Bridge abutment with prefabricated concrete parts and method for the production thereof

EP4397809A3Pending Publication Date: 2024-09-18ECHTERHOFF EXPRESSBRUCKEN GMBH
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
EP2024174136
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-02-04
Filing Date
2022-02-03
Publication Date
2024-09-18

AI Technical Summary

Technical Problem

Conventional bridge abutment construction methods are time-consuming and disrupt traffic routes due to the need for on-site formwork and demoulding, which slows down the construction process and increases traffic restrictions.

Method used

The use of prefabricated concrete facade parts with a base that tapers into a thinner formwork part, allowing for a smooth continuous facade and enabling the creation of a monolithic abutment wall with in-situ concrete, where prefabricated parts are connected by reinforcement cages and wing walls, reducing the need for additional formwork and demoulding work.

Benefits of technology

This method accelerates the construction process, minimizes traffic disruptions, and allows for the creation of deep in-situ concrete additions, providing a stable abutment wall that can be built independently of other structure components, enabling rapid completion with minimal traffic closures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGAF001_ABST
    Figure IMGAF001_ABST
Patent Text Reader

Abstract

Method for constructing a bridge abutment with a base slab, wing walls and an abutment wall made of cast-in-place concrete and an abutment outer wall or facade made of precast concrete elements, comprising the following process steps: - Formation of an abutment base from several facade precast concrete elements to be arranged side by side, - Installation of abutment wall reinforcement in the area above the base, whereby the abutment wall reinforcement extends over several facade precast concrete elements, - Construction of the wing walls, - Concreting of the abutment wall, - Concreting of the base slab.wherein the facade precast concrete elements have in their lower area a base corresponding to the thickness of the abutment wall, which on the outside of the abutment in the upper area transitions into a formwork part that is considerably thinner than the base, and that as further process steps the rear inner side of the abutment wall is closed by formwork and the sides of the abutment wall to be produced are closed with formwork elements formed by wing wall elements.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The invention relates to a bridge abutment and a method for its construction using precast concrete elements.

[0002] Bridge abutments are highly individually designed structures, which are therefore traditionally constructed using on-site formwork made of reinforced concrete and cast-in-place concrete. Formwork and demolding work, in particular, are time-consuming and disrupt the affected traffic routes.

[0003] DE 20 2019 100 831 U1 and DE 20 2019 104 913 U1 therefore already address an acceleration of the construction process, which is achieved primarily through the use of special precast concrete elements. This requires first pouring a blinding layer, onto which precast elements for the abutment wall are then placed and cast with in-situ concrete.

[0004] DE 24 39 466 A1 deals with methods for constructing a bridge substructure and prefabricated elements for it. The prefabricated elements are connected horizontally by cast-in-place concrete beams. For this purpose, the prefabricated elements are provided with a trench-shaped recess in their head area.

[0005] KR 102 181 805 B1 discloses precast concrete elements that each have trench-shaped recesses in both a head region and a foot region. The trench-shaped recesses are connected by recesses extending perpendicularly to these recesses through the respective precast concrete element. Using these precast concrete elements, vertical walls of an integral or semi-integral bridge structure can be constructed. An upper and a lower cast-in-place concrete beam are created in the recesses, connecting the precast concrete elements laterally.

[0006] The invention presented here was based on the objective of developing a bridge abutment that can be constructed even faster and with even fewer traffic disruptions, as well as a method for its manufacture. This objective is achieved by a method according to claim 1 and a bridge abutment according to claim 5.

[0007] For this purpose, prefabricated concrete facade elements are used, preferably made of reinforced concrete, which according to the invention have a base on the bottom essentially corresponding to the thickness of the abutment wall to be constructed. Above the base, the prefabricated concrete facade element tapers to a considerably thinner formwork part. The facade side, i.e. the outer side of the abutment wall to be constructed with it, transitions smoothly from the base into the formwork part, so that the prefabricated concrete facade element forms a uniform, flat and smooth, continuous facade side. The transition from the base to the formwork part is preferably formed by a clear shoulder. This is advantageous for the manufacture of the prefabricated elements, and when constructing the complete abutment wall, a pre-woven reinforcement cage can be placed on the shoulder over any existing connecting reinforcement coming from below.The base should preferably be dimensioned so that the precast concrete facade element stands stably on it.

[0008] Despite the base, the precast concrete facade element essentially has the shape of a wall, i.e. its width and height are considerably greater than the thickness of the base. Preferably in the area of ​​the base, the precast concrete facade element can have lateral recesses, i.e. side recesses where the base adjoins the base of an adjacent precast concrete facade element during the construction of the bridge abutment. If adjacent precast concrete facade elements each have such side recesses, reinforcement can be inserted into these. When the cavities of the abutment wall are subsequently filled with in-situ concrete, the adjacent precast concrete facade elements are connected to one another and further stabilized. To improve this hold, the side recesses can have projections and / or recesses so that they interlock firmly with the in-situ concrete to be filled and the inserted reinforcement.It is also possible for the base to have one or more bored pile recesses, at least at the bottom, which can also extend completely, usually vertically, through the base. This allows the base to be placed on bored piles that may have previously been installed for a deep foundation, connected to their reinforcement in a suitable manner, and filled accordingly.

[0009] To increase the contact area, the precast concrete facade element can have a spur at its lower end on the base that protrudes towards the outside or facade side. This spur reinforces the support of the abutment wall towards the free side, if soil conditions require it. The spur itself is preferably significantly lower than the rest of the base.

[0010] The base of the precast concrete facade element preferably has protruding connecting reinforcements at its lower end, on the inner side opposite the outer side, for connection to a base slab of the bridge abutment to be constructed. If no spur is provided on the opposite outer side, connecting reinforcements can also protrude from the base there to create a spur in-situ concrete if necessary.

[0011] The precast concrete facade elements are placed side by side as intended. If necessary, suitable reinforcement elements are inserted into existing side recesses. Reinforcement is then inserted above the base, spanning the adjacent precast concrete facade elements. After that, the rear or inner side of the abutment wall to be constructed is sealed with formwork elements, which can also be precast elements. To prevent in-situ concrete poured into the resulting cavity wall from spilling out laterally, the sides of the abutment wall to be constructed must also be sealed with formwork elements, which, according to the invention, are formed by wing wall elements.

[0012] To create a bridge abutment using precast concrete facade elements, several precast concrete facade elements are placed side by side, forming an abutment base. Abutment wall reinforcement bridging adjacent precast concrete facade elements is installed above their bases. The rear side or inner side of the abutment wall is closed with formwork elements, preferably precast reinforced concrete elements, and – if the sides of the abutment wall are also closed – the interior of the abutment wall is cast with in-situ concrete. The components of the abutment wall are monolithically connected by the in-situ concrete, so that the load of the bridge superstructure subsequently placed on the abutment wall is evenly distributed and joints between the precast concrete facade elements are bridged. Wing walls – preferably also made of precast concrete elements – are also constructed, and a floor slab is concreted.

[0013] Formwork elements, particularly those designed as precast reinforced concrete elements that close the rear or inner side of the abutment wall, can be designed and arranged so that they project upwards beyond the abutment. This allows for the simple creation of a chamber wall for the abutment wall. No additional work steps are required to create a chamber wall, in particular no formwork or demolding work.

[0014] By using precast concrete facade elements with an L-shaped cross-section, bridge abutments with cast-in-place concrete extensions of varying depths in the vertical direction can be easily realized. In particular, very deep cast-in-place concrete extensions, which form more than 30% of the abutment wall, preferably more than 50% of the abutment wall in a single vertical cross-section, can be easily realized using precast concrete facade elements with an L-shaped cross-section. Especially compared to precast concrete elements with a trough-like recess for the insertion of a cast-in-place concrete beam and a correspondingly U-shaped cross-section, precast concrete facade elements with an L-shaped cross-section are less susceptible to damage during transport and / or erection of the precast concrete elements and allow for easier insertion of reinforcement cages.

[0015] Preferably, the depth of the cast-in-place concrete supplement is selected depending on the position of the abutments for a bridge superstructure and the respective load distribution angles in the area of ​​the bridge abutment so that the load introduced at an abutment is distributed by the cast-in-place concrete supplement to more than one precast concrete element, in particular at least to the adjacent precast concrete elements.

[0016] A further major advantage of the method according to the invention is that the abutment wall can be constructed completely independently of the other parts of the construction work. In particular, there is no need to concrete a base slab beforehand, as the abutment wall is self-supporting and can also be connected to the base slab to be constructed later. Since the abutment wall forms the bridge support, it is essential for the construction speed of the entire structure that it be constructed as quickly as possible and with minimal disruption to traffic during the construction work. The method according to the invention enables the construction of the entire new bridge structure, preferably with only a single closure of the traffic passing under the bridge for the new construction work, since no formwork removal work is necessary on the outside of the abutment wall or the facade.

[0017] If a deep foundation is required, the method according to the invention can be used to pre-install bored piles, small bored piles, or micropiles in the subsoil below the foundation slab. These can also be arranged below the abutment base to be erected. For this purpose, the precast concrete facade elements are then provided with corresponding bored pile recesses through which the bored piles are connected with reinforcement to the precast concrete facade elements and, if necessary, through their bases, also to the upper part of the abutment wall to be constructed using in-situ concrete.

[0018] It is possible to use precast concrete facade elements with side recesses in the base area. Reinforcement must be inserted into these recesses between two adjacent precast concrete facade elements. These areas can be cast separately with in-situ concrete or, preferably, when the upper cavity of the abutment wall is cast, whereby the precast concrete facade elements are secured to each other in the base area in addition to their monolithic connection above the base. All precast concrete elements used are preferably reinforced with reinforcement and are usually designed as reinforced concrete elements.

[0019] To erect the entire structure as quickly as possible, the individual steps of the process are recommended as follows: The section of one of the wing walls adjacent to the abutment wall is erected first. From then on, the wing wall can be added to the rear simultaneously or in any order, and the precast concrete facade elements with base are erected one after the other, starting with the erected wing wall element. If these have side recesses in the base area, a reinforcement cage is inserted there before the next element is added, until the entire abutment base is completed. The abutment reinforcement, preferably in the form of a prefabricated reinforcement cage, is then inserted vertically from above and placed on the base projection.Since the wing wall elements should also preferably have connecting reinforcements engaging in this area to form a force-fitting and / or rigid connection to the abutment wall, the spatially overlapping reinforcing bars of the wing wall elements and the reinforcement cage, which is placed on the base, are preferably staggered or arranged at a distance in height from one another so that the reinforcements do not interfere with one another. They can now be linked together. The other side of the abutment base is also closed with a wing wall element. A preferably continuous abutment inner wall is then inserted at the rear, which represents the interior formwork. A monolithic structure is then created in the abutment wall by pouring in-situ concrete. The monolithic block serves to distribute the load so that the applied load is evenly distributed and joints are bridged.The bridge superstructure can then be placed on top of this completed abutment wall. Concreting the base slab is completely independent of these process steps and can be performed at any time, particularly at the same time as the abutment wall is being concreted, for example, once the second wing wall, which can serve as formwork for the base slab, has been fully erected.

[0020] Further advantages and details are set out in the dependent claims and the drawings described below. These illustrate, by way of example, the working steps of the inventive method, as well as the structure to be constructed in the various stages and the components used. They show: Fig. 1 schematically a bridge structure in side view with two bridge abutments, Fig. 2 with the Figures 2 a) to 2 f) the right abutment Fig. 1 schematically in different sections AA to FF, Fig. 3 with the Figures 3 a) to 3 g)the object from Fig. 2 in a documentation of the individual work steps (1.1) to (6) during its creation, supplemented by a section GG, Fig. 4 with the Figures 4 a) to 4 f) an alternative embodiment of the subject matter of the Fig. 2 and 3 in different sections AA to GG Fig. 5 another alternative embodiment of the bridge abutment in a side section AA and detail a, Fig. 6 with the Figures 6a) to 6d) Sectional views BB to EE- through the object from Fig. 5 Section AA, Fig. 7with the Figures 7 a) to 7 d) in Fig. 7a) Detail b and in Fig. 7c) Detail c from sections BB and CC of the Fig. 6 as well as sections 1-1 and 2-2 through these details and Fig. 8 a section FF through the object from Fig. 6 .

[0021] The Fig. 1The schematically sketched bridge structure has bridge abutments 1 on the right and left with bearing bases 2, on each of which an end cross girder 3 and the bridge superstructure 4 rests. In the following Figures 2 to 8 The right bridge abutment 1 is made of Fig. 1 shown in different sections, process steps in its creation and different designs.

[0022] Fig. 2 with Figures 2 a), 2 b), 2 c), 2 d), 2 e), 2 f) shows top left in Fig. 2 a) the right bridge abutment in section AA. There you can also see where the Figures 2 b) to 2 e)shown sections BB to EE. The bridge abutment 1 consists on its freely visible outer side of prefabricated concrete facade elements 6, one or more formwork elements 7 for the inner side, abutment wall reinforcement 8, an in-situ concrete filling and one or more bearing bases 9. The prefabricated concrete facade element 6 has a base 11 on the bottom, the thickness of which corresponds to that of the entire abutment wall. Towards the top, the prefabricated concrete facade element 6 merges into a considerably thinner formwork part 12, preferably a prefabricated concrete element with reinforcement. This and also the formwork part 7, which is preferably designed as a prefabricated reinforced concrete element, or the formwork elements 7 for the inner side are also referred to as an apron.

[0023] The shape of the L-shaped precast concrete elements 6 is preferably selected so that forces introduced into the bridge abutment 1 at the bearing bases 9 are distributed at a load distribution angle to more than one precast concrete element 6. This load distribution is achieved by the in-situ concrete supplement forming a sufficiently large portion of the abutment wall. Precast concrete elements 6 have a correspondingly low base 11 and correspondingly long formwork elements 12.

[0024] The internal formwork 7 consists of separate components. This includes the Figures 2a) , 3 a) and 4 a) flush with the abutment. However, it can also be designed to protrude beyond the abutment, forming a chamber wall of the abutment wall. An abutment wall with a chamber wall can thus be easily constructed without any additional work steps, in particular without additional formwork or demolding work.

[0025] The base 11 has integrated static reinforcement 13, which makes it suitable for high load-bearing capacity. At its lower end, the base 11 preferably has a connecting reinforcement 14 protruding on the inside for connection to a base plate 16. Instead of the protruding connecting reinforcement 14, screw connections for subsequently installed reinforcing bars can also be provided. The bridge abutment 1 is complemented by wing walls 17 and 18, which in the illustrated embodiment are each formed by three individual wing wall elements 27, 37, 47 and 28, 38, 48. The entire bridge abutment rests on a blinding layer 19.

[0026] The cut BB of the Fig. 2b) as well as the section FF defined in this section, shown in Fig. 2f), show that the wing walls 17, 18 also have connecting reinforcements 14 projecting inwards at the bottom for connection to the floor slab 16. In particular in section CC ( Fig. 2c) ) and EE ( Fig. 2e) ) it can be seen that the prefabricated concrete facade elements 6 have side recesses 21 in their base 11 and the outer wing wall elements 27, 28, into which reinforcement can be inserted and in-situ concrete can be poured to fix the position of the elements relative to each other. Corresponding recesses 22 can also be provided in the parts of the wing walls 17, 18, preferably on the top side, as shown in sections AA ( Fig. 2 a) ) and EE ( Fig. 2e) ) shown. Section DD ( Fig. 2d)) shows, in addition to the schematically indicated abutment reinforcement 8 above the base 11, that the adjacent wing wall elements 27, 28 above the base 11 also had inwardly projecting connecting reinforcements 24, with which the abutment wall reinforcement 8 can be connected, e.g. in a conventional manner, referred to as knotting or tying.

[0027] Fig. 3 with the figures Fig. 3 a) to Fig. 3 g) shows the individual process steps by which a bridge abutment can be constructed. It is proposed to use a process step (1.1), shown in Fig. 3b) , first erect the side wing wall 17 from the wing wall elements 27, 37 and 47. Once the first wing wall element 27 is erected, you can already start with step (1.2), shown in Fig. 3c), can be started. Since the wing wall element 27 has a side recess 21, as does the precast concrete facade element 6 to be attached to it, a reinforcement cage (not shown) is first inserted into this recess 21. Then, the first precast concrete facade element 6 is pushed forward, another reinforcement cage (also not shown) is inserted into the next side recess 21, and the next precast concrete facade element 6 is added, and so on, up to the planned width of the abutment wall, so that an abutment base is already formed. In step (2), the abutment wall is closed laterally by the wing wall element 28. The wing wall elements 38 and 48 can also be added. In step (3), the base plate 16 can then already be concreted. However, this is not absolutely necessary at this time. Steps (2) and (3) are in Fig. 2d)More importantly, steps 4 to 6 promote the completion of the abutment wall. For this purpose, step 4, shown in Fig. 2e), an abutment reinforcement, preferably in the form of a pre-woven reinforcement cage 8, is placed in the direction of arrow P above the base 11 on a ledge formed by the cage over protruding connecting reinforcements. The spacing of the reinforcement bars of the reinforcement cage 8 is preferably dimensioned such that the reinforcement bars of the abutment reinforcement 8 do not collide with those of the connecting reinforcement 24 of the wing wall elements 27, 28. A slightly offset arrangement is optimal for this purpose. In step (5), the inner formwork or the inner prefabricated reinforced concrete element 7 of the abutment wall is pushed in and fastened in the direction of arrow P, after which the abutment wall is concreted in step 6, the cavities of the abutment wall and the side recesses 21 being filled with in-situ concrete. Process step (3), namely the concreting of the floor slab, can take place simultaneously with process step (6), concreting of the abutment wall.Once the concrete of the abutment wall has reached the required strength, the bridge superstructure can be laid during a single traffic closure. Steps (5) and (6) are described in . Fig. 2f) reproduced.

[0028] Fig. 4 with the Figures 4 a) to 4 g) shows representations similar to the Fig. 2 with the Figures 2 a) to 2 f) , but for an alternative embodiment. The precast concrete facade element 6 has a spur 26 at its lower end, which projects outwards and enlarges the footprint of the abutment base and thus the entire abutment wall. Section GG of the Fig. 4 , shown in Fig. 4g) , furthermore shows that the side recesses 21 can preferably have projections and recesses in which the in-situ concrete which is subsequently filled can optimally grip and anchor itself with reinforcement cages which are shaped as closely as possible to the geometry of the side recesses 21.

[0029] The Fig. 5 to 8show the special features of another embodiment of the bridge abutment 1 according to the invention, wherein a deep foundation was constructed using bored piles 30, small bored piles, or micropiles. These were previously inserted into the subsoil. If, as shown, bored piles 30 are also arranged below the abutment wall, the prefabricated concrete facade elements 6 of the abutment wall can have bored pile recesses 31 in their bases 11. As shown, these can preferably pass completely through the base 11. The bored pile recesses 31 can be designed as shown in Fig. 7 with the Figures 7 a) to 7 d) shown also have projections and recesses, into which precisely fitting reinforcement cages 32 (see also Fig. 7 ) can be inserted. A load-securing connection of the abutment wall to the bored piles 30 can be achieved by connecting the reinforcements 14 and / or 32 with those of the bored piles in the lower area of ​​the prefabricated concrete facade elements 6 (see detail a in Fig. 5 ). The bored pile recesses 31 can be cast with in-situ concrete together with the upper section of the abutment wall.

[0030] The method according to the invention for constructing bridge abutments and the precast concrete facade elements 6 used for this purpose enable the construction of the abutment wall to be separated in time from the other process steps, in particular from the concreting of the base plate 16. This leads to an enormous acceleration and makes it possible to construct the bridge structure for a motorway below, for example, with only one full closure for the new construction and a significantly reduced impact on traffic due to the construction work.

Claims

1. Method for constructing a bridge abutment with a base slab (16), wing walls (17, 18) and an abutment wall with in-situ concrete and an abutment outer wall or facade made of precast concrete elements, with the method steps - formation of an abutment base from several precast concrete facade elements (6) to be arranged next to one another for the abutment outer wall, - introduction of an abutment wall reinforcement (8) in the area above the base (11), wherein the abutment wall reinforcement (8) extends over several precast concrete facade elements (6), - construction of the wing walls (17, 18), - concreting of the abutment wall, - concreting of the base slab (16). characterized in thatthe prefabricated concrete facade elements have in their lower region a base (11) corresponding to the thickness of the abutment wall, which base merges on the outer side of the abutment in the upper region into a formwork part (12) which is considerably thinner than the base (11), and that as a further process step, the rear inner side of the abutment wall is closed by formwork (7) and the sides of the abutment wall to be produced are closed with formwork elements which are formed by wing wall elements.

2. Method according to claim 1, wherein bored piles (30) are inserted into a subsoil beneath the base plate (16).

3. Method according to claim 2, wherein at least some of the bored piles (30) are inserted below the abutment base before the precast concrete facade elements (6) are erected, and wherein the bases (11) of the precast concrete facade elements (6) have bored pile recesses (31) above the bored piles (30), into which reinforcement (32) and then in-situ concrete are introduced.

4. Method according to one of the preceding claims, wherein the prefabricated concrete facade elements (6) have, at least in the region of their bases (11), side recesses (21) into which reinforcements are introduced which, after subsequent casting with in-situ concrete, fix the prefabricated concrete facade elements (6) against one another.

5. Bridge abutments made of reinforced concrete with a base plate (16), wing walls (17, 18) and an abutment wall with prefabricated concrete facade elements (6), abutment wall reinforcement (8) and in-situ concrete, characterized in thatthe prefabricated facade concrete elements (6) have in their lower region a base (11) corresponding to the thickness of the abutment wall, which base on the outside of the abutment in the upper region merges into a formwork part (12) which is considerably thinner than the base (11), and the abutment wall above the base (11) of the prefabricated facade concrete elements (6) is supplemented with formwork (7) on the rear inside, abutment wall reinforcement (8) and in-situ concrete to the full wall thickness, wherein adjacent prefabricated facade concrete elements (6) are monolithically connected by the abutment wall reinforcement (8) and the in-situ concrete, wherein the sides of the abutment wall to be produced are closed with formwork elements which are formed by wing wall elements.

6. Bridge abutment according to claim 5, characterized in that the base (11) has at least one bored pile recess (31) at least on the bottom side.

7. Bridge abutment according to claim 5 or 6, characterized in thatthe base (11) has side recesses (21) to accommodate reinforcement and in-situ concrete.

8. Bridge abutment according to claim 6 or 7, characterized in that the side and / or bored pile recesses (21, 31) have projections and / or recesses.

9. Bridge abutment according to one of claims 5 to 8, characterized in that the base (11) has at its lower end a spur (26) projecting towards the outside.

10. Bridge abutment according to one of claims 5 to 9, characterized in that the base (11) has at its lower end on the inside opposite the outside a protruding connecting reinforcement (14).

Citation Information

Patent Citations

  • Bridge abutment and bridge structure

    DE202019100831U1

  • Bridge substructure walls columns and piers - has prefabricated components with reinforcement protruding into foundation and is assembled in position

    DE2439466A1

  • Integral Abutment Bridge without Soil-Structure Interaction

    KR101585652B1

  • Precast concrete abutment / pier block unit for jointless bridge and Construction method of jointless bridge using thereof

    KR102181805B1