Joint structure and joint method for precast floor slabs
The precast slab joining method using reinforcing bar protrusions and connecting members addresses labor and cost issues, enhances safety, and prevents skin separation in high-rigidity slabs, ensuring efficient construction in facilities like semiconductor production.
Patent Information
- Application Number
- JP2023077425
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-09
- Publication Date
- 2024-11-21
AI Technical Summary
Conventional methods for joining precast slabs, such as welding and mechanical joints, are labor-intensive, costly, require special skills, and pose safety risks, especially in high-rigidity perforated slabs used in production facilities like semiconductor and precision equipment production, where microvibrations need to be prevented.
A precast floor slab joining method that uses reinforcing bar protrusions with connecting members and fillers to connect precast slabs, eliminating the need for welding and mechanical joints, thereby reducing labor, costs, and enhancing safety during transportation and construction.
The method improves adhesion between slabs, prevents skin separation, reduces fire risks, and addresses labor shortages while maintaining structural integrity and safety, allowing for efficient construction of high-rigidity slabs.
Smart Images

Figure 2024162148000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a joint structure for a precast deck and a joint method for a precast deck. [Background technology]
[0002] When constructing joints between precast decks using cast-in-place concrete, it is common to have the tips of reinforcing bars protrude from each of the precast decks to be joined and then weld these bars together or join them with mechanical joints (see, for example, Patent Document 1). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-2251 A Summary of the Invention [Problem to be solved by the invention]
[0004] When welding rebar, fire prevention measures are required because open flames are used, which is labor-intensive. When joining rebar with mechanical joints, it is costly because mechanical joints are expensive. In addition, welding and mechanical joints require special skills, so personnel must be secured. When transporting and constructing precast decks, measures must be taken to prevent rebar protruding from the precast deck from coming into contact with workers or objects, which is labor-intensive.
[0005] In recent years, there has been an increase in the use of high-rigidity perforated precast decks to prevent the occurrence of micro-vibrations in production facilities that produce semiconductors, precision equipment, etc. When using high-rigidity perforated precast decks, it is possible to use conventional construction methods, but in light of the current tight labor situation and the unique circumstances of production facilities where production operations need to be started immediately, the main structural framework such as beams is planned to be made of steel, and high-rigidity perforated precast decks are used for the floors.
[0006] Since the beams of steel-framed construction are a highly rigid structure, the high-rigidity perforated precast deck slabs must also be highly rigid. For this reason, high-rigidity perforated precast deck slabs often have a thick plate (generally 250mm or more) and a small support span. In such cases, when joining high-rigidity perforated precast deck slabs together, rather than focusing on joint strength, it is desirable to be able to transmit micro-vibrations between the high-rigidity perforated precast deck slabs, so that the high-rigidity perforated precast deck slabs and cast-in-place concrete can adhere closely to each other and prevent surface separation.
[0007] Therefore, an object of the present invention is to provide a precast deck slab joining structure and a precast deck slab joining method which can reduce labor and costs while preventing surface separation between the precast deck slab and cast-in-place concrete. [Means for solving the problem]
[0008] In order to achieve the above-mentioned object, the precast floor slab joint structure of the present invention comprises a reinforcing bar protruding portion protruding from the concrete floor portion of each of the precast floor slabs that are joined to each other, a connecting member that connects the reinforcing bar protruding portion of each of the precast floor slabs that are joined to each other, and a filler material that is filled between the concrete floor portions of each of the precast floor slabs that are joined to each other to embed the reinforcing bar protruding portion and the connecting member, wherein at least one end of the reinforcing bar protruding portion in the longitudinal direction is connected to the concrete floor portion, and a middle portion in the longitudinal direction is located on the side away from the concrete floor portion relative to both longitudinal ends of the reinforcing bar protruding portion and is curved so as to protrude on the side away from the concrete floor portion, and the connecting member is spanned between the reinforcing bar protruding portion of one of the precast floor slabs that are joined to each other and the reinforcing bar protruding portion of the other precast floor slab.
[0009] In order to achieve the above object, the method for joining precast floor slabs according to the present invention includes a precast floor slab installation step of installing precast floor slabs to be joined to each other, and a joining step of joining the precast floor slabs, wherein the precast floor slabs have a reinforcing bar protruding portion protruding from a concrete floor slab portion, and at least one end in the length direction of the reinforcing bar protruding portion is connected to the concrete floor slab portion, and a middle portion in the length direction is located on a side farther from the concrete floor slab portion than both ends in the length direction of the reinforcing bar protruding portion and is curved so as to protrude on the side farther from the concrete floor slab portion, and in the precast floor slab installation step, the concrete floor slab portions of each of the precast floor slabs to be joined to each other are connected to the precast floor slabs by connecting the precast floor slabs to the concrete floor slabs. The cast floor slabs are positioned at intervals in the direction in which the precast floor slabs are joined, and the reinforcing bar protrusions are arranged in the direction in which the precast floor slabs are joined. The joining process includes a reinforcing bar protrusion connecting process in which the reinforcing bar protrusions of each of the precast floor slabs that are being joined to each other are connected with a connecting member, and a filler filling process in which filler is filled between the floor concrete portions of each of the precast floor slabs that are being joined to each other. In the reinforcing bar protrusion connecting process, the connecting member is stretched across the reinforcing bar protrusion of one of the precast floor slabs that are being joined to each other and the reinforcing bar protrusion of the other precast floor slab. In the filler filling process, the reinforcing bar protrusions and the connecting member are embedded in the filler.
[0010] In the present invention, by connecting the rebar protrusions of the precast decks with connecting members, the rebar protrusions are connected to each other even after the precast decks are joined, improving the adhesion between the filler and the deck concrete, preventing surface separation. As a result, micro-vibrations can be transmitted between the precast decks. Since the rebars in the precast deck are connected with connecting members, fire prevention measures that would be required if the rebars were welded together are not necessary and the risk of fire is reduced. Also, compared to joining rebars with welding or mechanical joints, no special skills are required, which alleviates labor shortages and reduces construction costs. Also, because the rebar protruding from the precast deck is curved, safety during transportation and construction is increased compared to when it protrudes straight.
[0011] In addition, in the precast deck joint structure of the present invention, the reinforcing bar protrusion has both longitudinal ends connected to the concrete deck portion, and a connecting hole is formed between the reinforcing bar protrusion and the concrete deck portion, and the connecting member may be spanned between the connecting hole of one of the precast decks to be joined to each other and the connecting hole of the other precast deck.
[0012] In addition, in the precast deck joining method of the present invention, both longitudinal ends of the reinforcing bar protrusion are connected to the concrete deck portion, and a connecting hole is formed between the reinforcing bar protrusion and the concrete deck portion, and in the reinforcing bar protrusion connecting process, the connecting member may be spanned between the connecting hole of one of the precast decks to be joined to each other and the connecting hole of the other precast deck.
[0013] With this configuration, the connecting members can be easily connected to the protruding reinforcing bars by simply spanning the connecting holes of each of the precast decks to be joined.
[0014] In addition, in the precast floor slab joint structure of the present invention, the connecting member is formed in a U-shape having a pair of straight sections arranged in parallel with a gap between them, and a connection portion connecting one end of each of the pair of straight sections, and is arranged in a position where the U-shape opens downward, one of the pair of straight sections is inserted from above into the connecting hole portion of one of the precast floor slabs to be joined, and the other of the pair of straight sections is inserted from above into the connecting hole portion of the other of the precast floor slabs to be joined, and the connection portion may be in contact with the reinforcing bar protrusion portion of each of the precast floor slabs to be joined.
[0015] In addition, in the method of joining precast floor slabs according to the present invention, the connecting member is formed in a U-shape having a pair of straight sections arranged in parallel with a gap between them, and a connection portion connecting one end of each of the pair of straight sections, and in the reinforcing bar protrusion connecting process, the connecting member is in a position that opens downward, and one of the pair of straight sections is inserted from above into the connecting hole portion of one of the precast floor slabs to be joined, and the other of the pair of straight sections is inserted from above into the connecting hole portion of the other of the precast floor slabs to be joined, and the connection portion is brought into contact with the reinforcing bar protrusions of each of the precast floor slabs to be joined.
[0016] With this configuration, the reinforcing bar protruding portions of the precast decks that are to be joined together can be easily connected together with the connecting members. Effect of the Invention
[0017] According to the present invention, it is possible to reduce labor and costs, and also to prevent separation between the precast deck and the cast-in-place concrete. [Brief description of the drawings]
[0018] [Figure 1]This is a vertical cross-sectional view of the joint structure of a precast deck. [Diagram 2] FIG. 2 is a plan view of the joint structure of a precast deck. [Diagram 3] FIG. 11 is a plan view showing a first modified example of a joint structure for a precast deck. [Figure 4] FIG. 11 is a plan view showing a second modified example of the joint structure of the precast floor slab. [Diagram 5] FIG. 11 is a vertical cross-sectional view showing a second modified example of a joint structure for a precast deck. [Figure 6] FIG. 11 is a plan view showing a third modified example of the joint structure of the precast floor slab. [Figure 7] FIG. 11 is a plan view showing a fourth modified example of a joint structure for a precast deck. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0019] Hereinafter, a precast floor slab joining structure and a precast floor slab joining method according to an embodiment of the present invention will be described with reference to Figs. 1 and 2. As shown in FIG. 1, a precast floor slab 1 according to this embodiment is used for the floor of a production facility that produces semiconductors, precision equipment, and the like. The precast floor slab 1 is installed on a beam assembly 2 assembled from steel beams 21. The joining structure and joining method between adjacent precast floor slabs 1, 1 in the first horizontal direction will be described below. The horizontal direction perpendicular to the first horizontal direction is referred to as the second horizontal direction. In the drawings, the first horizontal direction is indicated by an arrow X, and the second horizontal direction is indicated by an arrow Y. Precast slabs 1,1 adjacent to each other in the first horizontal direction are joined above steel beams 21 extending in the second horizontal direction. Between the precast slabs 1,1 adjacent to each other in the first horizontal direction and above the steel beams 21, a filler 6 that joins the precast slabs 1,1 is filled. The precast slabs 1,1 are manufactured in a factory or the like and transported to the construction site. The filler 6 is, for example, cast-in-place concrete, or mortar or grout material filled at the site. The filler 6 may be a material other than those mentioned above as long as it is capable of joining the precast slabs 1,1. In FIG. 2, the concrete is omitted, and reinforcing bars 4 and connecting members 5, which will be described later, are indicated by solid lines.
[0020] The precast floor slab 1 has a concrete floor slab portion 3 and a plurality of reinforcing bars 4 embedded in the concrete floor slab portion 3. The concrete floor slab portion 3 is formed in a flat plate shape. An end face in a first horizontal direction of the concrete floor slab portion 3 is referred to as a joint end face 31. The precast floor slab 1 may be a high-rigidity perforated precast floor slab.
[0021] Of the multiple reinforcing bars 4, a reinforcing bar 41 provided on the upper part of the concrete deck portion 3 partially protrudes from the joint end surface 31 of the concrete deck portion 3. The part of the reinforcing bar 41 protruding from the joint end surface 31 of the concrete deck portion 3 is referred to as a reinforcing bar protruding portion 42. The reinforcing bar protrusion 42 is formed in an arc shape. Both longitudinal ends 421, 421 of the reinforcing bar protrusion 42 are connected to the concrete deck portion 3, and the longitudinal middle portion 422 is curved so as to protrude toward the side away from the concrete deck portion 3. Between the reinforcing bar protrusion 42 and the joint end surface 31 of the concrete deck portion 3, a connecting hole 43 is formed which penetrates in the vertical direction.
[0022] The precast floor slabs 1, 1 adjacent in the first horizontal direction are arranged with their rebar protrusions 42 spaced apart in the first horizontal direction. The joint end faces 31 of the precast floor slabs 1 adjacent in the first horizontal direction are also spaced apart in the first horizontal direction. The reinforcing bar protrusions 42 of the precast floor slabs 1 adjacent in the first horizontal direction are connected by connecting members 5. The reinforcing bar protrusions 42 and the connecting members 5 are embedded in the filling material 6.
[0023] The connecting member 5 is formed in a U-shape. The connecting member 5 in this embodiment is a member in which a reinforcing bar is bent into a U-shape. The connecting member 5 has a pair of straight portions 51, 52 arranged in parallel with a gap therebetween and extending linearly, and a connecting portion 53 that connects one end of each of the pair of straight portions 51, 52. The connecting member 5 connects the two reinforcing bar protruding portions 42, 42 in a position in which the connecting portion 53 is on the upper side of the straight portions 51, 52 and the two straight portions 51, 52 are arranged in parallel with a gap in the first direction. The height dimension of the connecting member 5 in the above-mentioned position is smaller than the height dimension of the slab concrete portion 3. When the connecting member 5 is in the above-mentioned position, one straight portion 51 is inserted from above into the connecting hole portion 43 of the reinforcing bar protrusion 42 of one precast deck 1, and the other straight portion 52 is inserted from above into the connecting hole portion 43 of the reinforcing bar protrusion 42 of the other precast deck 1, and the connection portions 53 are positioned above each of the two reinforcing bar protrusions 42. The connecting member 5 is hooked onto the two reinforcing bar protrusions 42 due to gravity. The connection portion 53 contacts each of the two reinforcing bar protrusions 42. The upper end of the connecting member 5, i.e., the upper end of the connection portion 53, is positioned below the upper surface of the concrete deck portion 3. The lower end of the connecting member 5, i.e., the lower ends of the straight portions 51, 52, are positioned above the lower surface of the concrete deck portion 3. In this embodiment, the anchoring member 22 is joined to the upper surface of the upper flange 211 of the steel beam 21 (see FIG. 1). The reinforcing bar protrusions 42 and the connecting member 5 are positioned so as not to interfere with the anchoring member 22.
[0024] The filler 6 is filled between the joint end faces 31 of the slab concrete portions 3 of adjacent precast slabs 1, and embeds the two reinforcing bar protrusions 42 and the connecting members 5. The filler 6 also embeds the anchoring members 22.
[0025] A method for joining precast decks according to this embodiment will be described. First, a precast deck 1 that has been manufactured in advance is placed on top of a beam structure 2 (precast deck installation process). The joint end faces 31 of the concrete deck portions 3 of the precast decks 1, 1 adjacent to each other in the first horizontal direction are arranged at intervals in the first horizontal direction. The rebar protrusions 42 of the precast decks 1 adjacent to each other in the first horizontal direction are arranged in the first horizontal direction.
[0026] Next, the precast floor slabs 1, 1 adjacent to each other in the first horizontal direction are joined (joining process). First, the reinforcing bar protrusions 42, 42 are connected with the connecting member 5 (reinforcing bar protrusion connecting process). With the connecting member 5 in a position that opens downward, one straight section 51 is inserted from above into the connecting hole 43 of the reinforcing bar protrusion 42 of one precast floor slab 1, and the other straight section 52 is inserted from above into the connecting hole 43 of the reinforcing bar protrusion 42 of the other precast floor slab 1. The connection sections 53 are positioned above each of the two reinforcing bar protrusions 42. The connecting member 5 is hooked onto the two reinforcing bar protrusions 42. Filler 6 is filled between the concrete deck portions 3 of the precast decks 1, 1 adjacent in the first horizontal direction (filler filling process). As described above, the filler 6 is, for example, cast-in-place concrete, mortar or grout material filled on-site. The connecting member 5 and the two rebar protruding portions 42 are embedded with the filler 6. After filling the filler 6, it is cured for a predetermined period of time to harden.
[0027] Next, the action and effect of the precast floor slab joining structure and the precast floor slab joining method according to this embodiment will be described. In the precast floor slab joining structure and precast floor slab joining method according to this embodiment, the reinforcing bar protrusions 42 of the precast floor slabs 1,1 are connected with the connecting members 5, and the reinforcing bar protrusions 42 remain connected even after the precast floor slabs 1,1 are joined, improving the adhesion between the filler 6 and the floor slab concrete portion 3 and preventing surface separation. As a result, micro-vibrations can be transmitted between the precast floor slabs 1,1. Since the reinforcing bars 4 of the precast deck 1,1 are connected to each other with the connecting members 5, fire prevention measures that would be required when welding the reinforcing bars together are not necessary and the risk of fire can be reduced. Also, compared to joining the reinforcing bars with welding or mechanical joints, no special skills are required, which can alleviate labor shortages and reduce construction costs. Also, since the reinforcing bar protrusions 42 protruding from the precast deck 1,1 are curved in an arc, safety during transportation and construction can be improved compared to when they protrude in a straight line.
[0028] In addition, in this embodiment, the connecting member 5 is formed in a U-shape and has a pair of straight sections 51, 52 arranged in parallel with a gap between them and extending in a straight line, and a connecting section 53 connecting one end of each of the pair of straight sections 51, 52. This allows the reinforcing bar protrusions 42, 42 of the precast floor slabs 1, 1 to be joined to each other to be easily connected to each other with the connecting members 5. Since the connecting members 5 of each of the precast floor slabs 1, 1 to be joined to each other come into contact with the reinforcing bar protrusions 42, it is possible to prevent the precast floor slabs 1, 1 to be joined from shifting in position.
[0029] The above describes embodiments of the precast deck joint structure and precast deck joint method according to the present invention, but the present invention is not limited to the above embodiments and can be modified as appropriate without departing from the spirit of the present invention. For example, in the above embodiment, the reinforcing bar protruding portion 42 is formed in an arc shape. The reinforcing bar protruding portion 42 does not have to be in an arc shape as long as the intermediate portion 422 in the longitudinal direction is curved so as to protrude toward the side away from the deck concrete portion 3.
[0030] In the above embodiment, the precast floor slabs 1, 1 adjacent in the first horizontal direction have their reinforcing bar protrusions 42 arranged at intervals in the first horizontal direction, but as shown in Fig. 3, the reinforcing bar protrusions 42 may be arranged at positions offset in the second horizontal direction. Also, as shown in Figs. 4 and 5, the reinforcing bar protrusions 42 may be arranged to overlap one another vertically.
[0031] In the above embodiment, both longitudinal ends 421, 421 of the reinforcing bar protrusion 42 are connected to the concrete floor 3, but one longitudinal end 421a may be connected to the concrete floor 3 and the other end 421b may be separated from the concrete floor 3, such as a reinforcing bar protrusion 42 in the shape of a 180° hook shown in Fig. 6 or a reinforcing bar protrusion 42 in the shape of a 135° hook shown in Fig. 7. In such a case, the reinforcing bar protrusions 42 are connected to each other by bridging the connecting member 5 between the reinforcing bar protrusion 42 of one precast floor slab 1 and the reinforcing bar protrusion 42 of the other precast floor slab 1 of the precast floor slabs 1, 1 to be joined to each other. Even in such a case, both longitudinal ends 421, 421 are located closer to the concrete deck part 3 than the curved longitudinal middle part 422. This prevents the end 421 of the rebar protruding part 42 that is away from the concrete deck part 3 from coming into contact with people or objects, thereby improving safety during transportation and construction. In the above embodiment, the filler 6 is filled on the steel beams 21, but it may be filled on a steel plate or the like.
[0032] In the above embodiment, the connecting member 5 is formed in a U-shape, but it may have any other shape as long as it is shaped to span the connecting hole 43 of the reinforcing bar protrusion 42 of each of the precast floor slabs 1, 1 to be joined. The connecting member 5 is inserted into the connecting hole 43 of the reinforcing bar protrusion 42 from above, but it may be inserted from below or from the side. In the above embodiment, the connecting member 5 is made of reinforcing bar, but it may be made of a steel material other than reinforcing bar. [Explanation of symbols]
[0033] 1 Precast deck 3. Concrete deck 5 Connecting members 6 Filling material 31 Joint end face 42 Reinforcing bar protrusion 43 Connection hole 51,52 Straight section 53 Connection
Claims
1. A rebar protrusion protruding from each of the concrete sections of the precast floor slabs that are joined to each other; A connecting member that connects the reinforcing bar protrusions of each of the precast floor slabs that are joined to each other; A filler is provided between the concrete floor sections of the precast floor sections that are joined together to embed the reinforcing bar protrusions and the connecting members. The reinforcing bar protruding portion is At least one end in the length direction is connected to the deck concrete portion, The intermediate portion in the longitudinal direction is located on the side away from the concrete floor portion relative to both ends in the longitudinal direction of the reinforcing bar protruding portion, and is curved so as to protrude on the side away from the concrete floor portion, A precast floor slab joint structure in which the connecting member is spanned between the reinforcing bar protrusion of one of the precast floor slabs to be joined to each other and the reinforcing bar protrusion of the other precast floor slab.
2. The reinforcing bar protruding portion has both ends in the longitudinal direction connected to the floor slab concrete portion, A connection hole is formed between the reinforcing bar protruding portion and the floor slab concrete portion, The precast deck joint structure described in claim 1, wherein the connecting member is bridged between the connecting hole portion of one of the precast decks to be joined and the connecting hole portion of the other precast deck.
3. The connecting member is The U-shaped connector has a pair of straight portions arranged in parallel with a gap therebetween and a connecting portion connecting one end of each of the pair of straight portions, and is disposed in a position in which the U-shaped connector is open downward; One straight portion of the pair of straight portions is inserted from above into the connection hole of one of the precast floor slabs to be joined to each other, The other straight portion of the pair of straight portions is inserted from above into the connecting hole of the other precast floor slab of the precast floor slabs to be joined together, The joint structure for precast slabs according to claim 2 , wherein the connection portion is in contact with the rebar protruding portion of each of the precast slabs being joined to each other.
4. a precast deck installation step of installing precast decks to be joined together; A joining step of joining the precast floor slabs, The precast floor slab has a reinforcing bar protruding portion protruding from the floor slab concrete portion, The reinforcing bar protruding portion is At least one end in the length direction is connected to the deck concrete portion, The intermediate portion in the longitudinal direction is located on the side away from the concrete floor portion relative to both ends in the longitudinal direction of the reinforcing bar protruding portion, and is curved so as to protrude on the side away from the concrete floor portion, In the precast floor slab installation process, the floor slab concrete portions of each of the precast floor slabs to be joined to each other are arranged at intervals in the direction in which the precast floor slabs are joined, and the reinforcing bar protruding portions are arranged in the direction in which the precast floor slabs are joined, The joining step includes: A reinforcing bar protrusion connection process for connecting the reinforcing bar protrusions of each of the precast floor slabs to be joined to each other with a connecting member; and a filler filling step of filling a filler between the floor concrete portions of each of the precast floor slabs that are joined to each other, In the reinforcing bar protrusion connection step, the connecting member is stretched across the reinforcing bar protrusion of one of the precast floor slabs to be joined to the reinforcing bar protrusion of the other precast floor slab, In the filler filling step, the reinforcing bar protrusions and the connecting members are embedded in the filler, thereby forming a precast deck slab joining method.
5. The reinforcing bar protruding portion has both ends in the longitudinal direction connected to the floor slab concrete portion, A connection hole is formed between the reinforcing bar protruding portion and the floor slab concrete portion, A method for joining precast floor slabs as described in claim 4, wherein, in the reinforcing bar protrusion connection process, the connecting member is spanned between the connection hole portion of one of the precast floor slabs to be joined to each other and the connection hole portion of the other precast floor slab.
6. The connecting member is formed in a U-shape having a pair of straight portions arranged in parallel with a gap therebetween and a connecting portion connecting one end of each of the pair of straight portions to each other, In the reinforcing bar protruding portion connecting step, the connecting member is in a position in which it opens downward, One of the pair of straight portions is inserted from above into the connection hole of one of the precast floor slabs to be joined to each other, The other straight portion of the pair of straight portions is inserted from above into the connecting hole of the other precast floor slab of the precast floor slabs to be joined together; The method for joining precast floor slabs according to claim 5 , wherein the connection portion is brought into contact with the reinforcing bar protruding portion of each of the precast floor slabs to be joined to each other.
Citation Information
Patent Citations
Precast concrete floor slab connection structure and connection method
JP2019002251A
Cited By
Lock rib sleeve shear wall structure, modular house and construction method of modular house
CN122215470A
Locked-rib shear wall structure, modular housing and its construction methods
CN122215470B