Alternative power supply fluid meter

The fluid meter uses a thermoelectric generator and capacitor system to optimize power supply, addressing bulk and cost issues of traditional batteries, ensuring continuous operation and extended battery life.

FR3148085A1Inactive Publication Date: 2024-10-25SAGEMCOM ENERGY & TELECOM SAS
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
FR2023004059
Authority / Receiving Office
FR · FR
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-04-21
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing fluid meters require a long-lasting power supply due to remote locations, and solutions like rechargeable batteries or large non-rechargeable batteries are bulky, costly, and prone to performance degradation from intermittent fluid circulation.

Method used

A fluid meter with a power supply system that includes a thermoelectric generator producing electricity from the temperature difference between the exterior and fluid in the pipe, combined with a battery and a capacitor, managed by a control block to optimize energy use.

Benefits of technology

Provides a compact, reliable, and cost-effective power solution that ensures continuous operation with reduced battery stress, extending battery lifespan and reducing bulk, while maintaining meter functionality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 00000000_0000_ABST
    Figure 00000000_0000_ABST
Patent Text Reader

Abstract

This fluid meter, configured to perform metrological measurements in a fluid circulation pipeline and to communicate information relating to said metrological data, comprises: - a pipeline (2), - at least one metrological sensor (4), - a control unit (6), - a power supply unit (10) configured to power the control unit, the power supply unit comprising a first power supply channel (11) comprising at least one battery (12), and a second power supply channel (21), and further comprising a first switch (S1) configured to selectively couple the first power supply channel (11) or the second power supply channel (21) to the control unit, the fluid meter comprising a thermoelectric generator (30) configured to produce electricity from a temperature difference between an exterior of the pipeline and the fluid in the pipeline,the second power supply line (21) being connected to the thermoelectric generator (30). Figure for the abbreviation: Fig.1,
Need to check novelty before this filing date? Find Prior Art

Description

Title of the invention: Alternating current powered fluid meter technical field

[0001] The invention relates to the technical field of fluid meters. A fluid meter is a metrological device configured to perform metrological measurements in a fluid circulation pipeline. The fluid can be liquid, such as water or oil, or gaseous, such as a gaseous mixture of hydrocarbons consisting mainly of methane, such as natural gas. The metrological measurements are generally a volume or flow rate relative to the fluid circulating in the pipeline. STATE OF THE ART

[0002] In order to obtain certain metrological data concerning the flow of a fluid in a pipeline, a fluid meter is typically used to generate and make available metrological measurements. To record these metrological measurements, fluid meters equipped with means for communicating information relating to said metrological data have been developed. These communication means can be adapted for remote communication, and for example, allow for wired or wireless transmission of this information. The communication means can also display various information in a menu-based display. In all cases, these metrological meters require a power supply.However, meters may be located in places that do not allow easy connection to the electrical grid, so they must have their own independent power supply, not connected to the electrical grid.

[0003] The simplest way to autonomously power a fluid meter is to equip it with a battery, that is, a non-rechargeable in-situ energy storage element. However, the energy storage capacity must be sufficient to provide power for a long period (typically 20 years), which necessitates the use of very large batteries. Furthermore, the battery's lifespan depends on the meter's power consumption, which can significantly reduce its lifespan. In any case, the battery eventually runs out and must be replaced, a tedious operation requiring monitoring of the battery's condition.

[0004] In order to overcome these drawbacks, it has been proposed to replace the electric cell with a rechargeable battery, for example powered by an electric generator configured to be driven by the flow of fluid in the pipeline and generate electricity recharging the battery.

[0005] However, the potentially intermittent nature of the fluid circulation necessitates a battery with a large electrical storage capacity, resulting in a large size and high cost. Furthermore, the irregularity of the fluid circulation episodes can lead to numerous incomplete charge-discharge cycles of the battery, reducing its performance over time. Description of the invention

[0006] The invention therefore aims to provide a fluid meter equipped with a power supply with a long lifespan, less bulky and more reliable.

[0007] The invention relates to a fluid meter configured to perform metrological measurements in a fluid circulation pipeline and to communicate information relating to said metrological data, comprising:

[0008] - a fluid pipeline,

[0009] - at least one metrological sensor configured to perform metrological measurements logics in fluid piping,

[0010] - a control block configured to receive metrological measurements and to to communicate information relating to said metrological data,

[0011] - a power supply configured to supply power to the control unit, the power supply unit comprising a first power supply channel including at least one battery, and a second power supply channel, the power supply unit further comprising a first switch configured to selectively couple the first power supply channel or the second power supply channel to the control unit.

[0012] The fluid meter includes a thermoelectric generator configured to produce electricity from a temperature difference between an exterior of the pipeline and the fluid in the pipeline, the second supply path being connected to the thermoelectric generator.

[0013] This device is advantageously complemented by the following features taken alone or according to all their technically possible combinations: - the thermoelectric generator comprises one or more thermoelectric modules partially inserted into a wall of the pipe; - an outgrowth is formed on the fluid circulation pipe, the outgrowth comprising at least one cavity, each cavity being configured to receive a thermoelectric module; - the pipe wall has a first thickness excluding the protrusion, each cavity comprising a protective part and a receiving part, the receiving part being of a smaller diameter than the protective part and being formed in the pipe wall at a distance from the inside of the pipe less than the first thickness, each thermoelectric module comprising a first portion configured to be at the temperature of the outside of the pipe and a second portion configured to be at the temperature of the fluid, the second portion being inserted into the receiving part; the thermoelectric generator includes a first external connector in contact with the first portion of a first thermoelectric module arranged at the input of the thermoelectric generator and connecting said first portion to the power supply, the thermoelectric generator further includes a second external connector in contact with the second portion of a last thermoelectric module arranged at the output of the thermoelectric generator and connecting said second portion to the power supply; a second portion of a thermoelectric module is connected by an internal connector to the first portion of another thermoelectric module; each thermoelectric module is composed of a first thermoelectric material having a first Seebeck coefficient, and a connector in contact with the first or second portion of the thermoelectric module is composed of a second thermoelectric material having a second Seebeck coefficient different from the first Seebeck coefficient; the second supply path includes a capacitor and a second switch configured to selectively couple the capacitor and the thermoelectric generator according to a charge level of the capacitor; The charge level is determined by the control block based on a first lookup table and the temperature difference when the capacitor is charging, and based on a second lookup table and functions implemented by the control block when the capacitor is discharging; The control unit is configured to, at least when the thermoelectric generator is generating electricity: position the first switch on the second power supply channel when the load level becomes higher than a high threshold; position the first switch on the first power supply channel when the capacitor charge level falls below a low threshold; the high threshold is greater than or equal to 80% of a maximum charge level, and the low threshold is less than or equal to 10% of the maximum charge level; The control unit is configured to determine a temperature difference between the outside of the pipe and the fluid, and to: • open the second switch when the temperature difference is less than a minimum temperature difference threshold; • close the second switch when the temperature difference is greater than or equal to a minimum temperature difference threshold; - the minimum temperature difference threshold is between 2°C and 5°C.

[0014] The invention also relates to a method for managing the power supply of a fluid meter as defined above, the fluid meter comprising a control unit and a power supply unit configured to supply energy to the control unit, the power supply unit comprising a first power supply channel comprising at least one battery, and a second power supply channel, the power supply unit further comprising a first switch configured to selectively couple the first power supply channel or the second power supply channel to the control unit, the second power supply channel being connected to a thermoelectric generator configured to produce electricity from a temperature difference between an outside of the pipe and the fluid in the pipe,the second power supply path further comprising a capacitor and a second switch configured to selectively couple the capacitor and the thermoelectric generator according to a charge level of the capacitor, the method being suitable for implementation by the control block and comprising the following steps: ,

[0015] - Switching the first switch to the first power supply channel,

[0016] - Determination of a temperature difference between an outside of the pipe and the fluid, and when the determined temperature difference becomes greater than or equal to a minimum threshold, the second switch closes.

[0017] - Estimation of a charging current from the temperature difference and a first lookup table providing an estimate of the associated charging current for each value of the temperature difference,

[0018] - Determination of a charge level of the charging capacitor from the current of estimated load and, when the estimated load level becomes greater than or equal to a predetermined high threshold, switching of the first switch to the second power supply channel,

[0019] - Estimation of a discharge current performed from implemented functions by the control block and a second lookup table providing, for each function implemented by the control block, an estimate of the associated discharge current,

[0020] - Determination of a charge level of the discharging capacitor as a function of the estimation of the discharge current and, when the estimated charge level becomes less than or equal to a predetermined low charge threshold, repetition of the previous steps previous.

[0021] The invention also relates to a computer program product capable of being implemented by a control block of a fluid meter as defined above, comprising instructions which, when the program is executed by the control block, cause the control block to implement the process as defined above.

[0022] Finally, the invention also relates to a computer-readable memory storing instructions executable by the computer for the execution of the steps of the process as defined above. DESCRIPTION OF THE FIGURES

[0023] Other features, objectives and advantages of the invention will become apparent from the following description, which is purely illustrative and not limiting, and which should be read in conjunction with the accompanying drawings on which:

[0024] - Fig. 1 is a schematic overview of a fluid meter according to a possible embodiment of the invention;

[0025] - [Fig.2] is a top view of a first embodiment of the outgrowth and cavities in the fluid meter piping;

[0026] - [Fig. 3] is a top view of a second embodiment of the protrusion and cavities of the fluid meter pipe; and

[0027] - [Fig. 4] is an implementation diagram of a fluid meter according to a possible embodiment of the invention.

[0028] Throughout all the figures, similar elements bear identical reference numerals DETAILED DESCRIPTION OF THE INVENTION

[0029] Figure 1 shows a fluid meter configured to perform metrological measurements of a fluid flowing in a fluid circulation pipe 2 defined by a wall 3 separating an interior of the pipe 2, in which the fluid flows, from an exterior of the pipe 2. The fluid meter is also configured to communicate information relating to said metrological data. Typically, the fluid circulation pipe 2 is part of the fluid meter in the sense that the fluid meter includes a portion of pipe in which the fluid flows, which is integrated into the fluid circulation network. To perform metrological measurements, the fluid meter includes at least one metrological sensor 4 configured to perform metrological measurements in the fluid pipe 2. The metrological sensor 4 is preferably located in the fluid pipe 2.The type of metrological sensor 4 depends on the technology used to perform the measurements, which can be ultrasonic, electromagnetic, thermal, or Coriolis effect technology. In the illustrated example, two transducers are used. Ultrasonic sensors are positioned opposite each other in the pipeline to perform ultrasonic metrological measurements in a known manner. The metrological measurements are generally a volume or flow rate relative to the fluid flowing in the pipeline 2, derived from the data collected by the metrological sensor(s) 4.

[0030] The fluid meter includes a control block 6 comprising at least one processor and one memory, configured to receive metrological measurements from the metrological sensor 4 and to communicate information relating to said metrological data. Typically, the metrological sensor 4 can be connected to the control block 6, for example by a wired connection, and transmits the metrological measurements to the control block 6.

[0031] The communication of information relating to metrological data is carried out by display on a screen and / or by transmission. The fluid meter may thus have a display screen 7 on which the information relating to metrological data can be displayed. The fluid meter may be equipped with a human-machine interface such as a button for triggering the display of this information relating to metrological data, and possibly for varying this display, for example by allowing different types of data to be scrolled through on the display screen 7. The information relating to metrological data may be transmitted outside the fluid meter, preferably by a wireless link, in which case the fluid meter may include an antenna and any other known element enabling remote communication with the fluid meter.

[0032] Preferably, the fluid meter complies with European Union Directive 2014 / 32 / EU on measuring instruments, better known by its English acronym MID for "Measuring Instruments Directive". In particular, the fluid meter must be able to continuously transmit information relating to metrological data. Similarly, the fluid meter must be able to perform metrological measurements at any time. Therefore, the fluid meter must have a continuous power supply.

[0033] For this purpose, the fluid meter includes a power supply 10 configured to continuously supply electricity to the control unit 6, and a thermoelectric generator 30 configured to produce electricity from the temperatures of the fluid and the outside of the pipe 2, the power supply 10 being coupled to the thermoelectric generator 30. The thermoelectric generator 30 is configured to produce electricity by means of the Seebeck effect, which is a thermoelectric effect, by which a potential difference appears at the junction of two materials subjected to a temperature difference.

[0034] The power supply 10 comprises two separate and independent paths: a first power supply path 11 comprising at least one battery 12 and a second power supply path 21 connected to the thermoelectric generator 30. A battery (or "primary cell" in English) is understood to be an electrical energy storage element that cannot be recharged, or whose configuration in the power supply 10 makes charging within this power supply 10 impossible. Typically, the first power supply path 11 comprises only the battery 12. The battery 12 preferably has a maximum energy reserve of less than 100 Wh, such as 30.6 Wh (8.5 Ah at 3.6 V) or 68.4 Wh (19 Ah at 3.6 V).

[0035] The power supply block 10 includes a first switch SI configured to selectively couple the first power supply channel 11 or the second power supply channel 21 to the control block 6, thus selecting whether the control block 6 is electrically powered by the first power supply channel 11 or the second power supply channel 21.

[0036] The second power supply 21 further includes a capacitor Cl and a second switch S2 configured to selectively couple or decouple the capacitor Cl from the thermoelectric generator 30. The capacitor Cl preferably has a maximum energy reserve Emax greater than or equal to 0.5 Wh, and preferably greater than or equal to 0.8 Wh. For example, the capacitor Cl can deliver an electrical charge of 0.222 Ah at 3.6 V. The capacitor Cl is preferably a supercapacitor. Typically, the capacitor Cl can be a hybrid layer supercapacitor, or HLC, but can also be any type of supercapacitor capable of providing a maximum energy reserve Emax greater than or equal to 0.5 Wh. Preferably, the maximum energy Emax of the capacitor Cl is at least 20 times less than the maximum energy of the battery 12.

[0037] The second switch S2 is located between the capacitor Cl and the thermoelectric generator 30. The second switch S2 is controlled by the control block 6 for its opening and closing. The second switch S2 is preferably a relay, for example an electromechanical relay.

[0038] The second power supply 21 may include, in series between the thermoelectric generator 30 and the second switch S2, various current shaping elements, and for example a rectifier 22 in series with a voltage regulator 24. In the illustrated example, a first terminal of the capacitor Cl is connected between the first switch S1 and the second switch S2, and a second terminal of the capacitor Cl is connected to a reference potential (example: ground).

[0039] The control block 6 is configured to determine a temperature difference AT between the outside of the pipe 2, whose temperature is denoted Tamb and The fluid, whose temperature is denoted Tfluid (AT = Tamb - Tfluid). More precisely, the control block 6 determines the temperature difference AT from temperature measurements taken by a first temperature sensor T1 configured to measure the temperature T1 outside the pipe 2, typically the ambient air, and by a second temperature sensor T2 configured to measure the temperature Tfluid of the fluid. The first and second temperature sensors T1 and T2 are connected to the control block 6 to transmit their respective measurements. The temperature sensors T1 and T2 are, for example, thermocouples. The second sensor T2 is, for example, embedded in the wall of the pipe 2 and / or may be in contact with the fluid.

[0040] The thermoelectric generator 30 comprises one or more thermoelectric modules 13, preferably identical and connected together in series. In other words, the thermoelectric modules 13 form a chain of thermoelectric modules extending from a first thermoelectric module 14 to a last thermoelectric module 15.

[0041] In the case where the thermoelectric generator 30 comprises only one thermoelectric module 13, this module 13 is both the first module 14 and the last module 15 of the thermoelectric chain.

[0042] Each thermoelectric module 13, 14, 15 comprises a first portion 16 configured to be located outside the pipe 2 and a second portion 17 configured to be located at and near the fluid. More specifically, the first portion 16, and the second portion 17 respectively, are configured to be at the temperature Tamb of the outside of the pipe 2, and at the temperature Tfluide of the fluid, respectively. In one embodiment, the first portion 16 comprises a first end of the module 13, 14, 15, and / or the second portion 17 comprises a second end of the module 13, 14, 15. Preferably, the thermoelectric modules 13, 14, 15 are cylindrical, and for example tubular with a constant diameter, to facilitate their installation.

[0043] The thermoelectric generator 30 further includes a first external connector 18a in contact with the first portion 16 of the first thermoelectric module 14 and connecting said first portion 16 of the first thermoelectric module 14 to the power supply 10.

[0044] The thermoelectric generator 30 also includes a second external connector 18b in contact with the second portion 17 of the last thermoelectric module 15 and connecting this second portion 17 of the last thermoelectric module 15 to the power supply 10. Typically, the first external connector 18a and the second external connector 18b are wires fixed, for example by soldering, to a thermoelectric module 14, 15.

[0045] More specifically, in one embodiment, the first and second external connectors 18a, 18b respectively connect the first portion 16 of the first module 14 and the second portion 17 of the last module 15 to the rectifier 22.

[0046] In one embodiment, the external connectors 18a, 18b are connected to the power supply 10 via intermediate electrical connections. Alternatively, the external connectors 18a, 18b extend to the power supply 10.

[0047] In addition, the second portions 17 of each thermoelectric module 13, 14 except the last module 15, are connected by an internal connector 18c to the first portion 16 of another thermoelectric module 13, 15. The internal connector 18c is thus in contact with the first and second portions 16, 17 connected.

[0048] For example, the contact of the external connectors 18a, 18b and the internal connectors 18c with their respective thermoelectric modules 13, 14, 15 is made by soldering. The internal connectors 18c are, for example, metallic wires.

[0049] In one embodiment, the external connectors 18a, 18b and internal connectors 18c are identical.

[0050] The thermoelectric modules 13, 14, 15 are composed of a first conductive thermoelectric material having a given first Seebeck coefficient SA. In addition, the external connectors 18a, 18b and internal connectors 18c are composed of a second conductive thermoelectric material having a given second Seebeck coefficient SB different from the first Seebeck coefficient SA.

[0051] In the case where the fluid meter is intended to be placed in an environment in which the temperature Tamb outside the pipe is generally higher than the temperature of the fluid Tfluide (by generally, we mean at least 50% of the time), i.e., for example, in the case of a cold water meter placed inside a building, the first and second thermoelectric materials are chosen such that the second Seebeck coefficient SB is greater than the first Seebeck coefficient SA, and preferably greater by at least 2 or 4 pV / K. Thus, in such a case, the first Seebeck coefficient SA is preferably relatively low, for example negative, while the second Seebeck coefficient SB is preferably relatively high, for example positive.For example, in such a case, the first thermoelectric material is aluminum, iron, or molybdenum oxide, and the second thermoelectric material is copper, nickel, strontium titanate, or is a solid polyelectrolyte.

[0052] On the contrary, in the case where the fluid meter is intended to be placed in an environment in which the temperature Tamb of the outside of the pipe is generally lower than the temperature of the fluid Tfiuide (by generally, we mean at least 50% of the time), i.e. for example in the case of a water meter hot, the first and second thermoelectric materials are chosen so that the second Seebeck coefficient SB is less than the first Seebeck coefficient SA, and preferably less by at least 2 or 4 pV / K. Thus, for example in such a case, the first thermoelectric material forming the thermoelectric modules 13, 14, 15 is copper, nickel, strontium titanate or is a solid polyelectrolyte, and for example, the second thermoelectric material forming the external connectors 18a, 18b and internal 18c is aluminium, iron, or a molybdenum oxide.

[0053] In any event, in all cases, the second Seebeck coefficient SB is different from the first Seebeck coefficient SA, and preferably different by at least 2 or 4 pV / K, so that a potential difference AV is generated within each module 13, 14, 15 between the first portion 16 and the second portion 17 due to the contact between said portions 16, 17 and the connectors 18a, 18b, 18c when there is a temperature difference AT between the temperature Tamb outside the pipe 2 and the temperature of the fluid Tfluid (AT = Tamb - Tfluid). The potential difference between the two points of contact between a thermoelectric module 13, 14, 15 and connectors 18a, 18b, 18c, i.e., between the first and second portions 16 and 17, is defined by the following relation:

[0054] AV = (SB-SA) x AT

[0055] Thus, in all the cases described above, the thermodynamic materials are chosen so that the potential difference between the two contact points between a thermoelectric module 13, 14, 15 and connectors 18a, 18b, 18c generally remains positive (at least 50% of the time, as long as the temperature difference AT between the temperature T^ of the outside of the pipe 2 and the temperature of the fluid Tfluid is of the same sign as the difference between the second Seebeck coefficient SB and the first Seebeck coefficient SA).

[0056] Furthermore, since the thermoelectric modules 13, 14, 15 are assembled in series, the potential differences AV add up to each other, so that at the terminals of the rectifier 22, the external connectors 18a and 18b produce a potential difference equal to AV multiplied by the number of thermoelectric modules assembled in series in the thermoelectric generator 30. Thus, the advantage is to assemble a large number of modules 13, 14, 15 in order to proportionally increase the production of electricity.

[0057] For example, the thermoelectric generator 30 has a number N of 14 or 27 thermoelectric modules 13, 14, 15, as represented in examples illustrated in Figures 2 and 3. However, the number N can take any other value according to the constraints or needs of the user.

[0058] In order to house the thermoelectric modules 13, 14, 15 and more generally the ge thermoelectric nebulizer 30, the pipe 2 includes an outgrowth 19 formed on an external surface (i.e. in contact with the outside) of the pipe 2. More precisely, the outgrowth 19 extends radially outwards (i.e. in a direction opposite to the position of the fluid) from the pipe 2 with respect to a flow axis of the fluid in the pipe 2 represented by an arrow in the embodiment of which an example is illustrated in [Fig.1].

[0059] The protrusion 19 includes one or more cavities 20 forming housings configured to receive the thermoelectric modules 13, 14, 15. In particular, each cavity 20 is configured to receive a thermoelectric module 13, 14, 15. In one embodiment, the protrusion 19 includes as many cavities 20 as the thermoelectric generator 30 has thermoelectric modules 13, 14, 15.

[0060] The cavities 20 can be made in the protrusion 19 so as to be aligned, as in the example illustrated in [Fig. 2], or staggered, as in the example illustrated in [Fig. 3], in order to accommodate more modules 13, 14, 15 in a reduced space. These examples are not limiting.

[0061] Each cavity 20 is blind and extends radially into the protrusion 19 with respect to the fluid flow axis. More precisely, each cavity 20 opens onto the outside of the pipe 2 and extends into the protrusion 19 to an internal point on the wall 3 of the pipe 2 sufficiently close to the fluid so that the bottom of the cavity 20 is substantially at the temperature of the fluid flowing in the pipe 2.

[0062] In one embodiment, each of the cavities 20 comprises a radially superimposed protective portion 20a and a radially superimposed receiving portion 20b, the receiving portion 20b constituting the deepest part of the cavity 20 in the wall 3 of the pipe 2 having the protrusion 19 and therefore closest to the fluid. In other words, the protective portion 20a extends between the opening end of the cavity 20 on the outside of the pipe 2 and the receiving portion 20b.

[0063] More precisely, the wall 3 of the pipe 2 has a constant first thickness El outside the protrusion 19. The protrusion 19 has a second thickness E2, so that the wall 3 at the protrusion 19 has a thickness equal to the sum of the first and second thicknesses El and E2. The protective portion 20b is more precisely formed in the wall of the pipe 2 having the protrusion 19 at a distance E3 from the inside of the pipe 2 less than the first thickness EL. In other words, the wall 3 locally includes a third thickness E3 at each cavity 20, this third thickness being less than the first thickness EL.

[0064] For example, the first thickness E1 is between 2 and 5 millimeters, and is typically 3 millimeters, the second thickness E2 is between 8 and 12 millimeters limmeters, and is typically 10 millimeters, and the distance E3, or third thickness E3, is between 0.3 and 1.7 millimeters, and is typically 1 millimeter.

[0065] In one embodiment, the protective part 20a has a diameter DI larger than the diameter D2 of the receiving part 20b. More specifically, the receiving part 20b of each cavity 20 is configured to enclose the second portion 17 of the module 13, 14, 15 inserted into said cavity 20, so as to hold and immobilize the module 13, 14, 15 in said cavity 20. Thus, the diameter D2 of the receiving part 20b is substantially close to, for example, half a millimeter larger than, the diameter of the second portion 17 of the thermoelectric modules 13, 14, 15. For example, the diameter D2 is between 1 and 3 millimeters, and is typically 2 millimeters.

[0066] The diameter of the protective part 20a is, on the other hand, larger, and configured so that no contact takes place between the module 13, 14, 15 and the protective part 20a, so as to electrically and thermally isolate the module 13, 14, 15 from its second portion 17. For example, the diameter of the protective part 20a is between 3 and 6 millimeters, and is typically 4 millimeters.

[0067] The radial thickness E2 of the protrusion 19 is configured such that the first portion 16 of the modules 13, 14, 15 inserted into the plurality of cavities 20 is exposed outside the pipe 2, i.e. outside the protective part 20a. In this way, the first portion 16 is kept at temperature Tamb outside the pipe 2.

[0068] The second portion 17 of each of the thermoelectric modules 13, 14, 15 is thus maintained in contact with the receiving portion 20b, located closest to the fluid flowing in the pipe 2, so that the second portion 17 is at the fluid temperature Tfluid of the fluid. Optionally, an electrically insulating thermal gel is applied to the second portion 17, so that the heat conduction from the fluid to the second portion 17 is improved while preventing electrical losses at the point of contact with the pipe 2, which may be made of brass. Finally, the free space between the protective portion 20a and the thermoelectric module 13, 14, 15 housed in said protective portion 20a may be filled with air or thermal insulation.The first switch SI and the second switch S2 are controlled by the control block 6 for their state: open or closed for the second switch S2, selection of the power supply path for the first switch SL. When the second switch S2 is closed and the first switch SI connects the control block 6 to the battery 12, which then powers the control block 6, the capacitor Cl is coupled to the thermoelectric generator 30 and recharges, storing electrical energy produced by the thermoelectric generator 30. When the second switch S2 is open and the first switch S1 connects the control block 6 to the . capacitor Cl of the second supply channel 21, the control block 6 is powered by the capacitor Cl, the battery 12 not being used.

[0069] The second switch S2 is configured to be controlled by the control block 6 according to the temperature difference AT determined by the control block 6 on the one hand when the capacitor Cl is in a state of charge, and according to a state of charge of the capacitor Cl determined by the control block 6 on the other hand when the capacitor Cl is in a state of discharge.

[0070] The first switch SI is configured to be controlled by the control block 6 according to a state of charge of the capacitor Cl determined by the control block 6. A state of charge or discharge of the capacitor Cl is determined by the control block 6 from an estimate of the current I representative of an intensity of the charging or discharging current of the capacitor Cl, or estimate of the charging or discharging current I.

[0071] More particularly, on the one hand, the estimation of the charging current I is carried out by the control block 6 and is based on a correspondence between the temperature difference AT between the outside of the pipe 2 and the fluid determined by the control block 6 and a first correspondence table (determined experimentally, and stored for example in the memory of the control block 6) providing for each value of AT an estimate of the current I.

[0072] On the other hand, the estimation of the discharge current I is carried out by the control block 6 and is based on a correspondence between functions implemented by the control block 6 and a second correspondence table (determined experimentally, and stored for example in the memory of the control block 6) providing for each function implemented an estimate of the current I.

[0073] The control block 6 is indeed configured to determine the state of charge (SoC) of the capacitor Cl from this estimate of the charging or discharging current I. More precisely, the state of charge is updated at each time step by means of the estimate of the charging or discharging current I.

[0074] For example, during the charging of capacitor Cl, the charge level (SoC) at the previous instant is incremented by a multiple of the intensity of the charging current I. Preferably, the charge level is expressed as a proportion of a maximum energy reserve Emax of capacitor CL. It follows that the expression for the energy, i.e. VI, is divided by Emax, with V the value of the voltage across the rectifier 22 delivered by the thermoelectric generator 30 (V being equal to AV multiplied by the number N of modules 13, 14, 15 assembled in series in the thermoelectric generator 30) and I the intensity of the charging current estimated by the control block 6 using the temperature difference AT and the first lookup table, and therefore that SoC(t+T)= SoC(t)+TVI / Emax.

[0075] Conversely, during the discharge of capacitor Cl, the charge level (SoC) at the previous instant is decremented by a multiple of the intensity of the discharge current I, hence SoC(t+T)= SoC(t)-TVI / Emax, with V the value of the voltage across the rectifier 22 delivered by the thermoelectric generator 30 (V being equal to AV multiplied by the number N of modules 13, 14, 15 assembled in series in the thermoelectric generator 30) and I the intensity of the discharge current estimated by the control block 6 using the functions implemented by the control block 6 and the second lookup table.

[0076] Preferably, the time step T is less than 10 seconds. Preferably, the time step T is greater than 0.1 seconds. For simplicity, the time step is 1 second here, which simplifies the determination of the charge level:

[0077] - under load: SoC(t+T)= SoC(t)+VI / Emax,

[0078] - in discharge: SoC(t+T)= SoC(t)-VI / Emax.

[0079] If the state of charge is sufficiently high, the first switch SI connects the second power supply channel 21 to allow the control block 6 to be powered by the capacitor Cl of the second power supply channel 21. Otherwise, the first switch SI connects the first power supply channel 11 to allow the capacitor Cl to be recharged while the battery 12 of the first power supply channel 11 powers the control block 6. The control block 6 is configured to, at least when the thermoelectric generator 30 is generating electricity:

[0080] - position the first SI switch on the second power supply channel 21 when the load level becomes greater than or equal to a high threshold,

[0081] - position the first SI switch on the first power supply channel 11 when the charge level of capacitor Cl becomes less than or equal to a low threshold.

[0082] Similarly, when the first switch SI is connected to the stack 12, and therefore the capacitor Cl is in the charging phase, the control block 6 is configured to:

[0083] - open the second switch S2 when the temperature difference AT is in less in absolute value than a minimum temperature difference threshold,

[0084] - close the second switch S2 when the temperature difference AT is reached greater than or equal in absolute value to a minimum threshold of temperature difference and that the temperature difference AT has the same sign as the difference defined by the second Seebeck coefficient SB minus the first Seebeck coefficient SA.

[0085] The same minimum temperature threshold can be used, but it is possible to use different thresholds.

[0086] Figure 4 shows an example of a fluid meter operating diagram showing the variations in the states of the first switch S1 and the second switch S2, with different steps implemented by the control block 6. In In a default state (SOO), for example, before the fluid meter is installed, the first switch S1 is on battery 12, meaning it connects the control block 6 to the first power supply channel 11. The second switch S2 is preferably closed. The charge on capacitor C1 can be zero (in which case the charge level is initialized to 0) or very low (in which case the charge level is initialized based on the non-zero initial charge value). In the first stage (S00), the second switch S2 is closed, connecting capacitor C1 to the thermoelectric generator 30. The first switch S1 is on battery 12. Capacitor C1 can then charge with electrical energy. In the second stage (S02), the temperature difference AT between the outside of pipe 2 and the fluid is measured by the control block 6, which receives the measurements of Tamb and Tfluid from the temperature sensors T1 and T2.The temperature difference AT is compared to a minimum temperature difference threshold to determine if the thermoelectric generator 30 is producing enough electricity to charge the capacitor CL. Depending on the result of the comparison in the second step (S02), the second switch S2 is opened or closed (step S03). Thus, if the temperature difference AT is less than the minimum threshold in absolute value, then the second switch S2 is open. Conversely, if the temperature difference AT is greater than or equal to a minimum threshold (the same or different) and the temperature difference AT has the same sign as the difference between the second Seebeck coefficient SB and the first Seebeck coefficient SA, then the second switch S2 is closed, allowing the capacitor CL to be charged. For example, the minimum temperature difference threshold is between 2°C and 5°C, and typically 3°C.

[0087] When the second switch S2 is closed, a fourth step (S04) is implemented, in which the control block 6 estimates the charging current I based on the temperature difference AT and the first lookup table, and updates the charging level according to the determined charging current I estimate. More precisely, as explained above, the charging state is incremented by a multiple of the charging current I estimate. Then, a test (S05) is performed to verify whether the charging level is greater than or equal to an upper threshold, by comparing the current charging level with this upper threshold. The upper threshold serves to verify that the capacitor Cl is sufficiently charged, and therefore corresponds to a charging level close to the maximum energy Emax that the capacitor can store. Typically, the upper threshold is at least 80% of the maximum energy Emax, and preferably at least 90% of the maximum energy Emax.

[0088] If this is not the case, control block 6 returns to the fourth step (S04) to continue charging capacitor CL. If the charge level is greater than or equal to the upper threshold, then control block 6 commands the opening of the second com Switch S2 and the first switch SI on capacitor Cl couple control block 6 and the second power supply channel 21 (step S06). Control block 6 is now powered by the discharging capacitor Cl, and no longer by battery 12. Opening the first switch S2 decouples capacitor Cl and the thermoelectric generator 30, thus preventing potential electrical disturbances. During the discharge of capacitor Cl, at each time step T, a step (S07) is performed to estimate the discharge current I and the charge level is updated by control block 6. More specifically, this estimation of the discharge current I is determined by control block 6 differently than in step S03. Indeed, the current I estimate is determined from the functions active in the time step of step S05 and the second lookup table.More precisely, active functions are those implemented by command block 6 (such as activating command block 6, sending a frame, performing a measurement burst, etc.). Furthermore, as explained above, the charge level is decremented by a multiple of the estimated discharge current I. Then, a test (S08) is performed to verify if the charge level is less than or equal to a lower threshold, by comparing the current charge level with this lower threshold. The lower threshold is used to verify that capacitor Cia has been sufficiently discharged, and therefore corresponds to a charge level close to the minimum. Typically, the lower threshold is less than 10% of the maximum energy Emax, and is, for example, less than or equal to 5% of Emax.

[0089] If the charge level is above the lower threshold, the discharge of capacitor Cl continues, and a new step (S07) of estimating the discharge current I and updating the charge level is performed. Conversely, if the charge level is below or equal to the lower threshold, this means that capacitor Cl has been sufficiently discharged and now needs to be recharged. Therefore, control block 6 then returns to step (S00), closes the second switch S2, and switches the first switch S1 to the first power supply channel 11 on the stack 12.

[0090] Finally, the control block 6 is configured to implement a computer program product comprising instructions which, when executed by the control block 6, lead to the implementation of the process described above.

[0091] The computer program product takes the form of a non-volatile medium, typically a computer-readable memory storing instructions which, when executed by a computer, cause the computer to implement the process described above.

[0092] As can be seen in this process, the control block 6 is configured to maximize the use of capacitor Cl and save battery 12. Battery 12 is then only used to recharge capacitor CL. Thanks to the With a constant power supply, the fluid meter is capable of communicating metrological data, for example by displaying it, even when there is no fluid flow. It should be noted that the charging time of capacitor Cl is inversely proportional to the temperature difference AT between the outside and the fluid, making the invention particularly well-suited for a hot water meter. Given the low energy requirements of the control unit 6, it is easy to ensure that the charging time of capacitor Cl is much shorter than its discharging time. Capacitor Cl can provide a significant portion of the power supply to the control unit 6. The battery 12, being under less stress, can be chosen with a lower energy storage capacity, resulting in a smaller footprint and lower cost, while maintaining or extending its lifespan.

[0093] The thermoelectric generator 30 used in the present invention has the advantage of not being intrusive in the fluid, and thus does not risk disrupting the accuracy of the metrology. Furthermore, such a thermoelectric generator 30 eliminates any risk of breakage or fouling compared to another intrusive electric generator.

[0094] Also, the solution presented in this presentation is economical, the additional cost related to the manufacture of the protrusion and the drilling of the cavities being very limited.

[0095] The invention is not limited to the embodiment described and shown in the accompanying figures. Modifications remain possible, particularly with regard to the constitution of the various technical features or by substitution of technical equivalents, without departing from the scope of protection of the invention.

Claims

Claims

1. A fluid meter configured to perform metrological measurements in a fluid circulation pipeline and to communicate information relating to said metrological data, comprising: - a fluid pipeline (2), - at least one metrological sensor (4) configured to perform metrological measurements in the fluid pipeline (2), - a control unit (6) configured to receive the metrological measurements and to communicate information relating to said metrological data, - a power supply unit (10) configured to supply power to the control unit (6), the power supply unit (10) comprising a first power supply path (11) comprising at least one battery (12), and a second power supply path (21), the power supply unit (10) further comprising a first switch (SI) configured to selectively couple the first power supply path (11) or the second power supply path (21) to the control unit (6),characterized in that the fluid meter comprises a thermoelectric generator (30) configured to produce electricity from a temperature difference (AT) between an exterior of the pipe (2) and the fluid in the pipe (2), the second supply path (21) being connected to the thermoelectric generator (30).,

2. Fluid meter according to claim 1, wherein the thermoelectric generator (30) comprises one or more thermoelectric modules (13, 14, 15) partially inserted into a wall (3) of the pipeline (2).

3. Fluid meter according to claim 2, in which a protrusion (19) is formed on the fluid circulation pipe (2), the protrusion (19) comprising at least one cavity (20), each cavity (20) being configured to receive a thermoelectric module (13, 14, 15).

4. Fluid meter according to claim 3, in which the wall (3) of the pipe (2) has a first thickness (El) outside the protrusion (19), each cavity (20) comprising a protection part (20a) and a receiving part (20b), the receiving part (20b) being of a diameter smaller than the protection part (20a) and being arranged in the wall (3) of the pipe (2) at a distance (E3) of the interior of the pipe (2) less than the first thickness (El), each thermoelectric module (13, 14, 15) comprising a first portion (16) configured to be at the temperature of the exterior of the pipe (Tamb) and a second portion (17) configured to be at the temperature of the fluid (Tfluid), the second portion (17) being inserted into the receiving part (20b).

5. Fluid meter according to claim 4, wherein the thermoelectric generator (30) comprises a first external connector (18a) in contact with the first portion (16) of a first thermoelectric module (14) arranged at the input of the thermoelectric generator (30) and connecting said first portion (16) to the power supply unit (10), the thermoelectric generator (30) further comprising a second external connector (18b) in contact with the second portion (17) of a last thermoelectric module (15) arranged at the output of the thermoelectric generator (30) and connecting said second portion (17) to the power supply unit (10).

6. A fluid meter according to claim 4 or 5, wherein a second portion (17) of a thermoelectric module (13, 14) is connected by an internal connector (18c) to the first portion (16) of another thermoelectric module (13, 15).

7. A fluid meter according to claim 5 or 6, wherein each thermoelectric module (13, 14, 15) is composed of a first thermoelectric material having a first Seebeck coefficient (SA), and a connector (18a, 18b, 18c) in contact with the first portion (16) or the second portion (17) of the thermoelectric module is composed of a second thermoelectric material having a second Seebeck coefficient (SB) different from the first Seebeck coefficient (Sa).

8. A fluid meter according to any one of claims 1 to 7, wherein the second power supply path (21) comprises a capacitor (Cl) and a second switch (S2) configured to selectively couple the capacitor (Cl) and the thermoelectric generator (30) as a function of a charge level (SoC) of the capacitor (Cl),

9. Fluid meter according to claim 8, in which the charge level (SoC) is determined by the control block (6) according to a first correspondence table and the temperature difference (AT) when the capacitor (Cl) charges, and according to a second correspondence table and implemented functions by the control block (6) when the capacitor (Cl) discharges.

10. Fluid meter according to claim 8 or 9, wherein the control block (6) is configured to, at least when the thermoelectric generator (30) generates electricity: - position the first switch (SI) on the second supply path (21) when the charge level (SoC) becomes greater than a high threshold, - position the first switch (SI) on the first supply path (11) when the charge level (SoC) of the capacitor (Cl) becomes lower than a low threshold.

11. A fluid meter according to claim 10, wherein the high threshold is greater than or equal to 80% of a maximum load level (Emax), and the low threshold is less than or equal to 10% of the maximum load level (Emax

12. )• Fluid meter according to any one of the preceding claims, in which the control block (6) is configured to determine a temperature difference (AT) between the outside of the pipe (2) and the fluid and to: - open the second switch (S2) when the temperature difference (AT) is less than a minimum temperature difference threshold, - close the second switch (S2) when the temperature difference (AT) is greater than or equal to a minimum temperature difference threshold.

13. A fluid meter according to claim 12, wherein the minimum temperature difference threshold is between 2°C and 5°C.

14. A method for managing the power supply of a fluid meter according to any one of claims 1 to 13, the fluid meter comprising a control unit (6) and a power supply unit (10) configured to supply power to the control unit (6), the power supply unit (10) comprising a first power supply path (11) comprising at least one battery (12), and a second power supply path (21), the power supply unit (10) further comprising a first switch (SI) configured to selectively couple the first power supply path (11) or the second power supply path (21) to the control unit (6), the second power supply path (21) being connected to a thermoelectric generator (30) configured to produce electricity from a temperature difference (AT) between an exterior of the ca-

15.

16. nalization (2) and the fluid in the pipe (2), the second supply path (21) further comprising a capacitor (Cl) and a second switch (S2) configured to selectively couple the capacitor (Cl) and the thermoelectric generator (30) according to a charge level of the capacitor (Cl), the method being able to be implemented by the control block (6) and comprising the following steps: - Switching the first switch (SOI) to the first power supply channel (11), - Determination (S02) of a temperature difference (AT) between an exterior of the pipe (2) and the fluid and, when the determined temperature difference (AT) becomes greater than or equal to a minimum threshold, closing (S03) of the second switch (S2), - Estimation (S04) of a charging current (I) from the temperature difference (AT) and a first correspondence table providing an estimate of the associated charging current for each value of the temperature difference (AT), - Determination (S04) of a charge level (SoC) of the capacitor (Cl) under charge from the estimated charge current (I) and, when the estimated charge level (SoC) becomes greater than or equal to a predetermined high threshold, switching (S06) of the first switch (SI) to the second power supply channel (21), - Estimation (S07) of a discharge current (I) carried out from functions implemented by the control block (6) and from a second correspondence table providing for each function implemented by the control block (6) an estimate of the associated discharge current (I), - Determination (S07) of a charge level (SoC) of the capacitor (Cl) during discharge as a function of the estimation of the discharge current (I) and, when the estimated charge level (SoC) becomes less than or equal to a predetermined low charge threshold, repetition of the preceding steps. Computer program product capable of being implemented by a control block (6) of a fluid meter according to any one of claims 1 to 13, comprising instructions which, when the program is executed by the control block (6), cause the control block (6) to implement the method according to claim 14. Computer-readable memory storing instructions executable by the computer for carrying out the steps of the method according to claim 14.

Citation Information

Patent Citations

  • Metering device

    JP2002270908A

  • Fuel cell battery charging and power system

    US20060063044A1

  • Device and Method for Augmenting the Useful Life of an Energy Storage Device

    US20100104896A1

  • Anomaly detection device

    WO2016140035A1