WAITING ORDER FOR RESUME OF CONCRETING PROCESS

DE602021022260T2Active Publication Date: 2024-11-27SPURGIN LEONHART SAS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
DE602021022260
Authority / Receiving Office
DE · DE
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-01-17
Filing Date
2021-01-15
Publication Date
2024-11-27
Estimated Expiration
2041-01-15

AI Technical Summary

Technical Problem

The bulkiness of traditional waiting boxes restricts the positioning of reinforcements within formwork volumes, as they house parts meant to be outside the formwork, limiting the arrangement and efficiency of concrete structure assembly.

Method used

A waiting assembly with a box design featuring three walls that seal internally during concrete pouring, optimized branch arrangements in a single plane, and a detachable cover to minimize bulk, allowing for reduced thickness and improved positioning of reinforcement branches within the box.

Benefits of technology

This design reduces the bulk of the waiting box, optimizing the size and positioning of reinforcement branches, enhancing the assembly efficiency and flexibility within the formwork volume.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The present invention relates to the field of connecting and resuming devices for concreting on construction sites and more particularly to the field of waiting boxes.

[0002] In the construction industry, it is common for concrete structures to be reinforced with metal reinforcement. These reinforcements generally have an arrangement in the form of a mesh structure mounted inside the partitioned volume in which the concrete is poured. The mesh structure then participates in absorbing the forces and stresses supported by the concrete.

[0003] On a construction site, casting operations are carried out successively for the construction of each of the concrete structures. However, it is essential that certain parts of the final concrete construction which are cast separately, are also assembled through their respective reinforcements to optimize the fixing of these different parts together and ensure the transfer of the supported stresses.

[0004] Conventionally, the junction of the reinforcements of these different concrete structures is thus carried out by means of waiting boxes. These boxes are made in the form of a flattened box associated with several reinforcement elements, a first respective part of which is housed inside the box while a second part has the form of hoops which emerge at a common face of this box. Prior to pouring the concrete, the box of the waiting box is strategically mounted against a wall of the formwork intended to receive the concrete. In this way, the hoops of the reinforcement are arranged so as to be oriented towards the inside of the formwork in order to make different connections with one or more of the reinforcements specific to the concrete structure poured into the formwork. During the pouring operation, the box of the waiting box protects the parts of the reinforcements housed there against the risk of being set by the concrete.Once the casting is complete and the formwork elements have been removed, the waiting box is taken into the concrete structure so that the face of the box initially resting against a wall of the formwork is positioned level with the surface of the concrete structure. The removal of this face of the box allows the deployment of the reinforcement portions housed inside the box outside the concrete structure to which they are associated. These reinforcement portions are then able to cooperate or be assembled with the structure of a new reinforcement.

[0005] However, the waiting boxes have the disadvantage of having a box which imposes a bulk in the formwork volume by housing parts of reinforcement intended in fine to be arranged outside the volume defined by the formwork. This bulk imposed by the boxes of the waiting boxes leads to restricting the possibilities of positioning the reinforcements inside the formwork volume. This bulk is also accentuated by the superposition of the different portions of reinforcements folded inside the box.

[0006] DE 20 2007 007583 U1 discloses a waiting assembly for resuming concreting.

[0007] The present invention aims to overcome this drawback by proposing a solution which makes it possible to limit the impact of the position of the box of a waiting box in the interior volume of a formwork while being easily implemented in existing waiting box production processes.

[0008] The invention thus relates to a waiting assembly for resuming concreting according to claim 1.

[0009] The invention will be better understood from the following description, which relates to a preferred embodiment, given as a non-limiting example, and explained with reference to the appended schematic drawings, in which: [ Fig. 1 ] is a schematic representation of an example of a box for a waiting assembly according to the invention. [ Fig. 2 ] is a schematic representation of an exemplary arrangement of armatures for a waiting assembly according to the invention. [ Fig. 3 ] is a schematic representation of an example of a first waiting set according to the invention. [ Fig. 4 ] is a schematic representation of a sectional view in the plane of the box of an example of a waiting assembly according to the invention. [ Fig. 5 ] is a schematic representation of a sectional view in a plane perpendicular to the plane of the box of an example of a first waiting assembly according to the invention. [ Fig. 6 ] is a schematic representation of an example of a second waiting assembly according to the invention. [ Fig. 7 ] is a schematic representation of a sectional view in a plane perpendicular to the plane of the box of an example of a first waiting assembly according to the invention. [ Fig. 8 ] is a schematic representation of a sectional view in a plane perpendicular to the plane of the box and the hoops of an example of a third waiting assembly according to the invention. [ Fig. 9 ] is a schematic representation of an example of a third waiting assembly according to the invention.

[0010] The invention relates to a waiting assembly 1 for resuming concreting according to claim 1.

[0011] The waiting assembly 1 of the invention thus corresponds to a box 2 associated with several reinforcements 7, 7bis. The box 2 defines a housing inside which a portion of the reinforcements 7, 7bis is positioned for the duration of the concrete pouring operation. The box 2 is made of at least three walls 3, 5, 6 arranged so as to make three faces of the housing. It should be noted that during the concrete pouring operation, it is imperative that the interior of the housing is sealed from the outside in order to prevent the branches of the reinforcements 7, 7bis from being caught in the solidified concrete. Also, according to a first construction variant, the ends of the second wall 5 and the third wall 6 are joined to close the housing over its entire periphery, around the edge of the first wall 3.According to a second construction variant, alternative to the first construction variant, the ends of the second wall 5 and the third wall 6 are joined by means of a fourth wall and a fifth wall which provide the respective junctions between the opposite ends of the second 5 and third 6 walls so that the housing of the box 2 is closed over its entire circumference, along the periphery of the edge of the first wall 3. Consequently, in each of the detailed construction variants, when the edge of the second 5 and third 6 walls, or even of the associated fourth and fifth walls, are level, the positioning of the box 2 against a formwork wall prior to pouring the concrete allows for complete closure of the interior volume of the box. The formwork wall thus acts as a closure cover.However, preferably, the box 2 is associated with a cover 8 with dimensions adapted for closing the box 2. According to an exemplary embodiment, this cover 8 has a shape and dimensions substantially identical to those of the first wall 3 of the box 2. This cover 8 is configured to be structurally detachable from the rest of the box 2. This cover 8 is thus positioned to optimize the sealing of the interior volume of the box 2 prior to the positioning of the box 2 against a formwork wall, before the concrete pouring operation begins. This cover 8 is also configured to be structurally detachable from the rest of the box 2 so that, after the concrete has set, once the formwork wall has been removed, the cover 8 is removed from the box 2 to free access to the branches of the reinforcements 7, 7bis of the assembly of the invention.

[0012] In the waiting assembly 1 according to the invention, the branches 7b of the pair of frames 7, 7bis are all arranged in the same plane inside the box 2. The arrangement of the branches 7b in the same plane thus contributes to the reduction of the size of the branches 7b in the box and therefore, consequently, allows a reduction in the thickness of the box 2. This reduction in the thickness of the box 2 also occurs when the plane shared by the branches 7 of the frames 7, 7bis is substantially parallel to the plane towards which the flattening of the box 2 is carried out.

[0013] Inside the box 2, the branches 7b of the frames 7, 7bis are folded at a substantially perpendicular angle relative to the plane of the arch 7a, so that a position of the arches 7a of the frames 7, 7bis that is too close together leads to an incompatibility of the size of the branches 7b of the frames 7, 7bis in the length of the box 2 when these branches 7b have lengths that are too great. Also, according to a particular example of construction of the waiting assembly 1 of the invention, at least a portion of the branches of the first frame 7 is arranged between the branches of the second frame 7bis. According to this example of construction, the branches 7b of the frames 7, 7bis are arranged to avoid any overlapping of branches 7b inside the box 2 and therefore avoid an arrangement with a superposition of the branches 7b incompatible with a reduction in the thickness of the box 2.In the context of this arrangement, the branches 7b of the frames 7, 7bis are capable of being folded in an identical orientation or, alternatively, in opposite directions, for example so that, on the one hand, the branches of the first frame 7 are directed towards the second frame 7bis and that, on the other hand, in a similar manner, the branches of the second frame 7bis are directed in the direction of the first frame 7. When, according to this example, the branches of the frames 7, 7bis are oriented in the direction of the homologous frame, the size of the branches of the frames 7, 7bis inside the box 2 is optimized according to the length of the box 2 and makes it possible to limit the length of the box accordingly.

[0014] According to a variant specific to the previous particular construction example, the waiting assembly 1 of the invention is characterized in that one of the branches of the first frame 7 is positioned between the branches of the second frame 7bis, and vice versa. According to this arrangement, for each of the frames 7, 7bis, a first branch is positioned at least partly between the branches of the homologous frame and a second branch is positioned laterally to the branches of the homologous frame, between a branch of the frame and the inner face of a wall of the box 2.

[0015] According to the invention: the branches of the first frame 7 are arranged so that the spacing of their free ends is less than the spacing of the respective ends of the corresponding hoop, the branches of the second frame 7bis are arranged so that the spacing of their free ends is greater than the spacing of the respective ends of the corresponding hoop, the branches of the first frame 7 being positioned between the branches of the second frame 7bis. The branches 7b of the frames 7, 7bis are arranged to adopt “V” shapes. This “V” shape is then closed for the branches of the first frame 7, while it is open for the branches of the second frame 7bis. According to a specific feature of these “V”-shaped arrangements of the branches of the frames 7, 7bis, each of the branches of these frames 7, 7bis is positioned substantially parallel to a respective branch of the homologous frame so that the “V”-shaped arrangements of the branches of these two frames 7, 7bis have a complementarity in the plane of positioning of the branches inside the box 2. The spatial complementarity of this construction variant thus contributes to the creation of an arrangement which optimizes the size of the branches 7b of the frames 7, 7bis inside the box 2.Indeed, the positioning of the branches of a first frame 7 between those of the second frame 7bis makes it possible to limit the size of the branches 7b of the frames 7, 7bis according to the thickness of the box 2 but also to prevent the branches of the frames 7, 7bis from being too far apart. increases the space requirement according to the width of the box 2. Also, this arrangement offers a solution allowing the space requirement of the reinforcement branches 7, 7bis inside the box 2 to be optimized, both in the length and thickness of the box 2 but also in its width.

[0016] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, the waiting assembly 1 according to the invention is characterized in that it comprises at least three reinforcements 7, 7bis, 7ter. The assembly 1 according to the invention is capable of integrating other additional reinforcements 7ter in addition to the first 7 and the second reinforcement 7bis mentioned previously. These additional reinforcements 7ter also comprise two parts arranged on either side of the first wall 3 of the box 2, these additional reinforcements 7ter being positioned through by means of dedicated orifices 4 of the first wall 3.It should be noted that, in this document, the characteristics relating to the “additional reinforcement” apply as much to a third reinforcement 7ter in addition to the first reinforcement 7 and the second reinforcement 7bis as to any reinforcement beyond the third and which would be integrated into the waiting assembly 1 of the invention.

[0017] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, the assembly 1 comprises at least one additional reinforcement 7ter positioned in alignment with the first reinforcement 7 with the second reinforcement 7bis, the branches of this additional reinforcement 7ter being oriented to be, respectively, substantially parallel to those of the closest reinforcement among the first 7 and the second reinforcement 7bis. Also, according to this particular example of construction, the additional reinforcement 7ter is positioned relative to the other reinforcements 7, 7bis of the waiting assembly 1 so as to ensure an arrangement making it possible to restrict the size of the branches of the different reinforcements 7, 7bis, 7ter inside the box 2 and to limit the volume thereof accordingly.Thus, as a specific example, when the first 7 and the second armature 7bis are arranged in “V” shapes. The additional armature 7ter adopts a “V” shape identical to that of the two armatures to which it is closest in the waiting assembly 1 of the invention among the first armature 7 having a closed “V” shape and the second armature 7bis having an open “V” shape. Also, if it is positioned close to the first armature 7, the additional armature 7ter adopts a closed “V” shape with branches arranged so that the spacing of their free ends is less than the spacing of the respective ends of the arch, the free ends then being positioned between the branches of the first armature 7.Similarly, if positioned close to the second reinforcement 7bis, the additional reinforcement 7ter adopts an open “V” shape with branches arranged so that the spacing of their free ends is greater than the spacing of the respective ends of the arch, the free ends then being positioned on either side of the branches of the second reinforcement 7bis. It should be noted that the additional reinforcements in addition to the third adopt a “V” shape, open or closed, arranged so that the branches of these additional reinforcements are positioned in a suitable and spatially complementary manner relative to the arrangement of the branches of the reinforcement closest to their positions in the waiting assembly 1.Also, the positioning according to an arrangement of the invention of one or more additional reinforcements 7ter on one side and / or the other of the first pair of reinforcements 7, 7bis allows an optimization of the size of the branches of the reinforcements 7, 7bis, 7ter inside the box 2 which allows a reduction in the thickness of the box 2.

[0018] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, at least one of the orifices 4 of the first wall 3 has an oblong shape. According to a preferred example of construction specific to this feature, the oblong shape of the orifice 4 is oriented along the axis of the branch of the frame 7, 7bis, 7ter which passes through the first wall 3 at the level of this orifice 4. Indeed, at the level of the junction between the end of the arch 7a and the end of the branches 7b, the frame 7, 7bis, 7ter has a curvature formed by the folding of the branches 7b at an angle substantially perpendicular to the plane of the arch 7a.Compared to an orifice of circular shape and identical width, this oblong shape thus allows the positioning of a part of the curvature formed by the folding of the reinforcement at the level of the thickness of the first wall 3, or even outside the box 2, so that the branch of the reinforcement is able to be arranged against the surface of the first wall 3 inside the box 2 and optimizes the position of the reinforcement to allow an improved reduction in the thickness of the box 2.

[0019] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, at least one of the orifices 4 of the first wall 3 is positioned at a stamped area 10 projecting from the outer surface of the first wall 3. In a similar manner to the previous particular example of construction, the relief provided by the stamping 10 of the first wall 3 of the box 2 makes it possible to position at least a portion of the curvature formed by the folding of the reinforcement against the surface of the first wall 3 near the orifice 4, so that an essential portion of the curvature of the reinforcement is positioned at the thickness of the first wall 3, or even outside the box 2. Inside the box 2, the branch of the reinforcement is thus able to be arranged against the surface of the first wall 3 to optimize the reduction of the thickness of the box 2.

[0020] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with some of the different examples of construction previously detailed, at least one of the orifices 4 of the first wall 3 is associated with at least one perforated cap 9 positioned projecting from the outer surface of the first wall 3. Thus, the waiting assembly 1 comprises at least one perforated cap 9 which has a dimension adapted to be positioned at the level of an orifice 4 of the first wall 3. This perforated cap 9 comprises a perforation of dimensions substantially identical to the hoop 7 so that it passes through it.The shape of the perforated cap 9 is also adapted to produce a relief making it possible to position at least a part of the curvature formed by the folding of the reinforcement against the surface of the first wall 3 near the orifice 4, so that an essential part of the curvature of the reinforcement is positioned at the level of the thickness of the first wall 3, or even outside the box 2. Inside the box 2, the branch of the reinforcement is thus able to be arranged against the surface of the first wall 3 to optimize the reduction of the thickness of the box 2. According to a specific feature of this feature proposed by way of example, the perforated cap 9 is produced in the form of a sphere section whose apex carries the perforation intended to be crossed by the reinforcement. The periphery of the perforated cap 9 comprises an interface for cooperation with the orifice 4 of the first wall to be fixed there.

[0021] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, the arches 7a of the different frames 7, 7bis, 7ter have a substantially identical spacing of their respective ends. In the interior volume of the box 2, the spacing at one of the ends of each of the pairs of branches 7b is conditioned by the spacing of the end of the arch 7a which relates to it. Also, in the context of managing the size of the branches 7b of the different frames 7, 7bis, 7ter inside the box 2, the identity of spacing of the ends of the arches 7a imposes an additional constraint on the arrangement of the branches 7b which the various arrangement features previously detailed make it possible to overcome.

[0022] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, the planes of the different arches 7a of the various reinforcements 7, 7bis, 7ter of the assembly 1 are arranged in planes parallel to each other and / or spaced apart from each other at a substantially identical spacing. Also, in the waiting assembly 1 of the invention, the different arches 7a positioned at the level of the external surface of the first wall 3 have a homogeneity of shape which facilitates the connections with one or more of the reinforcements of the construction at the level of which the waiting assembly 1 is intended to be installed prior to the pouring of concrete.Furthermore, the possibility of producing a waiting assembly 1 having such homogeneity of arrangement and shape of the hoops 7a positioned on the outer face of the first wall 3 makes it possible to meet production standard constraints.

[0023] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, the box 2 defining the housing has a thickness corresponding substantially to the thickness of the upper wall 3 and to the greatest thickness of one of the branches 7b of one of the frames 7, 7bis, 7ter. According to a specific example of this construction feature, the box 2 has a thickness which comprises, in addition to the thickness of the upper wall 3 and the greatest thickness of one of the branches 7b of one of the frames 7, 7bis, 7ter, the thickness of a cover 8 which closes all or part of the interior volume of the box 2.

[0024] According to another particular example of construction of the waiting assembly 1 of the invention, compatible with the various construction examples previously detailed, the box 2 defining the housing has a thickness of at most 13 millimeters, or even at most 10 millimeters. Indeed, depending on the thicknesses of the different frames 7, 7bis, 7ter used for the waiting assembly 1, the box 2 is capable of having a thickness restricted to at most 10 millimeters.

[0025] Of course, the invention is not limited to the embodiment described and shown in the attached drawings. Modifications remain possible, according to the claims.

Claims

1. Starter system (1) for concrete construction joints, said starter system (1) comprising: - a casing (2) the interior volume of which defines a housing of flattened shape, this casing (2) being made up of at least a first wall (3) comprising a plurality of through-orifices (4) and a second (5) and a third (6) wall, these latter walls being arranged one on each side of the first wall (3) in orientations substantially perpendicular to the plane of the first wall (3), each of the walls (3, 5, 6) having an interior surface and an exterior surface, - at least one pair of reinforcing bars (7, 7bis) arranged through orifices (4) in the first wall (3), each reinforcing bar (7, 7bis) comprising a hoop-shaped first part (7a) projecting at the exterior surface of the first wall (3) and a second part (7b) produced by a pair of branches projecting at the interior surface of the first wall (3), each of these branches structurally extending a respective end of the hoop while being arranged inside the housing, in a plane substantially perpendicular to the plane of the hoop, the pair of reinforcing bars (7, 7bis) comprising a first reinforcing bar (7) the branches of which are arranged in the one same plane as the branches of the second reinforcing bar (7bis), - the branches of the first reinforcing bar (7) are arranged in such a way that the separation of their free ends is less than the separation of the respective ends of the corresponding hoop, said starter system (1) for concrete construction joints being characterized in that: - the branches of the second reinforcing bar (7bis) are arranged so that the separation of their free ends is greater than the separation of the respective ends of the corresponding hoop, and in that - the branches of the first reinforcing bar (7) are positioned between the branches of the second reinforcing bar (7bis).

2. System (1) according to Claim 1, characterized in that at least part of the branches of the first reinforcing bar is arranged between the branches of the second reinforcing bar.

3. System (1) according to one of the preceding claims, characterized in that the system (1) comprises at least three reinforcing bars (7, 7bis, 7ter).

4. System (1) according to one of the preceding claims, characterized in that the system (1) comprises at least one additional reinforcing bar (7ter) positioned in the alignment of the first reinforcing bar (7) with the second reinforcing bar (7bis), the branches of this additional reinforcing bar (7ter) being oriented so as to be, respectively, substantially parallel to those of the closest reinforcing bar from among the first (7) and the second (7bis) reinforcing bar.

5. System (1) according to one of the preceding claims, characterized in that the planes of the various hoops (7a) of the various reinforcing bars (7, 7bis, 7ter) of the system (1) are arranged in mutually-parallel planes and / or are mutually spaced at substantially identical separations.

6. System (1) according to one of the preceding claims, characterized in that the casing (2) defining the housing has a thickness corresponding substantially to the thickness of the upper wall (3) and to the greatest thickness of one of the branches (7b) of one of the reinforcing bars (7, 7bis, 7ter).

7. System (1) according to one of the preceding claims, characterized in that the casing (2) defining the housing has a thickness of at most 13 millimetres.

8. System (1) according to one of the preceding claims, characterized in that at least one of the orifices (4) in the first wall (3) has an oblong shape.

9. System (1) according to one of the preceding claims, characterized in that at least one of the orifices (4) in the first wall (3) is positioned at a pressed zone (10) projecting on the exterior surface of the first wall (3) .

10. System (1) according to one of the preceding claims, characterized in that at least one of the orifices (4) in the first wall (3) is associated with at least one perforated cap (9) positioned so that it projects on the exterior surface of the first wall (3).