Control method, entity of a telecommunications network, communication method and user equipment
By dynamically adjusting the monitoring frequency of control channels based on service characteristics, the method optimizes BWP switching in 5G NR networks, addressing the challenge of heterogeneous services with varying quality of service requirements, reducing latency and power consumption.
Patent Information
- Application Number
- FR2023003685
- Authority / Receiving Office
- FR · FR
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-13
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing 5G NR networks face challenges in managing bandwidth parts (BWP) due to heterogeneous services with different quality of service requirements, as current mechanisms fail to efficiently switch between BWPs with varying numerologies, leading to suboptimal latency and power consumption.
A method to dynamically adjust the monitoring frequency of control channels based on service characteristics, allowing user equipment to efficiently switch between BWPs by optimizing the monitoring frequency according to the specific requirements of connected services.
This approach reduces latency and power consumption while ensuring optimal BWP activation, effectively managing multiple services with diverse constraints, thereby enhancing the overall efficiency and quality of service in 5G networks.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
Title of the invention: Control method, entity of a telecommunications network, communication method and user equipment Previous technique
[0001] The invention belongs to the general field of telecommunications.
[0002] It is more particularly relevant in the context of a telecommunications network offering the possibility for a user equipment (or UE for "User Equipment" in English) of this network to receive or transmit data on only a part of the bandwidth allocated by the network to the cell to which this user equipment is attached.
[0003] Such a feature, also known as BWP (BandWidth Part), was introduced particularly in the context of a 5G (i.e., 5th Generation) network and more specifically, the new 5G NR (New Radio) radio interface defined by the 3GPP standard starting with Release 15. It allows the bandwidth over which data associated with a UE is transmitted (i.e., sent or received by the UE) via the network to be dynamically adapted, and consequently, the numerology used by the UE on this band. By numerology, we mean, in the context of an OFDM (Orthogonal Frequency Division Multiplexing) transmission scheme such as that adopted by the 5G NR radio access technology, the spacing between the subcarriers and the length of the cyclic prefix, or equivalently, the duration of an OFDM symbol.
[0004] The use of a single numerology, as in 4G or LTE (Long Term Evolution) networks—namely, a 15 kHz spacing between subcarriers and a cyclic prefix length of approximately 4.7 ps—is hardly feasible in the context of a 5G network, due in particular to the multiple deployment scenarios envisaged, whether in terms of cell size, allocated frequency bands, resulting propagation effects (such as delay spread), the heterogeneous services offered in 5G (and the very diverse constraints arising from them), etc. The 5G NR radio access technology was therefore designed to provide some flexibility in this regard and to support several numerologies for the same carrier frequency, as illustrated in Table 1 below.
[0005] [Tables 1] Numerology p 0 1 2 3 4 Subcarrier Spacing (SCS) (kHz) 15 30 60 120 240 Useful Symbol Time (PS) 66.7 33.3 16.7 8.33 4.17 Approximate TCP Cyclic Prefix Length (PS) 4.7 2.3 1.2 0.59 0.29 Total TU+TCP Time of an OFDM Symbol (PS) 71.35 35.68 17.84 8.92 4.46 Duration of a slot (14 OFDM symbols) or TTI (Transmission Time Interval) (ms) 1 0.5 0.25 0.125 0.0625
[0006] The use of these multiple numerologies makes it advantageous to meet the diverse and varied constraints (also referred to as SLA for "Service Level Agreement" in English) in terms of latency, throughput and reliability, imposed by the different categories of services that 5G networks make possible. These different categories of services include in particular: - eMBB (for "enhanced Mobile Broadband" in English) type services relying on very high data rates to offer new experiences to users (e.g. virtual reality, augmented reality, HD video streaming, etc.); - uRLLC (ultra-reliable low-latency communication) services, which have strict requirements regarding latency and communication reliability (e.g., remote management services, industrial robots, telesurgery); and - mMTC type services (for "massive Machine Type Communication" in English), which include in particular the Internet of Things (or "loT" for "Internet of Things" in English), and which have high requirements in terms of deployment density in particular (e.g. connected city, connected agriculture, etc.). - V2X (Vehicle-to-Everything) services, allowing a vehicle to exchange information with another vehicle, infrastructure, the network, and / or a pedestrian. V2X services include safety services, which aim to... Examples include minimizing accidents and risks to passengers or road users (e.g., driver assistance or autonomous driving services), which require very low latency (less than a few milliseconds) and transmission reliability close to 100%, and other services (or "non-safety services") aimed more at improving traffic conditions, minimizing the impact of road congestion, improving passenger comfort, etc., which certainly require high transmission rates but can tolerate some latency and lower reliability; and - HMTC type services (for "High performance Machine Type Communications" in English), which, like mMTC type services, have high requirements in terms of deployment density (and therefore availability of resources to communicate), but also low latency and high transmission rates.
[0007] Thus, for example, as illustrated in Table 1, a high numerology (for example, corresponding to a 120 kHz spacing between subcarriers) makes it possible to reduce the duration of a transmission interval or TTI, and consequently the latency: it is therefore particularly well suited to uRLLC services. Conversely, a lower numerology makes it possible to achieve a higher data rate and is particularly well suited to eMBB services.
[0008] As mentioned previously, 5G NR radio access technology allows a UE, via the BWP functionality, to use a narrower bandwidth than the total bandwidth allocated by a 5G network to the cell in which the UE is located. This narrower bandwidth corresponds to a portion (hereafter referred to as BWP) of the total bandwidth allocated by the network to the cell. Given the bandwidths envisaged in 5G (up to 400 MHz for a single carrier), the use of this functionality advantageously allows, on the one hand, adaptation to UEs with reduced capacities in terms of supported bandwidth and / or that they can monitor, and on the other hand, a reduction in the complexity of the processing performed by the UEs (e.g., monitoring and decoding of control channels) and thus the power they consume.
[0009] Each BWP is characterized by a numerology (subcarrier spacing and cyclic prefix length) and by a number of consecutive Physical Resource Blocks (PRBs) that conform to this numerology. It begins at a certain Common Resource Block (CRB) whose location is identified relative to a CRB that serves as a reference for all numerologies, also called Reference Point A. Different BWPs may use the same numerology but have different bandwidths.
[0010] It should be noted that in the 5G NR context, a Resource Block (RB) (such as a PRB or CRB) is a frequency-domain element consisting of 12 consecutive subcarriers. The frequency spread of an RB therefore depends on the numerology considered: for example, two consecutive RBs for a numerology based on an Af spacing between subcarriers occupy the same frequency band as one RB for a numerology based on a 2Af spacing between subcarriers. A PRB is thus the smallest radio unit allocated to a UE in the 5G NR context.
[0011] Figure 1 schematically illustrates the concept of BWP. In this figure, two bandwidth portions, denoted BWP1 and BWP2, are considered, defined within the bandwidth BW associated with a carrier C allocated to a cell of a 5G network. In the example of Figure 1, the bandwidth portions BWP1 and BWP2 are associated respectively with two distinct numerologies corresponding to spacings between subcarriers Af and 2Af. PRB(Af), CRB(Af), and PRB(2Af), respectively, are denoted CRB(Af) and CRB(2Af), respectively, with PRB and CRB corresponding to the spacings Af and 2Af between the subcarriers.The BWP1 band portion begins at the CBR(Af)#m block, relative to the reference point A, and consists of M consecutive PRB(Af) corresponding to a spacing Af between the subcarriers; the BWP2 band portion begins at the CBR(2Af)#n block and consists of N consecutive PRB(2Af) corresponding to a spacing 2Af between the subcarriers, M and N denoting two integers greater than or equal to 1.
[0012] In accordance with the 3GPP standard, at the level of a UE, four BWPs can be configured in downlink (or DL) and four BWPs can be configured in uplink (or UL) for UE-associated data transmissions. The expression "UE-associated data transmission" here generally covers the reception of data by the UE and / or the transmission of data by the UE.
[0013] Depending on the service(s) used by a UE, activating one BWP may be more relevant than another, particularly due to the numerology associated with that BWP. Indeed, as previously mentioned, higher numerologies are particularly well-suited to services requiring low latency, such as uRLLC services, while lower numerologies are better suited to eMBB services requiring very high bandwidth. Therefore, it is not optimal to use the same numerology for two services with different constraints (or SLAs).
[0014] However, a UE in a 5G network can be connected simultaneously to different services. The 3GPP standard, for example, introduced the concept of "network slicing" in English. (or network slicing) whereby a physical 5G network can be divided into several logical slices, each logical slice being associated with a distinct service, characterized by its own SLA, and having dedicated radio resources. A single UE can be connected to 8 network slices simultaneously and therefore access distinct services at the same time. It should be noted that a UE in a 5G network can be connected to several distinct services even in the absence of network slicing.
[0015] US patent 10,880,949 proposes a signaling mechanism allowing the parallel activation of multiple BWPs (for simultaneous or overlapping use) at the UE level. Such activation advantageously manages the simultaneous connection of a UE to multiple services, for example, by configuring separate BWPs for services with different constraints. This mechanism reduces latency and limits service interruptions. However, this mechanism is incompatible with certain limitations imposed by the 3GPP standard on UEs with respect to BWP functionality.
[0016] Indeed, in accordance with the 3GPP standard, although several BWPs can be configured at the UE level, only one BWP can be active (i.e., used for transmitting data associated with the UE) at any given time in UL or DL. However, a UE can switch from one BWP to another, that is, activate a new BWP to replace the currently active one. Such a switchover can be decided by the network (the base station to which the UE is connected), for example, to meet the Quality of Service (QoS) requirements of a new service required by the UE, the new BWP being considered better suited, due to its numerology, than the currently active BWP for transmitting the data streams related to that service.Such a switchover is triggered by the base station sending, on a PDCCH (Physical Downlink Control Channel), a DCI (Downlink Control Information) message to the UE, in the format 0_l (for UL) or 1_1 (for DL), and including a BWP (Bandwidth Part Indicator) indicating the new BWP to be activated by the UE. The PDCCH control channel is broadcast by the base station on the cell it covers; the UE is configured by the network operator to periodically monitor this PDCCH control channel to detect information sent by the base station concerning it (and in particular the DCI information and, where applicable, the BWP indicators indicating the BWPs it must activate).
[0017] The document by K. Boutiba et al., entitled “Radio Resource Management in Multi-numerology 5G New Radio featuring Network Slicing”, IEEE International Conference on Communications (ICC), May 2022, proposes an algorithm based on a Deep Reinforcement Learning (DRL) allows for the allocation of resources to UEs connected to multiple network slices associated with different SLAs and the multiplexing of the numerologies assigned to them, while ensuring that only one BWP is active at any given time within a UE. To account for a UE's connection to multiple network slices, it is modeled as a plurality of virtual UEs, each virtual UE connected to a single network slice; furthermore, two constraints are imposed on the temporal resources allocated to the virtual UEs associated with the same UE: they must use the same numerology and must not overlap.
[0018] This algorithm therefore does not allow different numerologies to be associated with different services to which a UE is connected. However, as previously highlighted, using the same numerology for services with different quality of service requirements or priorities is not optimal.
[0019] In addition, the modeling on which the algorithm is based does not take into account the time required to allocate resources to the UEs and to notify them, where appropriate, of changes in BWP.
[0020] There is therefore a need for a mechanism to effectively implement a BWP functionality as defined by the 3GPP standard, in a network offering the possibility for a user device to be connected to several heterogeneous services typically having distinct priorities and / or quality of service requirements. Description of the invention
[0021] The invention makes it possible in particular to meet this need by proposing a method for controlling, by an entity of a telecommunications network, a so-called monitoring frequency at which a user device monitors a control channel capable of carrying at least one indicator of the portion of bandwidth allocated to said user device, said control method comprising: - an adjustment step, based on at least one characteristic of at least one data stream to be transmitted associated with said user equipment and relating to at least one service offered by the network, of said monitoring frequency; - a notification step specifying the adjusted monitoring frequency of said user equipment; and - a step of sending information intended for the user equipment on said control channel according to said adjusted monitoring frequency.
[0022] Correspondingly, the invention also relates to an entity of a telecommunications network comprising: - an adjustment module, configured to adjust, based on at least one characteristic of at least one data stream to be transmitted associated with a user device and relating to at least one service offered by said network, a quantity representative of a monitoring frequency of a control channel capable of carrying at least one indicator of the portion of bandwidth allocated to said user device; - a notification module, configured to notify said adjusted monitoring frequency to said user equipment; and - a sending module, configured to send information intended for the user equipment on said control channel according to said adjusted monitoring frequency.
[0023] The telecommunications network entity is, for example, a network base station (also called a gNB in the context of a 5G network). It can be a hardware entity or a software entity, which can be distributed across one or more network functions or hosted by one or more hardware devices.
[0024] The invention therefore proposes to dynamically adjust the monitoring frequency by the user equipment of the control channel that carries information relating to the BWPs to be activated at the user equipment level to transmit traffic (UL or DL traffic) relating to the services to which this user equipment is connected, and to use this adjusted monitoring frequency to transmit this information. By "adjusting the monitoring frequency of the control channel by the user equipment," we mean adjusting the number of times the user equipment performs this monitoring in a given time. For the invention, the parameter adjusted to change this monitoring frequency is irrelevant. Thus, when the monitoring is periodic, it could be the period with which the monitoring is repeated over time, or the inverse of this period, etc.
[0025] There is no limitation on the number or types of services to which the traffic relates. Thus, for example, the at least one service offered by the network may include at least one of the following services: - an “ultra Reliable Low Latency Communication” service, uRLLC; - an “enhanced Mobile BroadBand” service, eMBB; - a “massive Machine Type Communication” service, mMTC; - a "Vehicle to Everything" service, V2X; - a “High performance Mobile Type Communication” service, HMTC.
[0026] These services are defined by the 3GPP standard and correspond to various constraints in terms of latency, reliability, etc., as mentioned previously. Of course, the invention is not limited to these services, and other services, alternatively or complementaryly, may be considered in the context of the invention, with similar or identical constraints, or with different constraints than those of the aforementioned services.
[0027] The adjustment proposed by the invention is advantageously achieved by taking into account the characteristics of this traffic (typically the services to which this traffic relates, the priority given to these services or flows, the latency supported by these services or flows, the volume to be transmitted, etc.). It is therefore adapted to the user equipment in question. The characteristics of the traffic associated with the user equipment allow the network entity to estimate whether information intended for the user equipment should be sent over the control channel in order to optimize the transmission of this traffic, and if so, to control the timing at which this information can be sent to the user equipment and then detected and processed by it.
[0028] Typically, this information intended for the user equipment may include at least one BWP indicator assigned by the network entity to the user equipment (for example, to optimize the transmission of traffic associated with the user equipment) to be activated for the transmission of traffic associated with the user equipment (incoming or outgoing data stream(s)).
[0029] Thus, the invention makes it possible to benefit from adjusted monitoring and sending frequencies to notify the user equipment of a BWP change. The network entity can, thanks to the invention, control and adapt the timing of when the user equipment is notified of the BWP it must activate, according to the urgency and constraints of the traffic associated with that user equipment.
[0030] For example, in a particular embodiment, the adjustment step includes an increase in the monitoring frequency when at least two separate parts of the band are allocated to said user equipment for the transmission of said at least one data stream and when at least one said service and / or at least one said data stream is identified as priority or associated with a maximum latency below a given threshold.
[0031] Conversely, in one embodiment, the adjustment step includes a decrease in the monitoring frequency when one of the following conditions is met: - the same portion of the band is allocated to said user equipment for the transmission of said at least one data stream; - said at least one service includes only one or more services identified as non-priority or associated with a maximum latency greater than a given threshold; - said at least one stream includes only one or more streams identified as non-priority or associated with a maximum latency greater than a given threshold.
[0032] Typically, a service, or data stream, identified as priority is a service, or data stream, which often has high latency requirements (for example, supporting a maximum latency of less than 1ms), such as a uRLLC or V2X service, or a QoS stream of the Delay Critical GBR type (for "Guaranteed Bit Rate" in English).
[0033] Indeed, when all or part of the traffic associated with a user device relates to a service identified as priority or low-latency tolerant, it is desirable that the switchover to a BWP adapted to this type of service (e.g., associated with high numericity) can be carried out as quickly as possible in order to reduce latency and limit the risk of interruption of this service. This observation also applies to a priority or low-latency tolerant data flow, including when it relates to a non-priority service. To this end, the network entity can then advantageously, during the adjustment step, increase the monitoring frequency of the control channel so that the user device can be informed as soon as possible of the BWP assigned to it for this priority service or flow and activate it without undue delay.
[0034] Conversely, if the traffic associated with the user equipment does not concern a priority service or flow or one with high latency requirements (for example, an eMBB service), or if it does not require a change in BWP, the network entity can, during the adjustment step, reduce the monitoring frequency in order to limit the power consumed by the user equipment and preserve network resources.
[0035] The invention thus enables optimized and efficient management of the BWP functionality, particularly in a context where a change of BWP is being considered. It has a preferred, but not limiting, application when the user equipment is connected to several services with heterogeneous constraints or different priorities, as it offers the network operator the possibility of activating, without latency, a BWP adapted to each service in order to optimize the transmission of traffic associated with the user equipment.
[0036] Furthermore, the invention provides a substantial advantage over the prior art, according to which the control channel carrying the BWP indicators is periodically monitored by the user equipment with a fixed period, configured by the network operator at the user equipment level, via an RRC (for "Radio Resource Control") message sent by the base station when the user equipment establishes its connection with the network. Such a period is applied to all user equipment connected to the base station and is typically set by the operator to be equal to several slots (e.g., 5 or 8 slots) or TTI, which, in numerology, p=0 represents several milliseconds. It is therefore clear that if a BWP change is decided by the base station to transmit data streams associated with a user equipment relating to a uRLLC service, imposing a latency of less than one millisecond, the base station must wait for the next control channel containing information intended for the user equipment to transmit this instruction, therefore potentially several milliseconds depending on the value of the period configured by the operator, which can prove detrimental to the quality of the uRLLC service.
[0037] In contrast, in the invention, the monitoring frequency of the control channel and the frequency at which information intended for the user equipment is sent over this control channel (including, where applicable, BWP indicators) are configurable and are adapted to each user device, depending on its traffic and the services to which it is connected. The invention offers the possibility of easily achieving a compromise between latency and the power consumed by the user equipment and of satisfying the diverse and varied constraints of the services that a user is likely to access.
[0038] Furthermore, it is relatively simple to implement since it relies on the modification of the control channel monitoring frequency by the user equipment, which can be easily configured by the network operator, for example via an RRC message. It is also compatible with the constraint imposed by the 3GPP standard, according to which a user device can only have a single active BWP at any given time (it should be noted, however, that the invention also applies in the absence of this constraint), and, under this constraint, it allows for the optimization of traffic transmission associated with a user device connected to multiple services.
[0039] The invention therefore has a preferred application in the context of a 5G NR network as previously described. In this context, it amounts to dynamically adjusting the period of the periodic monitoring performed by the user equipment of the PDCCH channel broadcast by the base station on the cell, and using this adjusted period to more efficiently send DCI control information to the user equipment in the PDCCH channel. The flexibility offered by the invention makes it particularly well suited in the context of a 5G network implementing network slicing, in which a plurality of network slices can be used to offer a plurality of services to network users.
[0040] However, the invention applies in other contexts and to other network architectures, such as, for example, in a next-generation network (6G, etc.), or a proprietary network, or an Open-RAN architecture as defined by the O-RAN Alliance, implementing a BWP functionality and in which a user device is likely to be connected simultaneously to several services. In the context of an Open-RAN network architecture, the control method according to the invention can be implemented by a near-RT RIC type controller (for "near-Real Time RAN Intelligent Controller" in English), for example in a software application also known as xAPP (network entity according to the invention).
[0041] It should also be noted that the invention applies equally to the uplink (UL), to facilitate the transmission of outgoing streams from the user equipment, and to the downlink (DL), to facilitate the transmission of incoming streams from the user equipment, regardless of the resource multiplexing scheme envisaged in the network between the UL and DL channels (for example, time division multiplexing or TDD, or frequency division multiplexing or FDD). The invention is applied individually to each channel.In the event that the same control channel carries information concerning the upstream and downstream channels, and a different adjustment of the monitoring frequency is chosen for the upstream and downstream channels, then the higher of the two adjusted monitoring frequencies is chosen to be applied by the user equipment.
[0042] In a particular embodiment, said at least one flow characteristic taken into account by the network entity during the adjustment step may include, for said data flow associated with said service: - a volume of said data flow; and / or - information relating to the scheduling of data packets carried by said data stream and to a portion of bandwidth allocated to said service for the transmission of said data packets; and / or - a priority associated with said data flow and / or a maximum latency associated with said data flow; and / or - a priority associated with audited service; and / or - a slice of the network associated with said service.
[0043] Such characteristics advantageously reflect the volume of incoming or outgoing traffic, the scheduling of this traffic, and the services to which the user equipment is connected, as well as their constraints and priorities. This type of characteristic can influence how traffic transmission is organized for optimization purposes, and thus allows the entity to make an informed adjustment to the monitoring frequency. Of course, these examples of flow characteristics are not exhaustive, and other characteristics may be considered. Furthermore, the characteristics taken into account during the adjustment step may be representative of the actual traffic associated with the user equipment, or consist of an estimate or prediction of this traffic.
[0044] In a particular embodiment, the steps of adjusting the monitoring frequency, notifying the adjusted monitoring period and sending are repeated periodically.
[0045] For example, the monitoring frequency adjustment can be revised every frame (i.e. every 10ms in the context of a 5G NR network).
[0046] The period (called the adjustment period) with which the adjustment, notification and sending steps are repeated can condition, in particular, the duration over which the characteristics of the traffic associated with the user equipment are considered to adjust the monitoring frequency.
[0047] This embodiment offers additional flexibility: it allows the adjustment applied to the monitoring frequency to be revised if necessary according to the evolution of traffic and, where applicable, the services to which the user equipment is connected, the appearance of traffic, etc.
[0048] In a particular embodiment, it is also possible to have an adjustment period configurable by the network entity, for example according to the context in which the user equipment is located (e.g. its location) or the services to which it is connected.
[0049] Alternatively, the steps of adjusting the monitoring frequency, notification and sending can be triggered on detection of a particular event, such as, for example, the connection of the user equipment to a new service.
[0050] In a particular embodiment, during the adjustment step, the monitoring frequency is further adjusted according to at least one performance indicator (or KPI for "Key Performance Indicator" in English) of said user equipment and / or network.
[0051] Said at least one performance indicator may include for example: - power consumed by said user equipment; and / or - end-to-end network throughput or latency.
[0052] Thus, for example, increasing or decreasing the monitoring period can be evaluated (sized) based on at least one such performance indicator of the user equipment and / or the network. Taking such performance indicators into account allows for trade-offs when adjusting the monitoring period, without sacrificing user equipment and / or network KPIs that are likely to affect the user experience and / or that play an important role for the network operator. This results in an optimized implementation of the BWP functionality in the network.
[0053] By way of illustration, an increase in the monitoring frequency may be contingent upon the power consumed by the user equipment. Indeed, an increase in the monitoring frequency will result in an increase in The activity of the user equipment, which must be able to listen to and process the more frequent information sent to it, consequently leads to an increase in its power consumption. It is therefore important to ensure that this power increase remains within reasonable and acceptable limits for the user equipment, in order to conserve its resources, particularly its battery.
[0054] As mentioned previously, the flow characteristics taken into account for adjusting the monitoring frequency may be actual characteristics of these flows, or result from estimation or prediction. They may also be determined by the network entity from information collected from various sources.
[0055] Thus, in a particular embodiment, the control method further comprises a step of estimating said at least one characteristic of said at least one data stream to be transmitted associated with said user equipment from at least one parameter among: - at least one identifier of at least one network slice to which said user equipment is attached or authorized for said user equipment, and / or at least one service to which said user equipment is connected or authorized to connect; and - at least one piece of information provided by said user equipment.
[0056] This embodiment advantageously relies on information already known or transmitted to the network to obtain a reliable and accurate prediction of the characteristics of the traffic to be transmitted associated with a user equipment and to adjust as best as possible the monitoring frequency of the control channel and the frequency of sending information intended for the user equipment in this control channel.
[0057] In a particular embodiment, the control method further includes a step of learning a traffic prediction model for said user equipment, said prediction model being used by said network entity to determine said at least one characteristic of said at least one flow to be transmitted associated with said user equipment.
[0058] No limitations are attached to the nature of the prediction model learned during the training step and used to determine the characteristics of the traffic associated with the user equipment. For example, this prediction model may be based on a neural network, a reinforcement learning or deep reinforcement learning algorithm, a mathematical model, or a heuristic, etc.
[0059] In view of the foregoing, the invention relies on the network entity implementing the control method according to the invention to adjust the monitoring frequency of the control channel and the frequency of sending information in that control channel. intended for user equipment, but also on the user equipment itself.
[0060] Thus, according to another aspect, the invention also relates to a method of communication by a user device of a telecommunications network, this method comprising: - a step of receiving a notification of a so-called monitoring frequency at which said user equipment monitors a control channel, adjusted by a network entity in accordance with an adjustment step of a control method according to the invention, said control channel being capable of carrying at least one indicator of the portion of bandwidth allocated to said user equipment; and - a monitoring step of said control channel in accordance with said adjusted monitoring frequency.
[0061] Correspondingly, the invention also relates to user equipment for a telecommunications network comprising: - a receiving module, configured to receive a notification of a so-called monitoring frequency at which said user equipment monitors a control channel, adjusted by a network entity adjustment module according to the invention, said control channel being capable of carrying at least one indicator of the portion of bandwidth allocated to said user equipment; and - a monitoring module, configured to monitor said control channel in accordance with said adjusted monitoring frequency.
[0062] In a particular embodiment, the control method according to the invention further comprises, during said monitoring step, a detection in said control channel of at least one band portion indicator allocated to the user equipment to be activated.
[0063] In a particular embodiment of the communication method, said notification is an RRC, Radio Resource Control configuration message sent by the network entity and including a value of a period with which to reiterate monitoring of the control channel.
[0064] The communication method and user equipment according to the invention benefit from the same advantages mentioned above as the control method and the network entity.
[0065] In a particular embodiment, the control and communication processes are implemented by a computer.
[0066] The invention also relates to a computer program on a recording medium, this program being capable of being implemented in a or dinator or more generally in an entity of a telecommunications network conforming to the invention and comprising instructions adapted to the implementation of a control method as described above.
[0067] The invention also relates to a computer program on a recording medium, this program being capable of being implemented in a computer or more generally in user equipment conforming to the invention and comprising instructions adapted to the implementation of a communication method as described above.
[0068] Each of these programs can use any programming language, and be in the form of source code, object code, or code intermediate between source code and object code, such as in a partially compiled form, or in any other desirable form.
[0069] The invention also relates to an information medium or a recording medium readable by a computer, and comprising instructions for a computer program as mentioned above.
[0070] The information or recording medium can be any entity or device capable of storing programs. For example, the medium may include a storage means, such as a ROM, for example a CD-ROM or a microelectronic circuit ROM, or a magnetic recording means, for example a hard disk drive, or a flash memory.
[0071] On the other hand, the information or recording medium can be a transmissible medium such as an electrical or optical signal, which can be transmitted via an electrical or optical cable, by radio link, by wireless optical link or by other means.
[0072] The program according to the invention can in particular be downloaded onto an Internet-type network.
[0073] Alternatively, the information or recording medium may be an integrated circuit in which a program is incorporated, the circuit being adapted to execute or to be used in the execution of the control and communication processes according to the invention.
[0074] According to another, the invention also relates to a communication system comprising: - at least one entity of a telecommunications network conforming to the invention; and - at least one user device conforming to the invention, attached to said device by at least one network entity.
[0075] It can also be envisaged, in other embodiments, that the control and communication methods, the network entity, the user equipment and the communication system according to the invention present in combination all or part of the ca- aforementioned characteristics. Brief description of the drawings
[0076] Other features and advantages of the present invention will become apparent from the description below, with reference to the accompanying drawings, which illustrate an example of an embodiment without being limiting in any way. In the figures:
[0077] [Fig-1] the [Fig. 1], already described, represents bandwidth portions (or BWP) defined from a nominal bandwidth allocated to a network;
[0078] [Fig.2] [Fig.2] represents a communication system in a telecommunications network, according to the invention, in a particular embodiment;
[0079] [Fig.3] [Fig.3] schematically represents the hardware architecture of a computer on which a network entity and a user device conforming to the invention, belonging to the communication system of [Fig.2] are based;
[0080] [Fig.4] [Fig.4] represents, in the form of a flowchart, the main steps of a control process according to the invention, as implemented by a network entity according to the invention belonging to the communication system of [Fig.2];
[0081] [Fig.5] [Fig.5] represents, in the form of a flowchart, the main steps of a communication process according to the invention, as implemented by a user equipment conforming to the invention belonging to the communication system of [Fig.2];
[0082] [Fig.6] ;
[0083] [Fig. 7] Figures 6 and 7 illustrate, using an example, the benefit provided by the invention ([Fig. 6]: without the invention; [Fig. 7]: with the invention); and
[0084] [Fig.8] Fig.8 represents an embodiment of the invention based on an Open-RAN architecture. Description of the invention
[0085] Figure 2 represents, in its environment, a communication system 1, according to the invention in a particular embodiment.
[0086] In this embodiment, system 1 comprises: - at least one entity 2 of an NW telecommunications network, conforming to the invention; and - at least one user equipment or UE 3 of the NW telecommunications network, attached to said at least one entity 2, and conforming to the invention.
[0087] In the remainder of the description and in [Fig.2], for the sake of simplification, we consider a single entity 2 and a single user equipment 3 attached to this entity 2.
[0088] In the example of [Fig. 2], the NW telecommunications network is a 5G NR network as defined by the 3GPP standard (with the adaptations necessary for implementation). work of the invention, described below). It implements in particular the B WP functionality mentioned above, allowing a user device to use only a portion of the total bandwidth allocated to the cell to which it is attached, whether in DL to receive data and / or in UL to transmit data.
[0089] In this context, entity 2 according to the invention is a base station (also called gNode B or gNB) of the NW network, covering at least one CELL of the NW network to which the UE 3 is connected and through which the UE 3 can access the services offered by the NW network. It is assumed here that the CELL is configured with at least one CF carrier frequency to which the NW network operator has allocated a BW(CF) bandwidth. Thus, the BWP functionality allows the UE 3 to use, in transmission (download or upload), only a portion (BWP) of the BW(CF) bandwidth associated with a certain numerology p, when it is connected to the CELL. The UE 3 is informed of the BWP (and associated numerology) that has been assigned to it by the gNB 2 and that it must use (i.e. activate) at a given time via DCI control information intended for the UE 3 and sent by the gNB 2 in a PDCCH control channel (broadcast on the CELL cell).
[0090] DCI control information carried in PDCCH control channels can take different formats depending on the elements it carries. DCI control information in 0_l format (dedicated to UL) or 1_1 format (dedicated to DL) contains, in addition to the location of the time and frequency resources allocated in UL and / or DL to UE 3, a BWP indicator to be activated by the latter. This indicator uniquely designates a BWP to be activated by UE 3 and the associated numerology to be used. The 0_l and 1_1 formats of DCI control information and the elements they contain, as well as the other DCI control information formats proposed by the 3GPP standard, are described in particular in paragraph 7.3 of 3GPP document TS 38.212 entitled "Technical Specification Group Radio Access Network; NR; Multiplexing and channel coding (Release 17)”, v 17.5.0, March 2023.Thus, the PDCCH channel is a control channel capable of carrying a BWP indicator as defined in the invention.
[0091] As is known per se, the UE 3 is configured to periodically monitor the PDCCH channel with a period of TPDCch in order to detect whether it contains information intended for it, such as DCI information, and more specifically a BWP indicator designating the BWP to which it should switch. The TPDCch period is therefore a parameter representing the frequency at which the UE 3 monitors the PDCCH channel.
[0092] Furthermore, it follows from this configuration that if the gNB 2 has information to transmit to the UE 3, and in particular DCI information and BWP indicators, it sends them in the PDCCH channel in a manner consistent with this TPDCch period so that the UE 3 can detect and decode them. In other words, sending an indicator The transmission of BWP to UE 3 by gNB 2 is not necessarily periodic (some DCI information does not contain a BWP indicator depending on the format of that DCI information), but when DCI information is sent to UE 3 by gNB 2, this transmission is made in the current active BWP of UE 3 at a time coinciding with the TPDCch period with which UE 3 periodically monitors the PDCCH channel.
[0093] The TPDCch period is configured at the UE 3 level by the gNB 2 during the RRC reconfiguration when a connection is established between the UE 3 and the gNB 2. For example, it is assumed here that the TPDCch period is initially set by the network operator to be equal to several slots (or TTI) corresponding to the numerology p=0 (e.g., 5 slots corresponding to TPDCch=5ms). In the embodiment described herein, according to the invention, this TPDCch period is configurable and can change over time, as detailed later.
[0094] It should be noted that the invention can be applied in other contexts or to other architectures than that described here, such as for example in an Open-RAN context (as discussed in more detail later) or in a next-generation network, or even in a proprietary network, provided that the latter implements a BWP functionality allowing a user equipment of the network to use only a part of the bandwidth allocated to the cell to which it is attached to transmit (i.e. send and / or receive) data.
[0095] As is known per se, the NW telecommunications network allows for the provision of a plurality of services to its subscribers, each service being associated with specific constraints, particularly in terms of latency, transmission reliability, etc., defined by an SLA (Service Level Agreement). By way of illustration, the following services are considered here for the NW network: - an S1 service of the eMBB type (e.g. virtual reality, augmented reality, HD video streaming, etc.), requiring high data transmission rates; - an S2 service of the uRLLC type (e.g., autonomous driving or remote management service) requiring low latency (less than one millisecond) and high data transmission reliability; and - an S3 service of type mMTC (e.g., IoT) with a high requirement in terms of deployment density.
[0096] The S2 service is typically identified as having priority due to its latency requirements (below a given threshold, namely 1ms for uRLLC services).
[0097] In the embodiment described here, the NW network implements network slicing. Each SL slice is a logical subnetwork based on the physical infrastructure of the NW network and to which are allocated specific resources (e.g., hardware, software, etc.). The different SL slices of the network are therefore advantageously isolated from each other and have their own resources.
[0098] Each slice here offers a distinct service and is identified by a unique slice identifier, such as, for example, an S-NSSAI identifier (for "Single-Network Slice Selection Assistance Information") defined in the 3GPP standard. Thus, in the example in [Fig. 2], the slice SL(S1) is configured to offer the SI service and identified by the identifier S-NSSAI1, the slice SL(S2) is configured to offer the S2 service and identified by the identifier S-NSSAI2, and the slice SL(S3) is configured to offer the S3 service and identified by the identifier S-NSSAI3. It follows that, according to this configuration, not only does the S-NSSAI associated with a slice SL(Sn), where n is an integer equal to 1, 2, or 3 in the example considered, uniquely identify that slice, but also the Sn service it offers.
[0099] It is assumed here, for illustrative purposes, that UE 3 is simultaneously connected to several slices of the NW network, and more particularly to slices SL(S1) and SL(S2) through which it can access services S1 and S2.
[0100] Of course, these assumptions are not exhaustive, and this example is given only for illustrative purposes. Thus, other services can be offered by the NW network in addition to or as alternatives to the aforementioned services, such as a V2x service (which, depending on the scenario, may require latency of less than a few milliseconds and reliability close to 100% (so-called "Safety-related V2x" scenarios, including autonomous driving, for example), or, alternatively, high bandwidth, higher latency, and low reliability (so-called "Non-Safety-related V2x" scenarios, including high-bandwidth mobile entertainment, for example), an HMTC service (requiring low latency, high availability, and high bandwidth), etc. The NW network can also offer several distinct services within each category.
[0101] Furthermore, the UE 3 can be connected to a different number of slices and / or different services. Indeed, as mentioned previously, in accordance with the 3GPP standard, a UE can be connected to one or more slices (up to 8 simultaneously).
[0102] Finally, it is also possible to consider that the NW network offers a plurality of services with different constraints without implementing network slicing. Each service offered by the NW network is then uniquely identified, for example using a service identifier.
[0103] In the embodiment described herein, the gNB 2 and the UE 3 have the hardware architecture of a computer 4 as illustrated in [Fig. 3]. This hardware architecture includes, in particular, a processor (PROC), random access memory (MEM), read-only memory (ROM), a non-volatile NVM memory, and COM communication means enabling the gNB 2 and the UE 3, in particular, to communicate with each other. The non-volatile NVM memory constitutes a recording medium according to the invention, readable by the PROC processor, on which a program according to the invention is stored.
[0104] This program, denoted PROG2 when the hardware architecture of computer 4 is that of the gNB 2, is stored in the non-volatile NVM memory and comprises instructions defining the main steps of a control method according to the invention as implemented by the gNB 2 (network entity within the meaning of the invention). More specifically, it defines the functional modules of the gNB 2, which rely on and / or control all or part of the PROC, MEM, ROM, NVM, and COM elements of computer 4 mentioned above.
[0105] In the embodiment described here, the PROG2 program defines in particular the following functional modules of the gNB 2 (represented in [Fig.2]), which are activated for each UE of the CELL cell for which the gNB 2 is requested to transmit in UL or DL data associated with that UE (UE 3 in the example considered here): - a 2A determination module, configured to determine over a given period of time, at least one characteristic of the data flow(s) to be transmitted associated with this UE, and more specifically here, for each data flow, the service and / or priority associated with this service, the priority and / or maximum latency supported by this flow, as well as the corresponding volume (i.e. the number of packets to be transmitted carried by this flow); - a scheduling module 2B, configured to decide, based on the flow characteristics determined by module 2A, the time and frequency resources allocated to the transmission of these flows (PRBs allocated to the UE and transmission times of these PRBs) and their scheduling, taking into account, in particular, the service requirements relating to these flows as indicated in the SLAs. It is the scheduling module 2B that decides, in particular, the BWP and associated numerology to be used by the UE for the transmission of these flows; - a 2C adjustment module, configured to adjust, according to all or part of the characteristics of the flows obtained, the frequency at which the UE monitors the PDCCH control channel, referred to here as the PDCCH control channel monitoring frequency; - a 2D notification module, configured to notify the monitoring frequency adjusted by the 2C adjustment module to the EU; and - a 2E sending module, configured to send to the UE, taking into account the adjusted monitoring frequency, information intended for it in the PDCCH control channel, and in particular DCI control information containing BWP indicators that the EU must, where appropriate, successively activate for the transmission of flows associated with it.
[0106] The operation of modules 2A to 2E of the gNB 2 is further detailed later with reference to the steps of the control method according to the invention. It should be noted that the determination module 2A and the scheduling module 2B are optional; the gNB 2 can alternatively obtain the characteristics of the flows associated with a UE (for example, a prediction of such characteristics) from a network function of the NW network known as the data analysis function, also known as the NWDAF (for "NetWork Data Analysis Function") in the context of a 5G network.
[0107] Similarly, the computer program stored in the non-volatile NVM memory, when the hardware architecture of computer 4 is that of UE 3, is denoted PROG3 and includes instructions defining the main steps of a communication method according to the invention as implemented by UE3. More specifically, it defines the functional modules of UE 3, which rely on and / or control all or part of the PROC, MEM, ROM, NVM, and COM elements of computer 4 mentioned above.
[0108] The PROG3 program defines in particular the following functional modules of UE 3 (represented in [Fig.2]): - a 3A receiving module, configured to receive a notification of the adjusted monitoring frequency by the adjustment module of the gNB 2; and - a 3B monitoring module, configured to monitor the PDCCH control channel broadcast by the gNB 2 on the CELL cell, in accordance with the adjusted monitoring frequency notified to the 3A module.
[0109] In the embodiment described here, the PROG 3 program also defines a UE 3 activation module 3C, known per se, and configured to apply the DCI information sent by the gNB 2 in the PDCCH control channel. In particular, the 3C module is configured to activate each BWP indicated, if any, in the DCI information carried by the PDCCH channel, in a manner known per se and not described in detail here. For example, the activation module 3C here proceeds in a manner similar or identical to that defined in the 3GPP TS 38.101-2 document entitled "Technical Specification Group Radio Access Network; NR; User Equipment (UE) radio transmission and reception; Part 2: Range 2 Standalone (Release 18)", v 18.1.0 (03-2023), and also detailed in sections II to IV of the document by X. Lin et al. entitled “A Primer on Bandwidth Parts in 5G New Radio”, April 2020.
[0110] The operation of modules 3A to 3C of UE 3 is further detailed below. rienement en référence les étapes de process de communication selon l'invention.
[0111] As mentioned previously, it is considered here, for illustrative purposes, that UE 3 is simultaneously connected to both slices SL(S1) and SL(2) and can therefore simultaneously access the SI and S2 services offered by these slices. Figure 4 illustrates the main steps of a control method according to the invention as implemented by gNB 2 to efficiently manage UE 3's access to these SI and S2 services using the BWP functionality.
[0112] For the sake of simplicity, we limit ourselves here to UL access to the SI and S2 services by UE 3, in other words, to the outgoing data flows sent by UE 3 as part of its access to each of these services, via the NW network, to a remote entity (also referred to as outgoing data flows or outbound traffic associated with UE 3), regardless of the location of this remote entity (within or outside the NW network). The invention can, however, be applied in a similar or identical manner to incoming data flows, i.e., in DL.
[0113] In this context, the gNB 2 first determines, via its 2A determination module, the characteristics of the outgoing traffic associated with the UE 3 (i.e., data flows intended to be transmitted in UL by the UE), relating to each service to which the UE 3 is connected and authorized to be connected (SI and S2 services for the UE 3 in the example considered here) (step E10). The characteristics of the outgoing traffic are determined here over a defined time period, for example, the duration of a frame (10 ms). Of course, this example is given only for illustrative purposes, and a longer or shorter time period can be considered.
[0114] More specifically here, the estimation module 2A estimates, for each service (or equivalently here, each slice) to which UE 3 is connected or authorized to connect, whether it has priority or not (or equivalently, its priority) and the volume (i.e., the number of data packets) to be transmitted by UE 3 for each QoS stream identified for that service. Each QoS stream can group several service data streams related to UE 3 that have the same QoS requirements. One or more QoS streams (and incidentally, several service data streams) can be issued by UE 3 in UL for the same service (in other words, for the same slice here).
[0115] Each QoS flow is associated, in accordance with the 3GPP standard, with a 5QI value. 5QI values are scalar numbers defined in a standardized or non-standardized way for different flow categories (GBR (Guaranteed Bit Rate) flows, non-BGR (Non-Guaranteed Bit Rate) flows, and Delay Critical GBR flows). Each 5QI value points to a unique QoS profile, comprising a set of values assigned to various QoS parameters to be applied to all service data flows linked to the QoS flow to which that 5QI value is assigned. These QoS parameters Examples include a priority level, a maximum tolerated delay for a data packet (or PDB for "Packet Delay Budget") (latency or jitter), a data packet error rate (or PER for "Packet Error Rate"), a guaranteed throughput, a maximum throughput, etc. Further details on 5QI values are available in the 3GPP TS 23.501 document entitled "Technical Specification Group Services and System Aspects; System Architecture for the 5G System (5GS); Stage 2 (Release 17)", v 17.8.0 (2023-03).
[0116] A 5QI value is therefore used to characterize the QoS parameters that a QoS flow associated with a service must meet, and incidentally, the service data flows linked to that QoS flow. For example, a 5QI value of 1, associated with a priority level of 20, a PDB of 100ms, and a PER of 102, can be used to characterize a GBR flow of a voice conversation service. A 5QI value of 2, associated with a priority level of 40, a PDB of 150ms, and a PER of 103, can be used to characterize a GBR flow of a video conversation service (live streaming); and so on.
[0117] Such a 5QI value is conventionally provided by the gNB 2 to a UE (for example here to the UE 3) when it attaches to the gNB 2, for each service data stream that may be sent by the UE and linked to a QoS stream.
[0118] Of course, other indicators can be considered to characterize the latency requirements of a service data stream associated with a UE (or of a QoS stream to which such a service data stream is linked), such as a QoS class indicator (or QCI), a priority indicator reflecting the latency requirement of the stream, etc.
[0119] In the embodiment described here, the estimation module 2A obtains, at the end of step E10, a matrix of outgoing QoS flows associated with UE 3, denoted FMAT(3). The columns of this matrix represent the services (or slices here) to which UE 3 is connected, while its rows correspond to the different QoS flows relating to each service, each QoS flow being associated with a 5QI value.
[0120] The QoS flow matrix FMAT(3) obtained by the estimation module 2A contains, for each service (or slice) to which the UE 3 is connected, and for each QoS flow relating to this service associated with a value 5QI, the volume of service data flows to be transmitted (i.e. the number of data packets to be transmitted carried in these flows) linked to this QoS flow.
[0121] The QoS flux matrix FMAT(3) has, for example, at the end of step E10, the form shown in Table 2: [Tables 2] FMAT(3) Slice SL(S1) Slice SL(S2) QoS flow DF1, Value 5QI1 nbl 0 QoS flow DF2 Value 5QI2 nb2 0 QoS flow DF3, Value 5QI3 0 nb3 Or : - 5QI1 and 5QI2 denote the 5QI values associated respectively with the DF1 and DF2 QoS flows related to the non-priority SI service (i.e., the QoS flows likely to be exchanged within this service). The 5QI1 and 5QI2 values provide, in particular, the maximum latencies (PDB delays) supported by the DF1 and DF2 QoS flows (and incidentally by the data flows linked to these QoS flows). The DF1 and DF2 QoS flows comprise nbl and nb2 data packets respectively (which can be carried by one or more service data flows); and - 5QI3 designates the 5QI value associated with the DF3 QoS flow related to the priority service S2 (i.e., data that can be exchanged within this service). This 5QI3 value provides, in particular, the maximum latency (PDB delay) supported by the DF3 QoS flow (and incidentally by the service flows linked to this DF3 QoS flow). The DF3 QoS flow comprises nb3 data packets (which can be carried by one or more service data flows).
[0122] Of course, other forms of matrices or other data structures can be considered to collect the flow characteristics determined by the determination module 2A.
[0123] The FMAT(3) flow matrix can be determined by module 2A from information collected from one or more sources.
[0124] For example, for outbound flows, UE 3 can provide module 2A of gNB 2 with the volume (number of packets) it intends to send for each QoS flow associated with each service to which it is connected (and for each service data flow linked to such a QoS flow), as well as the 5QI value associated with each of these flows QoS.
[0125] Module 2A can further exploit information available to gNB 2 to construct the FMAT(3) matrix and obtain all or part of the characteristics of the outbound traffic associated with UE 3. Indeed, gNB 2 knows, for each slice of the NW network, the identifier (S-NSSAI) of that slice, the service(s) it offers, and the UEs connected to the slice. gNB 2 is also able to determine, by querying the NW network's Access and Mobility Function (also known as the AMF network function), the slices authorized for a particular UE following its registration with the NW network. Furthermore, gNB 2 has the SLAs associated with each service provided by the NW network., which allows it to identify the QoS flows related to this service as well as the 5QI values associated with these QoS flows (and incidentally, the priority associated with each QoS flow and the maximum latency supported by it and by each service data flow linked to this QoS flow). .
[0126] Module 2A can therefore use this information, combined with that provided where appropriate by UE 3, to complete the FMAT(3) matrix.
[0127] Alternatively, it can also exploit this information on the services to which UE 3 is connected and the priorities associated with those services, and estimate the outbound flows and the volume of those flows using a M0D(3) prediction model of the traffic associated with UE 3, established for each service offered by the NW network to which UE 3 is authorized to connect (or equivalently here for each slice of the NW network authorized for UE 3). There are no limitations on the nature of the prediction model, which may be based on a reinforcement learning or deep reinforcement learning algorithm, a mathematical model, a heuristic, etc.
[0128] In the illustrative example considered here, where both slices SL(S1) and SL(2) are allowed for UE 3, and only outbound traffic associated with UE 3 is taken into account, such a M0D(3) model comprises two components, a first component MOD(3,S1) corresponding to an UL traffic prediction model established for UE 3 for service SI (or equivalently for slice SL(S1)) and a second component MOD(3,S2) corresponding to an UL traffic prediction model established for UE 3 for service S2 (or equivalently for slice SL(S2)), i.e. MOD(3)=[MOD(3,S1) ; MOD(3,S2)].Such a prediction model M0D(3) can be learned (i.e., built and updated until it converges to a stable model) in a way known per se, from training data collected during a preliminary training phase. This training data corresponds to the aforementioned characteristics (number of flows, associated priority level, volume) determined for the outgoing flows associated with UE 3 during the training phase, each time UE 3 is connected to a service offered by a slice of the NW network. Such an ap- . Prentissage can be supervised or unsupervised.
[0129] The estimation module 2A may alternatively use, for each service to which the UE 3 is connected or allowed to connect, an outbound traffic prediction model associated with a plurality of UEs attached to the gNB 2 and connected or allowed to connect to that service (the plurality of UEs is, for example, a group of UEs connected or allowed to connect to the same slices, or the set of UEs attached to the gNB 2).
[0130] Moreover, as mentioned previously, in the illustrative example considered here, for the sake of simplicity, only outgoing data flows are considered for UE 3, i.e., those emitted by UE 3. Assuming the existence of incoming data flows intended for UE 3, module 2A can obtain the characteristics of these incoming flows, and complete the FMAT(3) matrix established for the incoming flows, from information provided by the remote entity originating the incoming flows and / or from information available to gNB 2, or by using a prediction model for DL traffic, in a similar or identical way to what has just been described for outgoing flows.
[0131] Alternatively, information enabling the determination of the FMAT(3) matrix of outgoing flows associated with UE 3 can be obtained by module 2A from other entities in the NW network having visibility on these flows, such as for example an NWDAF network function as mentioned above.
[0132] Based on the characteristics of the outgoing QoS flows contained in the FMAT(3) matrix, the gNB 2 scheduling module 2B (or scheduler) decides on the scheduling of the data packets carried by these flows (step E20). Different types of schedulers can be considered in the context of the invention, such as a scheduler configured to schedule data flow packets belonging to different slices as described in the paper by M. Raftopoulou et al. entitled "Optimisation of Numerology and Packet Scheduling in 5G Networks: To Slice or not to Slice", IEEE 93rd Vehicular Technology Conference, 2021, or in the paper by X. Zhang et al. entitled "RB Allocation Scheme for eMBB and uRLLC coexistence in 5G and Beyond", Wireless Communications and Mobile Computing, vol. October 11, 2021.These examples are given for illustrative purposes only and are not limiting in themselves; other schedulers may be used in the context of the invention, such as a scheduler based on an algorithm similar to that described in the document by Boutiba et al. cited above, but in which the constraint of using the same BWP and the same numerology for the SI and S2 services is relaxed.
[0133] Thus, the scheduling module 2B assigns a BWP associated with a numerology p (denoted BWP(p)) to each QoS flow relating to the services to which UE 3 is connected (S1 and S2 in the example considered here), based on knowledge of these services and QoS flows, their respective priorities or their respective latency requirements. The choice made by the scheduling module 2B of the BWP(p) bandwidth portion to activate for the transmission of QoS flows relating to a service takes into account the SLA associated with the service and the QoS profiles associated with the QoS flows: the BWP and the numerology p chosen make it possible to comply with the SLA of the service and the QoS profile of the QoS flows.
[0134] In the embodiment described here, the scheduling module 2B is configured to select the same BWP for all QoS flows relating to the same service. For example, a portion of bandwidth BWP2 (extracted from the bandwidth BW(CF) allocated to the cell CELL) associated with a high p2 numerology (e.g., p2=3 or 4 in Table 1), denoted in the sequence BWP2 / p2, is selected for QoS flows relating to the priority service S2 (flow DF3), while a portion of bandwidth BWP1 (extracted from the bandwidth BW(CF) allocated to the cell CELL) associated with a lower pl numerology (e.g., pl=0 or 1 in Table 1), denoted in the sequence BWPl / pl, is selected for the DF1 and DF2 flows relating to the non-priority service SI.
[0135] However, as mentioned previously, consideration may be given to choosing different BWPs to transmit QoS streams relating to the same service if this is relevant with regard to the QoS profiles associated with these QoS streams.
[0136] It should be noted that when selecting the BWP and numerology appropriate for each service to which UE 3 is connected (respectively, for each QoS stream relating to a service to which UE 3 is connected), the scheduling module 2B can be configured to first examine whether the current active BWP at UE 3, and the numerology associated with that current active BWP, can be used to transmit the QoS streams associated with that service (respectively, that QoS stream), in other words, whether they comply with the service SLA (respectively, the QoS profile associated with the QoS stream). If so, that BWP and the associated numerology can be prioritized for the service (respectively, for the QoS stream) in question to avoid a band part change.
[0137] Furthermore, the scheduling module 2B assigns for each QoS flow in the FMAT(3) flow matrix corresponding to non-zero traffic: - a set of PRBs for transmitting data packets from service data streams related to this QoS stream over the BWP assigned to the service to which this QoS stream relates; and - transmission times (TTI) of these PRBs.
[0138] By way of illustration, it is assumed that the scheduling performed by module 2B results in the following resource allocation: the nbl data packets of the QoS stream DF1 are distributed across the TTIs T0(1), Tl(1),..., TX(1) on BWPl(pl), then the nb2 data packets of the QoS stream DF2 are distributed across the TTIs T0(2), Tl(2),..., TX(2) on BWPl(pl), then the nb3 data packets of the DF3 stream are distributed across the TTIs T0(3), Tl(3),..., TX(3) on BWP2(p2). The resources thus allocated by module 2B are reported here in the outbound flow matrix FMAT(3). This outbound flow matrix FMAT(3) therefore represents the upcoming UL activity of UE 3 over the considered time period (one frame here). It should be noted that if there is no UL traffic for UE 3 during this time period, the outbound flow matrix FMAT(3) may be zero.
[0139] It is further assumed that before sending the DF1 stream, the current active BWP used for UL transmissions of UE 3 is the default defined UL BWP denoted BWP0(p0=0).
[0140] The gNB 2 adjustment module 2C then examines whether one or more BWP changes are required with regard to the scheduling performed by the scheduling module 2B to forward the outgoing traffic from UE 3 (test step E30).
[0141] In the embodiment described here, if module 2C determines that no BWP change is required (a "no" response in test step E30), then gNB 2, via its sending module 2E, informs UE 3 of the resources allocated to it for transmitting its outbound traffic (step E40). To this end, the sending module 2E sends DCI control information to UE 3 (for example, in the format 0_l or 0_0 described in the previously cited 3GPP TS 38.212) identifying these resources in the PDCCH channel. This transmission is timed to coincide with the current TPDCch period with which UE 3 periodically monitors the PDCCH channel so that UE 3 is able to detect and decode this DCI information.
[0142] In the illustrative example considered here, the following results from test step E30: - that a change of BWP is required, from the current BWP0(p0) to BWPl(pl), to transmit the data packets of the DF1 stream; - that no change to BWP is required from BWPl(pl) to transmit the DF2 stream data packets; and - that a change of BWP is again required, from BWPl(pl) to BWP2(p2), to transmit the data packets of the DF3 stream.
[0143] In other words, during the E30 test step, the 2C adjustment module detects that two BWP changes are required (yes response to the E30 test step).
[0144] In accordance with the 3GPP standard, each BWP change is notified by the gNB 2 to the UE 3 by sending DCI control information in the format 0_l (for UL transmissions) to the UE 3 on the PDCCH control channel. This DCI control information includes the BWP indicator designating the new band portion to be activated by the UE 3 and the associated numerology for data transmission, replacing the current active band portion and numerology.
[0145] According to the invention, before sending the BWP indicators, the 2C adjustment module examines whether an adjustment of the PDCCH channel monitoring frequency by UE 3 is relevant and, if so, evaluates the magnitude (i.e., sizes) of this adjustment (step E50). It should be noted that such an examination can be carried out even when no BWP change is required from UE 3 and therefore no BWP indicator is sent by gNB 2 for the frame on which the outbound traffic associated with UE 3 was considered.
[0146] In the embodiment described here, during step E50, the adjustment module 2C examines several conditions related on the one hand to the characteristics of the outgoing flows associated with the UE 3 to be transmitted, but also here to one or more performance indicators of the UE 3 and / or the NW network.
[0147] More specifically, the 2C adjustment module first determines whether at least two distinct bandwidth portions are allocated to UE 3 for the transmission of the identified outbound QoS streams (corresponding to non-zero traffic) in the FMAT(3) outbound stream matrix (and therefore for the service data streams associated with these QoS streams), and whether at least one service to which UE 3 is connected and / or at least one outbound QoS stream from the FMAT(3) matrix (and therefore incidentally at least one service data stream associated with this QoS stream) is identified as having priority or being associated with a maximum latency below a given threshold (step E51). This threshold is chosen to reflect a high latency requirement; for example, it is taken here to be 1 ms.
[0148] If this condition is not met (no response in step E51), for example all services to which UE 3 is connected are identified as non-priority or tolerate a maximum latency greater than a given threshold (latency considered low) or all QoS flows identified in the FMAT(3) outbound flow matrix (and therefore incidentally all service data flows related to these QoS flows) are identified as non-priority by gNB 2 (or as not demanding in terms of latency), or the same BWP is assigned to all services to which UE 3 is connected and to all outbound flows from the FMAT(3) flow matrix (and therefore incidentally to all service data flows related to these QoS flows), the 2C adjustment module examines whether the current monitoring frequency of the PDCCH channel by UE 3 can be reduced in order to decrease the power consumed by UE 3.Such a reduction translates into a decrease in the monitoring and decoding processes of the PDCCH channel implemented by UE 3, and therefore in the power consumed by the latter.
[0149] To this end, the 2C adjustment module determines whether the end-to-end network latency for each service to which UE 3 is connected (SI and S2 in the example considered here) reaches or exceeds a limit value Llim defined for that service, which corresponds to the maximum latency tolerated by that service (test step E52). This value The limit is extracted by gNB 2 for each service in its SLA. The end-to-end network latency for each service to which UE 3 is connected can be measured by UE 3 and provided by the latter to gNB 2, or alternatively, estimated by gNB 2.
[0150] If the limit value Llim is reached or exceeded for one of the services (yes answer in test step E52), the current monitoring frequency is maintained as is (i.e., no adjustment) (step E53). Indeed, while reducing the monitoring frequency would certainly reduce the power consumed by UE 3, it would increase the end-to-end latency of the network for that service, which would be detrimental to the quality of service.
[0151] The gNB 2, via its 2E sending module, then informs the UE 3 of the resources allocated to it for the transmission of its outgoing traffic, as described previously in step E40.
[0152] If the limit value Llim is not reached for any of the services to which UE 3 is connected (no response in test step E52), the 2C adjustment module reduces the current monitoring frequency, for example by increasing the TPDCch period with which UE 3 periodically monitors the PDCCH channel by a specified number of slots (step E54). This advantageously saves network resources and reduces the power consumption of UE 3.
[0153] To determine the order in which the monitoring frequency should be reduced, that is, to "size" the reduction to be made to the monitoring frequency (in the example considered above, to evaluate the number of slots to add to the period Tpdcch), the 2C module can proceed by trial and error, iteratively, for example by adding one (or more) slots to the period TPDCch at each iteration as long as the resulting end-to-end network latency for each service is less than the limit value Llim defined for that service. The maximum period allowing the end-to-end latency constraint to be met is denoted TPDCch adj. This period TPDCch adj, adjusted relative to the value TPDCch, represents the adjusted monitoring frequency.
[0154] It should be noted that steps E52 to E54 are optional and are intended to optimize the resources of the NW network and UE 3. Thus, in one embodiment, if the services related to the outbound flows associated with UE 3 do not have different priorities or different quality of service requirements, the PDCCH channel monitoring frequency by UE 3 remains unchanged (no adjustment). Furthermore, the adjustment module 2C can also be configured to implement the steps E52 to E54 described above when, at step E30, module 2C determines that no change to B WP is required by the scheduling proposed by module 2B.
[0155] If the condition examined in step E51 is met (yes in test step E51), the 2C tuning module examines whether an increase in the current monitoring frequency is possible in order to reduce latency due to the BWP change and improve the quality of service for the highest priority or latency-intensive services and / or flows. Such services are, for example, identified as high priority due to their latency requirements (e.g., uRLLC or V2X services) or because they are associated with QoS flows having high 5QI values, above a given threshold (e.g., above 82). Similar considerations apply to QoS flows and service data flows.
[0156] For this purpose, the 2C adjustment module determines whether the power consumed by the UE 3 has reached or exceeded a Plim limit value (test step E55). The power consumed by the UE 3 is a measurement taken by the UE 3, conventionally transmitted to the gNB 2, and available at the gNB 2 level. The Plim limit value represents the maximum power that the UE 3 is authorized to consume; it is known to the gNB 2 and defined by the NW network operator with regard to the limits imposed by the Regulations.
[0157] If the power consumed by the UE 3 has reached or exceeded its Plim limit value (yes answer in test step E55), the current monitoring frequency is maintained as is (no adjustment) (step E56). Indeed, increasing the monitoring frequency would result in an increase in the power consumed by the UE 3, which could be detrimental to the UE 3 user.
[0158] The gNB 2, via its 2E sending module, then informs the UE 3 of the resources allocated to it for the transmission of its outgoing traffic, as described previously in step E40.
[0159] Otherwise (if the answer to test step E55 is no), the 2C adjustment module increases the current monitoring frequency of the PDCCH control channel by UE 3, for example by reducing the TPDCch period by a specified number of slots (step E57). To evaluate the increase to be made to the current monitoring frequency (in other words, in the example considered here, the number of slots to subtract from the Tpdcch period), the 2C module can proceed iteratively by trial and error, for example by reducing the TPDCch period by one slot at each iteration as long as the power consumed by UE 3 remains below its Plim value. The minimum period required to meet the power consumption constraint of UE 3 is denoted TPDCch adj. This TPDCch adj period, adjusted relative to the TPDCch value, represents the adjusted monitoring frequency.
[0160] Other ways of determining whether an adjustment to the current monitoring frequency is relevant and, if so, of evaluating this adjustment, can be implemented by the adjustment module 2C during step E50, taking into account The characteristics of the flows associated with EU 3 collected in the FMAT(3) matrix, and where applicable, other factors such as performance indicators of EU 3 and / or the NW network. For example, the 2C adjustment module can use artificial intelligence (AI) or a machine learning (ML) algorithm, or a heuristic or game theory-based algorithm to which the flow characteristics and where applicable the performance indicators are provided as input parameters.
[0161] Furthermore, other quantities representative of the monitoring frequency can be envisaged than the period with which EU 3 monitors the PDCCH channel, such as for example the inverse of this period (frequency).
[0162] If, during step E50, an adjustment to the PDCCH channel monitoring frequency by UE 3 was decided (steps E54 and E57), then the adjusted monitoring frequency is notified to UE 3 by gNB 2 via its 2D notification module (step E60). For this purpose, the 2D notification module uses, for example, an RRC message to reconfigure UE 3 with the adjusted monitoring frequency, so that it implements it to monitor the PDCCH channel (i.e., so that it becomes the current monitoring frequency applied by UE 3). More specifically, this RRC message is used by the gNB 2 to modify the value of the monitoring-SlotPeriodicityAndOffset field which defines the periodicity with which the UE 3 must scan a determined frequency band (defined by the CORESET) to detect the PDCCH channel which carries the information (including DCI control information) intended for it.In other words, the monitoringSlotPeriodicityAndOffset field defines the value of the TPDCch period. Modifying the field with the value TPDCch adj informs UE 3 of the new monitoring frequency to apply.
[0163] It should be noted that reducing (decreasing) the monitoring frequency of UE 3 affects the frequency at which gNB 2 can send information to UE 3 in the PDCCH control channel, and in particular DCI control information carrying a BWP indicator. Indeed, gNB 2 must take this reduction into account when sending DCI information over the PDCCH control channel to UE 3, so that UE 3 can detect and decode this information. Depending on the adjustment made by module 2C, UE 3 will only be able to detect and decode this information at longer intervals compared to its initial configuration (if the monitoring frequency has been reduced) or, conversely, at shorter intervals (if the monitoring frequency has been increased).Thus, following the E60 RRC reconfiguration step of UE 3 with the adjusted monitoring frequency, the gNB 2 is configured to send DCI information in the PDCCH channel accordingly. of this adjusted monitoring frequency (step E70).
[0164] Advantageously, if a BWP change is required (for example, for the transmission of data packets from streams DF1 and DF2) and the monitoring frequency has been increased, gNB 2 can more quickly inform UE 3 of the new BWP to be activated by UE 3, by sending DCI control information in 0_l format on the PDCCH control channel. The DCI information also contains the resources allocated to UE 3 by the scheduling module 2B for the transmission of UE 3's outbound traffic. Any subsequent BWP change (for example, for the transmission of data packets from stream DF3) is reported to UE 3 in the same way (in the example considered, with the resources allocated to UE 3 on this new BWP for the transmission of data packets from stream DF3).
[0165] Steps E10 to E70 of the control process just described are repeated by gNB 2 several times (step E80), periodically in the embodiment described here, for example, with each new frame (i.e., every 10 ms here), as long as UE 3 is connected to gNB 2. Of course, a different period can be considered. Furthermore, in another embodiment, steps E10 to E60 can be triggered upon detection of a particular event, for example, the connection of UE 3 to a new slice or a new service, or any other event likely to modify the characteristics of the FMAT(3) stream matrix of UE 3.
[0166] Figure 5 describes the communication process steps implemented by the UE 3 in a particular embodiment, where the monitoring frequency of the UE 3's PDCCH control channel has been adapted by the gNB 2 (steps E54 and E57 of Figure 4). It should be noted that if the monitoring frequency has not been adapted, the UE 3 operates conventionally, as described in the prior art and as provided for in the 3GPP standard.
[0167] As described previously, the adjusted monitoring frequency is notified to the UE 3 by the gNB 2 via its 2D notification module at step E60 by means of an RRC message containing here the TPDCch adj period. This RRC message is received by the 3A acquisition module of the UE 3 (step F10).
[0168] Following the reception of the RRC message, the UE 3 and more particularly here its monitoring module 3B, is reconfigured with the value of the period TPDCch adj representative of the adjusted monitoring frequency to monitor the PDDCH channel (step F20).
[0169] Following this reconfiguration, the monitoring module 3B monitors the PDCCH channel at the adjusted monitoring frequency (step F30). In other words, every TPDCch adj, it scans the PDCCH channel to detect whether information intended for it, and in particular DCI control information, is being transmitted to it in the PDCCH channel by gNB 2. If so, it decodes this information and uses or executes it according to the nature of the information.
[0170] For example, following the sending by gNB 2 at step E70 of DCI control information including the resources allocated to the UE for the transmission of the DF1 and DF2 streams and the BWP indicator designating BWPl(pl), the UE 3 activates via its 3C activation module the BWPl(pl) and switches to this BWPl(pl) to transmit the DF1 and DF2 data streams in accordance with the resources allocated to it and within the maximum time allowed by the 3GPP standard indicated in paragraph 8.6 of the 3GPP TS 38.133 document entitled "Technical Specification Group Radio Access Network; NR; Requirements for support of radio resource management (Release 17)," v 17.8.0 (2022-12) (step F40).
[0171] Figures 6 and 7 illustrate, using a simple example, the gains provided by the invention.
[0172] In this example, we consider the transmission for a UE of a data stream Fl relating to a service offered by the slice SL(1) on a part of the BWP1 band and of a data stream F2 relating to a service offered by a slice SL(2) on a part of the BWP2 band, the service offered by the slice SL(2) being more priority (e.g. uRLLC) than the service offered by the slice SL(1) (e.g. eMBB).
[0173] Figure 6 represents, in the absence of implementation of the invention, the timing of the DCI information sent to the UE for the transmission of the Fl streams on BWP1 and F2 on BWP2, and how this DCI information is used by UE 3. In Figure 6, the TPDCch period of monitoring the PDCCH channel by UE 3 is fixed, and taken as equal to 5 slots or TTI.
[0174] In this context, some packets from the Fl and F2 streams (marked with a cross in [Fig. 6]) cannot comply with the scheduling (PRB, TTI, and BWP) intended to guarantee the SLA of the services offered by slices SL(1) and SL(2), resulting in degraded quality of service for the services offered by both slices. Indeed, dl represents the time remaining after transmission of packets from the Fl stream on BWP1 until the next PDCCH control channel containing DCI information enabling the switchover from BWP1 to BWP2; consequently, data packets from the F2 stream scheduled to be transmitted before the expiration of dl cannot be transmitted on BWP2. The same applies following the switchover to BWP2 for the transmission of data packets relating to the Fl stream scheduled according to the schedule to be transmitted before the expiration of d2, d2 designating the waiting time to switch from BWP1 to BWP2.
[0175] Figure 7 shows the timing of the DCI information sent to UE 3 for the transmission of the F1 and F2 streams, and how this DCI information is used by UE 3 when the invention is implemented. In Figure 7, the TPDCch period, initially set at 5 slots, is adjusted to 2 slots (TPDCch adj(i)X), then to 3 slots (TPDCch adj®), and then again to 2 slots (TPDCch adj(3)). In this context, all the stream packets Fl and F2 can be transmitted in accordance with the scheduling and the quality of services offered by the SL(1) and SL(2) slices is guaranteed.
[0176] In the embodiment described here, for the sake of simplicity, only outgoing data flows, i.e., UL, have been considered. However, the invention also applies to incoming data flows sent to the UE (i.e., DL), and it would not pose any difficulty for a person skilled in the art to adapt the description just given to the transmission of incoming data flows, by applying in a similar or identical manner what has just been described for UL data flows to DL data flows.
[0177] The invention also applies when the traffic associated with the user equipment includes inbound (DL) and outbound (UL) data streams, regardless of the multiplexing technique used between UL and DL (TDD or FDD). The invention is applied individually (independently) to each channel. However, it should be noted that since the PDCCH channel may carry DCI control information relevant to both UL and DL transmissions, if applying the invention in UL and applying it in DL results in different adjustments to the monitoring frequency, then the higher of the two adjusted monitoring frequencies is selected for application by the user equipment.
[0178] Furthermore, in the embodiment just described, the 5G NR network entity according to the invention and configured to implement the control method according to the invention is a gNB-type base station. The invention also applies to other network architectures, and in particular to an Open-RAN architecture as defined by the O-RAN Alliance.
[0179] As is well known, Open-RAN, or open radio access network, offers an evolution of mobile network architectures based on a fully programmable radio access network (RAN) made up of virtualized and disaggregated functions. Typically, as illustrated in [Fig. 8], for a 5G NR RAN, the base station or gNB is disaggregated into multiple radio units (O-RUs, for "Open Radio Unit"), distributed (O-DU, for "Open Distributed Unit") and centralized (O-CU, for "Open Centralized Unit"). The interfaces between these units (e.g., A1, E1, E2, etc.) are open and interoperable. Each unit is responsible for a specific function and protocol layer. For example, the O-RU is responsible for the lower physical layer (processing such as FFT, beamforming, etc.).), while the O-DU unit is responsible for scheduling, the upper physical layer and layer 2 including the MAC protocol (for "Medium Access Control").
[0180] In this architecture, the RAN functions are controlled and optimized by means of of an intelligent software controller or RIC (for "RAN Intelligent Controller"). The RIC is represented in two logical forms, each performing a different function: - a Non-RT RIC (for "Non-Real Time RIC"), which handles, among other things, the management of configurations, devices, faults, performance, and the lifecycles of all network elements, using intelligent algorithms (e.g., AI or ML) operating on a timescale greater than 1 second; and - a Near-RT-RIC (for "Near-Real Time RIC"), which hosts a large number of microservices or xApps, relying on algorithms operating on a timescale between 10ms and 1s. The UE's control of the PDCCH channel monitoring frequency according to the invention falls into this category of algorithms and can thus, in another embodiment, be implemented by an xApp 5 hosted by the Near-RT-RIC. The xApp 5 is a (software) entity of the network according to the invention, comprising functional modules 5A to 5E similar or identical to the functional modules 2A to 2E of the gNB 2, described previously. They are not described in further detail here.
[0181] Steps E10 to E70 described above are implemented by the xApp 5, in this other embodiment, in a similar or identical manner to that described above for the gNB 2, but involve communication interfaces specific to the Open-RAN architecture. The same applies to steps F10 to F30 implemented by the UE 3.
[0182] Thus, in this other embodiment, the information from UE 3 and AMF used by xApp 5 and possibly other entities in the NW network to construct the FMAT(3) flow matrix as described in step E10, is obtained by xApp 5 via an interface E2. It is also via this interface that the adjusted monitoring frequency, if applicable, is provided by xApp 5 to UE 3.
[0183] If the use of a traffic prediction model for UE 3 is envisaged for obtaining the FMAT(3) flow matrix, the learning phase and the determination of the FMAT(3) flow matrix using this prediction model are implemented at the Non-RT RIC level, which manages the AI or ML algorithms. The resulting FMAT(3) flow matrix is then transmitted to the xApp 5 hosted in the Near-RT RIC via the El interface, which makes the appropriate decisions, according to the invention, regarding the adjustment of the fPDccH monitoring frequency of the PDCCH channel by UE 3.
[0184] In yet another embodiment, the network entity according to the invention is hosted at the Non-RT RIC level. The same interfaces as those that come those described previously are then used.
Claims
Claims
1. Method for controlling, by an entity (2, 5) of a telecommunications network, a so-called monitoring frequency at which a user equipment (3) monitors a control channel capable of conveying at least one indicator of part of bandwidth allocated to said user equipment, said control method comprising: - a step (E54, E57) of adjusting, as a function of at least one characteristic of at least one data stream to be transmitted associated with said user equipment and relating to at least one service offered by the network, said monitoring frequency - a step (E60) of notifying said user equipment of said adjusted monitoring frequency; and - a step (E70) of sending information intended for the user equipment on said control channel as a function of said adjusted monitoring frequency.
2. A control method according to claim 1 wherein the steps of adjusting the monitoring, notification and sending frequency are repeated periodically.
3. Control method according to claim 1 or 2 wherein said information intended for the user equipment comprises at least one indicator of part of bandwidth allocated to the user equipment to be activated for the transmission of said at least one data stream.
4. Control method according to any one of claims 1 to 3 wherein during the adjustment step (E54, E57), said monitoring frequency is further adjusted as a function of at least one performance indicator of said user equipment and / or of the network.
5. Control method according to claim 4 wherein said at least one performance indicator comprises: - a power consumed by said user equipment; and / or - an end-to-end throughput or latency of the network.
6. A control method according to any one of claims 1 to 5. wherein the adjustment step comprises an increase (E54) of the monitoring frequency when at least two distinct band parts are allocated to said user equipment for a transmission of said at least one data stream and when at least one said service and / or at least one said data stream is identified as a priority or associated with a maximum latency lower than a given threshold.
7. Control method according to any one of claims 1 to 6 wherein the adjustment step comprises a reduction (E57) of the monitoring frequency when a condition is verified among: - the same part of band is allocated to said user equipment for a transmission of said at least one data stream - said at least one service comprises only one or more services identified as non-priority or associated with a maximum latency greater than a given threshold; - said at least one stream comprises only one or more streams identified as non-priority or associated with a maximum latency greater than a given threshold.
8. Control method according to any one of claims 1 to 7 wherein said at least one characteristic comprises for a said data flow associated with a said service: - a volume of said data flow; and / or - information relating to an ordering of the data packets carried by said data flow and to a portion of bandwidth allocated to said service for a transmission of said data packets; and / or - a priority associated with said service; and / or - a priority associated with said data flow and / or a maximum latency associated with said data flow; and / or - a slice of the network associated with said service.
9. Control method according to any one of claims 1 to 8 wherein said at least one service comprises at least one service from: - an “ultra Reliable Low Latency Communication” service, uRLLC; - an “enhanced Mobile BroadBand” service, eMBB; - a “massive Machine Type Communication” service, mMTC; - a “Vehicled to Everything”, V2X service; - a “High performance Mobile Type Communication” service, HMTC.
10. Control method according to any one of claims 1 to 9 further comprising a step of estimating (E10) said at least one characteristic of said at least one data stream to be transmitted associated with said user equipment from at least one element among: - at least one identifier of at least one network slice to which said user equipment is attached or authorized for said user equipment, and / or at least one service to which said user equipment is connected or authorized to connect; and - at least one information provided by said user equipment.
11. Control method according to any one of claims 1 to 10 further comprising a step of learning a traffic prediction model for said user equipment, this prediction model being used by said network entity to determine said at least one characteristic of said at least one flow to be transmitted associated with said user equipment.
12. Method of communication by user equipment (3) of a telecommunications network, said method comprising: - a step of receiving (F10) a notification of a so-called monitoring frequency at which said user equipment monitors a control channel, adjusted by a network entity in accordance with a step of adjusting a control method according to any one of claims 1 to 11, said control channel being capable of conveying at least an indicator of part of bandwidth allocated to said user equipment; and - a step of monitoring (F30) said control channel in accordance with said adjusted monitoring frequency.
13. Communication method according to claim 12 further comprising during said monitoring step (F30), a detection in said control channel of at least one indicator of part of band assigned to the user equipment to be activated.
14. Communication method according to claim 12 or 13 wherein said notification is an RRC, Radio Resource Control, configuration message sent by the network entity and comprising a value of a period with which to repeat the monitoring of the control channel.
15. Entity (2, 5) of a telecommunications network comprising: - an adjustment module (2C, 5C), configured to adjust, as a function of at least one characteristic of at least one data stream to be transmitted associated with a user equipment and relating to at least one service offered by said network, a monitoring frequency of a control channel capable of conveying at least one indicator of part of bandwidth allocated to said user equipment; - a notification module (2D, 5D), configured to notify said adjusted monitoring frequency to said user equipment; and - a sending module (2E, 5E), configured to send information intended for the user equipment on said control channel as a function of said adjusted monitoring frequency.
16. User equipment (3) of a telecommunications network comprising: - a reception module (3A), configured to receive a notification of a so-called monitoring frequency at which said user equipment monitors a control channel, adjusted by an adjustment module of a network entity according to the re- claim 15, said control channel being capable of conveying at least one indicator of part of bandwidth allocated to said user equipment; and - a monitoring module (3B), configured to monitor said control channel in accordance with said adjusted monitoring frequency.
17. Communication system (1) comprising: - at least one entity (2, 5) of a telecommunications network according to claim 15; and - at least one user equipment (3) according to claim 16, attached to said at least one entity.
Citation Information
Patent Citations
Multiple active bandwidth parts
US10880949B2
Techniques and apparatuses for bandwidth part wake-up signaling
US20190090299A1
Method and apparatus for reducing user equipment power consumption in wireless communication system
WO2020013623A1
