METHOD FOR THE ADDITIVE PRODUCTION OF A SUPPORTING COMPONENT
Patent Information
- Application Number
- DE502021005459
- Authority / Receiving Office
- DE · DE
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2020-11-04
- Filing Date
- 2021-08-31
- Publication Date
- 2024-10-31
- Estimated Expiration
- 2041-08-31
AI Technical Summary
In additive manufacturing, especially in powder bed processes like selective laser melting, support structures are often necessary due to geometric constraints, but their removal can be difficult, especially when the distance from the base is large or accessibility is limited, leading to inaccuracies and increased effort.
A method involving a first partial connection using a large number of small connection points between the support structure and a simple section of the component, with optional bridge elements for improved stability and heat dissipation, ensuring the connection points are smaller than the melting point expansion and spaced appropriately to facilitate easy removal.
This approach simplifies the removal of support structures by distributing the connection over a larger surface area with small connection points, enhancing accessibility and reducing the complexity of removing support structures, even in challenging geometries, while maintaining structural integrity and heat dissipation.
Description
[0001] The invention relates to a method for the additive manufacturing of a component for the further production of a finished part, wherein the finished part requires a support structure due to its design, since direct production of the entire finished part by means of known manufacturing processes is not possible without the support structure.
[0002] Various methods for the additive manufacturing of components are known from the state of the art. Relevant in this context is the so-called powder bed manufacturing process, in which the component is built up layer by layer. To produce a metallic component, the so-called SLM (Selective Laser Melting) process is generally used, in which a powdered material is melted layer by layer at the location of the respective component. In this process, the component is manufactured starting from a base surface onto which the corresponding powder is applied layer by layer.
[0003] It is now known from the state of the art that no arbitrary geometries can be produced without appropriate auxiliary measures. Problems that may arise include, on the one hand, insufficient heat dissipation of the heat introduced by the melting process or, on the other hand, local subsidence of the structure just produced in the powder bed, resulting in an inaccurate representation of the finished part. For this reason, support structures are regularly used which must be removed again after the component has been manufactured in order to obtain the finished part. In order to keep the effort required to produce the support structures and the effort required to remove them to a minimum, attempts are made to reduce the respective support structure to what is necessary. The support structures are generally built up starting from the base area.
[0004] The use of support structures extending from the base to the problematic section of the precast element is particularly disadvantageous if the distance from the base to the precast element is very large. Furthermore, precast elements sometimes have geometries that make it impossible to use support structures extending from the base to support problematic sections.
[0005] In these cases, the support structures used are connected to a section of the finished part that is initially easy to manufacture, in order to be able to support the problematic section from there. A disadvantage is that, precisely in these cases, access to the support structures is limited, making removal of the support structure particularly difficult. In any case, it is advantageous not to connect the support structure to the finished part over its entire surface. EP 3632591 A1 and the publication ZAFER CAGATAY OTER ET AL: "Support optimization for overhanging parts in direct metal laser sintering" (published in "Optik - International Journal for Light and Electron Optics", 2019) describe this. The proposal is to create a connection consisting of a large number of teeth or points.
[0006] EP 3 632 591 A1 discloses a method for additive powder bed manufacturing, wherein connection points are created by the melting point extending into the space between the component and the support structure.
[0007] The object of the present invention is to provide a connection between a support structure and a prefabricated component, the removal of which from the component can be carried out easily and reliably.
[0008] The stated object is achieved by a method according to the invention for producing a component according to the teaching of claim 1. Advantageous embodiments are the subject of the dependent claims.
[0009] The generic component is initially manufactured using a powder-bed manufacturing process. Which of the known manufacturing methods was used is initially irrelevant. At the very least, the powder-bed manufacturing process defines a base plane extending in an X-direction and a Y-direction. The component is constructed from the base plane, with the base plane thus also defining a Z-direction of the component. In this regard, it should be noted that the base plane only allows the definition of coordinates or an orientation for the definition of the generic component.
[0010] The type of component involved is also initially irrelevant. At least the solution according to the invention is particularly suitable for a component made of a metallic material. Likewise, the embodiment can be advantageously used for a component made of a ceramic material.
[0011] The component considered here comprises a finished part. The finished part can represent a final product, but the finished part is usually also subjected to further manufacturing processes. The finished part can be divided into different sections with regard to manufacturability depending on the powder bed manufacturing process used. There is at least one simple section, which is characterized by the fact that this area of the finished part, starting from the base plane, can be manufactured directly in the powder bed manufacturing process without a support structure. Furthermore, the finished part comprises a difficult section, which is characterized by the fact that its manufacture in the powder bed manufacturing process is not easily possible, so that the use of a support structure is necessary to achieve the desired result.
[0012] Accordingly, the component in question further comprises at least one support structure that enables the production of the difficult subsection. The support structure is connected to the difficult subsection via a second partial connection. In contrast to designs in which the support structure also extends from the ground plane, in this case, the support structure is connected to the simple subsection via a first partial connection. This enables the support of a difficult subsection even at a greater distance from the ground plane or when there is limited accessibility between the ground plane and the difficult subsection.
[0013] In accordance with the generic design, the first partial connection is realized using a plurality of separate connection points, thus extending over a larger surface area. It is essential that each individual connection point be selected as small as possible. Accordingly, the equivalent diameter of each connection point is intended to be no more than 1 mm. The equivalent diameter is determined by determining the smallest cross-section of each connection point connecting the support structure to the simple subsection of the precast element.
[0014] By using a multitude of small connection points, instead of, for example, a single, as small as possible, connection between the support structure and the simple subsection, the mechanical removal of the support structure from the simple subsection, i.e., the separation at the first subsection, is significantly facilitated. This is particularly advantageous because the proposed solution is specifically designed for applications where access is difficult. Nevertheless, the solution can also be used where good accessibility is available.
[0015] However, based on the inventive solution with the multitude of connection points, it may be necessary to create an improved connection in the first partial connection, for example, for better heat dissipation, in order to ensure the assembly of the support structure and the prefabricated part. Therefore, an embodiment is considered to be encompassed by the invention in which one or more bridge elements are used in the first partial connection. To ensure the inventive effect, however, it is required that the bridge element or each of the bridge elements has a maximum width of 2 mm, whereby the extension in the second direction is initially irrelevant.
[0016] If one or more bridge elements are present, it must still be ensured that in the first partial connection, the connection between the support structure and the simple section is essentially realized by the connection points. This is considered to be the case if the number of connection points is selected in relation to the size of the bridge element(s) such that the total cross-sectional area of the connection points corresponds to at least five times the total cross-sectional area of the bridge element(s).
[0017] The powder bed manufacturing process used results in a specific melting point expansion starting from a beam center point of the energy-intensive beam used – usually a laser beam. For example, a beam guided along a vector leads to melting of the powdered material with a process-dependent width and depth of the melted material. Accordingly, a specific melting point expansion can be determined as the averaged value of the width and depth on the component.
[0018] Considering the inventive design with the smallest possible connection points, it is particularly necessary to achieve the desired effect that the equivalent diameter of the connection points is smaller than the specific melting point expansion. From this, it is obvious that during the production of the connection points, the material must not melt continuously from the support structure to the finished part.
[0019] Although the melting point expansion is a process parameter, it can still be determined on the finished component. In this case, the melting point expansion at the same location on the component should be used as a comparison to the equivalent diameter.
[0020] If at least one bridge element is present, it is particularly advantageous if the cross-sectional area of the connection points corresponds to at least 20 times the cross-sectional area of the bridge element(s), so that the desired effect of the small connection points is not unnecessarily reduced by the at least one bridge element.
[0021] Improved separation of the support structure from the precast element is achieved when the connection points are as small as possible and the bridge element as narrow as possible. Accordingly, it is advantageous if the width of the bridge element(s) is no more than 1 mm. Furthermore, it is advantageous if the equivalent diameter of the connection points is no more than 0.5 mm.
[0022] Furthermore, a larger distance between the connection points is advantageous. Accordingly, it is preferable for the distance between adjacent connection points to be at least twice the equivalent diameter. However, it is particularly advantageous if the distance between adjacent connection points is at least five times the equivalent diameter.
[0023] To improve the stability and heat dissipation of the first partial connection, it is advantageous if the distance between the finished part and the support structure in the first partial connection is chosen to be as small as possible. Accordingly, it is advantageous if, in at least the majority of the first partial connection (i.e., in the area of at least 50% of the area), the distance between the finished part and the support structure is no more than 1 mm. Furthermore, it is particularly advantageous if the distance is no more than 0.6 mm.
[0024] In principle, it is advantageous if no bridge element is required. However, if sufficient stability for the support structure in support of the simple subsection, as well as sufficient heat dissipation from the support structure via the simple subsection, cannot be achieved with the connection points alone, a bridge element is preferably provided. It is particularly advantageous if this bridge element is arranged at the edge of the first subconnection facing the ground plane.
[0025] To manufacture the generic component, a model of a finished part is first required. Taking into account the intended manufacturing process in the powder-bed manufacturing process, it is possible to determine which area of the finished part can be manufactured directly in the intended process without additional support structures and which area of the finished part cannot be reproduced to the desired quality without additional measures. The first area that can be manufactured starting from the base plane forms the easy subsection. In contrast, the area that cannot be manufactured without additional measures can be defined as the difficult subsection.
[0026] The next step requires the determination of a support structure that enables the production of the difficult section in the intended powder bed manufacturing process.
[0027] With the definition of the component, comprising the finished part and the support structure, the actual production of the component can now take place in the powder-bed manufacturing process. A powdered material is introduced layer by layer into a build space, with the component's geometry being created layer by layer by melting the powdered material. This involves the use of an energy-intensive beam—usually a laser beam—which melts the surrounding powdered material at the respective beam center.
[0028] Essential for the embodiment according to the invention is the connection of the support structure to the simple partial section via a first partial connection, wherein the first partial connection is formed by the layer-by-layer melting process in accordance with the embodiment according to the invention or an embodiment advantageous therefor.
[0029] The correct representation of the finished part with the aid of the support structure, in particular taking into account the inventive design of the first partial connection, is promoted if, advantageously, the geometry of the support structure is first generated in each layer and only subsequently the geometry of the finished part.
[0030] A key aspect of the invention is that the connection points are as small as possible, while still providing sufficient stability to secure the position of the support structure. Taking into account that the surrounding material melts around the beam center, the invention provides for the beam center to be spaced from the finished part, i.e., from the subsequently created geometry of the finished part, in order to achieve small connection points.
[0031] This allows the connection points to be selected to be smaller than the width of the material melted on both sides of the laser beam. It is obvious that for the inventive design, the beam center point in the first partial connection must be spaced apart from the finished part next to the connection points, since no direct connection is provided between the support structure and the finished part apart from the connection points.
[0032] It is obvious that the distance from the beam center to the finished part must not be greater than the radius of the material melted by the beam in order to ensure the actual connection of the support structure to the finished part at the respective connection point.
[0033] It has been shown that the realization of small connection points can be advantageously achieved when the distance from the beam center to the finished part is at least 0.05 mm. This ensures that the width of the connection point is smaller than the width of the material melted by the beam. It is particularly advantageous if the distance from the beam center to the finished part is at least 0.1 mm.
[0034] Furthermore, it is advantageous if, apart from the connection points, there is no direct connection between the support structure and the finished part in the first partial connection, but the distance between the two sections is as small as possible. This improves heat dissipation from the support structure to the finished part and increases the stability of the connection. It is therefore advantageous if the distance from the beam center point during production of the support structure in the area of the first partial connection to the finished part is a maximum of 1.5 mm. This applies to at least half the extent of the first partial connection. A maximum distance of 1 mm is preferably maintained. However, it is particularly advantageous if the distance is less than or at most 0.7 mm. Furthermore, it is particularly advantageous if the distance is a maximum of 1.5 mm orpreferably at most 1 mm or particularly preferably at most 0.7 mm.
[0035] In the typically used powder-bed manufacturing process, the melting point expansion—that is, the width and depth of the dispersed material, starting from the beam center—depends not only on the beam intensity, for example, but also on the position of the component within the respective build space. This is primarily due to the varying deflection of the beam depending on its position within the build space. Accordingly, the component exhibits a locally specific melting point expansion as the average of the local width and depth.
[0036] If we now consider the manufacturing process with regard to the creation of the individual connection points, it should be noted that the equivalent diameter is smaller than the specific melting point expansion determined at the position of the respective connection point.
[0037] Furthermore, a specific melting radius can be determined as the extension of the molten powder material, measured from the center of the beam, perpendicular to the finished part.
[0038] To achieve a sufficiently small cross-section when creating the connection points, it is advantageous to maintain a distance of at least 0.1 times the melting radius from the beam center to the finished part. However, it is particularly advantageous if the distance corresponds to at least 0.5 times the melting radius, which allows for a particularly small cross-section of the respective connection point.
[0039] However, sufficient stability should be ensured. To achieve this, it is advantageous if the distance from the beam center to the finished part corresponds to a maximum of 0.9 times the melting radius. It is particularly advantageous if the distance when creating the respective connection point corresponds to a maximum of 0.8 times the melting radius.
[0040] If the advantageously small distance between the support structure and the finished part in the area of the first partial connection is now considered, the beam is advantageously guided in such a way that the distance over the majority of the first partial connection corresponds to a maximum of 10 times the melting radius. This allows heat transfer via the powdered material lying between the support structure and the finished part. It is more advantageous if the distance corresponds to a maximum of 5 times the melting radius. It is particularly advantageous if the distance between the support structure and the finished part is as small as possible, but without a direct connection between the support structure and the finished part in the first partial connection (i.e. obviously without considering connection points and possible bridging elements). Accordingly, a distance of a maximum of 0.3 times the melting radius is particularly advantageous.This significantly improves heat transfer across the small intermediate powder layer.
[0041] The use of an energy-intensive beam running along a path leads to a rounded melting zone at the end of each such path. In the first partial connection, the connection between the support structure and the finished part is created only by the connection points - or the connection points and the bridge element - whereby, according to the invention, the connection points should be as small as possible. In order to be able to determine the cross-section of the respective connection point resulting from the melting process as precisely as possible, it is advantageous if the vector along which the beam is guided when imaging the support structure is aligned with the vector along which the beam is guided when imaging the finished part. In this way, the opposing melting zones meet at the end of the respective vector orThe beam's connection points are aligned when mapping the support structure on one side and the finished part on the other. This allows for the advantageous pre-determination of the cross-section of the respective connection point with fixed beam vectors.
[0042] The following figures show exemplary embodiments of a component according to the invention: Fig. 1 shows a first schematic representation of an example of a component according to the invention; Fig. 2 shows a second schematic representation of a further example of a component according to the invention; Fig. 3 shows a representation of the finished part as a component of the component of Fig. 1 ; Fig. 4 an exploded view of the component of Fig. 1divided into the simple section, the difficult section, and the support structure; Fig. 5 shows a sketch of the first partial connection between the simple section and the support structure; Fig. 6 shows a detailed view of a connection point and a bridge element of the first partial connection; Fig. 7 shows a detailed view with a schematic representation of the manufacturing process for depicting the connection points.
[0043] In the Figure 1 A first exemplary embodiment of a component 01 according to the invention is outlined purely schematically, which comprises a finished part 02 and a support structure 05. For subsequent processes, essentially only the finished part 02 is required, while the support structure 05 is merely intended to enable the manufacturing process and is therefore actually undesirable.
[0044] The plan is for component 01 to be manufactured using a powder bed manufacturing process. Component 01 is built up starting from a base plane 09. Component 01 is therefore bounded on one side by this base plane 09. Base plane 09 extends in an X-direction and a Y-direction and defines a Z-direction in which component 01 is built up layer by layer.
[0045] The intended manufacturing process limits the possible design of the component because, depending on the geometry, it is sometimes not easily possible to reproduce this geometry. This leads to a possible delimitation of the finished part 02 into an area, the simple sub-section 03, which can be easily manufactured in the intended manufacturing process. In contrast, the finished part 02 has a further area, the difficult sub-section 04, which cannot be reproduced accurately in the intended manufacturing process without auxiliary measures. In this exemplary embodiment, the difficult sub-section 04, connected to the simple sub-section 02 via ribs 07, projects freely in the direction of the base plane 09, without it being possible to build up the difficult sub-section 04 starting from the base plane 09. In order to now enable the production of the finished part 02 with the difficult sub-section 04, a support structure 05 is required.The support structure 05 is connected to the easy section 03 via a first partial connection 21 and to the difficult section 04 via a second partial connection 22.
[0046] In the Figure 2 A further exemplary embodiment of a component 11 according to the invention is schematically sketched. This 11 also comprises a prefabricated part 12 and a support structure 15. The prefabricated part 12 has a pot-like shape open to the base plane 09. Here, the vertical wall extending in the Z direction forms a simple subsection 13, and the horizontal wall extending parallel to the base plane 09 forms the difficult subsection 14.
[0047] In this case, it would be possible to provide a support structure extending from the base level 09 to the difficult section 14, but this would then be disproportionately large. Therefore, it is also planned to use a support structure 15, which is connected to the simple section 13 via a first partial connection 31 and to the difficult section 14 via a second partial connection 32.
[0048] In the Figure 2 The finished part 02 of the component is now made of Fig. 01sketched, with only one half shown. The structure of the finished part 02 can be seen, starting from the base plane 09, which extends in the X and Y directions, in the direction of the Z axis. With the layered construction using the powder bed manufacturing process, the simple section 03 can be produced, whereas the difficult section 04 hangs virtually in the air, thus missing the starting point for the layered construction. Accordingly, the support structure 05 is required here.
[0049] The Figure 4 the division of component 01 - again only one half is shown - comprising a simple section 03 and a difficult section 04 of the prefabricated part 02 as well as the support structure 05.
[0050] In the Figure 5The area of the first partial connection 21 of component 01 is shown schematically. Basically, the invention provides that the connection between the simple partial section 03 of the prefabricated part 02 and the support structure 05 is realized by a plurality of small connection points 24, and that a small free distance remains between the connection points 24.
[0051] It can also be seen that at the edge of the first partial connection 21 facing the ground plane 09 there is a connection in the form of a bridge element 23 that is wider than the connection points 24.
[0052] To this end, the Figure 6A detailed view of the first partial connection 21 in the area of the bridge element 23 and the connection point 24 located above it. The bridge element 23 is provided at the lower edge of the support structure 05 as a connection to the finished part in order to ensure sufficient heat dissipation initially. However, the width 25 of the bridge element should also be chosen as small as possible. It has proven advantageous if the bridge element is formed over a few layers in the powder bed manufacturing process.
[0053] In contrast, the aim should always be to select the connection points 24 as small as possible. In particular, the equivalent diameter 26 of the connection point 24 should be smaller than the usual width of the material melted during the manufacturing process. This allows for easier removal of the support structure 05 from the finished part 02 in the subsequent process.
[0054] It can also be seen that the distance 27 between the support structure 05 and the finished part 02 in the first partial connection 21 is chosen to be small. Particles 08 of the powdered material used in the manufacturing process are naturally trapped between the support structure 05 and the finished part 02. The small distance promotes heat transfer from the support structure 05 to the finished part 02 via the enclosed particles 08.
[0055] The production of component 01 in the intended powder bed production process in the area of the first partial connection 21 is shown schematically in the Figure 7sketched. On the right, a sketch of support structure 05 is shown. Opposite on the left, sections of the finished part 02 are shown. During the manufacturing process, the surrounding particles are melted using an energy-intensive beam. The beam is guided along a vector 31, 32. A melting zone with a melting point extension 33 exists around the beam center. Furthermore, a melting radius 34 can be determined at the end of each vector. This radius 34 indicates the extension of the melting zone, starting from the beam center, at the end of the vector in the direction of the finished part 02.
[0056] As can be seen from the illustration, the respective connection point 24 has an equivalent diameter 26, which is 26 smaller than the melting point expansion 33. To achieve this, a distance 35 from the beam center to the finished part 02 is advantageously selected when depicting the connection points 24, which distance 24 is 24 smaller than the melting radius 34, but advantageously greater than 0.6 times the melting radius 34.
[0057] Furthermore, the position of the respective vectors 31 for depicting the finished part 02 and the vectors 32 for depicting the support structure 05 can be seen from the illustration. To ensure a defined, predictable equivalent diameter 26 of the connection point 24, this embodiment provides for the vectors 31, 32 to be aligned with one another.
[0058] As previously stated, it is advantageous if the distance 27 between the support structure 05 and the finished part 02 is selected to be as small as possible. However, an uncontrolled connection between the connection points 24 must be avoided. Therefore, the distance 36 from the beam center to the finished part 02 in the first partial connection 21 between the connection points 24 is approximately 2 to 3 times the melt radius 34.
Claims
1. Method for producing a component (01, 11) starting from a base plane (09), which (09) extends in an X direction and a Y direction and defines a vertical Z direction, having the following steps: - providing a model of the finished part (02, 12); - determining a straightforward partial section (03, 13), which (03, 13) can be produced, starting from the base plane (09), without a support structure (05, 15); and - determining a difficult partial section (04, 14), which (04, 14) is spaced apart from the base plane (09) and cannot be produced without a support structure (05, 15); and - determining a support structure (05, 15), which (05, 15) is connected to the straightforward partial section (03, 13) via a first partial attachment (21, 31) and to the difficult partial section (04, 14) via a second partial attachment (22, 32); - producing the component (01, 11) in a powder-bed manufacturing process in which local melting of a powdered material is accomplished by means of at least one beam, thereby defining a specific melting point extent (33) depending on the position, characterized in that the first partial attachment (21, 31) is formed by no bridge element (23) or by at least one bridge element having a width (25) of at most 2 mm and by a multiplicity of connection points (24) having an equivalent diameter (26), resulting from the determination of the smallest cross section of the respective connection point as connection of the support structure to the straightforward partial section of the finished part, of at most 1 mm, wherein the cross-sectional area of the connection points (24) in total corresponds to at least 5 times the cross-sectional area of the one or more bridge elements (23) in total, wherein the equivalent diameter (26) is smaller than the specific melting point extent (33), and wherein the beam centre point is always at a spacing from the finished part (02) during the creation of the connection points (24).
2. Method according to Claim 1, wherein the width (25) of the bridge element (23) is at most 1 mm; and / or wherein the equivalent diameter (26) is at most 0.5 mm; and / or wherein the distance between the connection points (24) corresponds to at least 5 times the equivalent diameter (26).
3. Method according to either of Claims 1 and 2, wherein a distance (27) between the finished part and the support structure in at least the majority of the first partial attachment is at most 1 mm, in particular at most 0.6 mm.
4. Method according to one of Claims 1 to 3, wherein a bridge element (23) is arranged at that edge of the first partial attachment (21, 31) that is adjacent to the base plane (09).
5. Method according to one of Claims 1 to 4, wherein in each layer first the support structure (05, 15) is created and then the finished part (02, 12) is created.
6. Method according to one of Claims 1 to 5, wherein the distance (35) from the beam centre point to the finished part (02, 12) during the creation of the connection points (24) is at least 0.05 mm, in particular at least 0.1 mm.
7. Method according to one of Claims 1 to 6, wherein the distance (35, 36) from the beam centre point to the finished part (02, 12) during the creation of the first partial attachment (21, 311) is at most 1.5 mm, in particular at most 1 mm, in at least half the surface area thereof.
8. Method according to one of Claims 1 to 7, which, depending on the position, has a specific melting radius (34) measured from the beam centre point perpendicularly in relation to the finished part (02, 12), wherein the distance (36) from the beam centre point to the finished part (02, 12) during the creation of the connection points (24) corresponds to at least 0.1 times and at most 0.9 times, in particular at least 0.5 times and / or at most 0.8 times, the melting radius (34).
9. Method according to one of Claims 1 to 8, which, depending on the position, has a specific melting radius (34) measured from the beam centre point perpendicularly in relation to the finished part (02, 12), wherein the distance (35, 36) from the beam centre point to the finished part (02, 12) during the creation of the first partial attachment (21, 31) corresponds to at most 10 times, in particular at most 5 times, in particular at most 3 times, the melting radius (34) in at least half the surface area thereof.
10. Method according to one of Claims 1 to 9, wherein the beam is guided along a respective vector (31, 32), wherein each vector (32) in the reproduction of the support structure (05, 15) is in line with a vector (31) in the reproduction of the finished part (02, 12).
