METHOD FOR GENERATING AN IRRADIATION TAX DATA SET FOR AN ADDITIVE MANUFACTURING DEVICE

DE502021005486D1Active Publication Date: 2024-11-07EOS GMBH ELECTRO OPTICAL SYST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE502021005486
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-06-08
Filing Date
2021-06-07
Publication Date
2024-11-07
Estimated Expiration
2041-06-07

AI Technical Summary

Technical Problem

Multi-scanner additive manufacturing machines face inefficiencies due to fixed allocation of irradiation resources, leading to uneven utilization and conflicts that delay production and affect component quality, as each resource is permanently assigned to specific areas, limiting flexibility and increasing construction time.

Method used

A method for generating an irradiation control data set that dynamically allocates work packages across multiple irradiation resources based on completion times and evaluation rules, optimizing the distribution of layer segments and irradiation patterns to improve resource utilization and component quality.

Benefits of technology

This approach enhances the manufacturing process by reducing construction time, improving component quality, and ensuring more even resource utilization, while maintaining the specified sequence and quality standards.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a method for generating an irradiation control data set for the additive manufacturing of a number of manufactured products or components in a manufacturing process. In particular, the invention comprises a method for generating an irradiation control data set for creating control data for a device for the additive manufacturing of at least a number of components in a manufacturing process, in which at least one layer of a build material is introduced into a process space, and the build material of the layer is selectively solidified into component layers by irradiating at least a portion of the layer using a plurality of irradiation resources, e.g., lasers.The invention further relates to a corresponding irradiation control data set, a method for additive manufacturing, a corresponding control data generation device, a device for additively manufacturing a number of manufactured products, and corresponding control data. A device for additive manufacturing is also referred to below as a manufacturing device or machine.

[0002] Additive manufacturing processes are becoming increasingly relevant in the production of prototypes and, now, also in series production. In general, "additive manufacturing processes" refers to manufacturing processes in which a finished product or component is built up by depositing material, usually based on digital 3D design data. The build-up is usually, but not necessarily, layer-by-layer. The term "3D printing" is often used as a synonym for additive manufacturing; the production of models, samples, and prototypes using additive manufacturing processes is often referred to as "rapid prototyping," and the production of tools as "rapid tooling." As mentioned at the beginning, a key aspect is the selective solidification of the build-up material. In many manufacturing processes, this solidification is achieved by irradiation with radiation energy, e.g.,electromagnetic radiation, particularly light and / or thermal radiation, but possibly also with particle radiation, such as electron beams. Examples of processes that use irradiation are "selective laser sintering" or "selective laser melting." In these processes, thin layers of a mostly powdered build-up material are repeatedly applied on top of one another. In each layer, the build-up material is selectively solidified by spatially limited irradiation of the areas that are to become part of the finished product after production. This is achieved by partially or completely melting the powder grains of the build-up material using the energy locally introduced at that location by the radiation. After cooling, these powder grains are then bonded together to form a solid.

[0003] Many such systems operate with a single irradiation resource, for example, a laser unit with a scanner-mirror system that can move a laser beam across a layer for selective solidification. To achieve higher process speeds, it is advantageous to use multiple irradiation resources in parallel. An example of this is described in WO 2016 / 110440 A1.

[0004] Document DE 10 2017 205051 A1 discloses a computer-aided method for generating a control data set for a generative layer-by-layer construction device for producing a three-dimensional object by means of the device; during production, a plurality of beams are directed onto different regions of a deposited layer of building material for the object.

[0005] With such "multi-scanner machines," it has often been the case that each of the irradiation resources is permanently assigned to a specific area in the process space. This means that the surface of the respective layer to be processed is divided into fixed areas, and each of the irradiation resources is permanently assigned to one of these areas across the entire height of the component to be manufactured, i.e., across all layers in the build direction in the process space. Only in a border area can more than one of the irradiation resources be used. For example, in a four-scanner machine, each layer is divided into four quadrants, and there is a cross-shaped overlap area, with all four irradiation resources or scanners operating only in the center.While such machines with multiple irradiation resources are generally faster than machines with a single irradiation resource, the fixed allocation of irradiation resources to specific layer areas has the disadvantage that the various irradiation resources are unevenly utilized depending on the component being manufactured or the components being manufactured in parallel. Therefore, the speed of building up a layer always depends on the time required by the irradiation resource that is most in demand during the current shift. If all irradiation resources are designed and arranged in such a way that they could, in principle, reach every area of ​​a layer within the process space, greater flexibility would be possible.However, here too, an irradiation strategy is defined before the start of the manufacturing process, in which the irradiation resources are assigned to predetermined layer areas, for example a division into quadrants, purely according to components or similar.

[0006] On machines with multiple irradiation resources, some or all components can be irradiated by multiple irradiation units. Irradiation of a layer with selective hardening of component cross-sections should generally be completed in the shortest possible time. The distribution of the areas to be irradiated, the irradiation sequence, and the allocation of work packages to irradiation resources, e.g., laser / scanner units, all influence component quality. This often results in conflicting objectives that can delay production or negatively impact certain quality characteristics of the components.

[0007] It is an object of the present invention to provide an improved or alternative control method or a control device for an apparatus for additive manufacturing, which preferably offers a possibility for further accelerating the manufacturing process, as well as to provide a method and a manufacturing device in which this control is used.

[0008] This object is achieved by a method according to claim 1, a corresponding irradiation control data set according to claim 10, by a method for additive manufacturing according to claim 11, by a control data generation device according to claim 12 and by a device for additive manufacturing according to claim 13, control data according to claim 14 and by a computer program product according to claim 15.

[0009] The method according to the invention serves to generate an irradiation control data set. This irradiation control data set, in turn, serves to create control data for a device for the additive manufacturing of a number of components (at least one component, but also several components) in a manufacturing process. In such a manufacturing process, at least one layer of a build-up material is introduced into a process chamber and solidified into at least one component layer by irradiating at least a portion of the layer. The build-up material can be pasty or powdery, e.g., a metal-based or polymer-based powder. Solidification occurs selectively using a plurality of irradiation resources, wherein several, preferably at least two, more preferably at least three, and particularly preferably at least four, irradiation resources are controlled or utilized.

[0010] This means that at least one component is manufactured from at least one component layer, but usually from a large number of component layers. Multiple components can also be manufactured in which their respective component layers are solidified at the corresponding locations in the respective layer of the build material by the irradiation resources. Each component layer can be divided into layer segments. This division into layer segments can be based on different structures of a component layer (e.g. contour, downskin, upskin, infill) or a subdivision of work steps for creating the component layer (if a jump occurs, i.e. the respective irradiation resource is switched off and a target location of the irradiation is relocated at the same time, a subdivision occurs). The layer segments therefore correspond to geometric arrangements of layered solidifications of a build material or of layered geometric shapes.Each shift segment can be assigned (at least) one "work package." Such a work package is a procedural representation of a shift segment and represents, for example, a set of work steps for creating the corresponding shift segment or an abstract object of this shift segment in a workflow.

[0011] A work package can, for example, be assigned to a contour of a component. This contour is a layer segment of the outer border of a component, in particular of a closed component cross-section. Other work packages can be assigned to the InFill of the component layer. The term InFill refers to a filling of the component cross-section bordered by the contour. Other work packages can be assigned to the UpSkin or DownSkin layer segments, each of which is a filling within the contour, but can also be part of the contour under certain circumstances. DownSkin is the term used to describe an area of ​​a component that is to be consolidated or has been consolidated and that borders on build material that is not to be consolidated or loose, which is arranged below the build material that is to be consolidated or has been consolidated during the build process. UpSkin is the term used to describe an area of ​​a component that is to be consolidated or has been consolidated and that borders on build material that is not to be consolidated or loose.Loose build-up material is adjacent, which is placed above the solidified build-up material during the build process. The terms "contour," "InFill," "DownSkin," and "UpSkin" can alternatively or additionally each encompass a defined method for selectively solidifying the designated area, e.g., a characteristic set of irradiation parameter values. A work package can, for example, correspond to the work-related representation of a contour (the data-related object "contour, component X, layer Y, position") or to the sequence of concrete work steps for creating this contour.

[0012] Based on a work package, an irradiation resource can, for example, solidify a complete contour of a component cross-section in one layer, either directly with the work steps provided by the work package or by means of work steps derived from the corresponding work package.

[0013] An irradiation resource is understood to be a separately controllable beam or radiation emission location. A radiation emission location can also be understood to be, for example, a controllable mirror system (the so-called scanner), i.e., one radiation source supplies several such mirror systems. In principle, however, each irradiation resource can also have its own radiation source with an associated scanner. The use of separate radiation sources for the individual irradiation resources, for example, configuring each irradiation resource with its own scanner and its own laser, has the advantage that no beam splitters or the like are required and, for example, if one radiation source fails, multiple irradiation resources are not affected.However, in some cases, using a single radiation source for multiple irradiation resources may be advantageous for cost and / or space reasons. Preferred irradiation sources in this case are light-emitting irradiation sources such as lasers.

[0014] A preferred irradiation resource includes a beam source, e.g., a laser or electron beam source, capable of generating a beam that can solidify the build material, a scanner, and often also an optical device for focusing the beams. A scanner is an optical device with which a beam can be deflected. A scanner can comprise multiple deflection devices to deflect the beam along multiple axes. If the beam source has sufficient power and the beams are focused on a specific "point" (i.e., a specific location) of a layer, the build material is melted. By changing the deflection of the scanner, the point can be moved in the plane of the layer. A track of melted or sintered build material can be created along the trajectory of this point. This track is also referred to as a "melt track."The speed at which the point moves in the plane of the layer is also called the "scan speed".

[0015] The component layers or layer segments are irradiated by the irradiation resource in the form of an irradiation pattern. An irradiation pattern is a geometric arrangement of melt paths with which a geometric shape is traced or filled. This can, for example, be a filling of an area with a line pattern (e.g., for an upskin or downskin area) or a path along the component surface (e.g., for a contour). This irradiation pattern can be realized in the form of irradiation parameters. The term "irradiation parameters" refers to an abstract description of an irradiation pattern combined with parameters for generating control commands. These can be constant power specifications and scan speeds, as well as generation instructions specified as functions. Therefore, in the context of this application, the term "irradiation parameters" also includes specific irradiation parameter values.An irradiation pattern can be a simple method of deflecting the scanner along a trajectory in a feed direction, but can also contain a substructure (e.g., "hatching"). To solidify at least a portion of the layer, the irradiation site is often moved according to the control data along a number of scan lines arranged within an irradiation strip, for example, like a hatch pattern. These scan lines are therefore also referred to as "hatch lines."

[0016] The term "feed direction" refers to the direction in which the trajectory is / would be traversed without a substructure. This term refers to the propagation direction of the solidification along the course of the actually solidified irradiation stripe during the production of the component layer. The solidification advancement preferably occurs in a direction along the longitudinal extent of the irradiation stripe. The feed direction describes the propagation or progression of the solidification on a macro level, i.e., the level of the entire irradiation stripe. The term feed direction does not refer to a micro level of solidification, i.e., the movement of the irradiation site along the individual scan lines within an irradiation stripe.In other words, during hatching, a movement of the irradiation site along the scan lines on a micro level causes the advancement of solidification along the irradiation stripe on a macro level.

[0017] A work package can include such irradiation parameters or contain data that can be used to generate irradiation parameters. For example, a work package contains an abstracted form of movement commands for a scanner and temporally or spatially assigned target powers for a radiation source. An irradiation parameter can be assigned to a work package. Control commands for irradiating a sequence of melt tracks can be generated for a specific irradiation resource within a work package.

[0018] The method according to the invention comprises the following steps: a) Provision of layer data comprising data for the structure of layer segments for a component layer.

[0019] This layer data includes data from which control data for creating layer segments for a component layer can be determined, in particular irradiation parameters or data from which irradiation parameters can be determined. The layer data can, for example, include geometric data, e.g. information about a cross-section of a component whose outline is formed by coordinate points in the x / y plane, i.e. a virtual plane parallel to the real build field of the production device. Each plane or layer has an individual z-coordinate. The layer data can also include directional information for scanning by a beam used for solidification, power / speed of the beam and distance between trajectories and other data. b) Distribution of the layer data across several work packages to form a basic set of work packages.

[0020] At least one work package is assigned to each slice segment, whereby each work package is assigned to a slice segment, but several work packages can be assigned to a slice segment. For example, a slice segment can be a continuous contour; in this case, it is preferable to assign a work package to this contour. However, a slice segment can also be an in-fill of a contour in which multiple deposits occur (e.g., the beam is switched off and the scanner is moved). In this case, each part after a deposit is preferably a separate work package and all these work packages are assigned to the slice segment. As indicated above, a work package can comprise a sequence of commands for controlling a laser and the scanner or, alternatively, an electron beam and a deflection field (i.e., an irradiation resource).A work package can therefore represent the command sequence for a component or even a sub-area of ​​a component. For example, areas with different irradiation patterns or different parameterization (scan speed, power, and possibly intensity distribution) can be considered separate work packages. However, in the context of the process, a work package can also be a data object that represents the aforementioned sequence of commands.

[0021] Dividing a slice segment into multiple work packages is particularly advantageous if it requires further subdivision due to its geometric size and / or processing time, e.g., if a specified maximum stripe length is exceeded during irradiation in the form of a stripe pattern, or if specified working ranges of irradiation resources are exceeded. Preferably, only subdivisions are performed where no continuous scan lines (scan vectors, trajectories) need to be split, i.e., the splitting preferably occurs at points where the laser is switched off for a jump to the next line sequence. This generally prevents shortened scan vectors within a stripe.

[0022] All work packages can initially be part of the base set of all work packages and are preferably also initially part of the base set. This base set can, in particular, comprise an ordering of these work packages, e.g., in the form of a directed graph. This base set is reduced by work packages during the process, which are then assigned to work package groups and removed from the base set. This advantageously allows shift data to be distributed across multiple irradiation resources in the form of work packages. c) Provision of a clearly defined ordering relationship for the work packages.

[0023] This sequence relation comprises the sequence to be followed for different layer segments of a component (e.g. contours first, then DownSkin or UpSkin and finally InFill) and in particular represents general rules for ordering work packages. For the irradiation of different segments (contour, UpSkin, DownSkin, InFill), adhering to a certain sequence can be advantageous depending on the material. In particular, the surface quality of a component can be improved, for example, if areas on the surface are irradiated or solidified first. This predetermined sequence gives rise to dependencies between the work packages depending on their assignment to the different areas. A preferred sequence relation can comprise a directed graph that covers the work sequence of layer segments or rules that determine which type of layer segments or work packages come before other layer segments or work packages.Work packages must be completed (e.g., "Contour first, then InFill"). d) Determination of a processing sequence for the work packages based at least on the sequence relation.

[0024] After this step, it is known which work packages must be completed before others. This step preferably results in a simply directed graph of the work packages (i.e., a graph without loops). This graph can be viewed as a new base set, but it can also be viewed as a representation of the base set for subsequent steps. The directed graph is preferably created in addition to the base set. This has the particular advantage that work packages can then be taken into account that have not yet been processed at a time relevant to the process but have already been assigned. The assigned work packages can then be deleted from the base set but still exist in the graph (and "block" the subsequent work packages).In the following, only work packages that are included in both the graph and the base set can be considered (i.e., not the work packages that have not yet been processed and the work packages dependent on them). One advantage of this feature is an improvement in component properties, e.g., with regard to the surface structure. e) Determination of an (expected) completion time for each of the irradiation resources for each work package group of work packages that have already been assigned to these irradiation resources.

[0025] Each work package group contains the work packages for a treatment resource that have already been assigned to it, as well as any waiting times, if any. It can, of course, also contain no elements if no work package has yet been assigned. The completion time is the amount of time a treatment resource needs to process the work packages and includes the time required for each of the included work packages and any additional waiting times. As a rule, the completion times for different treatment resources are different, but they can also be the same, especially at the beginning when the completion time is 0.

[0026] To determine the completion time, the time required to complete each work package or at least a group of work packages can be determined in advance. This is, for example, the time required for irradiation, possibly including jump times between trajectories to be consolidated within a work package during which no irradiation takes place. The time can be estimated in advance or determined by simulation depending on the allocation of the work packages to the irradiation resources. This step is preferred for determining the completion time, but not absolutely necessary, as this can also be repeatedly determined from the work package groups. f) Selection of an irradiation resource taking into account the completion time determined for it, preferably the irradiation resource with the shortest determined completion time (i.e. the earliest completion time).

[0027] Therefore, a irradiation resource is selected, preferably the one that is completed first based on the current status of the work package distribution. If multiple irradiation resources with the same shortest completion time are eligible, one of the irradiation resources can be selected based on other parameters, e.g., randomly, based on position, or based on the last component processed.

[0028] Depending on the shortest completion time determined, a check can be carried out to determine whether all of the work packages ordered in step d) can already be processed in a production process. For example, it may be the case that a group of work packages cannot be carried out at the time in question because a mandatory preceding work package is still being processed by another irradiation resource and is not yet completed. The work packages in question can then be removed from the processing sequence or their selection can be blocked. One advantage of this feature is the reduction in construction time by improving the utilization of the irradiation resources. g) Determination of a selection set of work packages from the basic set of work packages, based on the sequence relationship, whereby the selection set includes those work packages that can be processed according to the processing sequence.

[0029] In this step, those work packages are grouped together in a selection set that may actually be processed at the time in question. Preferably, a filter is also carried out to determine whether all necessary work packages could already be processed in a real process (see above) or whether user specifications exist that prohibit or require the processing of a work package. Further filtering can also be carried out in this step, e.g. whether work packages may even be processed by the selected irradiation resource. The selection set therefore contains those work packages that can be processed in the shortest determined completion time, at least based on the sequence relationship. One advantage of the feature is the improvement in the utilization of the irradiation resources while adhering to the sequence relationship, which in turn leads to an improvement in component properties.h) Selection of a work package from the selection set taking into account a given evaluation rule.

[0030] A single work package can be selected, or a group of work packages can be selected, although the selection of a single work package is preferred. The selection is based on the evaluation rules. This evaluation rules serves to evaluate work packages with a view to a selection. Therefore, the most suitable work package is selected from the work set. It is preferred that, based on the evaluation rules, the work packages in the selection set are assigned an individual evaluation value. This evaluation value can be based, for example, on the degree to which the selected irradiation resource is suitable for performing the work package in question.However, it can also be determined by the position of the respective work package in relation to other work packages currently being processed by other radiation resources, and a rating can be given as to the extent to which smoke above the shift will impair the execution of the respective work package. In a very simple case, the rating rule could specify: "Simply take the next work package from the selection set." By selecting it from the selection set, it is ensured that the work package can be executed at the current time (at the time with the shortest completion time).

[0031] To select the most suitable work package for assignment (based on the rating), the different work packages in the selection set are preferably compared with one another. The prerequisite for this is the definition of a comparison operator that allows a statement to be made as to whether assigning one work package makes more sense than assigning another. This comparison operator arises from the rating rules. In the simplest case, the comparison can comprise two numerical ratings, but it is also possible to carry out this comparison, for example, using a list of priorities or a classification. If a numerical rating is carried out, the selected work packages can be assigned a value based on their rating. If the quality of an rating is linked to a high value, the work package with the highest value is given priority.If the quality of an assessment is associated with a low value, the work package with the lowest value is preferentially selected.

[0032] There are many different types of criteria for comparison, with particularly important criteria being divided into two groups based on their objectives. One group concerns criteria for improving component properties, while the second group concerns criteria for reducing completion time. Preferred criteria for improving component properties are: Position along a flow direction (positions downstream of a current irradiation position receive a worse rating than positions upstream of the irradiation position), angle of incidence of the beam of an irradiation resource on the build area of ​​the additive manufacturing device in the working plane (the further the beam deviates from the vertical, the worse the rating), irradiation direction, in particular the angle between the scan trajectory and the vector from the perpendicular foot point of the irradiation resource to the respective working point, or the distinction between irradiation being preferably directed towards the irradiation resource (slow) or preferably away from it (piercing). The preference for one of these irradiation directions is selected depending on the material or process, since different materials exhibit different behaviors.For an additive manufacturing machine using a laser as the irradiation resource and steel powder as the build material, for example, slow laser exposure is preferred because less smoke has been observed. However, with other materials, sharp exposure can also reduce the generation of material ejection ("spatter") and thus improve part properties. Preferred criteria for reducing build time are: the number or processing time of the subsequent work packages (the larger the number or processing time, the better the rating) and the spatial distance from the work package previously processed by the irradiation resource (the smaller the distance, the better the rating).

[0033] Criteria that impact specific component properties are given higher priority and can be assigned a higher weighting. Prioritization within this group is preferably specific to different materials and processes, so that the criterion that has the greatest influence on a specific component property receives the highest rating, i.e., is weighted with a correspondingly high weighting factor and / or is examined first in the nested comparison. For example, some build materials react particularly sensitively to the beam incidence angle of a laser, while for other build materials, the direction of movement of the laser spot on the build material has a greater influence on certain component properties.

[0034] During the comparison (evaluation), several criteria can be checked in a nested manner. For example, the number of subsequent work packages that require the work package in question can be compared first; if these numbers are the same, the position opposite to the flow direction is compared. The order of the comparisons defines a prioritization of important to less important criteria. This means that during the evaluation, a first group of (particularly important) evaluation criteria from the evaluation rule set is preferably used first. If two or more work packages are equally rated but have the highest rating, these work packages are evaluated using another group of (particularly next most important) evaluation criteria from the evaluation rule set, until only one best-rated work package remains, or no evaluation criteria remain.

[0035] Preferably, different ratings B i of individual criteria are combined into a single rating B B := B(B 0 , B 1 , ... BN ), where N is the number of criteria. This is particularly a linear combination, e.g., B(B 0 ,..BN ) = sum(W i * B i ), where W i are weighting factors.

[0036] Both methods can also be combined by using the numerical evaluation in a nested comparison. One advantage of this feature is that it can improve construction time or component quality. Furthermore, the preferred implementation does not require computationally intensive iterative optimization. i) Assign the selected work package to a work package group associated with the currently selected irradiation resource and remove this work package from the base set of work packages.

[0037] The selected work package is then assigned to an irradiation resource. Since the entire process can be performed prior to processing and is not necessarily linked to a specific machine (only the number and positioning of the irradiation resources relative to each other and relative to the build area should be identical), it is only necessary to assign the selected work package to a work package group, which in turn is assigned to the selected irradiation resource. This results in a data set of work package groups containing work data for the respective irradiation resources of a device for the additive manufacturing of a number of components.

[0038] To prevent duplicate work packages, the assigned work packages are deleted from the base set. This generally results in different processing sequences for each run when the process is repeated with the modified base set. j) Repeat at least steps d) to i) until a predetermined termination criterion is met.

[0039] A preferred termination criterion is the number of assigned or remaining work packages, with a preferred termination condition requiring the distribution of all work packages. Other specified or additional steps can also be included in the repetition, although it is preferable not to repeat steps whose results do not change.

[0040] An irradiation control data set according to the invention has been generated using a method according to the invention. It preferably contains work package groups with work packages for the individual irradiation resources. The irradiation control data set can already include concrete irradiation parameters or simply abstract work packages from which irradiation parameters can be derived.

[0041] A method according to the invention for the additive manufacturing of at least one component layer of at least one component comprises the steps: Introducing a layer of a build-up material into a process chamber; selectively solidifying the build-up material of the layer by irradiating at least a portion of the layer using a plurality of irradiation resources; controlling the irradiation resources using control data generated using an irradiation control data set according to the invention.

[0042] A control data generation device according to the invention for generating an irradiation control data set for creating control data for a device for additive manufacturing of at least a number of components in a manufacturing process, in which at least one layer of a build-up material is introduced into a process space and the build-up material of the layer is selectively solidified into component layers by irradiating at least a partial area of ​​the layer using a plurality of irradiation resources, comprising an allocation unit designed to: a) Processing of provided shift data comprising data for the structure of shift segments for a component layer, b) Dividing the shift data into several work packages to form a basic set of work packages, c) Providing a clearly defined sequence relationship for the work packages, d) Determining a processing sequence of the work packages based at least on the sequence relationship, e) Determining a completion time for each of the irradiation resources for each work package group of the work packages that have already been previously assigned to these irradiation resources, f) Selecting an irradiation resource taking into account the completion time determined for it, preferably the irradiation resource with the shortest determined completion time, g) Determining a selection set of work packages from the basic set of work packages, based on the sequence relationship,wherein the selection set comprises those work packages which can be processed according to the processing sequence, h) selecting a work package from the selection set taking into account a predetermined evaluation rule set, i) assigning the selected work package to a work package group which is assigned to the currently selected irradiation resource and removing this work package from the basic set of work packages, j) repeating at least steps d) to i) until a predetermined termination criterion is reached.

[0043] A device according to the invention for the additive manufacturing of at least one component layer of at least one component in an additive manufacturing process comprises at least one feed device for introducing a layer of a building material into a process space, a plurality of irradiation resources for selectively solidifying the building material of the layer by irradiating at least a partial region of the layer, and a control data generation device according to the invention.

[0044] Control data according to the invention for controlling a device for additive manufacturing are designed such that they were generated using an irradiation control data set according to the invention.

[0045] The invention can be implemented in the form of a computer unit with suitable software. This applies in particular to the control data generation device, which can be implemented in the form of suitable software program components in the computer unit. For this purpose, the computer unit can, for example, have one or more cooperating microprocessors or the like. A largely software-based implementation has the advantage that even previously used control devices can be easily upgraded to operate in the manner according to the invention through a software or firmware update.

[0046] In this respect, the object is also achieved by a corresponding computer program product with a computer program which can be loaded directly into a memory device of a computing device (in a control data generation device and / or a control device of a device for the additive manufacturing of a component layer of a component), with program sections in order to carry out all steps of the method according to the invention when the program is executed in the computing device. Such a computer program product can, in addition to the computer program, optionally comprise additional components such as, for example, documentation and / or additional components, including hardware components such as, for example, hardware keys (dongles, etc.) for using the software. For transport to the control device and / or for storage on or in the control device orA computer-readable medium, for example a memory stick, a hard disk or another portable or permanently installed data storage device, can serve as the control device, on which the program sections of the computer program that can be read and executed by a computer unit of the control device or monitoring device are stored.

[0047] Further, particularly advantageous embodiments and developments of the invention emerge from the dependent claims and the following description, wherein the independent claims of one claim category can also be developed analogously to the dependent claims and embodiments of another claim category and, in particular, individual features of different embodiments or variants can be combined to form new embodiments or variants within the scope of protection of the claims.

[0048] According to a preferred method, the work packages additionally include defined irradiation parameters, which can be information on the management or type of irradiation, but also explicit allocations to irradiation resources. The preferred method additionally includes the following steps: Provision of an assignment relation for assigning irradiation parameters to irradiation resources.

[0049] This allocation relation preferably includes decision criteria as to whether a radiation resource meets the requirements for the radiation parameters, for example, whether the required type of radiation, energy, frequency, or intensity can be provided. However, in a simple case, the allocation relation can also simply check whether the respective radiation resource is explicitly specified in the radiation parameters or whether it has been excluded. Filtering the selection set of work packages based on the assignment relation and the irradiation parameters depending on the selected irradiation resource.

[0050] In this step, a decision is made as to whether the work packages can or may be assigned to the selected irradiation resource at all according to the assignment relation and the irradiation parameters. If not, the work package in question is deleted from the selection set or not included in the selection set at all. Preferably, at least the second of these steps takes place after the order relation has been applied. In another preferred embodiment, it is applied beforehand. However, the steps can also be part of step i), i.e., taken into account in the form of an evaluation. One advantage of this development of the method according to the invention is an improvement in component properties; a distinction can be made between different irradiation resources which may, for example, have a different power spectrum, a different beam diameter, or a different intensity distribution.

[0051] According to a preferred method, the evaluation rules comprise an evaluation for at least one criterion of the group spatial distance of the work package to the selected irradiation resource (e.g. by determining the perpendicular point of the exit point of a laser beam from the optics, whereby the perpendicular point lies in the working plane or on the construction field), number of work packages dependent on the completion of the work package, position of the work package relative to a spatial extent of a determined or predefined smoke extraction area, spatial distance of the work package to a previously assigned work package, duration of the work packages that require the work package in question, spatial distance between beams of the irradiation resources.

[0052] Preferably, a rating value is calculated for each criterion (based on this rating rule), with the rating rule being designed to assign a numerical value to at least one criterion. Particularly preferably, different criteria are additionally assigned different weightings, or the rating rule assigns different numerical weightings to criteria.

[0053] For example, a work package whose execution at the relevant time (in the shortest completion time) lies outside an expected plume of smoke that is created when another work package is executed by a different radiation resource is assigned a better rating (e.g. a higher rating value) than work packages whose execution lies within this plume.

[0054] One advantage of taking into account the spatial distance of the work package from the selected irradiation resource is that it can, for example, lead to a reduction in smoke development and an improvement in component properties.

[0055] An advantage of considering the location of a work package relative to the extent / location of a smoke exhaust area is that irradiation of an area shadowed by smoke can be avoided, which can lead to an improvement of component properties (e.g., lower porosity and / or improved mechanical properties of the component).

[0056] One advantage of considering the spatial distance of a work package from a previously assigned work package is that it can reduce construction time by reducing jump distances of an irradiation resource between the areas of different work packages, thus reducing unproductive completion time. In addition, component properties can be improved by continuing hardening after a still-warm, previously hardened area.

[0057] One advantage of taking into account the number of work packages that the work package in question requires is that this can lead to a reduction in completion time.

[0058] The last point of the criteria is particularly important when using electron beams. These must not be too close to each other, as their electric fields can negatively influence each other. However, even when using light beams, local temperature distributions can occur that can negatively influence each other.

[0059] According to a preferred method, a check is performed to determine whether the selected work package can also be irradiated by another irradiation resource and whether this other irradiation resource is better suited to completing the work package with regard to a predetermined criterion, in particular with regard to an angle of incidence (on the construction site) or deflection angle of a beam of the irradiation resource and / or distance to the work package. This can be easily decided based on the position at which the work package is to be performed. If the other irradiation resource is better suited, the other irradiation resource is declared the selected irradiation resource, and the selected work package is assigned to a work package group that is assigned to this (new) currently selected irradiation resource.

[0060] Within the scope of this preferred embodiment, the completion times of the relevant irradiation resources without the relevant work package are preferably also compared with one another. A change of the selected irradiation resource only occurs if the relevant completion times differ by a maximum of a predetermined time period. The change between the irradiation resources therefore only occurs if the difference in the completion times Δt (= t completion (X) - t completion (Y)) of both irradiation resources is smaller than a specified value t tolerance. This means that, in the worst case, the completion time can be extended by Δt due to this single assignment. However, the assignment does not necessarily have to affect this time difference, since the change can lead to time savings.Instead of t tolerance, a budget for the entire layer could also be used for the specified time period, and the completion time could be simulated with and without changes. This, in turn, could be made dependent on a layer-specific minimum layer time necessary to avoid exceeding a specified substrate temperature (e.g., the temperature of the surface of the build material). This minimum layer time can be calculated using thermal simulation or determined by measuring the temperature of the build area. One advantage of this development of the method according to the invention is an improvement in component properties through a locally more favorable angle of incidence of the beam on the build material or an irradiation direction more advantageous for certain component properties.

[0061] According to a preferred method, the evaluation rule set comprises a cost function, and the evaluation, in particular evaluation values, of the work packages are determined in the course of optimizing this cost function. This cost function preferably comprises a completion time and / or the completion times and / or criteria and / or a relevance assignment according to the above-mentioned evaluation rules and / or a predetermined criterion according to the previously described selection of another irradiation resource.

[0062] The evaluation (in particular the determination of the evaluation values) is preferably carried out by means of an iterative optimization of a schedule, in particular by means of an optimization of the completion time.

[0063] When evaluating the currently selected work packages according to the evaluation rules as described above, a decision is made in each case that can influence the decision options in subsequent assignments. However, the quality of this decision can essentially only be assessed once the entire shift has been calculated. A preferred optimization algorithm calculates a set of evaluations and resulting decisions for each iteration, thus determining the assignment to the work package groups (the irradiation units) and the chronological sequence for the entire shift. The result is then evaluated using a cost function. For the first iteration, these decisions can essentially be made arbitrarily, but preferably based on the evaluation rules.To generate further solutions and thus sets of decisions, various algorithms are known, for example, genetic algorithms that combine decisions from previous iterations. This is also referred to as combinatorial optimization. An advantage of this refinement of the method according to the invention is that an optimized schedule can be determined using the cost function, which can improve construction time and component properties, albeit at the expense of the required computation time.

[0064] According to a preferred method, the processing sequence of the work packages (see step d) above) is additionally determined according to a user specification. Preferably, only user specifications that satisfy the sequence relationship are taken into account (or only those user specifications are permissible). The user specification preferably comprises a specification for a feed direction and / or a specification for assigning an irradiation resource to a (specific) component. Thus, the component in question, or defined parts of the component, are essentially manufactured by the irradiation resource in question. An advantage of this further development of the method according to the invention is an improvement in component properties in certain areas, as there is no change in the irradiation resource if it was assigned by the user, as well as the possibility of taking into account special requirements or specifications of an operator.

[0065] A preferred method comprises the steps: Determining whether work packages in the selection set and work packages already assigned to the currently selected irradiation resource belong to the same component, and if so, creating a new selection set comprising the determined work packages in the selection set that have the relevant affiliation.

[0066] It is therefore examined whether already selected work packages are used to process the same component as (already sorted) work packages in the work package group of the currently selected irradiation resource. These work packages are then assigned to the current selection set, or the remaining work packages are deleted from the original selection set. These steps can also be processed in conjunction with the evaluation or be part of the evaluation rules. However, it is preferable to filter the selection set in this way before the evaluation. An advantage of this development of the method according to the invention is a small number or shorter distances of jumps between the areas of work packages, which is accompanied by a reduction in completion time. In addition, there is now also the option of continuing the irradiation at a still warm location, thus potentially improving component properties.

[0067] According to a preferred method, to determine the processing order, the work packages are arranged in a simply directed graph based on the sequence relation. In this graph, the work packages are present as nodes, and their relationship (workflow) to one another is in the form of directed edges according to the sequence relation. When determining the selection set of work packages from the basic set of work packages, preferably only those work packages are used for which no work package in the graph has to be processed beforehand. In relation to the graph, this means that no work package is included in the selection set to which an edge leads. Therefore, no start nodes or successors are ever selected. It is preferred that the basic set of work packages is the directed graph or includes it. The graph always represents the state at the time of assignment.It is preferred to determine whether, at a point in time during production corresponding to the shortest completion time, work packages are being executed and have not yet been processed. Successors to these work packages are preferably not yet included in the selection set. An advantage of this development of the method according to the invention is that the sequence relationship can be taken into account, which can lead to an improvement in component properties.

[0068] According to a preferred method, if no work packages can be found for the selected irradiation resource, but unprocessed work packages exist, a predetermined waiting time is assigned to the selected irradiation resource instead of a work package. In this case, no work package is deleted from the basic set and at least the repeated steps of the method are carried out again. The waiting time is preferably predetermined in the sense of a time value or is calculated dynamically based on criteria (e.g. processing by the other irradiation resources). It is preferred that the length of the waiting time is such that at least one further work package is completed by another irradiation resource during this time. An advantage of this development of the method according to the invention is that the sequence relationship is maintained.

[0069] A preferred, simple structure for a processing sequence, especially a directed graph, can be based purely on membership in specific areas. The input is a list containing shift segments in the desired order, from which all shift segments are considered starting with the second entry in the list. For each work package belonging to the previous shift segment (therefore, starting with the second shift segment), a dependency is added to the processing sequence for all work packages belonging to the currently considered shift segment.

[0070] A preferred further structure of a processing sequence, in particular of a directed graph, in which the relationships are restricted to topologically connected regions, can be achieved as follows. The advantage of such a processing sequence is that the number of dependencies between the work packages is reduced, thus providing more options for distributing the work packages among the irradiation resources. Similar to the previous simple structure, individual layer segments are considered from a list containing layer segments in the desired order, and all layer segments are traversed in a loop, starting with the second entry in the list. For each first work package belonging to the segment under consideration, work packages from the previous segment that are adjacent to the first work package are determined.For all adjacent work packages, a dependency is added to the first work package in the processing sequence. In particular, a list of adjacent predecessors of work packages is used.

[0071] There may be further preferences regarding the irradiation sequence that may conflict with the already specified relative order between the work packages. For example, to avoid laser / smoke interactions, it may be required that the work packages be irradiated opposite to the flow direction. The following characteristics could be part of the evaluation rules, but they could also be used to determine the processing sequence.

[0072] Figure 9shows a flowchart of an embodiment for creating a further processing sequence, a further directed graph GG. This flowchart describes an algorithm that adds dependencies for work packages in an area potentially shadowed by smoke, provided this does not result in a contradiction. The input is a base set with all work packages and the processing sequence (e.g., the directed graph), which already contains all mandatory dependencies, e.g., due to the irradiation sequence of the layer segments. For each first work package, all work packages that are potentially shadowed by smoke during the irradiation of the first work package are determined.

[0073] All work packages shadowed by smoke are then traversed, and for each work package, a check is made to determine whether prior irradiation of the first work package is required. Only if this is not the case, a dependency of the first work package on the relevant work packages is added to the processing sequence (e.g., the graph).

[0074] The advantage of the invention is a particularly high productivity (short construction time) through a more even utilization of all irradiation resources, a simultaneous adherence to a predetermined relative irradiation sequence between the layer segments (contour, downskin, upskin, infill, etc.) and a resulting improved component quality (e.g. with regard to the mechanical properties of the component, such as its fracture or tensile strength, but also with regard to its surface quality), which is further improved by the preferred minimization of changes in the irradiation resources, especially on the component surface. In addition, in a preferred embodiment, the most suitable irradiation resource is assigned (e.g.the laser with the most favorable angle of incidence on the build-up material), maintaining a preferred irradiation direction relative to the position of the scanner, maintaining a preferred irradiation direction relative to the laminar flow and avoiding smoke-laser interactions.

[0075] The invention is explained in more detail below with reference to the attached figures using exemplary embodiments. It is pointed out again that, for the sake of simplicity, the following description of the figures describes an inventive manufacturing method for at least one component layer in a manufacturing process, wherein the device for additive manufacturing is controlled by control data generated according to an inventive method for generating control data. Furthermore, only a single component layer or a single component is to be manufactured, without limiting the invention thereto. In the various figures, identical components are provided with identical reference numerals. The figures are generally not to scale.

[0076] They show: Figure 1a schematic, partially sectional view of an embodiment of a device according to the invention for the additive manufacturing of manufactured products, Figure 2 a schematic representation of an allocation of layer regions of a layer to different irradiation resources according to an embodiment of the method according to the invention, Figure 3 a schematic representation of an allocation of layer regions of a layer to different irradiation resources according to a further embodiment of the method according to the invention, Figure 4 a schematic representation of a component layer to illustrate the structure of a directed graph, Figure 5 a flowchart of an embodiment of a method according to the invention for generating an irradiation control data set, Figure 6a flowchart with a more detailed representation of an embodiment of a method according to the invention for generating an irradiation control data set, Figure 7 a flowchart of an embodiment for creating a directed graph, Figure 8 a flowchart of an embodiment for creating another directed graph, Figure 9 a flowchart of an embodiment for creating another directed graph.

[0077] The following exemplary embodiments are described with reference to a device 1 for the additive manufacturing of manufactured products in the form of a laser sintering or laser melting device 1, wherein it is explicitly pointed out again that the invention is not limited to laser sintering or laser melting devices.

[0078] The device is therefore referred to below - without any loss of generality - as "laser sintering device" 1 and the term "exposure" is used synonymously with the term "irradiation".

[0079] Such a laser sintering device 1 is shown schematically in Figure 1 shown. The device has a process chamber 3 or a process space 3 with a chamber wall 4, in which the manufacturing process essentially takes place. Located in the process chamber 3 is an upwardly open container 5 with a container wall 6. The upper opening of the container 5 forms the current working plane 7. The area of ​​this working plane 7 lying within the opening of the container 5 can be used to build the object 2 and is therefore referred to as the construction field 8.

[0080] The container 5 has a base plate 11 which is movable in a vertical direction V and is arranged on a carrier 10. This base plate 11 closes off the container 5 at the bottom and thus forms its base. The base plate 11 can be formed integrally with the carrier, but it can also be a plate formed separately from the carrier 10 and fastened to the carrier 10 or simply mounted thereon. Depending on the type of specific construction material, for example the powder used, and the manufacturing process, a construction platform 12 can be attached to the base plate 11 as a construction base on which the object 2 is built. In principle, however, the object can also be built on the base plate 11 itself, which then forms the construction base.

[0081] The basic construction of the object 2 takes place in that a layer of building material 13 is first applied to the construction platform 12, then the building material is selectively solidified with a laser at the points which are to form parts of the object 2 to be manufactured, then the base plate 11, thus the construction platform, is lowered with the aid of the carrier 10 and a new layer of the building material 13 is applied and then selectively solidified, etc. The working plane 7 located in the construction field 8 then corresponds to the current layer.

[0082] In Figure 1The object 2 constructed in the container 5 on the build platform 12 is shown below the work plane in an intermediate state. It already has several solidified layers S, surrounded by unsolidified build material 13. Various materials can be used as build material, preferably powder, in particular metal powder, plastic powder, ceramic powder, sand, filled or mixed powders, or even pasty materials.

[0083] Fresh build material 15 is located in a storage container 14 of the laser sintering device 1. With the aid of a coater 16 movable in a horizontal direction H, the build material can be applied in the form of a thin layer in the working plane 7 or within the build area 8.

[0084] Optionally, an additional radiant heater 17 is located in the process chamber 3. This can be used to heat the applied build material 13, so that the irradiation device used for selective solidification does not have to introduce too much energy. This means, for example, that with the help of the radiant heater 17, a certain amount of basic energy can be introduced into the build material 13, which is naturally still below the energy required for the build material 13 to melt or sinter. An infrared radiator, for example, can be used as the radiant heater 17.

[0085] For selective solidification, the laser sintering device 1 has an irradiation device 20 or, more specifically, an exposure device 20, which comprises a plurality of irradiation resources 21a, 21b.

[0086] In Figure 1Only two irradiation resources 21a, 21b are schematically shown. However, the device preferably has additional irradiation resources, preferably at least four irradiation resources. In principle, the individual irradiation resources 21a, 21b can be constructed in the same way, as shown here as an example in Figure 1is shown. Each irradiation resource 21a, 21b has its own laser 22a, 22b as radiation source 22a, 22b, which generates its own laser beam L. This laser beam L is deflected via its own deflection device 23a, 23b (also called scanner 23a, 23b). This deflection device 23a, 23b can be a controllable mirror system. Furthermore, each laser beam L is then appropriately focused onto the working plane 7 by a focusing device 24a, 24b, which is also assigned to the irradiation resource 21a, 21b. The entire irradiation device 20 is located outside the process chamber 3, and the laser beams L are each guided into the process chamber 3 via a coupling window 25 attached to the top of the process chamber 3 in the chamber wall 4.

[0087] The lasers 22a, 22b can be gas or solid-state lasers or any other type of laser, such as laser diodes, in particular VCSELs (Vertical Cavity Surface Emitting Lasers) or VECSELs (Vertical External Cavity Surface Emitting Lasers). The lasers 22a, 22b can be constructed similarly or differently. It is also not mandatory that all irradiation resources 21a, 21b be constructed similarly.

[0088] The laser sintering device 1 further contains a sensor arrangement 40 which is suitable for detecting process radiation emitted during the impact of the laser beams L on the build material 13 in the working plane 7. This sensor arrangement 40 operates with spatial resolution, i.e. it is capable of detecting a type of emission image of the respective layer S. Preferably, an image sensor or a camera which is sufficiently sensitive in the range of the emitted radiation is used as the sensor arrangement 40. Alternatively or additionally, one or more sensors could also be used to detect optical and / or thermal process radiation, e.g. photodiodes which detect the electromagnetic radiation emitted by the incident laser beams L, or temperature sensors for detecting emitted thermal radiation.Assigning the signal of a sensor that does not have spatial resolution to the coordinates would be possible by temporally assigning the coordinates used to control the laser beam to the sensor signal. Figure 1 The sensor arrangement 40 is arranged within the process chamber 3. However, it could also be located outside the process chamber 3 and then detect the process radiation, for example, through another window in the process chamber 3.

[0089] The measurement signals MS detected by the sensor arrangement 40 are transferred to a control device 30 of the laser sintering device 1, which also serves to control the various components of the laser sintering device 1 for the overall control of the additive manufacturing process. For this purpose, the control device 30 has a measurement signal interface 33, at which the measurement signals MS are received from the process chamber 3. These can then be evaluated by a measurement signal evaluation unit 34 to determine whether disruptions have occurred within the manufacturing process, for example, whether, in the case of simultaneous production of several components, further completion of one of the components is no longer advisable, since, taking into account the measurement signals MS, it can be expected that this component will be rejected anyway.

[0090] The control device 30 here has an online control strategy modification unit 31, which can control the components of the irradiation device 20—in this case, the individual irradiation resources 21a, 21b and their individual components, namely the lasers 22a, 22b, the deflection device 23a, 23b, and the focusing devices 24a, 24b—each separately using suitable irradiation control data BS. The control strategy modification unit 31 outputs the current irradiation control data BS to the components of the irradiation resources 21a, 21b such that they follow a defined irradiation strategy ST, wherein this irradiation strategy ST is predetermined by the irradiation data set according to the invention. The irradiation control data BS is output here via a data interface 32, via which the individual irradiation resources 21a, 21b or their components also send function feedback FR to the control device 30 or.here, the control strategy modification unit 31 can be transferred. Via a control interface 36, the control device 30 can also control the radiant heater 17 using suitable heating control data HS, the coater 16 using coating control data SD, and the movement of the carrier 10 using carrier control data TS.

[0091] The control device 30 also has an interface 35, via which the entire device 1 can be coupled, here e.g., via a bus 50 or another data connection, to a terminal 60 with a display or the like. An operator can use this terminal 60 to control the control device 30 and thus the entire laser sintering device 1. Likewise, the device 1 could also be controlled via a user interface (not shown) integrated into the control device 30. In particular, with the aid of the terminal 60, e.g., via the bus 50, process control data PS, which may include the irradiation control data BS according to an irradiation strategy ST, the heating control data HS, the coating control data SD, or the carrier control data TS, could also be transmitted to the control device 30. The irradiation strategy ST is predetermined by the irradiation control data set according to the invention.The process control data PS can, in particular, also be stored in a memory 37 of the control device 30 for further use. A possible structure of an irradiation strategy ST will be described below with reference to . Figure 2 explained.

[0092] In this exemplary embodiment, the terminal 60 comprises a control data generation device 100 according to the invention. This device is used to create an optimized irradiation control data set from computer-generated 3D objects that have previously been sliced ​​into slices. From this data set, correspondingly optimized process control data PS for the laser sintering device can be created. This control data generation device 100 and a method for creating a corresponding irradiation control data set are described below using exemplary embodiments.

[0093] It should be noted again at this point that the present invention is not limited to such a laser sintering device 1. It can be applied to any other method for the generative or additive production of a three-dimensional object by layer-by-layer application and selective solidification of a building material, wherein multiple energy beams are emitted from separately controllable irradiation resources for solidification onto the building material to be solidified. Accordingly, the irradiation resources can be constructed not only with lasers, as described here, but any irradiation resource could be used with which energy can be selectively applied to or into the building material as wave or particle radiation. For example, other light sources, electron beams, etc., could be used instead of lasers.

[0094] Even if in Figure 1While only a single object 2 is displayed, it is possible and usually also common practice to produce several objects in parallel in the process chamber 3 or in the container 5. For this purpose, the build-up material is scanned layer by layer by the energy beam at locations that correspond to the cross-sections of the objects in the respective layer.

[0095] For the method to be applied, component 2 (or the simultaneously manufactured components 2) must first be divided into component layers and then into layer segments. These layer segments (geometric objects) are always assigned a single work package (representation of the layer segment or sequence of construction steps) or a plurality of work packages.

[0096] Figure 2shows the distribution of the cross-sectional area of ​​a component 2 (component layer SB) in a layer S to the various irradiation resources in such a way that the partial cross-sectional areas are distributed as evenly as possible to the irradiation resources. Figure 3 The entire cross-sectional area is divided into four segments by two dividing lines passing through the surface center M. The component layer SB comprises an outer contour C, which is considered here as a single layer segment S1, and an infill (InFill IF), which is divided into four layer segments S2, S3, S4, and S5. Within the framework of the irradiation strategy, the layer segments S1, S2, S3, S4, and S5 can then be created using various irradiation resources by solidifying build-up material.

[0097] Figure 3shows another possible division of the cross-sectional area of ​​a component 2 (component layer SB) in a layer S into layer segments S1, S2, S3, S4, S5. In this component 2, the contour C is, in contrast to Figure 2not shown as a thick line, but as a hatched area. In this example, the InFill IF is divided, e.g., into areas where the radiation is switched off at the transition. The solid lines within the InFill IF are not part of the component, but represent virtual boundaries between the layer segments S2, S3, S4, S5. On the right, the assignment of the layer segments S1, S2, S3, S4, S5 to work packages A1, A2, A3, A4, A5 is indicated. However, it should be noted that the layer segments S1, S2, S3, S4, S5 are generally not represented in the form of geometric objects (although that is also possible), but as abstract objects or irradiation parameters or construction steps. The method according to the invention works with the work packages A1, A2, A3, A4, A5.

[0098] Figure 4shows a schematic representation of a component layer SB to illustrate the structure of a directed graph (see also the following explanations). Component 2 has a V-shaped structure, and is shown here during its production. A lower part is already made of solidified construction material 13 (see, for example, Figure 1) have been solidified into component layers and the component layer SB currently to be manufactured can be seen at the top. The layer segments S1, S2, S3, S4 relating to contour C, UpSkin US, DownSkin DS and InFill IF still need to be processed. It should be noted here that the layer segments S1, S2, S3, S4 in this example do not necessarily represent connected surfaces, but functionally different areas of the component layer SB. A layer segment S1 corresponds to the contour C, a layer segment S2 corresponds to the DownSkin DS, a layer segment S4 corresponds to the UpSkin US and a layer segment S3 corresponds to the InFill IF. The layer segments S1, S2, S3, S4 are each assigned work packages A1, A2, A3, A4, A5, A6, A7, A8.

[0099] The direction of an airflow LR is indicated above by an arrow. Smoke generated during the production of a work package A1, A2, A3, A4, A5, A6 blows toward the top right in the drawing. It would therefore be advantageous to produce work packages A1, A2, A3, A4, A5, A6 according to the processing direction indicated below by an arrow, as this avoids smoke disruption. Therefore, work package A6 should be produced first, top right, followed by its neighboring work package A5 and its neighboring work package A4, and then the other three work packages in the same way.

[0100] However, conflicts could arise if it is specified that UpSkin US and DownSkin DS slice segments S2, S4 must be processed first before the respective inner InFill IF can be irradiated. A possible graph for the processing sequence of slice segments S1, S2, S3, S4 could look like this: S1 → S2 → S3 → S4 and would essentially represent a sequence relation R (see, for example, Figure 5 ).

[0101] Figure 5 shows a flowchart of an embodiment of a method according to the invention for generating an irradiation control data set. Step I:

[0102] The input data is layer data D, the generation of which is known in the state of the art. This layer data D includes, for example, a geometric description of the melt tracks to be created, as well as an assignment to irradiation parameters (e.g., exposure parameters) and segments. This layer data D is divided into work packages A1, A2, A3, A4, and A5, which form the base set G. The exposure time can be determined for each of these work packages. Step II:

[0103] Dependencies are determined between these work packages A1, A2, A3, A4, and A5, which are stored as a simply directed graph GG. These dependencies are specified by the sequence relation R, which can be viewed as a set of rules for creating the directed graph GG. The graph GG shown shows that work package A1 must be processed first (left node) before work packages A2 and A3 can be processed (middle nodes). Work packages A4 and A5 (right nodes), in turn, depend on the processing of work package A3. Step III:

[0104] Work packages A1, A2, A3, A4, and A5 are evaluated based on the GG graph. Only those work packages A1, A2, A3, A4, and A5 that can actually be processed are selected, e.g., those for which all predecessors have already been processed or those that have no predecessors. These selected work packages are evaluated. Criteria that lead to better component quality or a higher build rate can be used for the evaluation. Step IV:

[0105] Work packages A1, A2, A3, A4, and A5 are distributed among the irradiation resources in such a way that the order specified in the graph is taken into account. Since data sets are usually created first and irradiation resources are not directly accessed, distribution is achieved by assigning work packages A1, A2, A3, A4, and A5 to work package groups AG1, AG2, and AG3. For this purpose, the work package A1, A2, A3, A4, and A5 that has received the highest rating is assigned.

[0106] For output, work packages A1, A2, A3, A4, and A5 can be assigned as machine commands specific to an exposure resource. After assignment, further calculations can be performed if necessary, for example, to apply calibration values ​​or coordinate transformations specifically for an exposure unit (laser).

[0107] A number of nested rules can be applied for the assignment to the lasers and the processing rules, which map necessary conditions as well as preferred sequences and assignments: Rule 1: Fixed sequence relationship that must always be adhered to. Rule 2 (optional): Sequence preferences of a user (e.g. preferred exposure direction). If these contradict Rule 1, they are not taken into account. Rule 3 (optional): Specifications as to which work packages may be processed by which irradiation resource (work area, type of optics, spot size, laser power, etc., manually defined assignment), which are always adhered to (if necessary by inserting wait times). Rule 4 (optional): Once a laser has started to expose a component, this laser will first expose all work packages belonging to these components, if possible. However, a new component may be started if it is necessary to wait for a work package that must be exposed by another laser (e.g. due to Rule 3). Rule 5 (if necessaryOptional): Specifications that determine the order in which the work packages are processed while observing all previous conditions: distance from the scanner, position along the smoke exhaust, spatial distance from the previous work package, number and / or duration of subsequent work packages. Rule 6 (Optional): Preferred allocation to a specific laser (e.g., according to the angle of incidence). This is only given priority if the construction time is extended by a maximum of a specified tolerance.

[0108] Figure 6 shows a flowchart with a more detailed representation of an embodiment for steps III and IV of Figure 5 . In the individual steps you can see symbols that characterize these steps.

[0109] The process begins at a starting point ("Start"), where a basic set G of work packages A12, A2, A3, A4, A5 is available (see, for example, step I in Figure 5). In this example, the procedure always returns to this starting point, always considering a current base quantity (reduced by work packages already assigned).

[0110] In the next step ("∃Ax"), a check is made to see if there is a work package Ax for which the following steps have not yet been completed. If there is none ("x"), the program ends; if there is one, the following steps are executed. The procedure thus runs through all work packages Ax in the base set G.

[0111] In the next step, the completion times T1, T2 of the irradiation resources 21a, 21b are determined and compared. In the example shown, T1 is shorter than T2 (which can change with each new run), and the irradiation resource 21b with the completion time T1 is selected (small arrow in the box). In this step, the irradiation resource 21a, 21b with the shortest completion time, i.e., the one with the earliest completion time, is always selected.

[0112] In the next step ("Ax ← T1"), the work packages that are no longer included in the base set but are still in the graph GG are determined. If the completion time of one of these work packages Ax is before the shortest completion time, it is deleted from the graph GG. This is indicated by the double arrow. It should be noted at this point that assigned work packages Ax are removed from the base set G after their assignment (step "G=G-{Ax}"), but in this example, they initially remain in the directed graph. Performing this step has the advantage that it can now also be considered whether the assigned work package Ax has already been processed at a time of the completion time that corresponds to the shortest completion time (which is unlikely).

[0113] Alternatively, a list can be maintained, for example, in which the already assigned work items are assigned to their expected completion time. Work items that are removed from the graph are also removed from this list, so that no further attempts are made to delete this work item from the graph in a subsequent run.

[0114] In the next step, the directed graph GG consisting of work packages A1, A2, A3, A4, and A5 of the base set G, which takes into account rule 1 (required assignment rules R1) and rule 2 (user defaults R2), is used to create a selection set AM. For this purpose, the predecessors of the graph, which are also located in the base set, are used (assigned work packages Ax that still need to be processed, are located in the graph and "block" their successors, but are no longer included in the base set). The right shows an example of a filled selection set AM with the set elements {A1, A3, A5}. For the irradiation resource with the earliest completion time, for example, the set of work packages Ax for which all required work packages (rules 1 and 2) have already been completed at that time is determined based on the graph GG.

[0115] In the next step, rule 3 (allocation rules for irradiation resources R3) is used as a filter for the selection set AM, whereby a work package Ax is not included or removed again if it may not be irradiated by the selected irradiation resource 21b. In this example, all work packages A1, A2, A3, A4, and A5 may be irradiated by all irradiation resources 21a, 21b, and the selection set AM remains unchanged. From the selection set AM, the set A' of work packages that may be processed by the irradiation resource according to rule 3 is determined, and this set A' is the new selection set AM.

[0116] In the next step, optional rule 4 (assignment rules for a component R4) is applied as a filter for the selection set AM. In this example, work package A5 could not be included or removed again because it is not related to the component in question. To the right, subset B is shown, which only contains the elements {A1, A2} and could be the result of rule 4.

[0117] The modification of the choice set according to rule 4 can be achieved with the following steps by checking whether the subset B is empty ("B={}") and if so, keeping the choice set unchanged ("AM=AM") or if not, treating the subset B as a new choice set ("AM=B").

[0118] Next, a step is taken to check whether any element remains in the selection set AM ("AM={}"). If the selection set is empty, a waiting time is inserted into the work package group instead of a work package (which can be treated like a work package or a wait command, hence "Ax ≙ TW"). It is preferred that the waiting time is long enough for the next work package to be completed. If the selection set is not empty, i.e., selected work packages are present, the process continues and reaches step IV of the Figure 5 .

[0119] In the next step, the work packages Ax of the selection set AM are evaluated based on an evaluation rule set (see, for example, Rule 5). In the example shown, work package A3 is selected. This work package A3 could now be assigned to the work package group of irradiation resource 21b. In the example shown here, however, an additional optimization step takes place beforehand.

[0120] If the evaluation is based on Rule 5, the eligible work packages Ax are preferentially evaluated according to various criteria, e.g., distance to the scanner, location along the smoke vent, distance from the previous work package, duration, and / or number of work packages that require the work package under consideration. The various criteria are summarized into a rating number, and the individual criteria are preferentially weighted using selectable factors (weighting factors). The work package with the best rating is selected for assignment.

[0121] During this optimization step, according to Rule 6, a check is carried out to determine whether another irradiation resource 21a might be better suited to processing work package A3, e.g., due to the angle of incidence. If this is the case, work package A3 is assigned to the other irradiation resource 21a or its work package group; otherwise, it is assigned to the originally selected irradiation resource 21b.

[0122] The assigned work package Ax (here work package A3) is deleted from the basic set in the step "G=G-{Ax}" so that it is not assigned twice.

[0123] In this example, the assignment is repeated until all work packages have been assigned.

[0124] Figure 7shows a flowchart of an embodiment for creating a directed graph GG without considering the topology. The construction of such a dependency graph can be based purely on membership in certain areas. The input is a list containing layer segments S1, S2, S3 in the desired order. This list can be viewed as an order relation R (see, for example, Figure 5 in which this procedure could be carried out in step II). The individual layer segments Si from this list are now considered.

[0125] In a loop ("b'Si") all segments are traversed starting with the second entry in the list.

[0126] For each work package Ax belonging to the previous segment Si-1 (list: "AxεS(i-1)"), an edge is entered in the graph GG to all work packages belonging to the currently considered segment Si (list: "AxεSi"). This assignment is symbolized in the corresponding box with two crossed arrows.

[0127] Figure 8 shows a flowchart of an embodiment for creating another directed graph GG, in which the relationships are restricted to topologically connected regions. This method could also be used in step II of the Figure 5 The advantage here is that the number of dependencies between the work packages Ax is reduced, so there are more options for distributing the work packages Ax among the irradiation resources. Similar to Figure 7individual layer segments Si are considered from a list containing layer segments S1, S2, S3 in the desired order and all layer segments Si are traversed in a loop ("b'Si") starting with the second entry in the list.

[0128] For each work package Ax belonging to the considered shift segment Si (list: "AxεSi"), work packages Ay (list: "AxεS(i-1)") are determined from the previous shift segment Si-1 that are adjacent to Ax ("Ax|Ay"). For all work packages Ay, an edge is added to work package Ax in the graph GG. A list of adjacent predecessors of work packages Ay is used (list: "Ay→"). In this variant, the graph GG is always free of cycles.

[0129] There may be further preferences regarding the irradiation sequence, which may conflict with the already specified relative order between the work packages. For example, to avoid laser / smoke interactions, it may be required that the work packages be exposed opposite to the flow direction.

[0130] Figure 9 shows a flowchart of an embodiment for creating another directed graph GG. This method could also be used in step II of the Figure 5This flowchart describes an algorithm that adds dependencies for work packages in a potentially smoke-shadowed area to a directed graph GG, if this does not result in a contradiction. The input is a base set G with all work packages Ax and the directed graph GG, which already contains all mandatory dependencies, e.g., due to the exposure sequence of the layer segments. For illustration, the base set was Figure 5 used, where one should imagine N work packages Ax, with N»1. For each of the N work packages Ax ("VAx"), all work packages Ay are determined that are potentially shadowed by smoke during the exposure of work package Ax.

[0131] All shaded work packages are traversed ("VAy"), and for each work package Ay, it is checked whether prior exposure of work package Ax is required. Only if this is not the case, an edge from work package Ay to work package Ax is added to the graph GG.

[0132] Finally, it should be noted once again that the figures described in detail above are merely exemplary embodiments that can be modified in a variety of ways by those skilled in the art without departing from the scope of the invention. Furthermore, the use of the indefinite articles "a" or "an" does not exclude the possibility that the respective features may be present in multiple instances. Likewise, the term "unit" does not exclude the possibility that the unit may consist of several interacting subcomponents, which may also be spatially distributed. List of reference symbols

[0133] 1 Device for additive manufacturing / laser sintering device 2 Manufactured product / component 3 Process space / process chamber 4 Chamber wall 5 Container 6 Container wall 7 Working plane 8 Construction field 10 Carrier 11 Base plate 12 Construction platform 13 Build material 14 Storage container 15 Build material 16 Coater 17 Radiant heater 20 Irradiation device / exposure device 21a, 21b Irradiation resource 22a, 22b Radiation source / laser 23a, 23b Deflection device / scanner 24a, 24b Focusing device 25 Coupling window 30 Control device 31 Control strategy modification unit 32 Data interface 33 Measurement signal interface 34 Measurement signal evaluation unit 35 Interface 36 Control interface 37 Memory 40 Sensor arrangement / camera 50 Bus 60 Terminal 100 Control data generation device 101 Allocation unit A1, A2, A3, A4, A5, A6, A7, A8, Ax,Ay Work package AM Selection set BR Processing direction BS Irradiation control data BW Evaluation rule set C Contour D Layer data DS DownSkin F Manufacturing process FR Function feedback H Horizontal direction HS Heating control data IF InFill L Laser beam LR Direction of the air flow M Center of area MS Measurement signal P Work package PS Process control data R Sequence relation S Layer SB Component layer S1, S2, S3, S4, S5 Layer segment SD Coating control data ST Irradiation strategy T1, T2 Completion time TS Carrier control data TW Waiting time US UpSkin V Vertical direction,

Claims

1. A method for generating an irradiation control data set for creating control data (PS) for a device (1) for additive manufacturing of a number of components (2) in a manufacturing process in which at least one layer (S) of a build material (13) is introduced into a process space (3) and the build material (13) of the layer (S) is selectively solidified to form at least one component layer (BS) by irradiating at least one section of the layer (S) using a plurality of irradiation resources (21a, 21b), comprising the steps: a) providing layer data (D) comprising data for the build-up of layer segments (S1, S2, S3, S4, S5) for a component layer (BS), b) dividing the layer data (D) into multiple work packages (A1, A2, A3, A4, A5, A6, A7, A8) while forming a basic set (G) of the work packages (A1, A2, A3, A4, A5, A6, A7, A8), c) providing a firmly defined sequence relation (R) for layer segments (S1, S2, S3, S4, S5) or for the work packages (A1, A2, A3, A4, A5, A6, A7, A8), characterized in that the method additionally comprises the following steps: d) specifying a processing sequence of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) based at least on the sequence relation (R), e) determining an execution time (T1, T2) for each of the irradiation resources (21a, 21b) for the respective work package group (AG1, AG2, AG3) of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) which have previously been assigned to these irradiation resources (21a, 21b), f) selecting an irradiation resource (21a, 21b) taking into account the execution time (T1, T2) determined for the irradiation resource (21a, 21b), preferably the irradiation resource (21a, 21b) with the respective shortest execution time (T1, T2), g) determining a selection set (AM) of work packages (A1, A2, A3, A4, A5, A6, A7, A8) from the basic set (G) of work packages (A1, A2, A3, A4, A5, A6, A7, A8) based on the sequence relation (R), the selection set (AM) comprising those work packages (A1, A2, A3, A4, A5, A6, A7, A8) which can be processed according to the processing sequence, h) selecting a work package (A1, A2, A3, A4, A5, A6, A7, A8) from the selection set (AM) taking into account a specified set of evaluation rules (BW), i) assigning the selected work package (A1, A2, A3, A4, A5, A6, A7, A8) to a work package group (AG1, AG2, AG3) which is assigned to the currently selected irradiation resource (21a, 21b) and removing this work package (A1, A2, A3, A4, A5, A6, A7, A8) from the basic set (G) of work packages (A1, A2, A3, A4, A5, A6, A7, A8), j) repeating at least steps d) to i) until a predetermined termination criterion is reached.

2. The method according to claim 1, wherein the work packages (A1, A2, A3, A4, A5, A6, A7, A8) additionally comprise defined irradiation parameters, additionally comprising the steps: - providing an assignment relation for assigning irradiation parameters to irradiation resources (21a, 21b), - filtering the selection set of work packages (A1, A2, A3, A4, A5, A6, A7, A8) based on the assignment relation and the assigned irradiation parameters depending on the selected irradiation resource (21a, 21b).

3. The method according to any one of the preceding claims, wherein the set of evaluation rules (BW) comprises an evaluation for at least one criterion of the group - spatial distance of the work package (A1, A2, A3, A4, A5, A6, A7, A8) from the selected irradiation resource (21a, 21b), - number of work packages (A1, A2, A3, A4, A5, A6, A7, A8) that depend on the execution of the work package (A1, A2, A3, A4, A5, A6, A7, A8), - position of the work package (A1, A2, A3, A4, A5, A6, A7, A8) relative to a spatial extent of a determined or predefined smoke extraction area, - spatial distance of the work package (A1, A2, A3, A4, A5, A6, A7, A8) relative to a previously assigned work package (A1, A2, A3, A4, A5, A6, A7, A8), - duration of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) which require the respective work package (A1, A2, A3, A4, A5, A6, A7, A8) - distance of beams of the irradiation resources (21a, 21b) from each other, wherein preferably based on this set of evaluation rules (BW), a respective evaluation value is calculated, wherein the set of evaluation rules (BW) is configured in such a way that it assigns a numerical value to the at least one criterion, wherein particularly preferably, different weightings are additionally assigned to different criteria and / or the set of evaluation rules (BW) assigns different numerical weightings to criteria.

4. The method according to any one of the preceding claims, wherein it is checked whether the selected work package (A1, A2, A3, A4, A5, A6, A7, A8) can also be irradiated by another irradiation resource (21a, 21b) and whether this other irradiation resource (21a, 21b) is better suited for executing the work package (A1, A2, A3, A4, A5, A6, A7, A8) with respect to a predetermined criterion, in particular with respect to an angle of incidence or angle of deflection of a beam of the irradiation resource (21a, 21b) and / or a spatial distance of the irradiation resource (21a, 21b) from the work package (A1, A2, A3, A4, A5, A6, A7, A8), wherein in the case that the other irradiation resource (21a, 21b) is better suited, the other irradiation resource (21a, 21b) becomes the selected irradiation resource (21a, 21b) and an assignment of the selected work package (A1, A2, A3, A4, A5, A6, A7, A8) to a work package group (AG1, AG2, AG3) which is assigned to this currently selected irradiation resource (21a, 21b) takes place, wherein preferably the execution times (T1, T2) of the respective irradiation resources (21a, 21b) without the respective work package (A1, A2, A3, A4, A5, A6, A7, A8) are compared with one another and a change of the selected irradiation resource (21a, 21b) takes place in the case where the respective execution times (T1, T2) differ maximally by a predetermined time span.

5. The method according to any one of the preceding claims, wherein the evaluation control system (BW) comprises a cost function and the evaluation, in particular evaluation values, of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) is determined in the course of an optimization of this cost function, wherein preferably this cost function comprises - a completion time and / or - the execution times (T1, T2) and / or - criteria and / or a relevance assignment according to claim 3 and / or - a predetermined criterion according to claim 4, and preferably wherein the evaluation, in particular a determination of the evaluation values, is performed by means of an iterative optimization of a schedule, in particular of the completion time.

6. The method according to any one of the preceding claims, wherein specifying the processing sequence of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) is additionally carried out according to a user specification, and wherein preferably only user specifications are taken into account which satisfy the sequence relation (R), preferably wherein the user specification comprises a specification for a feed direction and / or a specification for an assignment of an irradiation resource (21a, 21b) to a component (2).

7. The method according to any one of the preceding claims, comprising the steps: - determining whether work packages (A1, A2, A3, A4, A5, A6, A7, A8) of the selection set (AM) and work packages (A1, A2, A3, A4, A5, A6, A7, A8) already assigned to the currently selected irradiation resource (21a, 21b) have an affiliation to the same component (2), and if so, - creating a new selection set (AM) comprising the determined work packages (A1, A2, A3, A4, A5, A6, A7, A8) of the selection set (AM) which have the respective affiliation.

8. The method according to any one of the preceding claims, wherein for specifying the processing sequence, the work packages (A1, A2, A3, A4, A5, A6, A7, A8) are arranged, based on the sequence relation (R), in a directed simple graph (GG), and wherein, when determining the selection set (AM) of work packages (A1, A2, A3, A4, A5, A6, A7, A8) from the basic set (G) of work packages (A1, A2, A3, A4, A5, A6, A7, A8), preferably only those work packages (A1, A2, A3, A4, A5, A6, A7, A8) are used for the processing, of which no work package (A1, A2, A3, A4, A5, A6, A7, A8) of the graph (GG) has to be processed beforehand, wherein preferably the basic set (G) of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) is or comprises the directed graph (GG).

9. The method according to any one of the preceding claims, wherein in the case that no work packages (A1, A2, A3, A4, A5, A6, A7, A8) can be found for the selected irradiation resource (21a, 21b), but work packages (A1, A2, A3, A4, A5, A6, A7, A8) are present that are not processed yet, this selected irradiation resource (21a, 21b) is assigned a predetermined waiting time (TW) instead of a work package (A1, A2, A3, A4, A5, A6, A7, A8).

10. An irradiation control data set that has been generated by means of a method according to any one of the preceding claims.

11. A method for additive manufacturing of at least one component layer of at least one component (31), comprising the steps: - introducing a layer (S) of a build material (13) into a process space (3); - selectively solidifying the build material (13) of the layer (S) by irradiating at least one section of the layer (S) by means of a plurality of irradiation resources (21a, 21b), - controlling the irradiation resources (21a, 21b) by means of control data (PS) which have been generated using an irradiation control data set according to claim 10.

12. A control data generation device (100) for generating an irradiation control data set for creating control data (PS) for a device (1) for additive manufacturing of at least a number of components (2) in a manufacturing process in which at least one layer (S) of a build material (13) is introduced into a process space (3) and the build material (13) of the layer (S) is selectively solidified to form component layers (BS) by irradiating at least one section of the layer (S) using a plurality of irradiation resources (21a, 21b), comprising an assignment unit (101) adapted for: a) processing provided layer data (D) comprising data for the build-up of layer segments (S1, S2, S3, S4, S5) for a component layer (BS), b) dividing of the layer data (D) into multiple work packages (A1, A2, A3, A4, A5, A6, A7, A8) while forming a basic set (G) of the work packages (A1, A2, A3, A4, A5, A6, A7, A8), c) providing a firmly defined sequence relation (R) for layer segments (S1, S2, S3, S4, S5) or for the work packages (A1, A2, A3, A4, A5, A6, A7, A8), characterized in that the assignment unit (101) furthermore is adapted for: d) specifying a processing sequence of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) based at least on the sequence relation (R), e) determining an execution time (T1, T2) for each of the irradiation resources (21a, 21b) for the respective work package group (AG1, AG2, AG3) of the work packages (A1, A2, A3, A4, A5, A6, A7, A8) which have previously been assigned to these irradiation resources (21a, 21b), f) selecting an irradiation resource (21a, 21b) taking into account the execution time (T1, T2) determined for the irradiation resource (21a, 21b), preferably the irradiation resource (21a, 21b) with the shortest execution time (T1, T2) determined in each case, g) determining a selection set (AM) of work packages (A1, A2, A3, A4, A5, A6, A7, A8) from the basic set (G) of work packages (A1, A2, A3, A4, A5, A6, A7, A8) based on the sequence relation (R), the selection set (AM) comprising those work packages (A1, A2, A3, A4, A5, A6, A7, A8) which can be processed according to the processing sequence, h) selecting a work package (A1, A2, A3, A4, A5, A6, A7, A8) from the selection set (AM), taking into account a specified set of evaluation rules (BW), i) assigning the selected work package (A1, A2, A3, A4, A5, A6, A7, A8) to a work package group (AG1, AG2, AG3) which is assigned to the currently selected irradiation resource (21a, 21b) and removing this work package (A1, A2, A3, A4, A5, A6, A7, A8) from the basic set (G) of work packages (A1, A2, A3, A4, A5, A6, A7, A8), j) repeating at least steps d) to i) until a predetermined termination criterion is reached.

13. A device (1) for additive manufacturing of at least one component layer (SB) of at least one component (2) in an additive manufacturing process, comprising at least one supply device for introducing a layer (S) of a build material (13) into a process space (3), a plurality of irradiation resources (21a, 21b) for selectively solidifying the build material of the layer by irradiating at least one section of the layer, and a control data generating device (100) according to claim 12.

14. Control data (PS) for controlling a device (1) for additive manufacturing, wherein the control data (PS) have been generated using an irradiation control data set according to claim 10.

15. A computer program product comprising a computer program directly loadable into a storage device of a control data generating device (100) and / or a control device (30) of a device (1) for additive manufacturing of a component layer of a component (2), comprising program sections to carry out all steps of the method according to any one of claims 1 to 9 when the computer program is executed in the control data generating device (100) and / or the control device (30).