Method for operating a rail network comprising monitoring of infrastructure components

EP4436858A1Pending Publication Date: 2024-10-02HITACHI RAIL GTS DEUTSCHLAND GMBH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
EP2022798103
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Priority Date
2021-11-26
Filing Date
2022-09-30
Publication Date
2024-10-02

AI Technical Summary

Technical Problem

The difficulty in tracing and managing infrastructure components within railway networks, particularly those related to control and safety technology, leads to challenges in targeted maintenance and replacement, affecting operational safety due to misplaced or excess components.

Method used

A method involving the assignment of unique identifiers to infrastructure components, recording component data in a central electronic database, and using a uniform data interface to track life cycle events, allowing for efficient maintenance and replacement of components.

Benefits of technology

Ensures operational reliability and safety by enabling easy and reliable tracking and maintenance of critical infrastructure components, reducing the risk of operational disruptions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 1.1
    Figure 1.1
Patent Text Reader

Abstract

The invention relates to a method for operating a rail network, involving monitoring of infrastructure components (29, 37) which are part of the railside control and safety technology of the rail network, wherein the infrastructure components (29, 37) are each assigned a unique identifier and component data of the respective infrastructure components (29, 37) associated with this identifier are recorded in a central electronic database (3), wherein the component data comprise at least component-type data and life-cycle data, wherein the user (5, 7, 9, 11) can access the database (3) by means of a standard data interface, and in the case of life-cycle events (15, 17, 19, 21, 23, 25, 27) the associated life-cycle data of the infrastructure components (29, 37) is updated in the database (3), and wherein due dates for servicing and / or for replacement of subsets of the infrastructure components (29, 37) are determined by means of the database (3), wherein the locations of the infrastructure components (29, 37) of the subsets are determined by means of the database (3), and then the infrastructure components (29, 37) of the subsets are serviced and / or replaced. The invention achieves a high operational safety in a rail network, in a simple manner.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] Procedure for operating a railway network with monitoring of infrastructure components

[0002] The invention relates to a method for operating a railway network, wherein infrastructure components are monitored.

[0003] Railway networks include numerous components that are important for the smooth operation of the railway network.

[0004] The online publication "GS1 in the Railway Sector," downloaded on November 4, 2021, from https: / / www.qs1-qermany.de / branchenanqebote / technische-industrien / qs1-stan- dards-im-bahnsektor / , proposes lifecycle management of components, tracking of wagons and traction units, and maintenance management of infrastructure components. It proposes the application of the GS1 standard for the collection of operational lifecycle data. Furthermore, the unique identification of an axle box at Schäffler is reported.

[0005] Infrastructure components that are part of the trackside control and safety technology are of particular importance for safety in railway networks. During the installation and maintenance of infrastructure components of the trackside control and safety technology, it can be particularly difficult to determine whether and where corresponding components have been installed in the railway network. For example, surplus components may be moved between different construction sites by fitters, depending on the acute need identified by the individual fitter. This makes targeted later replacement or targeted later maintenance of corresponding infrastructure components of the trackside control and safety technology more difficult. This can compromise operational safety in the railway network.

[0006] From the internet publication "Who we are and what drives us - About fTRACE", downloaded on November 4, 2021 from htps: / / web.ftrace.com / ueber-uns, it has become known that traceability data is being collected in the fish and meat processing industry, and in particular that cross-company data transmission and data queries are being established.

[0007] From the Wikipedia article “EPCIS”, downloaded on 4.11.2021 at It has become known to record events according to a standard with specified interfaces, allowing users to increase control over their processes. The object of the present invention is to achieve high operational reliability in a railway network in a simple manner.

[0008] This object is achieved by a method for operating a railway network, wherein infrastructure components which are part of a track-side control and safety technology of the railway network are monitored, wherein each infrastructure component is assigned a unique identifier and component data of the respective infrastructure components assigned to this identifier are recorded in a central electronic database, wherein the component data comprise at least component type data and life cycle data, wherein users access the database via a uniform data interface, and in the event of life cycle events, the associated life cycle data of the infrastructure components are updated in the database, and wherein reasons for maintenance and / or replacement of subsets of the infrastructure components are determined by means of the database,whereby the locations of the infrastructure components of the subsets are determined using the database, and the infrastructure components of the subsets are then maintained and / or replaced.

[0009] The central electronic database allows events relevant to control and signaling infrastructure components to be recorded, and in particular, these infrastructure components can be easily and reliably tracked throughout their lifecycle. Using the information from the database, control and signaling infrastructure components requiring maintenance or replacement can be identified and tracked, and replacement and maintenance can be carried out easily and quickly. This makes it particularly easy and reliable to ensure operational safety on the railway network.

[0010] Track-side control and signaling technology includes, in particular, interlocking technology and infrastructure components for train control. Switch structures, signals, and sensors for detecting traffic on the railway network also fall under control and signaling technology. The term "track-side" is understood as the opposite of "vehicle-side." The central electronic database can be implemented on a database server, to which a large number of other computers are typically connected, allowing access to the database. In particular, the central electronic database can be part of a cloud computing infrastructure.

[0011] The uniform data interface enables harmonized access to the central electronic database by a large number of different users.

[0012] In particular, the uniform data interface can be a data interface according to the EPCIS (Electronic Product Code Information Services) standard. The unique identifier is preferably an identification number, for example, the GTIN (Global Trade Item Number) of the GS1 system.

[0013] The component type data of infrastructure components can include, in particular, serial and / or component numbers. Lifecycle data is data that accrues during the life cycle of the infrastructure component. For infrastructure components in the form of sensors, lifecycle data can also include measurement data from the sensors.

[0014] A reason for maintenance and / or replacement of a subset of infrastructure components can, for example, be the discovery of a serial defect or a desired update or upgrade. Using the central electronic database, the component data, particularly the component type data, can then be used to determine which infrastructure components are affected, the locations of the infrastructure components in this subset, and the infrastructure components in this subset can then be maintained and / or replaced.

[0015] Reasons for maintenance or replacement can also be based on or partly based on the life cycle data of the infrastructure components. Previous use, known mechanical, thermal or electrical loads and age can in particular trigger maintenance or replacement. In a variant of this procedure, the life cycle events include one or more of the following events: manufacture, storage, maintenance, trackside installation, trackside removal. During manufacture, the identifier, as well as the component type data and the date of manufacture are particularly relevant. During storage, in addition to the identifier and the date of entry or removal, the location of the warehouse is particularly important. During maintenance, it is also important to know which maintenance steps were carried out. During trackside installation and removal, the location is important in addition to the identifier.

[0016] In a further variant of this method, the infrastructure components also include complex infrastructure components, each of which includes one or more replaceable subcomponents that are not themselves recorded in the database as infrastructure components, and a replacement of a subcomponent of a complex infrastructure component is also recorded as a life cycle event, wherein at least a date of replacement of the subcomponent and a subcomponent type of the newly installed subcomponent are also recorded for this life cycle event.

[0017] Complex infrastructure components are infrastructure components that comprise a multitude of subcomponents. The subcomponents of complex infrastructure components are at least partially interchangeable subcomponents. It is not always possible or sensible to record the interchangeable subcomponents separately as a separate infrastructure component with component data in the central database. Such recording would generally involve considerable effort, at the very least.

[0018] Over time, a subcomponent of a complex infrastructure component may need to be replaced. This replacement may subsequently impact the function and / or durability of the complex infrastructure component or become relevant in other ways later. In such cases, it is advantageous to record the replacement of the subcomponent as a lifecycle event of the complex infrastructure component, along with the date of the replacement and the subcomponent type. The date of the replacement and the subcomponent type of the new subcomponent can be stored in the central database as part of the component data of the complex infrastructure component; this can be done with little effort.

[0019] If, for example, after replacing the same subcomponent in a large number of complex infrastructure components, it turns out that this replacement leads to problems, the central database can be used to determine which subset of the complex infrastructure components must subsequently be maintained (e.g. by replacing the subcomponent) and / or, if necessary, must be replaced entirely and where the complex infrastructure components of the subset are located.

[0020] In a further variant of this method, the infrastructure component has an identifier which can be read by a user by means of an electronic terminal device communicating with the database and which allows a conclusion to be drawn about the unique identifier, in particular wherein the identifier can be read by means of the electronic terminal device optically or by radio, preferably RFID.

[0021] To record component data in the central database, it is particularly advantageous if an existing infrastructure component is easy to identify. This easy identifiability is ensured by the marking. By being able to infer the identifier, the component data assigned to the existing infrastructure component can be recorded in the central database after the marking has been read using the electronic device communicating with the database. The electronic device can be a tablet computer or a smartphone, for example. Optionally, the marking can also contain human-readable components. The marking can be in the form of a sticker or an engraving, for example.

[0022] After or during the reading of the marking, the database can also be updated with component data via the electronic device. For example, if an infrastructure component is stored in a warehouse, the infrastructure component can be identified by its marking, and the date and location of the storage can be recorded as component data in the central database.

[0023] Depending on the application, the user can also manually enter additional component data into the central database via the electronic device. This can be done, for example, during maintenance of an infrastructure component, where the user has performed certain maintenance steps that are not automatically recorded.

[0024] The marking can, for example, be an optically machine-readable marking. Examples include barcodes or 2D codes, which can be read with barcode readers or cameras.

[0025] Alternatively, the marking can be machine-readable via radio frequency. RFID ("radio-frequency identification") technology is particularly suitable for this purpose. Passive RFID tags are preferred.

[0026] In a further variant of this method, the infrastructure components include sensors for detecting traffic on the railway network and / or associated sensor components. The sensors are preferably train detection sensors. For example, they can be ultrasonic sensors, microwave sensors, and / or optical sensors. However, the sensors can also detect non-train traffic, such as road vehicles and pedestrians that are crossing or intend to cross train traffic.

[0027] In another variant of this method, the infrastructure components include axle counters or axle counter components. An axle counter is a special sensor device that specifically counts the number of axles passing a rail at the location where the axle counter is installed. One possible measuring principle for axle counters is based on measuring the elastic deformation caused by the weight of a train transferred from the axle to the rail using a strain sensor element. The strain sensor element, which is part of the axle counter components, can specifically comprise a fiber Bragg grating, whose strain state can be optically measured.

[0028] Axle counters play a crucial role in the safety of the railway network. In particular, axle counters can be used to determine whether a particular section of track is still occupied by a train or has become completely clear, allowing it to be released to subsequent trains without the risk of collision. Therefore, recording component data from axle counters is important, for example, if it turns out after installation that a specific batch of axle counters has a serial defect and needs to be replaced.

[0029] In a further variant of this process, trackside interim storage facilities for infrastructure components are established in the railway network, and the life cycle events also include the storage of infrastructure components in the trackside interim storage facilities and the removal of infrastructure components from the trackside interim storage facilities. A trackside interim storage facility is typically established only for the duration of construction or maintenance work on a section of the railway network. In particular, the interim storage facility is established for a period of 1 year or less, preferably 6 months or less, and particularly preferably 1 month or less. The trackside interim storage facility is then used to store, for example, infrastructure components that are subsequently to be installed on site.

[0030] A major problem with such interim storage facilities is that they generally do not currently have a typical storage infrastructure. In particular, there is currently no provision for booking in or out of storage or removal. In many cases, there are more infrastructure components in the interim storage facility than are actually installed on site, e.g., to ensure sufficient buffer in the event of defects. After construction work has been completed, there may still be infrastructure components left over, which may then be moved to other locations, e.g., to other interim storage facilities. This means that in many cases it is no longer possible to determine the location of an infrastructure component.

[0031] If the life cycle events also include the storage of infrastructure components in and removal from the interim storage facilities, the respective location of the infrastructure components can be determined from the central database. The component data of the infrastructure components can then include, for example, in addition to the location of the interim storage facility, the date of storage and / or removal from the interim storage facility. On-site registration or deregistration is particularly easy if the infrastructure component has a label that can be read by a user using an electronic device that communicates with the database.

[0032] In a further variant of this procedure, the reasons for maintenance and / or replacement of subsets of infrastructure components are determined by evaluating component data from other infrastructure components that do not belong to the subsets. Reasons for maintenance and / or replacement arise not only from the evaluation of the component data of the infrastructure components being replaced, but also, alternatively or additionally, from the evaluation of component data from other infrastructure components. In many cases, this allows conclusions to be drawn about the infrastructure components of the subsets or their technical condition, particularly if the infrastructure components of the subsets and the other infrastructure components are spatially adjacent or are otherwise jointly affected by certain influences.The evaluation of the component data of the other infrastructure components is particularly easy because they are consolidated in the central database.

[0033] Other infrastructure components that could be considered include trackside sensors that record, for example, the number of passing trains or train axles, and / or the speed and / or weight of the passing trains. The measurement data thus acquired is then component data from the sensors, which can be recorded in the central database. For this purpose, the sensors are preferably electronically connected to the central database and automatically report the measurement data to the central database.

[0034] Alternatively or additionally, other infrastructure components such as beacons can also be considered. Beacons are transponders in the railway track that store railway operational information and transmit it to rail vehicles passing through the beacons. The railway operational information recorded and / or stored in the beacons then represents component data that is recorded in the central database. For this purpose, the beacons are preferably electronically connected to the central database and automatically report the measurement data to the central database.

[0035] Possible infrastructure components of the subsets include switches, in particular switch drives and locks, as well as all trackside signal box components.

[0036] In a further development of this variant, information on the number and / or intensity of loads, in particular mechanical, and / or thermal and / or electrical loads, on the infrastructure components of the subsets is determined from the component data of the other infrastructure components and included in the determination of the causes.

[0037] Information on the number and / or intensity of loads on the infrastructure components of the subsets is particularly relevant for determining the reasons for maintenance and / or replacement. The higher the number and the greater the intensity of the loads, the sooner maintenance or replacement typically becomes necessary. Mechanical loads, such as vibrations, and thermal loads are particularly relevant. Electrical loads, such as voltage spikes resulting from switching operations or external factors such as lightning strikes, can also play a role.For example, if a sensor measures the speed and weight of trains passing through a switch structure and records this data in the central database as part of the sensor's component data, this allows for direct conclusions to be drawn about the frequency and intensity of associated loads and, consequently, the wear and tear on the switch structure. The sensor's component data can thus be used to determine a suitable time for maintenance or replacement of the switch structure.

[0038] In a further development of this development, the other infrastructure components are axle counters or axle counter parts, and the component data of the other infrastructure components is measurement data, in particular a number of counting events, of the axle counter or axle counter parts. The number of counting events is typically the number of axles crossing the track at the location where the axle counter is mounted. A key advantage of axle counters is the particularly reliable recording of counting events.

[0039] In a further variant of this procedure, to determine the reasons for maintenance and / or replacement of subsets of infrastructure components, external information not originating from the database is evaluated. This external information is correlated with component data from the database. In addition to component data recorded in the database, external information—i.e., information that is not directly component data from infrastructure components of the rail-side control and safety technology of the railway network—can also be used to determine the technical condition of the infrastructure components. In particular, the evaluation of external information can allow the degradation of the infrastructure components of the subsets to be determined.

[0040] The external information can, for example, be retrieved automatically via a computer network. The correlation of the external information allows, in particular, an assignment to specific infrastructure components. If the external information is, for example, information on location-dependent environmental influences, it is compared with the locations of the infrastructure components of the subsets determined from the database.

[0041] In a further development of this variant, information about the number and / or intensity of loads, particularly mechanical or thermal loads, on the infrastructure components of the subsets is determined from the external information and incorporated into the determination of the reasons for maintenance and / or replacement. Information about the number and / or intensity of loads on the infrastructure components is particularly relevant for determining the reasons for maintenance and / or replacement, as these tend to degrade the infrastructure components. Therefore, external information that allows the determination of information about the number and / or intensity of loads is particularly important.

[0042] In a further development of this advancement, the information about the number and / or intensity of loads is information about the number of trains and / or their speed and / or their weight that pass the locations of the infrastructure components of the subsets. In this case, the external information can be data from an external database from which the aforementioned information about the trains is derived and which can be linked to the central database. When trains pass the locations of the infrastructure components of the subsets, mechanical loads in particular occur. The higher the weight and speed of the trains, the higher the mechanical load typically is.

[0043] In an alternative development of this advancement, the information on the number and / or intensity of loads is information on the number of thermal cycles and / or the temperature ranges of the thermal cycles, which are derived from weather data for the locations of the infrastructure components of the subsets. Weather data for the locations of the infrastructure components of the subsets can, for example, be retrieved automatically from corresponding online databases. The variation in temperature over time is particularly relevant. The higher the number and the wider the temperature ranges of the thermal cycles, the greater the degradation of the infrastructure components of the subsets. If weather data is included, it is possible to determine much more precisely when maintenance or replacement is required.Accordingly, safety margins for maintenance or replacement intervals can be reduced, resulting in lower costs without compromising operational reliability.

[0044] The number of thermal cycles and their temperature ranges are particularly relevant for the adhesive joints between axle counter components and rails. These adhesive joints can degrade under significant thermal stress, even leading to detachment from the rail. If detachment occurs, the axle counter can no longer provide measurement data. If weather data is included in the determination of failure events, the axle counter's adhesive joint can usually be replaced or serviced with a new one before it fails.

[0045] In a further variant of this method, installation points for at least some infrastructure components are set up on the railway network using local control devices, whereby the control devices can determine whether an infrastructure component is currently installed or missing at the respective installation point, and if a reason to replace the infrastructure component at the respective installation point has been identified and a temporary absence of the infrastructure component at the installation point has been identified by the control device, in the event of a user failing to register a new infrastructure component at the installation point in the database within a predefined waiting time after the control device has again detected the installation of a new infrastructure component at the installation point, an error message is issued and / or a command is triggered,that the infrastructure component at the monitored installation location may no longer be used until a new infrastructure component at the installation location has been registered in the database by a user. The control device can have a sensor, such as an optical sensor, to monitor the installation location. The installation or absence of the infrastructure component at the installation location can also be detected, for example, by opening or closing an electrical circuit. The control device is preferably connected to the central database and automatically reports a temporary absence.

[0046] The error message displayed serves to alert the user(s) that the registration failed and to prompt them to register the new infrastructure component. This ensures that the central database is up to date and that the recorded component data is therefore current.

[0047] Initiating the command, however, forces the new infrastructure component to be registered so that it can be used subsequently. This ensures that the central database is up to date and increases the operational reliability of the railway network.

[0048] Further advantages of the invention will become apparent from the description and the drawings. Likewise, the above-mentioned and further-described features can be used individually or in combination in any desired manner. The embodiments shown and described are not intended to be exhaustive, but rather are exemplary in nature for describing the invention.

[0049] The invention is illustrated in the drawings and explained in more detail using exemplary embodiments. They show:

[0050] Fig. 1 is an illustration of a cloud computer infrastructure for carrying out the method according to the invention,

[0051] Fig. 2 is a schematic representation of a temporal sequence of life cycle events of an infrastructure component, the monitoring of which is part of the method according to the invention,

[0052] Fig. 3 is a schematic representation of a complex infrastructure component having a replaceable subcomponent, for the invention; Fig. 4 is an illustration of an optical reading of an infrastructure component's identification, for the invention;

[0053] Fig. 5 shows an infrastructure component in the form of an axle counter mounted on a rail for the invention;

[0054] Fig. 6 is a schematic representation of a part of a railway network with infrastructure components in the form of an axle counter and a switch structure, with an intermediate storage facility being constructed on the track side, for the invention; and

[0055] Fig. 7 is a schematic representation of a level crossing at which an infrastructure component in the form of a sensor for detecting traffic in the railway network is provided for the invention.

[0056] In the following description of the drawings, identical reference symbols are used for identical or functionally identical components.

[0057] Fig. 1 shows an illustration of a cloud computer infrastructure 1 suitable for implementing the method according to the invention. The cloud computer infrastructure 1 comprises, as an essential element, a central electronic database 3 in which component data of infrastructure components that are part of a rail-side control and safety system of a railway network are stored. A multitude of different users 5, 7, 9, 11 access the central database 3 via a uniform data interface. For example, the users here are a manufacturer 5, an installer 7, maintenance personnel 9, and an operator 11 for the infrastructure components in the railway network.

[0058] Using database 3, maintenance personnel 9 can, in particular, identify infrastructure components requiring maintenance or replacement based on their digital twin. Automatic algorithms can be applied (e.g., evaluating operating time and mechanical stresses), or specific infrastructure components can be identified based on individual search criteria (e.g., a specific component type in conjunction with a specific manufacturing date). For infrastructure components for which a reason for maintenance or replacement has been identified using database 3, the respective location is determined, and maintenance personnel 9 specifically visits these locations and maintains and / or replaces the affected infrastructure components (not shown in detail).

[0059] Fig. 2 schematically shows a chronological sequence of life cycle events 15, 17, 19, 21, 23, 25, 27 of an infrastructure component, the monitoring of which is part of the method according to the invention. The course of time is indicated by a timeline 13. The life cycle events 15, 17, 19, 21, 23, 25, 27 include, for example, production 15, shipping 17 after production 15, storage 19 in a central warehouse, further storage 21 in a trackside interim storage facility, trackside installation 23 and trackside removal 25. The infrastructure component is, for example, a sensor. The acquisition of measurement data is shown as a further life cycle event 27. Other possible life cycle events (e.g. maintenance) between the trackside installation 23 and the trackside removal 25 are indicated by dots.When life cycle events 15, 17, 19, 21, 23, 25, 27 occur, the associated life cycle data of the infrastructure component is updated in the central database 3.

[0060] Fig. 3 shows a schematic illustration of a complex infrastructure component 29 comprising a plurality of subcomponents 31, 33. One of the subcomponents 31, 33 is a replaceable subcomponent 33. The replaceable subcomponent 33 is not itself recorded in the central database 3. However, if the replaceable subcomponent 33 is replaced, this is recorded as a life cycle event, and at least a date of replacement of the replaceable subcomponent 33 and a subcomponent type of the newly installed subcomponent (not shown here) are stored in the central database 3 as part of the component data of the complex infrastructure component 29.

[0061] The complex infrastructure component 29 shown in Fig. 3 also has an identification 35 in the form of a barcode, which can be read optically. Fig. 4 schematically shows the reading of an identification 35 of an infrastructure component 37. The identification 35 is, for example, a barcode. The reading is carried out by a user (not shown here) using an electronic terminal 39 that communicates with the central database 3. The electronic terminal 39 is, for example, a tablet computer with a camera. The identification 35 allows a conclusion to be drawn about the unique identifier of the infrastructure component 37. In contrast to the optical readout shown here, the identification 35 can also be read out, for example, wirelessly.The reading is typically carried out to log a life cycle event of the infrastructure component 37 (e.g. storage in a warehouse).

[0062] Figure 5 shows an infrastructure component in the form of an axle counter 41. The axle counter 41 is mounted on a rail 43. The axle counter components of the axle counter 41 include, for example, two strain sensor elements 45. The axle counter 41 counts the number of axles 47 passing the rail 43 at the location where the axle counter 41 is mounted.

[0063] Figure 6 schematically illustrates part of a railway network. A trackside interim storage facility 49 is set up within the railway network for infrastructure components not shown here. Lifecycle events also include the storage of infrastructure components in the trackside interim storage facility 49 and the removal of infrastructure components from the trackside interim storage facility 49.

[0064] Part of the railway network includes, among other things, railway tracks 51 and signals 53; a signal 53 is shown here as an example. The interim storage facility 49 has been set up near signal 53 to temporarily store infrastructure components (not yet installed on the trackside) that are required for a repair of signal 53. The infrastructure components in the railway network (already installed on the trackside) also include, for example, an axle counter 55 and a switch structure 57. The component data of the axle counter 55 and the switch structure 57 are recorded in the central database 3. To determine the reasons for maintenance and / or replacement of the switch structure 57 (infrastructure component), component data of the axle counter 55 (other infrastructure component) is evaluated here.In particular, information about the number of loads on the switch structure 57 is determined from the component data of the axle counter 55 and included in the determination of the events (trains passing the axle counter 55 must also pass the switch structure 57). The component data of the axle counter 55 also includes measurement data from ongoing railway operations, more specifically, a number of counting events from the axle counter 55.

[0065] Furthermore, to determine the reasons for maintenance and / or replacement of the switch structure 57 and / or the axle counter 55, an evaluation of external information that does not originate from the central database 3 is also carried out, whereby the external information is correlated with component data from the central database 3. The external information originates, for example, from an external database 59. From the external information, information about the number and intensity of loads on the switch structure 57 and / or the axle counter 55 is determined and included in the determination of the reasons.

[0066] In the example shown, the information about the number and intensity of loads includes information about the speed and weight of a train 61 passing the location of the switch structure 57 or the location of the axle counter 55.

[0067] The information on the number and intensity of loads also includes information on the number of thermal cycles and the temperature ranges of the thermal cycles, which are derived from weather data for the location of the switch structure 57 and the location of the axle counter 55, respectively. The weather data here originates from several nearby weather stations 63, one of which is shown as a representative example.

[0068] Figure 7 is a schematic representation of a level crossing 65 where a road 67 crosses a railway track 69. An infrastructure component in the form of a sensor 71 for detecting traffic on the railway network is provided at the level crossing 65. More specifically, this sensor 71 is, for example, in the form of a camera, which also optically detects non-train traffic that is crossing or intends to cross the train. Non-train traffic includes, in particular, pedestrians and road vehicles.

[0069] The sensor is installed at a location 73, which is monitored by a local control device 75. The control device 75 shown as an example is based on the fact that if a sensor 71 is installed, an electrical circuit 77 is closed, while if the sensor 71 is missing, the electrical circuit 77 is open. The control device 75 is also connected to the central database 3.

[0070] If a reason to replace the sensor 71 at the installation location 73 has been identified and a temporary absence of the sensor 71 at the installation location 73 was detected by the control device 75 (in this case, if the circuit 77 was initially open and then closed again), if a user fails to log in a new sensor at the installation location 73 to the central database 3 within a predetermined waiting period after the control device 75 has again detected the installation of a new infrastructure component (not shown here) at the installation location 73, an error message will be issued. This can initiate the subsequent log-in. Alternatively or additionally, after the installation of the new infrastructure component has been detected by the database 3, use of the newly installed infrastructure component can be blocked until it has been logged in to the database 3.Please note that the closure of the infrastructure component may result in the closure of part of the railway network (here, for example, level crossing 65).

Claims

Claims 1. A method for operating a railway network, wherein infrastructure components (29, 37) that are part of a trackside control and safety system of the railway network are monitored, wherein each infrastructure component (29, 37) is assigned a unique identifier and component data of the respective infrastructure components (29, 37) are recorded in a central electronic database (3) associated with this identifier, wherein the component data includes at least component type data and life cycle data, wherein users (5, 7, 9, 11) access the database (3) via a uniform data interface, and in the case of life cycle events (15, 17, 19, 21, 23, 25, 27) the associated life cycle data of the infrastructure components (29, 37) are updated in the database (3), and wherein reasons for maintenance and / or replacement of subsets of the infrastructure components (29, 37) are determined using the database (3).wherein the locations of the infrastructure components (29, 37) of the subsets are determined using the database (3), and then the infrastructure components (29, 37) of the subsets are maintained and / or replaced.

2. Method according to claim 1, characterized in that the life cycle events (15, 17, 19, 21, 23, 25, 27) comprise one or more of the following events: manufacturing (15), storage (19, 21), maintenance, trackside installation (23), trackside removal (25).

3. A method according to one of the preceding claims, characterized in that the infrastructure components (29, 37) also include complex infrastructure components (29), each comprising one or more interchangeable sub-components (33) that are not themselves recorded in the database (3) as infrastructure components (29, 37), and that a replacement of a sub-component (33) of a life cycle event (15, 17, 19, 21, 23, 25, 27) is also included. complex infrastructure component (29) is recorded, whereby at least a date of replacement of the sub-component (33) and a sub-component type of the newly installed sub-component are also recorded in this life cycle event.

4. Method according to one of the preceding claims, characterized in that the infrastructure component (29, 37) has a marking (35) which can be read by a user (5, 7, 9, 11) by means of an electronic terminal device (39) communicating with the database (3), and which allows a conclusion to be drawn about the unique identifier, in particular wherein the marking (35) can be read by means of the electronic terminal device (39) optically or by means of radio, preferably RFID.

5. Method according to one of the preceding claims, characterized in that the infrastructure components (29, 37) comprise sensors (71) for detecting traffic in the railway network and / or associated sensor parts.

6. Method according to one of the preceding claims, characterized in that the infrastructure components (29, 37) comprise axle counters (41, 55) or axle counter parts (45).

7. Method according to one of the preceding claims, characterized in that trackside intermediate storage facilities (49) for infrastructure components (29, 37) are set up in the railway network, and that the life cycle events (15, 17, 19, 21, 23, 25, 27) also include the storage (21) of infrastructure components (29, 37) in the trackside intermediate storage facilities (49) and the removal of infrastructure components (29, 37) from the trackside intermediate storage facilities (49).

8. Method according to claim 7, characterized in that the intermediate storage facility (49) is established for a period of 1 year or less, preferably 6 months or less, particularly preferably 1 month or less.

9. Method according to one of the preceding claims, characterized in that, in order to determine the reasons for maintenance and / or replacement of the subsets of infrastructure components (29, 37), an evaluation of component data from other infrastructure components (29, 37) that do not belong to the subsets is carried out.

10. Method according to claim 9, characterized in that information about a number and / or intensity of loads, in particular mechanical and / or thermal and / or electrical loads, of the infrastructure components (29, 37) of the subsets is determined from the component data of the other infrastructure components (29, 37) and is included in the determination of the causes.

11. Method according to claim 10, characterized in that the other infrastructure components (29, 37) are axle counters (41, 55) or axle counter parts (45), and that the component data of the other infrastructure components (29, 37) are measurement data, in particular a number of counting events, of the axle counters (41, 55) or axle counter parts (45).

12. Method according to one of the preceding claims, characterized in that, in order to determine the reasons for maintenance and / or replacement of the subsets of infrastructure components (29, 37), an evaluation of external information not originating from the database (3) is carried out, wherein the external information is correlated with component data from the database (3).

13. Method according to claim 12, characterized in that information about a number and / or intensity of loads, in particular mechanical or thermal loads, of the infrastructure components (29, 37) of the subsets is determined from the external information and is included in the determination of the causes. The method of claim 13, characterized in that the information on the number and / or intensity of loads is information on the number of trains (61) and / or their speed and / or their weight passing the locations of the infrastructure components (29, 37) of the subsets. The method of claim 13, characterized in that the information on the number and / or intensity of loads is information on the number of thermal cycles and / or the temperature ranges of the thermal cycles, which result from weather data for the locations of the infrastructure components (29, 37) of the subsets.A method according to one of the preceding claims, characterized in that installation sites (73) for at least some infrastructure components (71) are set up in the railway network by means of local control devices (75), wherein it is possible to determine by means of the control devices (75) whether an infrastructure component (71) is currently installed or missing at the respective installation site (73), and that if a reason for replacing the infrastructure component (71) at the respective installation site (73) has been identified and a temporary absence of the infrastructure component (71) at the installation site (73) has been detected by means of the control device (75), - in the event that a new infrastructure component (29, 37) is not registered at the installation site (73) by a user (5, 7, 9, 11) in the database (3) within a specified waiting period after the installation of a new infrastructure component (29, 37) at the installation site (73) has been confirmed again by the control device (75), an error message is issued and / or - a command is triggered that the infrastructure component (71 ) at the monitored installation site (73) may no longer be used until a new infrastructure component (29, 37) at the installation site has been booked into the database (3) by a user (5, 7, 9, 11 ). System comprising a central electronic database (3) and a multitude of infrastructure components (29, 37) that are part of a rail-side control and safety technology of a railway network, set up for carrying out a method according to one of the preceding claims.