrigeration cycle device (100) according to claim 1, wherein the operation control unit (122), when receiving the operation request for the operation (63) transmitted from the outside (91), controls the operation power of each of the plurality of refrigeration cycle devices (110) to be lower than the operation power in a case where the operation of a single refrigeration cycle device (110) is performed. [3] Refrigeration cycle device (100) according to one of claims 1 or 2, wherein the control device (120) comprises a memory (921) for storing as a limit number (123) the number of refrigeration cycle devices (110) which start the operation of the operation at the same time in a case where the operation request for the operation (63) transmitted from outside (91) is received, and wherein the operation control unit (122), when the operation request for the operation (63) transmitted from the outside (91) is received, starts the operation of the operation of the limitation number (123) of refrigeration cycle devices (110) of the plurality of refrigeration cycle devices (110). [4] The refrigeration cycle device (100) according to any one of claims 1 to 3, wherein the operation control unit (122), when receiving the operation request for the operation (63) transmitted from the outside (91), controls the operation performance of the refrigeration cycle to be lower than the operation performance in a case where the operation request for the operation (63) is transmitted from the inside of the building, so that the time until reaching the target state is long. [5] The refrigeration cycle device (100) according to any one of claims 1 to 4, wherein the operation control unit (122), when receiving the operation request for the operation (63) transmitted from the outside (91), controls the operation power of the refrigeration cycle to be low by limiting the maximum electric power consumption of the refrigeration cycle to be equal to or lower than the rated electric power consumption. [6] The refrigeration cycle device (100) according to any one of claims 1 to 5, wherein the operation control unit (122), when receiving the operation request for the operation (63) transmitted from the outside (91), checks whether or not the total electric power of the electric power of the electric devices exceeds the electric power usable in the house based on information about the electric power usable in a house in which the plurality of refrigeration cycle devices (110) are arranged and information about the electric power of electrical devices including the plurality of refrigeration cycle devices (110), the electrical devices being the electrical devices used in the house, and starts the operation of the operation of the plurality of refrigeration cycle devices (110) in a case where the total electric power does not exceed the electric power usable in the house. [7] The refrigeration cycle device (100) according to any one of claims 1 to 6, wherein the refrigerant used in each of the plurality of refrigeration cycle devices (110) is a moderately flammable refrigerant or a flammable refrigerant. [8] Refrigeration cycle control system (500), comprising: a file server (20); and a refrigeration cycle device (100) comprising: a plurality of refrigeration cycle devices (110), each having a refrigeration circuit in which a refrigerant is compressed and circulated in a compressor (32) and in which heat is absorbed from a low-temperature heat source and released to a high-temperature heat source by a heat exchanger (34, 36), and a control device (120) for controlling the operation of the plurality of refrigeration cycle devices (110), wherein the file server (20) contains a lifestyle log (21) indicating the lifestyle of a user (80) of the plurality of refrigeration cycle devices (110), and wherein the control device (120) comprises: a detection unit (121) for receiving an operation request for an operation (63) which controls the plurality of refrigeration cycle devices (110) arranged in a building interior toward a target state, and an operation control unit (122) for controlling the plurality of refrigeration cycle devices (110), when an operation request for the operation (63) transmitted from outside (91) is received, based on the lifestyle protocol (21) with a lower operation performance towards the target state than the operation performance of the plurality of refrigeration cycle devices (110) in a case where the operation request for the operation (63) is transmitted from inside the building, and wherein the operation control unit (122), when the operation request for the operation (63) transmitted from the outside (91) is received, staggers the operation start points of at least some of the plurality of refrigeration cycle devices (110). [9] A method for controlling a refrigeration cycle of a refrigeration cycle device (100), the refrigeration cycle device (100) comprising: a plurality of refrigeration cycle devices (110), each having a refrigeration circuit in which a refrigerant is compressed and circulated in a compressor (32) and in which heat is absorbed from a low-temperature heat source and released to a high-temperature heat source by a heat exchanger (34, 36), and a control device (120) for controlling the operation of the plurality of Refrigeration cycle devices (110), wherein the method for controlling the refrigeration cycle comprises: Receiving an operation request for an operation (63) by a detection unit (121) of the control device (120), which controls the plurality of refrigeration cycle devices (110) arranged inside the building towards a target state; when an operation request for the operation (63) transmitted from outside (91) is received, controlling the plurality of refrigeration cycle devices (110) by an operation control unit (122) of the control device (120) into the target state with lower operating power than the operating power of the plurality of refrigeration cycle devices (110) in a case where the operation request for the operation (63) is transmitted from inside the building, and when the operation request for the operation (63) transmitted from the outside (91) is received, staggering the operation start points of at least some of the plurality of refrigeration cycle devices (110) by the operation control unit (122).

Citation Information

Patent Citations

  • Air conditioner

    JP2015010769A

  • JP002015010769A