Foundation for precast formwork pylon, method of making and installing such a foundation

The prefabricated formwork foundation addresses the challenges of environmental pollution, long installation times, and cost instability in pylon anchoring by using a prefabricated formwork system that minimizes concrete usage and simplifies the installation process, achieving efficient and cost-effective anchoring of high-voltage pylons.

EP4556656A1Pending Publication Date: 2025-05-21RTE RESEAU DE TRANSPORT DELECTRICITE
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
EP2023306961
Authority / Receiving Office
EP · EP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-11-14
Publication Date
2025-05-21

AI Technical Summary

Technical Problem

Existing solutions for anchoring pylons, such as those used in high-voltage electrical installations, face challenges including high environmental pollution risk from concrete pouring, long drying times, unstable cost prices, and complex installation processes.

Method used

A prefabricated formwork foundation for pylon feet, comprising a lower sole and a side shell with a peripheral upper face capable of supporting the pylon foot, allows for reduced concrete usage and eliminates the need for on-site concrete pouring, thereby minimizing environmental impact and shortening installation time.

Benefits of technology

The prefabricated formwork foundation reduces environmental pollution, shortens installation time to just two to three days, and lowers costs by controlling material quantities, while maintaining the necessary strength and stability to support high-voltage pylons.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure IMGAF001_ABST
    Figure IMGAF001_ABST
Patent Text Reader

Abstract

This foundation (10) for pylon foot(s) comprises a prefabricated formwork (12) intended to be buried in an excavation and comprising a lower sole (16), intended to be arranged at the bottom of the excavation and forming a base of the formwork (12), and a lateral shell (18, 20), extending from the lower sole (16) and forming a lateral enclosure of the formwork (12) intended to be buried in the excavation. The lateral shell (18, 20) has a peripheral upper face (26) capable of supporting itself at least one foot of the pylon and a central upper opening (28) making it possible to define with the lower sole (16) an interior volume of the formwork (12) to be backfilled.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] The present invention relates to a foundation for pylon foot(s) intended to be buried in an excavation. It also relates to a method of manufacturing and installing such a foundation.

[0002] It applies to the anchoring to the ground of a pylon having a certain weight and subject to certain significant loads or constraints, such as an electrical pylon for overhead transport and / or distribution of high or very high voltage electrical current, for example 63 kV or 90 kV for high voltages. In this voltage range, the pylons are generally made of four-legged lattices anchored to the ground on a foundation that must be able to withstand pull-out forces of 300 kN and a moment of 1000 kN.m. Although the invention aims to be able to provide a foundation suitable for this type of pylon, it applies more generally to other pylons for overhead cable transport installations or even to other pylons used in other technical fields.

[0003] In the field of air transport and / or the distribution of electrical current, the foundation must be installed, either by digging a pit in the ground for the anchoring of a new pylon when creating or extending an overhead power line, or by replacing a pre-existing foundation when replacing a pylon or simply to reinforce this foundation.

[0004] A first known solution for creating or replacing foundations consists of pouring concrete superficially into a previously dug excavation provided with a metal reinforcement. This first solution has two major drawbacks: a high risk of environmental pollution due to the large quantity of concrete that must be poured on site and possible losses of concrete in the immediate vicinity (groundwater, watercourses); a long drying time, generally reaching at least one month and then requiring guying of the pylon resting on the foundation. When it is chosen to replace a pre-existing foundation, it also has two other drawbacks: dimensions of the foundation dependent on the excavation carried out, which is itself dependent on the pre-existing foundation and the ground in place; an unstable cost price due to the quantity of concrete required, which is variable.

[0005] A second known solution for replacing foundations is, for example, recommended when a pre-existing foundation base in a solid mass must be replaced. It consists of driving two or three steel micropiles deep into the ground near each foot of the existing pylon, then welding these micropiles to the corresponding foot using metal plates, before replacing the pre-existing base with a new base. The new base is then also welded to the neighboring micropiles, then concrete is poured around the new base and the micropiles to ensure protection against corrosion. A cylindrical steel mold can be placed in the excavation for this purpose to limit the quantity of concrete to be poured around the new base and the micropiles. In any case, this second solution also has the two major drawbacks mentioned above.It also has other disadvantages such as the cost price which is high and depends on the price of steel, a significant increase in the footprint due to the addition of micropiles, the setting in the concrete of certain elements of each foot of the pylon such as gussets, members or diagonals, which then poses maintenance problems and the duration of the site for the installation which can extend up to a week or two, without counting the drying time of the poured concrete.

[0006] For all these reasons, the present invention relates more specifically to a foundation for pylon foot(s) comprising prefabricated formwork intended to be buried in the excavation. Thus, drying time is theoretically no longer a problem and the risk of environmental pollution is reduced or even eliminated. Costs are also reduced by better control of the quantities of materials used.

[0007] Even more specifically, the present invention relates to a prefabricated formwork foundation comprising: a lower sole intended to be placed at the bottom of the excavation and forming a base of the formwork; and a side shell extending from the lower sole and forming a side enclosure of the formwork intended to be buried in the excavation.

[0008] Such a foundation is known in different forms.

[0009] For example, patent document DE 1 932 594 U describes a prefabricated formwork foundation comprising a lower sole B and a side shell R1, R2 forming with the lower sole a volume inside which cables can be passed for an electrical supply to the base of the pylon to be supported. This foundation is very specific and of limited use for street furniture, not very robust and not suitable for receiving an electricity pylon.

[0010] For example, patent document KR 10-1236921 also relates to a foundation for a tubular foot 8 of a pylon with prefabricated formwork. This formwork has two half-shells 2a and 2b which, when placed against each other, can be considered as comprising a lower flange, on which the pylon foot rests directly, and a lateral shell surrounding the base of the pylon foot. Given the small section of the lower flange on which the entire weight of the pylon foot rests, either the latter must be of very limited weight, or the lower flange must be of very great thickness, which is not the case in document KR 10-1236921. This foundation is therefore also very specific and of limited use, not very robust and not suitable for receiving an electricity pylon.

[0011] For example, patent document FR 2 661 701 B1 also describes another type of prefabricated formwork foundation comprising a lower sole 15 and a side shell in the form of a revolution candle 16 which extends in the direction of the base of the pylon to be supported. Although suitable for anchoring the bases of electricity pylon to the ground, such a foundation is only partially prefabricated: the lower sole 15 remains a concrete structure to be poured into the excavation and the interior volume of the revolution candle 16 also remains to be filled with poured concrete to form a foundation block. This results in the persistent risk of environmental pollution due to the pouring of concrete and an on-site drying time to be taken into account.

[0012] It may therefore be desirable to provide a foundation for the base(s) of the pylon which allows one to overcome at least some of the aforementioned problems and constraints.

[0013] A foundation for pylon base(s) is therefore proposed, comprising prefabricated formwork intended to be buried in an excavation and comprising: a lower sole intended to be placed at the bottom of the excavation and forming a base of the formwork; and a side shell extending from the lower sole and forming a side enclosure of the formwork intended to be buried in the excavation; in which the side shell has a peripheral upper face capable of supporting at least one foot of the pylon and a central upper opening allowing to define with the lower sole an interior volume of the formwork to be backfilled.

[0014] Thus, by placing the load of supporting the pylon foot(s) on the peripheral upper face of the side shell, the prefabricated formwork of the foundation is lightened without compromising its robustness and without the need to pour more concrete, the internal volume of the formwork being able to be simply backfilled. Indeed, the dimensioning of the side shell is not too constrained since the support of the pylon foot(s) is done over the entire height of the side shell itself supported by the lower flange. This results in the possibility of designing a less expensive foundation with relatively light prefabricated formwork, i.e. transportable, given the aforementioned stress and moment constraints that it must be able to withstand. This also results in a simplified, and therefore faster, installation of the foundation.Two to three days are sufficient for a replacement installation under consignment (in the case of an electricity transmission and / or distribution installation).

[0015] Optionally, the peripheral upper face capable of supporting at least one foot of the pylon is formed by the thickness of the side shell.

[0016] Also optionally, the lower sole and the side shell are prefabricated in reinforced concrete.

[0017] Also optionally, the lower sole and the side shell are separately prefabricated parts, which can be bolted together.

[0018] Optionally, the side shell is also formed from at least two separately prefabricated side shell portions, which can be bolted together.

[0019] Also optionally, the lower sole is provided with a through drainage hole.

[0020] Also optionally, the side shell is provided with at least one through hole for the passage of the earthing cable for the pylon it is intended to support.

[0021] Also optionally, the side shell is essentially parallelepipedal in shape, so as to form a peripheral upper face in a rectangular frame, with a lower rectangular flange for attachment to the lower sole which itself takes the form of a rectangular plate.

[0022] Also optionally, threaded rods are partially inserted into the side shell and extend orthogonally from its peripheral upper face so as to receive a base structure intended to mechanically link the prefabricated formwork and the pylon.

[0023] A method of manufacturing and installing a foundation for pylon base(s) is also proposed, comprising the following steps: prefabrication of a formwork intended to be buried in an excavation and comprising: a lower sole intended to be placed at the bottom of the excavation and forming a base of the formwork, and a side shell extending from the lower sole and forming a side enclosure of the formwork intended to be buried in the excavation; arrangement of an excavation on the ground intended to receive the prefabricated formwork; installation of the prefabricated formwork in the excavation; and backfilling of the excavation around the formwork; in which the side shell is prefabricated so as to have a peripheral upper face capable of supporting at least one foot of the pylon and a central upper opening making it possible to define with the lower sole an interior volume of the formwork to be backfilled, and in that the backfilling of the excavation further comprises backfilling in the interior volume of the formwork.

[0024] Optionally: the prefabricated formwork is designed in several separately prefabricated parts, assembled together by bolting during the installation of the prefabricated formwork in the excavation; and each bolting element remaining visible after installation is covered with a protective layer against corrosion, for example a layer of mortar.

[0025] Also optionally, the backfilling of the excavation includes: a first backfill flush with the upper peripheral face of the side shell; a contribution of a surface layer of concrete at the level of the prefabricated formwork after anchoring the pylon; and a second backfill around the surface layer of concrete.

[0026] The invention will be better understood with the aid of the following description, given solely by way of example and with reference to the appended drawings in which: there figure 1 schematically represents in perspective the general structure of a foundation for pylon foot(s) with prefabricated formwork, according to one embodiment of the invention; figure 2 schematically represents in perspective the general structure of a lower sole of the prefabricated formwork of the figure 1 ; there figure 3 schematically represents in perspective the general structure of a first lateral half-shell of the prefabricated formwork of the figure 1 ; there figure 4 schematically represents in perspective the general structure of a second lateral half-shell of the prefabricated formwork of the figure 1 ; there figure 5 schematically represents in perspective all the elements of the figures 2 , 3 And 4 after assembly and fixing, topped with a base for receiving the feet of a pylon; the figure 6 schematically represents in perspective the arrangement of a base structure between the receiving base of the figure 5 and the feet of a pylon; and the figure 7 illustrates the successive stages of a manufacturing and installation process for the prefabricated formwork foundation of the figure 1 , according to one embodiment of the invention.

[0027] Foundation 10 for pylon foot(s) shown schematically in perspective on the figure 1 mainly comprises a prefabricated formwork 12 of essentially rectangular sections and optionally a metal base structure 14 also rectangular, carried by this formwork, intended to receive the four feet of a pylon. The foundation 10 is designed to be installed in a excavation dug in the ground and to serve as a stable support for a pylon, only the metal base structure 14 possibly remaining above the ground after backfilling. The rectangular configuration of the assembly is adapted to a certain type of pylon, such as a metal lattice pylon of rectangular section with four feet anchored to the ground. This type of pylon corresponds to what is done for the overhead transmission and / or distribution of high-voltage electric current, for example 63 kV or 90 kV. But the configuration and dimensions of the foundation can be adapted without difficulty to other types of pylons, electric or otherwise.

[0028] Prefabricated formwork 12 more precisely comprises three main elements prefabricated separately in reinforced concrete: a lower sole 16 intended to be arranged horizontally at the bottom of the excavation and forming a base of the prefabricated formwork 12; a first lateral half-shell 18 extending orthogonally from the lower sole 16 and forming a first lateral enclosure portion of the prefabricated formwork 12 intended to be buried in the excavation; and a second lateral half-shell 20 extending orthogonally from the lower sole 16 and forming a second lateral enclosure portion of the prefabricated formwork 12 intended to be buried in the excavation.

[0029] In the particular and non-limiting example of the figure 1 , the lower sole 16 takes the form of a rectangular plate of length L16 approximately equal to 4.5 meters, width W16 approximately equal to 2.5 meters and thickness or height H16 approximately equal to 35 centimeters for a volume of reinforced concrete C50 / 60 of metallic reinforcement, of classes XC2 and S4, of a little less than 4 m 3 < implying a weight of approximately 9.9 tonnes.

[0030] In the particular and non-limiting example of the figure 1 also, the first lateral half-shell 18 takes a rectangular parallelepiped shape with three solid lateral faces, forming the first lateral enclosure portion of the prefabricated formwork 12, and with the three other empty faces, so as to have a U-shaped section in top view. It further comprises a first rectangular flange 22 for fixing to the lower sole 16 extending orthogonally, from the base of the face forming the lateral bottom of the first enclosure portion, that is to say horizontally when the first lateral half-shell 18 extends vertically from the lower sole 16 arranged horizontally, towards the outside of this first enclosure portion.The whole thing came from material by molding concrete around a metal frame and has a maximum length L18 approximately equal to 2.1 meters, a width W18 approximately equal to 2.3 meters and a maximum height H18 approximately equal to 1.9 meters for a volume of reinforced concrete C50 / 60 of metal frame, of classes XC2 and S4, of a little less than 2.9 m 3< implying a weight of approximately 7.6 tons when the thickness of the first portion of enclosure and the first flange is approximately equal to 35 centimeters, including a possibility of recesses arranged in the three faces of the first portion of enclosure.

[0031] In the particular and non-limiting example of the figure 1 also, and by planar symmetry, the second lateral half-shell 20 takes a rectangular parallelepiped shape with three full lateral faces, forming the second lateral enclosure portion of the prefabricated formwork 12, and with the three other empty faces, so as to have a U-shaped section in top view. It further comprises a second rectangular flange 24 for fixing to the lower sole 16 extending orthogonally, from the base of the face forming the lateral bottom of the second enclosure portion, towards the outside of this second enclosure portion.The whole thing came from the material by molding concrete around a metal frame and presents by symmetry a maximum length L20 equal to L18, a width W20 equal to W18 and a maximum height H20 equal to H18 for a volume of reinforced concrete C50 / 60 of metal frame, of classes XC2 and S4, of a little less than 2.9 m 3< implying a weight of approximately 7.6 tonnes when the thickness of the second portion of enclosure and the second flange is approximately equal to 35 centimeters, including a possibility of recesses arranged in the three faces of the second portion of enclosure.

[0032] When the two lateral half-shells 18 and 20 are placed against each other by bringing together the open ends of their two U-shaped sections, to form a complete lateral enclosure of rectangular section with four closed faces, both being arranged on the lower flange 16 so as to also close the bottom of this lateral enclosure while retaining a central upper opening, the entire prefabricated formwork 12 that these three elements 16, 18, 20 constitute weighs approximately 24.1 tonnes while each element individually weighs less than 10 tonnes. The subdivision into three separate elements of the prefabricated formwork 12 thus makes it easier to transport.But if weight is not a problem for transport, especially in the case of dimensioning and configuration allowing for lighter precast formwork, it is possible as an alternative to design a side shell formed from a single piece of reinforced concrete, or even a side shell and lower flange assembly formed from a single piece of reinforced concrete. Also as an alternative, it is possible to increase the number of parts forming the precast formwork, in particular to provide more than two separately precast side shell portions if the total weight of the assembly justifies it.

[0033] In this configuration of formation of the lateral enclosure of the prefabricated formwork 12, the thickness of the lateral shell made up of the two lateral half-shells 18 and 20 forms a peripheral upper face 26 in a rectangular frame capable of supporting itself at least one pylon foot. In the particular but non-limiting example of the figure 1 , it is capable of supporting four feet of the same pylon by means of the rectangular metal base structure 14 which it supports directly. This peripheral upper face 26 delimits a rectangular central upper opening 28 of the lateral shell 18, 20 which allows it to define with the lower sole 16 an interior volume of the prefabricated formwork 12 to be backfilled.

[0034] We therefore finally note the obtaining of a relatively light prefabricated foundation structure in view of the weight and the constraints that it is intended to undergo. This advantage is linked to the fact that it is the height H18, H20 of the lateral shell 18, 20 which makes it capable of supporting these constraints when it rests on the lower sole 16, functionally forming a pillar at the right of each pylon foot to be supported from the lower sole 16 to the peripheral upper face 26. This is the reason why the interior volume of the prefabricated formwork 12 does not need to be filled with concrete, but can simply be backfilled with earth thanks to the central upper opening 28. This is also the reason why recesses (called "masks" in the technical field concerned) can be designed in the walls of the lateral enclosure of the prefabricated formwork 12 to lighten the assembly.

[0035] The materials, dimensions and weights indicated above are provided for purely illustrative purposes and are suitable for the manufacture of a prefabricated formwork foundation for a 90 kV high-voltage power line pylon. They can be easily adapted for other pylons.

[0036] In the example of the figure 1 , the first lateral half-shell 18 is fixed to the upper face of the lower sole 16 by bolting. To do this, its first rectangular flange 22 is pierced throughout its thickness with two rows of five conduits 30 each. These ten conduits 30 are intended to receive the threaded rods of ten bolting elements, for example with fixing sleeves (anchored and cast in the concrete of the lower sole 16), threaded rods (screwed into the sleeves and extending into the conduits 30), washers and nuts (screwed to the tops of the threaded rods protruding from the conduits 30), or with sleeves, washers and threaded rods with bolting heads, or any other existing and equivalent bolting variant.

[0037] In the example of the figure 1 also, the second lateral half-shell 20 is fixed on the upper face of the lower sole 16 by bolting. To do this, its second rectangular flange 24 is pierced throughout its thickness with two rows of five conduits 32 each. These ten conduits 32 are also intended to receive the threaded rods of ten bolting elements, for example with fixing sleeves (anchored and cast in the concrete of the lower sole 16), threaded rods (screwed into the sleeves and extending into the conduits 32), washers and nuts (screwed to the tops of the threaded rods protruding from the conduits 32), or with sleeves, washers and threaded rods with bolting heads, or any other existing and equivalent bolting variant.

[0038] In the example of the figure 1 also, the two lateral half-shells 18 and 20 are reported and fixed against each other by bolting. To do this, niches 34 are formed in hollow at the open ends of the U-shaped section of one of the two, for example the second lateral half-shell 20 and arranged to receive suitable bolting elements, for example with fixing sleeves (anchored and cast in the concrete of the first lateral half-shell 18), perforated plates (at the ends with tabs incorporated in the concrete of the second lateral half-shell 20) and headed screws (screwed to the sleeves passing through the perforated plates).

[0039] The lower sole 16 is shown alone on the figure 2 according to a perspective showing its upper face for receiving the two side half-shells 18 and 20.

[0040] It shows its shape as a rectangular plate with a thickness of H16 over almost its entire length L16, but having two stops 36, 38 in excess thickness over its entire width W16 at its two longitudinal ends. The thickness H'16 at the two longitudinal ends is for example approximately equal to 38 centimeters, or approximately 3 centimeters more than H16. The first stop 36 fulfills a longitudinal wedge function against which the first rectangular flange 22 of the first lateral half-shell 18 is positioned longitudinally, while the second stop 38 fulfills a longitudinal wedge function against which the second rectangular flange 24 of the second lateral half-shell 20 is positioned longitudinally.

[0041] On one of its two longitudinal edges, the upper face of the lower flange 16 is pierced with six holes 40 with fixing sleeves (anchored and cast in the concrete), at the rate of two series of three holes each, for the temporary fixing by bolting of two guide angles 42, 44. The first guide angle 42 fulfills a transverse wedge function against which the first lateral half-shell 18 is positioned transversely, while the second guide angle 44 fulfills a transverse wedge function against which the second lateral half-shell 20 is positioned transversely.

[0042] At its center, the lower sole 16 is pierced with a through drainage hole 46. It allows the evacuation of water from the interior volume of the prefabricated formwork 12 when the latter is installed at the bottom of the excavation and backfilled.

[0043] In the vicinity of the first stop 36, the upper face of the lower sole 16 is pierced with two rows of five holes 48 each. The ten holes 48 are equipped with the aforementioned fixing sleeves (anchored and cast in the concrete) in correspondence with the ten conduits 30 when the first lateral half-shell 18 is positioned and wedged longitudinally and transversely on the lower sole 16. Similarly, in the vicinity of the second stop 38, the upper face of the lower sole 16 is pierced with two rows of five holes 50 each. The ten holes 50 are equipped with the aforementioned fixing sleeves (anchored and cast in the concrete) in correspondence with the ten conduits 32 when the second lateral half-shell 20 is positioned and wedged longitudinally and transversely on the lower sole 16.

[0044] Finally, the upper face of the lower sole 16 is provided with four sockets 52 (anchored and cast in the concrete) for fixing lifting anchors. These four fixing sockets 52 are arranged symmetrically in a rectangle around the drainage hole 46, that is to say around the center of gravity of the lower sole 16, and as far away as possible without encroaching on the rows of holes 48 and 50. They allow the transport or movement by elevation using slings of the lower sole 16 while maintaining its balance and horizontality.

[0045] The first side half-shell 18 is shown alone in perspective on the figure 3 .

[0046] According to a first front view A, it has an inverted L shape due to one of its side walls, in which a first recess or mask 54 is formed, and to its first rectangular flange 22 forming the base of the inverted L. It can be seen that, according to an alternative embodiment which differs slightly from the figure 1 , two transverse channels 56 are formed in the upper face of the first rectangular flange 22, at the bottom of which extend the two rows of conduits 30 visible in the figure 1 and invisible in the figure 3 , in which the ten aforementioned bolting elements are intended to be housed and screwed. This allows them to be covered with a protective layer against corrosion after bolting.

[0047] According to a second view B from the left, the outer bottom wall of the lateral half-shell 18 also has a recess or mask 58. It is also provided with two sockets 60 (anchored and cast in the concrete) for fixing lifting anchors in the upper left and right parts. In the upper central part, it is pierced with a through hole 61 allowing the passage of an earthing cable. This through hole 61 can also be placed lower, in the recess or mask 58 for example. According to this same view B, the free lateral face of the first rectangular flange 22 is provided with two additional sockets 62 (anchored and cast in the concrete) for fixing lifting anchors in the left and right parts.The four fixing sockets 60 and 62 allow the transport or movement by elevation using slings of the first lateral half-shell 18 while maintaining a certain balance along a lifting axis positioned directly above its center of gravity, but positioning it at a right angle to its final position on the lower sole 16.

[0048] According to a third top view C, it can be seen that the peripheral upper face portion 26 formed by the thickness of the first lateral half-shell 18 is also provided with two sockets 64 (anchored and cast in the concrete) for fixing lifting anchors on the left and right branches of the U that it forms. According to this same view, the first rectangular flange 22 is also provided with a socket 66 (anchored and cast in the concrete) for fixing a lifting anchor. The latter is centered on the upper face of the first flange 22 between the two transverse channels 56. The three fixing sockets 64 and 66 allow the transport or movement by elevation using slings of the first lateral half-shell 18 while maintaining the final positioning that it must have on the lower sole 16.In practice, this elevation with three sockets 64, 66 for three lifting anchors is less assured than the previous one with four sockets 60, 62 for four lifting anchors. It is therefore suitable for an excavation of the first lateral half-shell 18 above the lower sole 16 already arranged at the bottom of the excavation, when this first lateral half-shell 18 has previously been approached close to the excavation by elevation with four lifting anchors, then straightened at a right angle.

[0049] The second side half-shell 20 is shown alone in perspective on the figure 4 .

[0050] According to a first front view D, it has an L shape due to one of its side walls, in which is formed a recess or mask 68 complementary to the recess or mask 54, and to its second rectangular flange 24 forming the base of the L. It can be seen that, according to the aforementioned variant embodiment which differs slightly from the figure 1 , two transverse channels 70 are formed in the upper face of the second rectangular flange 24, at the bottom of which extend the two rows of conduits 32 visible in the figure 1 and invisible in the figure 4 , in which the ten aforementioned bolting elements are intended to be housed and screwed. This allows them to be covered with a protective layer against corrosion after bolting.

[0051] According to a second view E from the left, the bottom inner wall of the second lateral half-shell 20 is pierced in the central upper part with a through hole 72 allowing the passage of an earthing cable. Its non-visible outer wall also has a recess or mask similar to the recess 58. It is also provided with two sockets similar to the sockets 60 (anchored and cast in the concrete) for fixing lifting anchors in the upper left and right parts. The through hole 72 can also be placed lower in the recess or mask formed in the non-visible outer wall. The non-visible free lateral face of the second rectangular flange 24 is provided with two additional sockets 62 (anchored and cast in the concrete) for fixing lifting anchors in the left and right parts.These four fixing sockets similar to the sockets 60 and 62 allow the transport or movement by elevation using slings of the second lateral half-shell 20 while maintaining a certain balance along a lifting axis positioned directly above its center of gravity, but positioning it at a right angle to its final position on the lower sole 16.

[0052] According to a third top view F, it can be seen that the peripheral upper face portion 26 formed by the thickness of the second lateral half-shell 20 is also provided with two sockets 74 (anchored and cast in the concrete) for fixing lifting anchors on the left and right branches of the U that it forms. The second rectangular flange 24 is also provided with a socket similar to the socket 66 (anchored and cast in the concrete) for fixing the lifting anchor. The latter is centered on the upper face of the second flange 24 between the two transverse channels 70. These three fixing sockets similar to the sockets 64 and 66 allow the transport or movement by elevation using slings of the second lateral half-shell 20 while maintaining the final positioning that it must have on the lower sole 16.In practice and as for the first lateral half-shell 18, this elevation with three sockets for three lifting anchors is less assured than the previous one with four sockets for four lifting anchors. It is therefore suitable for an excavation of the second lateral half-shell 20 above the lower flange 16 already arranged at the bottom of the excavation, when this lateral half-shell 20 has previously been approached close to the excavation by elevation with four lifting anchors, then straightened at a right angle.

[0053] The perspective view of the figure 4 finally allows to clearly visualize eight niches 34 formed in hollow at the open ends of the U-shaped section of the second lateral half-shell 20 to respectively receive eight perforated plates 76 with end tabs incorporated in the concrete of the second lateral half-shell 20. The first lateral half-shell 18 is provided correspondingly with eight fixing sockets at the open ends of its U-shaped section not visible on the figure 3 .

[0054] The lower sole 16, the first lateral half-shell 18 and the second lateral half-shell 20 are shown in perspective on the figure 5 , in their assembled configuration and assumed to be fixed by bolting, according to a view opposite that of the figure 1 .

[0055] It can be seen by transparency that threaded rods 78 are partially inserted into the concrete of the side shell 18, 20 and extend orthogonally upwards from its peripheral upper face 26. These threaded rods 78 are distributed at the four corners of the frame formed by the peripheral upper face 26 and there are four of them per corner, i.e. sixteen in all. They all have a curved lower portion housed in the concrete reinforcement to reinforce their insertion. On the other hand, their upper portion which comes out of the peripheral upper face 26 is straight. Four L-shaped plates 80 are arranged and fixed on these threaded rods 78 by double bolting using pairs of nuts, at the rate of one L-shaped plate 80 with four holes for each set of four threaded rods 78 at the four corners of the peripheral upper face 26.When the prefabricated formwork foundation 12 is arranged approximately horizontally at the bottom of the excavation by assembling and fixing the three prefabricated parts 16, 18 and 20, its horizontality can be refined by adjusting the positioning of the four L-shaped plates 80 on the sixteen threaded rods 78 using the pairs of nuts of the double bolting.

[0056] As shown schematically in perspective on the figure 6 , the threaded rods 78 allow, in cooperation with the L-shaped plates 80, to receive the metal base structure 14 visible on the figure 1 and whose function is to mechanically link the prefabricated formwork 12 and the four feet of a pylon for which it serves as a foundation.

[0057] This metal base structure 14 comprises four angles 82 arranged in a metal frame above the rectangular frame formed by the peripheral upper face 26 of the side shell 18, 20, resting on the four L-shaped plates 80. These four angles 82 are connected to each other and to four other angles 84 extending more or less vertically (more precisely according to the inclinations close to the vertical of the four feet of the pylon to be anchored) at the four corners of the frame using folded gussets 86 screwed onto the L-shaped plates 80 and onto all the angles 82, 84.

[0058] A process for manufacturing and installing the prefabricated formwork foundation 12 of figures 1 à 6 will now be described with reference to the figure 7 .

[0059] During a first step 100, the formwork 12 is prefabricated in the factory. As indicated previously for reasons of weight, it can be made up of three separately prefabricated parts made of reinforced concrete, namely: the lower flange 16 forming the base of the formwork, the first lateral half-shell 18 and the second lateral half-shell 20, knowing that the two lateral half-shells 18, 20 attached to each other on the lower flange 16 and fixed by bolting form the lateral enclosure of the formwork. As already indicated, the dimensions, materials and weights which have been described in detail previously are suitable for forming the foundation of a 90 kV high-voltage line electricity pylon, but they are easily adaptable for other contexts, other constraints and other applications.There are many finite element modeling software tools available for this purpose that allow constraints to be incorporated to define the required dimensions and materials. In particular, the surface area and composition of the lower flange 16 must be sufficient to withstand the tilting moment of the pylon to be supported. By modeling, it is possible to easily determine this surface area as well as the reinforcement rate to be provided in the reinforced concrete.

[0060] During a following step 102, the prefabricated parts 16, 18, 20 are transported to the site, close to a pre-existing excavation or one to be carried out. The two lateral half-shells 18 and 20 are delivered “flat”, that is to say with a right-angle turn to the right of the first lateral half-shell 18 relative to its arrangement on the figure 3 and to the left of the second side half-shell 20 relative to its arrangement of the figure 4 , for security and stability reasons.

[0061] During a step 104 which can be carried out independently of step 102, before, during or after, an excavation is dug (in the case of creation of a foundation for a pylon) or redeveloped (in the case of replacement of a foundation for a pylon) with an excavation bottom as horizontal as possible to accommodate the lower sole 16 of the prefabricated formwork 12. During this step, all the necessary ground and / or rope markings can be prepared to guide the precise positioning of the prefabricated formwork 12, so that it is correctly oriented according to the constraints that the pylon that it is intended to support will itself have to undergo.

[0062] In a subsequent step 106, the prefabricated parts 16, 18, 20 are placed on the ground. The two side half-shells 18, 20 are turned over at right angles to be placed in the position of the figures 3 And 4. As for the lower sole 16, it is laid flat, its upper face upwards, and the two guide angles 42, 44 are screwed into the fixing sleeves of the six holes 40. Threaded guide rods can be screwed vertically into some of the fixing sleeves of the holes 48 and 50, for example three guide rods in some of the holes 48 and three guide rods in some of the holes 50.

[0063] In a subsequent step 108, the lower sole 16 is transported by lifting, using slings fixed to four lifting anchors themselves screwed into the four fixing sleeves 52, also using any lifting equipment but suitable for lifting loads of up to 10 tonnes, to the bottom of the excavation. Two earthing cables have been previously arranged at the bottom of the excavation so as to have ends rolled into loops under the lower sole 16.

[0064] During a following step 110, the two lateral half-shells 18, 20 are successively transported by lifting, using slings fixed to three lifting anchors themselves screwed into the three aforementioned fixing sleeves, namely the three sleeves 64, 66 of the first lateral half-shell 18 and the three corresponding sleeves of the second lateral half-shell 20, and arranged precisely at the bottom of the excavation on the lower sole 16 by longitudinal and transverse wedging using the stops 36, 38 and the angles 42, 44. The threaded guide rods can then be unscrewed and removed.

[0065] During a following step 112, the three parts 16, 18, 20 installed at the bottom of the excavation are fixed together by bolting as detailed previously. During this step, each bolting element remaining visible after installation is covered with a protective layer against corrosion, for example a layer of mortar. The transverse channels 56, 70, as well as the niches 76 are thus filled. Also during this step, the earthing cables are introduced into the holes 61 provided for this purpose to be connected to the pylon from the interior volume of the prefabricated formwork 12. Finally, the two guide angles 42, 44 are unscrewed and removed.

[0066] In a subsequent step 114, the four L-shaped plates 80 are laid, adjusted and fixed as explained previously with reference to the figure 5 . The metal base structure 14 is then also installed as explained previously with reference to the figure 6 .

[0067] During a following step 116, a first backfilling consists of replacing and compacting earth in the excavation, around the prefabricated formwork 12 and in its interior volume, for example flush with the upper peripheral face 26 of the side shell 18, 20.

[0068] During a following step 118, the pylon is mounted and anchored on the prefabricated formwork foundation 12 by fixing it to the metal base structure 14.

[0069] During a following step 120, a surface layer of bagged concrete may optionally be provided in line with the prefabricated formwork 12 to provide mechanical protection against corrosion of at least a portion of the exposed metal elements of the foundation, namely the upper portions of the threaded rods 78 extending beyond the peripheral upper face 26, the four L-shaped plates 80 and the metal base structure 14.

[0070] Finally, a last optional step 122 consists of carrying out a second backfilling around the surface layer of concrete added in step 120.

[0071] Regardless of the 100 manufacturing which is carried out in the factory, an installation to replace a pylon structure on a pre-existing foundation can extend over three days: a first day of site preparation, in particular by dismantling and protecting the pre-existing structure, corresponding to the execution of step 104; a second day of installation of the foundation 10, corresponding to the execution of steps 102 and 106 to 116; a third and final day of operational installation of the pylon, corresponding to the execution of steps 118 to 122.

[0072] It is clear that a foundation for pylon foot(s) such as that described above is easy and quick to install for creation or replacement. It only requires the assembly of parts and adjustment, without calling upon other complex and specific skills in the field of civil engineering. By the fact that it is prefabricated formwork 12, there is also no problem of drying time during its burial and no risk of environmental pollution either. By its particular configuration described above and in accordance with the general principles of the present invention, it can remain of relatively limited cost, size and weight in view of what it must itself support in weight and constraints.

[0073] It will also be noted that the invention is not limited to the embodiment described above. It will indeed appear to those skilled in the art that various modifications can be made to the embodiment described above, in light of the teaching which has just been disclosed to them. In the detailed presentation of the invention which is given above, the terms used should not be interpreted as limiting the invention to the embodiment set out in the present description, but should be interpreted to include all equivalents which can be foreseen by those skilled in the art by applying their general knowledge to the implementation of the teaching which has just been disclosed to them.

Claims

1. Foundation (10) for pylon base(s) comprising a prefabricated formwork (12) intended to be buried in an excavation and comprising: - a lower sole (16) intended to be placed at the bottom of the excavation and forming a base of the formwork (12); and - a lateral shell (18, 20) extending from the lower sole (16) and forming a lateral enclosure of the formwork (12) intended to be buried in the excavation; characterized in that the side shell (18, 20) has a peripheral upper face (26) capable of supporting at least one foot of the pylon and a central upper opening (28) making it possible to define with the lower sole (16) an interior volume of the formwork (12) to be backfilled.

2. Foundation (10) for pylon foot(s) according to claim 1, in which the peripheral upper face (26) capable of itself supporting at least one foot of the pylon is formed by the thickness of the lateral shell (18, 20).

3. Foundation (10) for pylon foot(s) according to claim 1 or 2, in which the lower sole (16) and the side shell (18, 20) are prefabricated from reinforced concrete.

4. Foundation (10) for pylon base(s) according to any one of claims 1 to 3, in which the lower sole (16) and the side shell (18, 20) are separately prefabricated parts, which can be connected to each other by bolting.

5. Foundation (10) for pylon base(s) according to any one of claims 1 to 4, in which the side shell (18, 20) is formed from at least two separately prefabricated side shell portions, which can be connected to each other by bolting.

6. Foundation (10) for pylon foot(s) according to any one of claims 1 to 5, in which the lower sole (16) is provided with a through drainage hole (46).

7. Foundation (10) for pylon base(s) according to any one of claims 1 to 6, in which the side shell (18, 20) is provided with at least one through hole (61, 72) for passing an earthing cable for the pylon which it is intended to support.

8. Foundation (10) for pylon foot(s) according to any one of claims 1 to 7, in which the side shell (16, 18) is of essentially parallelepiped shape, so as to form a peripheral upper face (26) in a rectangular frame, with a lower rectangular flange (22, 24) for fixing to the lower sole (16) which itself takes the form of a rectangular plate.

9. Foundation (10) for pylon base(s) according to any one of claims 1 to 8, in which threaded rods (78) are partially introduced into the side shell (18, 20) and extend orthogonally from its peripheral upper face (26) so as to receive a base structure (14) intended to mechanically link the prefabricated formwork (12) and the pylon.

10. Method for manufacturing and installing a foundation (10) for pylon foot(s) comprising the following steps: - prefabrication (100) of a formwork (12) intended to be buried in an excavation and comprising: • a lower sole (16) intended to be arranged at the bottom of the excavation and forming a base of the formwork (12), and • a lateral shell (18, 20) extending from the lower sole (16) and forming a lateral enclosure of the formwork (12) intended to be buried in the excavation; - arrangement (104) of an excavation on the ground intended to receive the prefabricated formwork (12); - installation (108, 110, 112, 114) of the prefabricated formwork (12) in the excavation; and - backfilling (116, 118, 120, 122) of the excavation around the formwork (12); characterized in thatthe side shell (18, 20) is prefabricated (100) so as to have a peripheral upper face (26) capable of supporting itself at least one foot of the pylon and a central upper opening (28) making it possible to define with the lower sole (16) an interior volume of the formwork (12) to be backfilled, and in that the backfill (116, 118, 120, 122) of the excavation further comprises a backfill (116) in the interior volume of the formwork (12).

11. Method for manufacturing and installing a foundation (10) for pylon foot(s) according to claim 10, in which: - the prefabricated formwork (12) is designed in several separately prefabricated parts, assembled together by bolting (112) during the installation (108, 110, 112, 114) of the prefabricated formwork (12) in the excavation; and - each bolting element remaining visible after installation is covered (112) with a protective layer against corrosion, for example a layer of mortar.

12. Method for manufacturing and installing a foundation (10) for pylon foot(s) according to claim 10 or 11, in which the backfilling (116, 118, 120, 122) of the excavation comprises: - a first backfilling (116) flush with the peripheral upper face (26) of the side shell (18, 20); - a supply (120) of a surface layer of concrete at the level of the prefabricated formwork (12) after anchoring (118) of the pylon; and - a second backfilling (122) around the surface layer of concrete.

Citation Information

Patent Citations

  • PREFABRICATED FOUNDATION FOR POLICE BALLPOSTS OR SIMILAR WIRED COMMUNICATION OR SIGNALING POSTS.

    DE1932594U

  • Foundation for a superstructure, particularly for a wind turbine, wind turbine with the foundation, method of forming a wind turbine foundation