SENSOR UNIT AND METHOD FOR DETECTING FAULT CURRENTS IN A POWER SUPPLY NETWORK

DE502021005245D1Inactive Publication Date: 2024-10-10SIEMENS AG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE502021005245
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-09
Publication Date
2024-10-10
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Current sensor units in energy supply networks cannot detect fault currents during the charging phase, leading to delayed fault detection and localization, especially in low-voltage networks, which hampers efficient network operation and customer safety.

Method used

A sensor unit with a current transformer, load resistor, energy buffer, and electronic unit that monitors and evaluates charging voltage to detect fault currents during both measuring and charging phases, allowing continuous monitoring and quick fault localization.

Benefits of technology

Enables the detection of fault currents and de-energized conductors during the charging phase, facilitating rapid fault localization and minimizing disruptions, thus ensuring safety and reducing the impact on customers.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

Technical area

[0001] The present invention generally relates to the field of energy distribution networks and energy supply. In particular, the present invention relates to a sensor unit which enables the detection of fault currents or faults in a conductor to be monitored in a power supply network. The sensor unit has a current transformer which is used in a measuring phase to determine a current in the conductor to be monitored in the power supply network via a load resistor and in the charging phase to charge an energy buffer for the internal power supply of the sensor unit. An electronic unit is provided for controlling the sensor unit and for evaluating and transmitting measurement results. Furthermore, the present invention relates to a method for the continuous detection of fault currents in a power supply network using the sensor unit according to the invention. State of the art

[0002] Due to the increasing penetration of decentralized, mostly renewable energy generation systems (e.g., photovoltaic systems, wind turbines, etc.), the traditional operation of energy supply networks, such as medium-voltage and low-voltage grids, is facing major challenges. The development of electromobility and the resulting increased substitution of electricity for other forms of energy transmission are also leading to further challenges. So-called smart grids are often seen as a solution.

[0003] Electrical power grids transmit and distribute electrical energy from the generator to the end user. A key task of an energy grid operator is to ensure and improve the reliability of the electrical energy supply to end users. In addition to optimal operation during normal operation, another key aspect of managing modern energy distribution and supply networks is the digitalization and automation of fault management. This allows for the rapid and targeted detection, localization, and rectification of malfunctions and faults (e.g., damage, short circuits, earth faults, etc.) in the energy grid infrastructure (e.g., transformer stations, lines, cables, etc.). This ensures the safety of people and the conservation of operating resources.Furthermore, the number of end users or customers affected by the error can be kept as low as possible.

[0004] Faults can often be detected and localized relatively quickly in high-voltage transmission networks (e.g. in Europe in a voltage range of 60 kV (kilovolts) to 380 kV and higher) and in medium-voltage distribution networks (e.g. 1 kV to approx. 60 kV in Europe), usually the higher medium-voltage level, because these networks with comparatively high coverage usually use relatively expensive protection, measuring and station control devices for network automation. In particular, distribution networks at the usually low medium-voltage level and especially distribution networks at the low-voltage level (e.g. between 230 / 400 volts up to 1000 volts in Central Europe) are comparatively little automated. In particular, the operating status of low-voltage networks is often difficult for the respective network operator to determine. However, rapid and targeted fault localization is essential for efficient network operation.Furthermore, power grid lines – regardless of the voltage level – are rarely monitored. For example, in transmission grids, very long unmonitored lines between distribution and switching units are common. If a fault occurs along such a line, it is relatively difficult to identify the fault location and initiate targeted remediation.

[0005] An operator of an energy supply network, especially at the low-voltage level, frequently received reports of faults (e.g., power outages) directly from its customers or end users, who reported a power outage to the operator by phone. Such reports had to be collected, reviewed, and processed accordingly. Such a process alone was often comparatively time-consuming.

[0006] For example, there has now been a move to equip electrical distribution networks, particularly power grids at the medium-voltage and low-voltage levels, with sensor units that at least enable monitoring of the operating status of the power grid. Such sensor units include so-called fault indicators (also known as "Fault Circuit Indicators" (FCI) or "Fault Passage Indicators (FPI)"), which, for example, measure current at their installation location (e.g., in an overhead line and / or a cable line of the power grid). Based on the measured current, such sensor units can determine whether the operating status is permissible or impermissible, or whether a fault (e.g., damage to the overhead line or cable line, short circuit or ground fault, etc.) in the power grid is present.If such a sensor unit detects an error at its measuring point, the sensor unit can emit a signal or a message by which an error can be detected and localized.

[0007] Such so-called fault indicators are already available on the market in various designs. Previous fault indicators, such as the one known from US Pat. No. 5,677,678, were only capable of indicating a fault condition at the measuring point using an optical signal. This exclusively optical indication means that maintenance personnel must search the line where the fault is expected until the fault location is found.

[0008] Therefore, the approach has been to equip the sensor units or fault indicators with communication capabilities and to integrate them, for example, as additional components into a network control system of the energy supply network operator. Such concepts are known, for example, from the documents US 8,665,102 B2 or WO 2016 / 023585A1. Such sensor units have, for example, a radio connection, via which measured values ​​and / or error / fault messages can be sent from the sensor units to a higher-level control unit, which can be installed, for example, in a transformer station at a transition to the next higher voltage level or in a control room, or to a monitoring system. For the radio connection, the sensor units or fault indicators can, for example, be equipped at the factory with a radio module (e.g. modem, mobile radio gateway, transceiver, etc.). Such sensor units often contain internal energy storage devices, such as batteries, rechargeable batteries, etc., is used to supply the sensor unit with independent power. However, such sensor units require regular maintenance, as batteries, for example, have a limited lifespan.

[0009] From the document US 2020 / 0408810 A1, for example, a current sensor for determining the level of an electric current in a conductor of a power supply network is known, which uses a current transformer both to measure the current in the conductor and to supply energy to the current sensor and the integrated logic and the integrated radio unit or transceiver. In order not to influence the measurement by energy generation or charging of an energy buffer, which must provide and ensure sufficient energy for the ongoing operation of the sensor unit, separate measuring phases and charging phases are necessary, which usually alternate. In an active measuring phase, the sensor unit can, for example, measure a fault current occurring in the monitored line with high resolution and, with the help of the charged energy buffer, in the event of a fault in the power supply network or line, wirelessly transmit a fault / error message to, for example,a higher-level control unit or a control room. During a charging phase, in which the energy buffer is being charged using the current transformer, the sensor unit is usually inactive. This means that it can neither measure nor transmit data, since the integrated logic and the radio unit are usually de-energized. The sensor unit only returns to the measuring phase once the energy buffer has been charged. Such a sensor unit therefore has the disadvantage that a fault current which occurs during a charging phase of the sensor unit cannot be measured using the measuring transformer and therefore cannot be detected. If a fault also occurs on the line which, for example, requires an emergency shutdown of the line and / or the power supply network, further charging of the energy buffer of the sensor unit is prevented and the sensor unit can no longer transmit information to the higher-level control unit or the control room.

[0010] Publication DE 11 2010 001638 B4 concerns, in general, the measurement of electricity consumption and, in particular, a non-invasive and self-powered measurement of electrical current flowing through a power line in order to enable analysis of electricity consumption on a per-circuit breaker basis.

[0011] The publication DE 10 2018 106940 A1 concerns a measuring device for distributed current and voltage measurement of current-carrying conductors.

[0012] Publication US 2013 / 321965 A1 describes a residual current device configured to detect a residual current signal. The residual current device is designed to open the switching contacts upon detection of a residual current greater than a predeterminable tripping current. A first circuit arrangement is designed to prevent the residual current device from tripping if a residual current occurs whose duration is shorter than half a period of a mains frequency of an associated power grid.

[0013] Publication US 2012 / 249151 A1 describes a compact residual current device for functional testing without interrupting the downstream power grid. It comprises two separate trip circuits, with a first trip circuit independent of the mains voltage and a second trip circuit dependent on the mains voltage. During the functional test, one of the trip circuits or the other trip circuit monitors the electrical network to be protected for residual currents.

[0014] Publication US 2004 / 183522 A1 discloses a device for detecting the current in a power line of a power system. The device relates in particular to the field of current sensors used to monitor current flow in power systems, specifically to a self-powered or remotely powered current sensor device that provides an output signal. Description of the invention

[0015] The invention is therefore based on the object of specifying a sensor unit and a method for detecting fault currents in a power supply network, by means of which fault currents in the conductor to be monitored can be detected and error messages can be transmitted even during a charging phase of the sensor unit.

[0016] This object is achieved by a sensor unit and a method of the type mentioned above having the features of the independent patent claims. Advantageous embodiments of the present invention are described in the dependent claims.

[0017] According to the invention, the problem is solved by a sensor unit with which fault currents in a conductor to be monitored in a power supply network (e.g., medium-voltage network or low-voltage network) are detected. Such a sensor unit has at least: a current transformer, which is used both to determine a current in a conductor to be monitored in the power supply network during a measuring phase and to charge the sensor unit during a charging phase; a load resistor, via which the current in the conductor to be monitored can be determined during the measuring phase; an energy buffer for an internal energy supply of the sensor unit, which is charged via a charging circuit during the charging phase; and an electronic unit for controlling the sensor unit and for evaluating and transmitting measurement results.

[0018] Furthermore, the electronic unit of the sensor unit is configured to monitor or continuously measure a charging voltage at the energy buffer and to compare it with an upper threshold and a lower threshold. Furthermore, the sensor unit has two switching elements which are controlled by the electronic unit in such a way that when the charging voltage at the energy buffer reaches and / or exceeds the upper threshold, a first switching element is closed and a second switching element is opened, thereby putting the sensor unit into the measuring phase, and when the charging voltage at the energy buffer reaches and / or falls below the lower threshold, the first switching element is opened and the second switching element is closed, thereby putting the sensor unit into the charging phase.During the charging phase of the sensor unit, the electronic unit continues to use the monitored charging voltage at the energy buffer to determine a current or a current level in the conductor to be monitored and thereby detect fault currents in the conductor to be monitored.

[0019] The main aspect of the solution proposed according to the invention is that by measuring and evaluating the charging voltage at the energy buffer of the sensor unit during the charging phase, the current in the conductor to be monitored can be easily monitored even during the passive charging phase, in which the load resistor for measuring the current in the conductor to be monitored is de-energized, and fault currents or faults can thus be detected. Monitoring the current in the conductor to be monitored is possible because the charging time or voltage swing at the energy buffer is proportional to this current. Although the current transformer of the sensor unit saturates when loaded by the energy buffer, strong increases in the line current can be detected based on a resulting change in the charging curve of the energy buffer and thus from a measurement of the charging voltage at the energy buffer. With appropriate knowledge of the component properties (e.g.Depending on the factors (e.g., current transformer hysteresis, power consumption of the electronic unit, etc.) and the appropriate selection of components for the sensor unit, at least a rough current value, particularly a fault current, in the conductor to be monitored can be detected and estimated. Thus, the proposed sensor unit can quickly and easily detect fault currents and faults such as malfunctions in the conductor to be monitored, even during the charging phase.

[0020] In addition to detecting fault currents in the monitored line, the proposed sensor unit also offers the advantage of detecting de-energized conductors, such as overhead lines. For example, if the charging voltage of the energy buffer increases only slightly or not at all for a certain period during the charging phase, this indicates a de-energized conductor. The sensor unit can then, for example, use the residual energy in the energy buffer to issue a corresponding error message.

[0021] With the help of the sensor unit, it is possible to quickly detect and report errors and / or faults in a line in a power supply network, not only during the measuring phase of the sensor unit, but also during the charging phase. This enables more precise fault localization in the power supply network. Ideally, for more detailed information (e.g. fault message, etc.) on errors that have occurred, additional information can be transmitted from neighboring sensors of the sensor units. The sensor units in the power supply network can be synchronized in such a way that neighboring sensor units are not in the charging phase at the same time, which enables more precise localization and high-quality measurement in the event of a fault (e.g. high fault currents, de-energized line, etc.).In the event of a fault, a conductor can be selectively switched off, thus ensuring personal safety, conserving equipment and keeping the number of customers affected by a fault to a minimum.

[0022] It is advantageous if the lower threshold value of the charging voltage at the energy buffer is set in such a way that an amount of energy is available in the energy buffer for reduced operation of the sensor unit during the charging phase. It is also advantageous if the upper threshold value of the charging voltage at the energy buffer is set in such a way that the energy buffer is charged for high-resolution measurement of the current in the conductor to be monitored and the transmission of the measurement results. The amount of residual energy in the energy buffer when the lower threshold value is reached and / or undershot simply ensures that the sensor unit can continue to operate with reduced power consumption. This means that the charging voltage at the energy buffer can continue to be monitored during the charging phase (if necessary at a reduced frequency) and evaluated with regard to fault currents in the conductor to be monitored.Furthermore, the remaining energy allows at least short data packets to be sent as error messages. When the upper threshold is reached or exceeded, the charging voltage is high enough for the sensor unit to enter the measuring phase. This means that the energy buffer is fully charged for precise, high-resolution measurements and transmission of the measurement results.

[0023] A practical embodiment of the sensor unit provides that the electronic unit of the sensor unit has at least one control unit, by which the two switching elements can be controlled in opposite directions using control signals, a measuring circuit for processing and evaluating measured values ​​and the charging voltage at the energy buffer, and a radio module for transmitting measurement results derived from the measured values ​​and the measured charging voltage. For this purpose, the electronic unit can ideally be designed as digital logic (e.g., a microcontroller), to which the radio module for transmitting the measurement results is assigned or into which the radio module for transmitting the measurement results is integrated.

[0024] Furthermore, the measuring circuit of the electronic unit is ideally configured to determine the current or a current magnitude and / or fault currents in the conductor to be monitored in the power supply network from measured values ​​at the load resistance of the sensor unit during the measuring phase. Furthermore, it is advantageous if the measuring circuit of the electronic unit is also configured to use the charging voltage at the energy buffer during the charging phase to detect a current magnitude and / or fault currents in the conductor to be monitored in the power supply network. In this way, fault currents in the conductor to be monitored can be quickly detected by the sensor unit both during the measuring phase and during the charging phase, improving fault localization in the power supply network.

[0025] A useful development of the sensor unit provides that the sensor unit further comprises a power supply circuit, via which the electronic unit is supplied with a corresponding, stabilized voltage from the energy buffer. The power supply circuit can be designed, for example, as a DC-DC converter. Using the power supply circuit, the supply voltage for the electronic unit of the sensor unit can be very easily set to a predetermined value and kept stable.

[0026] Furthermore, it is advantageous if a radio technology with low energy consumption and a long range is provided for the wireless transmission of the measurement results from the sensor unit. This means that as little energy as possible is consumed by the sensor unit for the transmission of the measurement results, such as measured values ​​of the current in the conductor to be monitored, error messages when a fault current is detected, fault messages e.g. in the event of a short circuit, earth fault, wire break, etc., which means that an active measuring phase of the sensor unit can last significantly longer than the passive charging phase of the sensor unit. One radio technology that can be used is what is known as narrowband Internet of Things or narrowband IoT radio technology. This is a radio technology for extensive radio networks with low energy consumption, particularly in industrial environments. Narrowband IoT uses a sub-area of ​​the Long Term Evolution (LTE) mobile communications standard.

[0027] Ideally, the two switching elements of the sensor unit are implemented as transistors, field-effect transistors, or semiconductor switches. A capacitor, particularly a so-called supercapacitor (short: supercap) or ultracapacitor, can advantageously be used as an energy buffer. These can be charged and discharged very quickly and withstand significantly more switching cycles than rechargeable batteries. The application areas of supercapacitors range from providing extremely small currents to maintain data content in static memory units in electronic devices to use in power electronics—for example, as an energy buffer.

[0028] The stated object is also achieved by a method for detecting fault currents in a power supply network, which method is carried out by the sensor unit. During an active measuring phase of the sensor unit, a current in a conductor of the power supply network to be monitored is determined using a load resistor, and during a passive charging phase of the sensor unit, an energy buffer for the internal energy supply of the sensor unit is charged via a charging circuit. For this purpose, a charging voltage at the energy buffer of the sensor unit is monitored or continuously measured and compared with an upper threshold value and a lower threshold value. When the charging voltage reaches and / or exceeds the upper threshold value, a first switching element of the sensor unit is closed and a second switching element of the sensor unit is opened, whereby the sensor unit is put into the measuring phase.When the charging voltage reaches and / or falls below the lower threshold, the first switching element of the sensor unit opens and the second switching element of the sensor unit closes, which puts the sensor unit into the charging phase. In addition, the charging voltage at the energy buffer continues to be measured during the sensor unit's charging phase, and a current or current magnitude in the monitored conductor of the power grid is derived from the measured charging voltage. This allows fault currents, interference, and errors in the monitored conductor to be detected even during the sensor unit's charging phase.

[0029] The advantage of the method proposed by the invention is that, even during the charging phase of the sensor unit, fault currents in the conductor to be monitored, as well as faults, disturbances (e.g., ground faults, short circuits, etc.), and a de-energized conductor can be easily and quickly detected by measuring and evaluating the charging voltage at the energy buffer of the sensor unit. The method also enables precise fault localization in the power grid, since a sensor unit can detect a fault current even during the charging phase and transmit a corresponding message, for example, to a control unit or control room.

[0030] It is advantageous if the lower threshold value for the charging voltage is set in such a way that the energy buffer of the sensor unit provides an amount of energy during the charging phase with which the sensor unit can be operated at a reduced measuring frequency during the charging phase and measurement results can be transmitted to a reduced extent.

[0031] Furthermore, it is advantageous if the upper threshold value for the charging voltage on the energy buffer is set in such a way that the energy buffer is charged with an amount of energy with which the sensor unit can measure with high resolution during the measuring phase and can transmit measurement results.

[0032] It is also advantageous if the measurement results determined during the measuring phase and during the charging phase are transmitted wirelessly from the sensor unit to a higher-level control unit using radio technology with low energy consumption and a long range. In this way, the energy required to transmit the measurement results, for example to a higher-level control unit or a control room, can be kept to a minimum. This means that the active measuring phase of the sensor unit can last significantly longer than the passive charging phase. On the other hand, measurement results can also be sent during the passive charging phase in a reduced volume (e.g. data packets with error / malfunction messages with reduced packet size) with the amount of energy defined by the lower threshold for the charging voltage.

[0033] It is also advantageous to perform a comparison with locally and / or centrally stored historical data from the sensor unit's charging phase to detect a fault current during the charging phase of the sensor unit. By comparing historical data—e.g., in the form of locally or centrally learned profiles (e.g., daily profiles of the sensor unit's measurement and charging phases, etc.)—deviations detected based on the charging voltage during the charging phase can be more easily verified, and fault currents in the conductor being monitored can be more easily detected.

[0034] Furthermore, it can ideally also be provided that, in order to detect a fault current during the charging phase of the sensor unit, a comparison is made with measurement data from other, ideally neighboring, sensor units installed in the power supply network. This measurement data can ideally be transmitted to the sensor unit using a radio technology with low energy consumption and a short range, a so-called low-power low-range technology, such as Bluetooth Low Energy (BLE for short) or ZigBee, for example, during a measuring phase and stored in the sensor unit for comparison during the charging phase. Additional sensor units can be used, for example, sensor units that are installed on different line phases but within the same line section of the power supply network.With the help of the measurement data from the other, usually neighboring sensor units, deviations that were detected by the sensor unit during the charging phase based on the charging voltage can then be better interpreted. Short description of the drawing

[0035] The invention is explained below by way of example with reference to the accompanying figures. They show: Figure 1 schematically shows an exemplary arrangement of a sensor unit according to the invention for detecting fault currents in a power supply network; Figure 2 an example of a sequence of the method for the continuous detection of fault currents in a power supply network using the sensor unit according to the invention; Figure 3 schematically an exemplary application of the sensor unit according to the invention in an energy supply network. Implementation of the invention

[0036] Figure 1shows a schematic representation of an exemplary arrangement of a sensor unit SE, by means of which a current I flowing through the conductor L of the power supply network can be measured by means of inductive coupling to a conductor (e.g. cable, overhead line, etc.) of a power supply network, in particular a medium or low voltage network. From the measurement of the current I, the sensor unit SE can then derive a possible fault in the conductor L or a fault in the power supply network (e.g. damage to the conductor L, short circuit, earth fault, etc.). For the inductive, non-invasive coupling of the sensor unit SE to the conductor L of the power supply network, the sensor unit SE has a current transformer SW. The conductor L of the power supply network forms the primary side of the current transformer SW, the secondary side of which is connected to the sensor unit SE. The current transformer SW is adapted to the respective conductor L - i.e.a transformation ratio of the current transformer SW is designed according to the currents I to be expected in the conductor L.

[0037] The sensor unit SE is designed in such a way that the sensor unit SE determines, for example, a level of the current I of the conductor L from the electrical energy supplied by the current transformer SW and digitizes the determined level of the current I and makes it available wirelessly, for example, to a higher-level control unit as a measurement result and / or detects a fault current in the conductor L based on the determined level of the current I and wirelessly sends a corresponding message (e.g. error message, fault message) to the higher-level control unit as a measurement result.

[0038] The sensor unit SE can, for example, be implemented in such a way that the secondary side of the current transformer SW is connected to a rectifier circuit, which for the sake of simplicity is not shown in Figure 1. A series circuit of a first switching element S1 and a load resistor or burden Rb is arranged parallel to the secondary side of the current transformer SW, the load resistor Rb being connected on the one hand to the first switching element S1 and on the other hand to a common potential P. A transistor, a field-effect transistor, semiconductor switch or the like can be used as the first switching element S1, for example. During a measuring phase of the sensor unit SE, a current flows through the load resistor Rb, generating a voltage drop as measured value MW across the load resistor Rb, from which current drop, for example, can be derived from the level of the current I in the conductor L.

[0039] Furthermore, a second switching element S2 is arranged in series with the secondary side of the current transformer SW or with the rectifier circuit (not shown), which second switching element S2 is also connected by a first terminal to the series circuit comprising the first switching element S1 and the load resistor Rb. A transistor, field-effect transistor, semiconductor switch or similar can also be used as the second switching element S2. A charging circuit HS is connected to a second terminal of the second switching element S2. The charging circuit HS is connected, for example, via one terminal to the common potential P and via a further terminal to a first terminal of an energy buffer EB. The energy buffer EB can be charged during a charging phase of the sensor unit SE via the charging circuit HS using the energy made available via the current transformer SW. The energy buffer EB is also connected to the common potential P by a second terminal.A capacitor, ideally a supercapacitor or ultracapacitor, can be used as an energy buffer EB.

[0040] Furthermore, a DC voltage supply circuit is connected to the other terminal of the charging circuit HS, which is also connected to the common potential P via a terminal. The DC voltage supply circuit supplies a corresponding, usually stabilized voltage, provided by the energy buffer EB, to an electronic unit MMT connected to it. This voltage is used to control the switching elements S1, S2 of the sensor unit SE and to evaluate and transmit measurement results (e.g., measured values ​​of the current I in conductor L, error messages, fault messages, etc.). A DC-DC converter, for example, can be used as the DC voltage supply circuit.

[0041] The electronic unit MMT is configured to monitor or continuously measure a charging voltage LP at the energy buffer EB and compare it with a predefined upper and lower threshold value for the charging voltage LP. Furthermore, the electronic unit MMT is configured to control the first switching element S1 and the second switching element S2 in such a way as to switch the sensor unit SE from the charging phase to the measuring phase and from the measuring phase to the charging phase. For this purpose, for example, the measured charging voltage LP is compared with the upper and lower threshold values ​​for the charging voltage LP.

[0042] If the upper threshold value is reached and / or exceeded by the measured charging voltage LP at the energy buffer EB, the first switching element S1 is closed and the second switching element S2 is opened via corresponding control signals AS1, AS2 of the electronic unit MMT. The sensor unit SE is put into the measuring phase, in which the level of the current I in the conductor L to be monitored is determined based on measured values ​​MW at the load resistor Rb, and fault currents can thus be detected through appropriate evaluation. The upper threshold value of the charging voltage LP at the energy buffer EB is set such that the energy buffer EB is sufficiently charged for high-resolution measurement of the current I in the conductor L to be monitored and the transmission of the measurement results derived from the measured values ​​MW.

[0043] However, if the charging voltage LP at the energy buffer EB reaches or falls below the lower threshold, the first switching element S1 is opened and the second switching element S2 is closed via the corresponding control signals AS1, AS2 of the electronic unit MMT. This switches the sensor unit SE from the measuring phase to the charging phase. This means that the energy buffer EB is charged via the charging circuit HS using the energy provided by the current transformer SW. However, the charging voltage LP at the energy buffer EB continues to be measured and evaluated in order to be able to identify the current I in the conductor L to be monitored or any fault currents that may occur from the charging voltage and to be able to forward corresponding measurement results, such as error and / or fault messages with a reduced data volume, e.g. to a higher-level control unit and / or control room.The lower threshold value of the charging voltage LP at the energy buffer EB for switching from the measuring phase to the charging phase is set so that a residual amount of energy is available in the energy buffer EB for reduced operation of the sensor unit SE during the charging phase, with which the sensor unit SE can be measured and evaluated at a reduced frequency and measurement results can be transmitted with a reduced scope (e.g. short data packets with information for detecting errors, etc.) at reduced power consumption.

[0044] For this purpose, the electronic unit MMT of the sensor unit SE can, for example, have a control AN for controlling the first and second switching elements S1, S2, a measuring circuit MS for processing and evaluating measured values ​​MW at the load resistor Rb and the charging voltage LP at the energy buffer EB, as well as a radio unit FM for transmitting measurement results. With the control AN of the electronic unit MMT, the switching elements S1, S2 are each controlled in opposite directions by means of corresponding control signals AS1, AS2 to switch between the measuring phase and the charging phase of the sensor unit SE. For this purpose, the first switching element S1 is controlled with the first control signal AS1 and the second switching element S2 with the second control signal AS2. For a so-called cold start capability of the sensor unit SE, the switching elements S1, S2 are connected such that the sensor unit SE is in the charging phase when switched on or connected to the conductor L. This meansthe first switching element S1 is open and the second switching element S2 is closed in a currentless state of the sensor unit SE.

[0045] The measuring circuit MS of the electronic unit MMT can be used, during the measuring phase, to determine, for example, a level or the current I in conductor L from the measured values ​​MW at the load resistance Rb and, from this, to detect, for example, fault currents in conductor L. During the charging phase, the measuring circuit MS can use the measured values ​​of the charging voltage LP at the energy buffer EB to derive, for example, a level of the current I or fault currents in the conductor L to be monitored.

[0046] The measurement results derived from the measured values ​​MW or the measured values ​​of the charging voltage LP, which may include, for example, data and / or information such as measured values ​​of the current I in conductor L, error messages, fault messages, etc., can then be wirelessly transmitted by the radio module FM, for example, to a higher-level control unit and / or a control room. The electronic unit MMT can be designed as digital logic, in particular as a microcontroller, through which, for example, the control AN and the measuring circuit MS are implemented. The radio module FM can, for example, be assigned to the digital logic or integrated into the digital logic.

[0047] For example, an FM radio module with low energy consumption and a relatively long range can be used as the FM radio module (e.g., a low-power long-range radio module for narrowband IoT radio technology). However, wireless data transmission from the sensor unit SE to the higher-level control unit can also be carried out using radio technologies such as LTE, GPRS, etc., or via a private network of the utility grid operator. Furthermore, the FM radio module can be configured to exchange measurement data with other sensor units SE installed in the power grid, particularly neighboring sensor units SE, using a radio technology with low energy consumption and a short range (e.g., Bluetooth, ZigBee, etc.).

[0048] Figure 2shows a schematic and example sequence of the method for the continuous detection of fault currents in a power supply network using the sensor unit SE. The sensor unit SE is, for example, in the charging phase, e.g. after switching on or first connecting the sensor unit SE to the conductor L - i.e. during a so-called cold start. I.e. the energy buffer EB is connected to the secondary side of the current transformer SW via the second switching element S2 and is charged with a charging voltage LP via the charging circuit HS in order to internally supply the electronic unit MMT with energy. Furthermore, the first switching element S1 is open, whereby the load resistor Rb is disconnected from the current transformer SW and no measured values ​​MW are generated at the load resistor Rb.

[0049] When switching from the measurement phase, the energy buffer EB typically stores at least enough energy to enable reduced operation of the sensor unit SE—for example, measuring the charging voltage LP at the energy buffer EB at a reduced measuring frequency. When switching on or first switching on the sensor unit SE, or during a cold start, the energy buffer EB must first be charged with an amount of energy for reduced operation (e.g., to the lower threshold of the charging voltage) in order to supply the electronic unit MMT with sufficient energy for reduced operation during the charging phase, since during a cold start, little or no energy is typically stored in the energy buffer EB.

[0050] In a first evaluation step 101, the charging voltage LP at the energy buffer EB of the sensor unit SE is measured by the electronic unit MMT or by the measuring circuit MS of the electronic unit MMT, and the measured charging voltage LP is compared with an upper threshold value for the charging voltage LP. The upper threshold value of the charging voltage LP at the energy buffer EB can be set such that the energy buffer EB is charged with an amount of energy that is sufficient to enable the sensor unit SE to measure with high resolution or at a high measuring frequency during the measuring phase and to transmit the measurement results in their entirety, especially in the event of a fault. This means that the upper threshold value of the charging voltage LP is reached, for example, when the energy buffer is sufficiently or fully charged.

[0051] If it is determined in a first check step 102 that the charging voltage LP at the energy buffer EB has reached and / or exceeded the upper threshold value—i.e., the energy buffer EB is sufficiently charged—the sensor unit SE is switched to the measuring phase in a switching step 103. For this purpose, the first switching element S1 is closed by a corresponding first control signal AS1, and the second switching element S2 is opened by a corresponding control signal AS2 of the control unit AN.

[0052] During the measuring phase, the load resistor Rb is connected to the current transformer SW via the closed first switching element S1. A current therefore flows through the load resistor Rb, which creates a voltage drop that depends on the current through the load resistor Rb. This means that during the measuring phase, for example, the voltage drop across the load resistor Rb or the current through the load resistor RB can be used as the measured value MW in order to determine the current I in the conductor L, for example in the measuring circuit MS of the electronic unit MMT, or to detect a fault current in the conductor L. This means that during the measuring phase, the sensor unit SE performs high-resolution measurements and, for example, in the event of a fault, measurement results such as the level of the current I in the conductor, error messages, fault reports, etc. are transmitted.from the FM radio module of the MMT electronic unit to a higher-level control unit and / or a control room, whereby, for example, a radio technology with low energy consumption and a long range, such as Narrowband IoT radio technology, can be used.

[0053] During the measuring phase, the electronic unit MMT of the sensor unit SE is supplied with electrical energy from the energy buffer EB via the DC voltage supply circuit. This means that the energy buffer is discharged to supply energy to the sensor unit SE. Furthermore, during the measuring phase, in a second evaluation step 104, the charging voltage LP at the energy buffer is monitored or measured and compared with the lower threshold value for the charging voltage LP. The lower threshold value for the charging voltage is set such that sufficient energy reserves are still available in the energy buffer EB for reduced operation of the sensor unit SE, especially the electronic unit MMT and the radio unit FM, during the charging phase.

[0054] If, in a second checking step 105, for example, the measuring circuit MS of the electronic unit MMT determines that the charging voltage LP monitored or measured at the energy buffer has reached or fallen below the lower threshold value, the sensor unit SE is switched to the charging phase in a switching step 106. In the switching step 106 to the charging phase, the first switching element S1 is opened by means of a corresponding control signal AS1 from the control unit AN and the second switching element S2 is closed by means of a corresponding second control signal AS2. This means that the load resistor Rb is de-energized and the secondary side of the current transformer SW is connected to the charging circuit via the second switching element S2 in order to charge the energy buffer EB. During the charging phase, the sensor unit SE operates with reduced energy consumption, with the electronic unit MMT at least using the remaining amount of energy stored in the energy buffer EB, for exampleis supplied with energy via the DC power supply circuit.

[0055] During the charging phase, the charging voltage LP at the energy buffer EB continues to be monitored or measured using the measuring circuit MS in accordance with the first evaluation step 101. From the measured charging voltage LP at the energy buffer EB, the electronic unit MMT or the measuring circuit MS determines possible fault currents I in the conductor L of the power supply network to be monitored. Since a charging duration or a voltage swing at the energy buffer EB are proportional to the current I flowing through the conductor L of the power supply network to be monitored, a strong increase in the conductor current I can be detected based on a resulting change in the charging curve of the energy buffer EB, despite saturation of the current transformer SW of the sensor unit SE due to a load from the energy buffer EB. With appropriate knowledge of the component properties of the sensor unit SE (e.g. hysteresis of the current transformer SW, power consumption of the electronic unit MMT, etc.) a fault current I in the conductor L can be detected and at least a rough value of the fault current I can be determined.

[0056] Furthermore, a comparison of the monitored charging voltage or data derived from the charging phase with, for example, historical data from previous charging phases of the sensor unit SE or with measurement data from other sensor units SE installed in the energy supply network can be carried out to detect errors or malfunctions. For example, stored or locally / centrally learned profiles (e.g. daily profile, etc.) can be used for error detection, whereby, for example, the course and duration of a current charging phase of the sensor unit SE are compared with the learned profile or the stored historical data in order to detect, for example, fault currents and to report an error in the event of significant deviations. Alternatively or additionally, a comparison could also be made with data from other sensor units SE, which are located, for example, in the same line sector of the energy supply network - ie, for exampleon different line phases, but in the same section of the power grid, in order to better interpret, for example, deviations from historical data from the charging phase of the sensor unit SE. To obtain measurement data from other, usually neighboring sensor units SE, a radio technology with low energy consumption and a short range—i.e., a low-power, low-range technology such as Bluetooth Low Energy, etc.—can be used.

[0057] If a fault current I in conductor L is detected during the charging phase of the sensor unit SE based on the charging voltage LP measured at the energy buffer EB, then at least a reduced message (e.g., a short data packet, etc.) containing information about the detected fault in conductor L or in the power supply network is transmitted using the energy reserve in the energy buffer EB. The FM radio module of the electronic unit MMT is again used for data transmission, e.g., to a higher-level control unit or a control room.

[0058] If it is now determined during the charging phase of the sensor unit SE—again by means of the first monitoring step 102—that the charging voltage at the energy buffer EB reaches or exceeds the upper threshold, the sensor unit SE is switched back to the measuring phase in switching step 103. This means that the energy buffer EB is recharged, for example, and can once again fully supply the electronic unit MMT with energy for a high-resolution measurement and full data transmission.

[0059] In Figure 3 is an exemplary and schematic application of the sensor unit from Figure 1 or the associated procedure according to Figure 2 shown. Figure 3shows a schematic diagram of an example power supply network, such as a medium-voltage or low-voltage network, which has, for example, three conductors L1, L2, L3 in the form of overhead lines. The power supply network is divided into line segments SK1, SK2, SK3, for example. In each of the line segments SK1, SK2, SK3, sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 are installed on each of the three conductors L1, L2, L3 at a distance which is specified, for example, by a segment length. These sensor units can detect faults in the respectively monitored conductor L1, L2, L3 even during their charging phase. The sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 of a conductor segment SK1, SK2, SK3 can be combined to form sensor groups G1, G2, G3.For example, the sensor units S11, S12, S13 of a first conductor segment SK1 form a first sensor group G1, the sensor units SE21, SE22, SE23 of the second conductor segment SK2 form a second sensor group G2 and the sensor units SE31, SE32, SE33 of the third conductor segment SK3 form a third sensor group G3.

[0060] The sensor groups G1, G2, and G3 can transmit their respective measurement results ME1, ME2, and ME3 (e.g., measured current values ​​in the monitored conductor L1, L2, and L3; error messages, fault information, etc.) wirelessly – e.g., using low-power, high-range radio technology (e.g., NB-IoT, etc.) – to a control unit KE in a control room LW. In the control room LW, the fault localization is then controlled by the higher-level control unit KE based on the measurement results ME1, ME2, and ME3 of the sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, and SE33 or sensor groups G1, G2, and G3.

[0061] For optimized fault localization, sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 can be synchronized in such a way that the charging phases of neighboring sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 or sensor groups G1, G2, G3 do not overlap, since the sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 can only report fault currents or faults in the conductor to be monitored L1, L2, L3 to a reduced extent during the charging phase. This meansIn order to have reliable measurement results ME1, ME2, ME3 of a fault current in the event of a fault and to optimise the localisation of the fault location, the respective sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 and / or sensor groups G1, G2, G3 are synchronised using the approaches briefly described below in such a way that the sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 and / or sensor groups G1, G2, G3 of adjacent conductor segments SK1, SK2, SK3 are never in the charging phase at the same time. This means that the charging phases of adjacent sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 or sensor groups G1, G2, G3 are coordinated in such a way that they do not overlap in time.Ideally, the sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 to be charged are evenly distributed across conductors L1, L2, L3, and there is always approximately the same number of sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 in the charging phase. For example, if the second sensor group G2 is in the charging phase and therefore only delivers reduced measurement results ME2, synchronization ensures that the first and third sensor groups G1, G3 in the first and third conductor segments SK1, SK3 are active or in the measuring phase, respectively, and deliver detailed measurement results ME1, ME3 to the higher-level control unit KE for fault localization.

[0062] If, for example, a fault occurs, such as a short circuit or an earth fault, in the third conductor segment SK3 and an affected sensor unit SE21, SE22, SE23 of the second sensor group G2 is in the charging phase, for example, the fault can be detected as follows: The sensor units SE11, SE12, SE13, SE21, SE22, SE23 of the first and second sensor group G1, G2 detect, for example, a high fault current caused by the fault (e.g. short-circuit current) in the respective monitored conductor L1, L2, L3. Although the affected sensor unit SE21, SE22, SE23 of the second sensor group G2 is not able to carry out a high-resolution or precise measurement due to the charging phase, the fault can at least be detected and a measurement result, such as an error message, can be sent to the control unit KE in a reduced form. The fault can therefore be very easily localized to the third conductor segment SK3.In addition, the sensor units SE11, SE12, and SE13 of the first sensor group G1, which is not in the charging phase at the same time as the second sensor group G2 due to synchronization, send detailed measurement results ME1 of the fault to the control unit KE. After a protective device in the power supply network is triggered, all sensor groups G1, G2, and G3, for example, are de-energized.

[0063] In order to ensure synchronization of adjacent sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 or sensor groups G1, G2, G3 or to prevent overlapping of the charging phase of adjacent sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 or sensor groups G1, G2, G3, synchronization can be carried out centrally, for example by the control unit KE. For this purpose, for example, each sensor unit SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 can learn the respective duration of the respective measuring and charging phase over a number of cycles using an initial standard program and transfer the learned data for the measuring and charging phase to the control box, which then creates a corresponding schedule for the sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 or sensor groups G1, G2, G3 of a network section to be controlled.

[0064] Alternatively, evolutionary approaches (EA for short) with stochastic behavior can be used to synchronize the sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 or sensor groups G1, G2, G3. Furthermore, the use of a self-stabilizing synchronization method, such as the so-called firefly clock synchronization algorithm, or selection algorithms (e.g., leader election methods) would also be conceivable, in which the sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33, which are connected to the same line L1, L2, L3, synchronize with each other or decentrally.

[0065] Another option for synchronizing sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 or sensor groups G1, G2, G3 is a distributed approach based on the idea of ​​bus access methods such as Carrier Sense Multiple Access, or CSMA for short. This compares, for example, the charging phase of a sensor unit SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 with a transmitting phase when accessing a data bus. During this phase, it is important to avoid, for example, two sensor units SE11, SE12, SE13, SE21, SE22, SE23, SE31, SE32, SE33 charging or drawing power from the power grid at the same time in a locally limited area - comparable to transmitting with CSMA.

Claims

1. Sensor unit for identifying fault currents in a power supply network, at least having: - a current transformer (SW) which is used to both determine a current (I) in a conductor (L), to be monitored, of the power supply network in a measuring phase and also to charge the sensor unit (SE) in a charging phase; - a charging resistor (Rb), by way of which the current (I) in the conductor (L) to be monitored can be determined in the measuring phase; - an energy buffer (EB) for an internal power supply of the sensor unit (SE), which is charged by way of a charging circuit (HS) in the charging phase; - and an electronic unit (MMT) for controlling the sensor unit and for evaluating and transmitting measuring results; wherein the electronic unit (MMT) is designed to monitor a charging voltage (LP) on the energy buffer (EB) and to compare the same with an upper threshold value; characterised in that the electronic unit is further designed to compare the charging voltage with a lower threshold value, and that the sensor unit (SE) has two switching elements (S1, S2) which are controlled by the electronic unit (MMT) in such a way that a first switching element (S1) is closed and a second switching element (S2) is opened when the upper threshold value is reached and / or exceeded by the charging voltage (LP) on the energy buffer (EB), as a result of which the sensor unit (SE) is moved into the measuring phase, and that the first switching element (S1) is opened and the second switching element (S2) is closed when the lower threshold value is reached and / or not met by the charging voltage (LP) on the energy buffer (EB), as a result of which the sensor unit (SE) is moved into the charging phase, wherein the electronic unit is designed to use the charging voltage (LP) on the energy buffer (EB) to derive the current in the conductor (L) to be monitored during the charging phase.

2. Sensor unit according to claim 1, characterised in that the lower threshold value is defined for the charging voltage (LP) on the energy buffer (EB) in such a way that in the energy buffer (EB) a quantity of energy is available for a reduced operation of the sensor unit (SE) during the charging phase, and that the upper threshold value is defined for the charging voltage (LP) on the energy buffer (EB) in such a way that the energy buffer (EB) is charged for a highly resolved measurement of the current (I) in the conductor (L) to be monitored and the transmission of the measuring results.

3. Sensor unit according to one of the preceding claims, characterised in that the electronic unit (MMT) of the sensor unit (SE) at least has: - a control (AN), by means of which the two switching elements (S1, S2) can be controlled opposingly by means of control signals; - a measuring circuit (MS) for processing and evaluating measured values (WM) and the charging voltage (LP) on the energy buffer (EB); and - a radio module (FM) for transmitting measuring results, which can be derived from the measured values (MW) and the charging voltage (LP).

4. Sensor unit according to claim 3, characterised in that the measuring circuit (MS) is designed to determine the current and / or fault currents (I) in the conductor (L), to be monitored, of the power supply network during the measuring phase from measured values (WM) on the charging resistor (Rb) and to use the charging voltage (LP) on the energy buffer (EB) to identify a height of the current (I) and / or to identify fault currents (I) in the conductor (L), to be monitored, of the power supply network during the charging phase.

5. Sensor unit according to one of the preceding claims, characterised in that the sensor unit (SE) further has a voltage supply circuit (DC), by way of which the electronic unit (MMT) is supplied with a corresponding, stabilised voltage from the energy buffer (EB).

6. Sensor unit according to one of the preceding claims, characterised in that a radio technology with a low energy requirement and high range is provided for a wireless transmission of the measuring results of the sensor unit (SE).

7. Sensor unit according to one of the preceding claims, characterised in that transistors, field effect transistors or semiconductor switches are provided as a first switching element (S1) and as a second switching element (S2) of the sensor unit (SE).

8. Sensor unit according to one of the preceding claims, characterised in that the energy buffer (EB) of the sensor unit (SE) is designed as a capacitor, in particular as what is known as a supercapacitor.

9. Method for identifying fault currents in a power supply network with a sensor unit (SE) according to claims 1 to 8, wherein during a measuring phase a current (I) in a conductor (L), to be monitored, of the power supply network is determined by the sensor unit (SE) with the aid of a charging resistor (Rb), and wherein during a charging phase of the sensor unit (SE), an energy buffer (EB) is charged for the internal power supply of the sensor unit (SE) by way of a charging circuit (HS), wherein a charging voltage (LP) is monitored on the energy buffer (EB) of the sensor unit (SE) and is compared with an upper threshold value; characterised in that the charging voltage is further compared (102, 105) with a lower threshold value, that a first switching element (S1) of the sensor unit (SE) is closed and a second switching element (S2) of the sensor unit (SE) is opened (103) when the upper threshold value is reached and / or exceeded by the charging voltage (LP), as a result of which the sensor unit is moved into the measuring phase, that the first switching element (S1) is opened and the second switching element (S2) is closed when the lower threshold value is reached and / or not met by the charging voltage (LP), as a result of which the sensor unit (S2) is moved into the charging phase, and that during the charging phase of the sensor unit (SE) the charging voltage (LP) is measured on the energy buffer (EB) and is used to derive the current (I) in the conductor (L), to be monitored, of the power supply network.

10. Method according to claim 9, characterised in that the lower threshold value is defined for the charging voltage (LP) on the energy buffer (EB) in such a way that a quantity of energy is made available by the energy buffer (EB) to the sensor unit (SE) during the charging phase, with which quantity of energy the sensor unit (SE) can be operated during the charging phase with a reduced measuring frequency and measuring results can be transmitted to a reduced extent.

11. Method according to one of claims 9 to 10, characterised in that the upper threshold value for the charging voltage (LP) is defined on the energy buffer (EB) in such a way that the energy buffer (EB) is charged with a quantity of energy with which the sensor unit (SE) is able to be measured with high resolution during the measuring phase and measuring results can be transmitted.

12. Method according to one of claims 9 to 11, characterised in that the measuring results, which are determined (101, 104) during the measuring phase and during the charging phase, are wirelessly transmitted from the sensor unit (SE) to a higher-level control unit by means of a radio technology with a low energy consumption and a large range.

13. Method according to one of claims 9 to 12, characterised in that a comparison with locally and / or centrally stored, historical data of the charging phase of the sensor unit (SE) is carried out in order to recognise a fault current (I) during the charging phase of the sensor unit (SE).

14. Method according to one of claims 9 to 13, characterised in that a comparison with the measurement data of further sensor units (SE) attached in the power supply network is carried out (101) in order to identify a fault current (I) in the charging phase of the sensor unit (SE).

15. Method according to claim 14, characterised in that a radio technology with a low energy requirement and a small range is used for a transmission of the measurement data of the further sensor units (SE) attached in the power supply network, which are used for the comparison in the charging phase.