Measurement restrictions
By allowing User Equipment to autonomously skip specific measurement windows, the UE prioritizes delay-critical data transmission in 5G networks, addressing scheduling restrictions and improving XR system capacity and latency performance.
Patent Information
- Application Number
- GB2023005837
- Authority / Receiving Office
- GB · GB
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-20
- Publication Date
- 2024-10-23
AI Technical Summary
Current 5G network architectures face scheduling restrictions due to radio resource management (RRM) measurements, which hinder efficient data transmission, particularly for delay-critical applications like extended reality (XR), leading to potential packet delay budget violations and reduced system capacity.
User Equipment (UE) autonomously skips certain synchronization signal block measurement timing configuration (SMTC) windows for intra-frequency measurements or measurement gaps for inter-frequency RRM measurements to prioritize delay-critical traffic, allowing for more efficient data transmission without compromising RRM performance.
This approach reduces scheduling restrictions and delays, ensuring that delay-critical data is transmitted within the packet delay budget, thereby enhancing XR system capacity and meeting quality of service criteria.
Smart Images

Figure 00000000_0000_ABST
Abstract
Description
TECHNICAL FIELD Various example embodiments relate generally to measurement restrictions for protect transmission of critical data. BACKGROUND It is known that a user equipment (UE) can be configured to perform measurements. It is also known that the user equipment may need to transmit or data. However, it is unclear how to manage coexistence of both at the same time. BRIEF DESCRIPTION According to some aspects, there is provided the subject matter of the independent claims. Some further aspects are defined in the dependent claims. LIST OF THE DRAWINGS In the following, the invention will be described in greater detail with reference to the embodiments and the accompanying drawings, in which Figure 1 presents a network, according to an embodiment; Figures 2 and 3 show some example problems in current specifications; Figures 4 and 5 show methods, according to some embodiments; Figures 6 and 7 show signaling flow diagrams, according to some embodiments; Figure 8 shows on a time line how data transfer is more efficient owing to some of the embodiments; and Figures 9 and 10 illustrate apparatuses, according to some embodiments. DESCRIPTION OF EMBODIMENTS The following embodiments are exemplary. Although the specification may refer to “an”, “one”, or “some” embodiment(s) in several locations of the text, this does not necessarily mean that each reference is made to the same embodiment(s), or that a particular feature only applies to a single embodiment. Single features of different embodiments may also be combined to provide other embodiments. For the purposes of the present disclosure, the phrases “at least one of A or B”, “at least one of A and B”, “A and / or B” means (A), (B), or (A and B). For the purposes of the present disclosure, the phrases “A or B” and “A and / or B” means (A), (B), or (A and B). For the purposes of the present disclosure, the phrase “A, B, and / or C" means (A), (B), (C), (A and B), (A and C), (B and C), or (A, B, and C). It shall be understood that although the terms “first” and “second” etc. may be used herein to describe various elements, these elements should not be limited by these terms. These terms are only used to distinguish one element from another. For example, a first element could be termed a second element, and similarly, a second element could be termed a first element, without departing from the scope of example embodiments. Embodiments described may be implemented in a radio system, such as one comprising at least one of the following radio access technologies (RATs): Worldwide Interoperability for Micro-wave Access (WiMAX), Global System for Mobile communications (GSM, 2G), GSM EDGE radio access Network (GERAN), General Packet Radio Service (GRPS), Universal Mobile Telecommunication System (UMTS, 3G) based on basic wideband-code division multiple access (W-CDMA), high-speed packet access (HSPA), Long Term Evolution (LTE), LTE-Advanced, and enhanced LTE (eLTE). Term ‘eLTE’ here denotes the LTE evolution that connects to a 5G core. LTE is also known as evolved UMTS terrestrial radio access (EUTRA) or as evolved UMTS terrestrial radio access network (EUTRAN). A term “resource” may refer to radio resources, such as a physical resource block (PRB), a radio frame, a subframe, a time slot, a subband, a frequency region, a sub-carrier, a beam, etc. The term “transmission” and / or “reception” may refer to wirelessly transmitting and / or receiving via a wireless propagation channel on radio resources The embodiments are not, however, restricted to the systems / RATs given as an example but a person skilled in the art may apply the solution to other communication systems provided with necessary properties. One example of a suitable communications system is the 5G system. The 3GPP solution to 5G is referred to as New Radio (NR). 5G has been envisaged to use multiple-input-multiple-output (MIMO) multi-antenna transmission techniques, more base stations or nodes than the current network deployments of LTE (a so-called small cell concept), including macro sites operating in co-operation with smaller local area access nodes and perhaps also employing a variety of radio technologies for better coverage and enhanced data rates. 5G will likely be comprised of more than one radio access technology / radio access network (RAT / RAN), each optimized for certain use cases and / or spectrum. 5G mobile communications may have a wider range of use cases and related applications including video streaming, augmented reality, different ways of data sharing and various forms of machine type applications, including vehicular safety, different sensors and real-time control. 5G is expected to have multiple radio interfaces, namely below 6GHz, cmWave and mmWave, and being integrable with existing legacy radio access technologies, such as the LTE. The current architecture in LTE networks is distributed in the radio and centralized in the core network. The low latency applications and services in 5G may require to bring the content close to the radio which leads to local break out and multi-access edge computing (MEC). 5G enables analytics and knowledge generation to occur at the source of the data. This approach requires leveraging resources that may not be continuously connected to a network such as laptops, smartphones, tablets and sensors. MEC provides a distributed computing environment for application and service hosting. It also has the ability to store and process content in close proximity to cellular subscribers for faster response time. Edge computing covers a wide range of technologies such as wireless sensor networks, mobile data acquisition, mobile signature analysis, cooperative distributed peer-to-peer ad hoc networking and processing also classifiable as local cloud / fog computing and grid / mesh computing, dew computing, mobile edge computing, cloudlet, distributed data storage and retrieval, autonomic self-healing networks, remote cloud services, augmented and virtual reality, data caching, Internet of Things (massive connectivity and / or latency critical), critical communications (autonomous vehicles, traffic safety, real-time analytics, time-critical control, healthcare applications). Edge cloud may be brought into RAN by utilizing network function virtualization (NVF) and software defined networking (SDN). Using edge cloud may mean access node operations to be carried out, at least partly, in a server, host or node operationally coupled to a remote radio head or base station comprising radio parts. Network slicing allows multiple virtual networks to be created on top of a common shared physical infrastructure. The virtual networks are then customised to meet the specific needs of applications, services, devices, customers or operators. In radio communications, node operations may in be carried out, at least partly, in a central / centralized unit, CU, (e.g. server, host or node) operationally coupled to distributed unit, DU, (e.g. a radio head / node). It is also possible that node operations will be distributed among a plurality of servers, nodes or hosts. It should also be understood that the distribution of work between core network operations and base station operations may vary depending on implementation. Thus, 5G networks architecture may be based on a so-called CU-DU split. One gNB-CU controls several gNB-DUs. The term ‘gNB’ may correspond in 5G to the eNB in LTE. The gNBs (one or more) may communicate with one or more UEs. The gNB-CU (central node) may control a plurality of spatially separated gNB-DUs, acting at least as transmit / receive (Tx / Rx) nodes. In some embodiments, however, the gNB-DUs (also called DU) may comprise e.g. a radio link control (RLC), medium access control (MAC) layer and a physical (PHY) layer, whereas the gNB-CU (also called a CU) may comprise the layers above RLC layer, such as a packet data convergence protocol (PDCP) layer, a radio resource control (RRC) and an internet protocol (IP) layers. Other functional splits are possible too. It is considered that skilled person is familiar with the OS1 model and the functionalities within each layer. In an embodiment, the server or CU may generate a virtual network through which the server communicates with the radio node. In general, virtual networking may involve a process of combining hardware and software network resources and network functionality into a single, software-based administrative entity, a virtual network. Such virtual network may provide flexible distribution of operations between the server and the radio head / node. In practice, any digital signal processing task may be performed in either the CU or the DU and the boundary where the responsibility is shifted between the CU and the DU may be selected according to implementation. Some other technology advancements probably to be used are Software-Defined Networking (SDN), Big Data, and all-lP, to mention only a few non-limiting examples. For example, network slicing may be a form of virtual network architecture using the same principles behind software defined networking (SDN) and network functions virtualisation (NFV) in fixed networks. SDN and NFV may deliver greater network flexibility by allowing traditional network architectures to be partitioned into virtual elements that can be linked (also through software). Network slicing allows multiple virtual networks to be created on top of a common shared physical infrastructure. The virtual networks are then customised to meet the specific needs of applications, services, devices, customers or operators. The plurality of gNBs (access points / nodes), each comprising the CU and one or more DUs, may be connected to each other via the Xn interface over which the gNBs may negotiate. The gNBs may also be connected over next generation (NG) interfaces to a 5G core network (5GC), which may be a 5G equivalent for the core network of LTE. Such 5G CU-DU split architecture may be implemented using cloud / server so that the CU having higher layers locates in the cloud and the DU is closer to or comprises actual radio and antenna unit. There are similar plans ongoing for LTE / LTE-A / eLTE as well. When both eLTE and 5G will use similar architecture in a same cloud hardware (HW), the next step may be to combine software (SW) so that one common SW controls both radio access networks / technologies (RAN / RAT). This may allow then new ways to control radio resources of both RANs. Furthermore, it may be possible to have configurations where the full protocol stack is controlled by the same HW and handled by the same radio unit as the CU. It should also be understood that the distribution of labour between core network operations and base station operations may differ from that of the LTE or even be non-existent. Some other technology advancements probably to be used are Big Data and all-lP, which may change the way networks are being constructed and managed. 5G (or new radio, NR) networks are being designed to support multiple hierarchies, where MEC servers can be placed between the core and the base station or nodeB (gNB). It should be appreciated that MEC can be applied in 4G networks as well. 5G may also utilize satellite communication to enhance or complement the coverage of 5G service, for example by providing backhauling. Possible use cases are providing service continuity for machine-to-machine (M2M) or Internet of Things (loT) devices or for passengers on board of vehicles, or ensuring service availability for critical communications, and future rail-way / maritime / aeronautical communications. Satellite communication may utilize geostationary earth orbit (GEO) satellite systems, but also low earth orbit (LEO) satellite systems, in particular mega-constellations (systems in which hundreds of (nano)satellites are deployed). Each satellite in the mega-constellation may cover several satellite-enabled network entities that create on-ground cells. The on-ground cells may be created through an on-ground relay node or by a gNB located on-ground or in a satellite. The embodiments may be also applicable to narrow-band (NB) Internet-of-things (loT) systems which may enable a wide range of devices and services to be connected using cellular telecommunications bands. NB-loT is a narrowband radio technology designed for the Internet of Things (loT) and is one of technologies standardized by the 3rd Generation Partnership Project (3GPP). Other 3GPP loT technologies also suitable to implement the embodiments include machine type communication (MTC) and eMTC (enhanced Machine-Type Communication). NB-IoT focuses specifically on low cost, long battery life, and enabling a large number of connected devices. The NB-loT technology is deployed “in-band" in spectrum allocated to Long Term Evolution (LTE) - using resource blocks within a normal LTE carrier, or in the unused resource blocks within a LTE carrier’s guard-band - or “standalone” for deployments in dedicated spectrum. The embodiments may be also applicable to device-to-device (D2D), machine-to-machine, peer-to-peer (P2P) communications. The embodiments may be also applicable to vehicle-to-vehicle (V2V), vehicle-to-infrastructure (V21), infrastructure-to-vehicle (12V), or in general to V2X or X2V communications. Figure 1 illustrates an example of a communication system to which embodiments of the invention may be applied. The system may comprise a control node 110 providing one or more cells, such as cell 100, and a control node 112 providing one or more other cells, such as cell 102. Each cell may be, e.g., a macro cell, a micro cell, femto, or a pico cell, for example. In another point of view, the cell may define a coverage area or a service area of the corresponding access node. The control node 110, 112 may be an evolved Node B (eNB) as in the LTE and LTE-A, ng-eNB as in eLTE, gNB of 5G, or any other apparatus capable of controlling radio communication and managing radio resources within a cell. The control node 110, 112 may be called a base station, network node, or an access node. The system may be a cellular communication system composed of a radio access network of access nodes, each controlling a respective cell or cells. The access node 110 may provide user equipment (UE) 120 (one or more UEs) with wireless access to other networks such as the Internet. The wireless access may comprise downlink (DL) communication from the control node to the UE 120 and uplink (UL) communication from the UE 120 to the control node. Additionally, although not shown, one or more local area access nodes may be arranged such that a cell provided by the local area access node at least partially overlaps the cell of the access node 110 and / or 112. The local area access node may provide wireless access within a sub-cell. Examples of the sub-cell may include a micro, pico and / or femto cell. Typically, the sub-cell provides a hot spot within a macro cell. The operation of the local area access node may be controlled by an access node under whose control area the sub-cell is provided. In general, the control node for the small cell may be likewise called a base station, network node, or an access node. There may be a plurality of UEs 120, 122 in the system. Each of them may be served by the same or by different control nodes 110, 112. The UEs 120, 122 may communicate with each other, in case D2D communication interface is established between them. The term “terminal device” or “UE” refers to any end device that may be capable of wireless communication. By way of example rather than limitation, a terminal device may also be referred to as a communication device, user equipment (UE), a Subscriber Station (SS), a Portable Subscriber Station, a Mobile Station (MS), or an Access Terminal (AT). The terminal device may include, but not limited to, a mobile phone, a cellular phone, a smart phone, voice over IP (VoIP) phones, wireless local loop phones, a tablet, a wearable terminal device, a personal digital assistant (PDA), portable computers, desktop computer, image capture terminal devices such as digital cameras, gaming terminal devices, music storage and playback appliances, vehicle-mounted wireless terminal devices, wireless endpoints, mobile stations, laptop-embedded equipment (LEE), laptop-mounted equipment (LME), USB dongles, smart devices, wireless customer-premises equipment (CPE), an Internet of Things (loT) device, a watch or other wearable, a head-mounted display (HMD), a vehicle, a drone, a medical device and applications (e.g., remote surgery), an industrial device and applications (e.g., a robot and / or other wireless devices operating in an industrial and / or an automated processing chain contexts), a consumer electronics device, a device operating on commercial and / or industrial wireless networks, and the like. In the following description, the terms “terminal device”, “communication device”, “terminal”, “user equipment” and “UE” may be used interchangeably. In the case of multiple access nodes in the communication network, the access nodes may be connected to each other with an interface. LTE specifications call such an interface as X2 interface. For IEEE 802.11 network (i.e. wireless local area network, WLAN, WiFi), a similar interface may be provided between access points. An interface between an LTE access point and a 5G access point, or between two 5G access points may be called Xn. Other communication methods between the access nodes may also be possible. The access nodes 110 and 112 may be further connected via another interface to a core network 116 of the cellular communication system. The LTE specifications specify the core network as an evolved packet core (EPC), and the core network may comprise a mobility management entity (MME) and a gateway node. The MME may handle mobility of terminal devices in a tracking area encompassing a plurality of cells and handle signalling connections between the terminal devices and the core network. The gateway node may handle data routing in the core network and to / from the terminal devices. The 5G specifications specify the core network as a 5G core (5GC), and there the core network may comprise e.g. an access and mobility management function (AMF) and a user plane function / gateway (UPF), to mention only a few. The AMF may handle termination of non-access stratum (NAS) signalling, NAS ciphering & integrity protection, registration management, connection management, mobility management, access authentication and authorization, security context management. The UPF node may support packet routing & forwarding, packet inspection and QoS handling, for example. A UE needs to measure periodically the signal of nearby cells and / or of portions of the bandwidth outside the current bandwidth part (BWP) configuration. 5G differentiates between intra-frequency RRM measurements, which are performed on the same frequency of the serving cell albeit outside the current BWP, and inter-frequency RRM measurements, which are performed on a different frequency than the serving cell. In order to make inter-frequency measurements, a UE equipped with a single RF module must suspend the connection with the serving cell to tune the RF module on the frequencies of nearby cells. Similarly, during intra-frequency measurements, the UE may suspend communication operations (Tx / Rx) with the serving cell, since it is measuring a portion of the spectrum that falls outside the BWP. The time duration during which the UE suspends the communication with the serving cell to perform intra- and inter-frequency measurements is called Measurement Gaps and it is configured using RRC signalling. In addition to the Measurement Gaps, the network configures the UE with the timing and periodicity of the SSB burst of nearby cells to perform inter-frequency measurements using the SSB Measurement Timing Configuration (SMTC). The SMTC window can partially or fully overlap with the measurement gap. According to the standard, the UE prioritizes RRM measurements over PDCCH decoding and communication operations with the service cell. Therefore, the configuration of Measurement Gaps and SMTC introduces scheduling restrictions, since the network cannot schedule when the UE performs RRM measurements. It may be beneficial to enhance data transmission of delay-critical data, such as extended reality (XR), without being compromised by scheduling restrictions from the UE due to prioritizing radio resource management (RRM) measurements. The problem of harmful scheduling restrictions due to RRM measurements has been discussed before e.g. from a network-centric point of view. In short, such networkcentric solutions rely on the gNB to inform the UE to skip a certain pattern of SMTC windows for RRM measurements and instead prioritize PDCCH / PDSCH reception and / or PUSCH / PUCCH transmission. However, further measurement gap enhancements for more efficient data transmission / reception with XR traffic is under discussion as part of Rel-19 XR enhancements. According to the current 3GPP NR specifications, the network configures the UE when to measure RSRP from e.g. synchronization signal blocks (SSBs) or channel state information reference signals (CSl-RSs). This may be configured by means of RRC signalling of the so-called SMTC (SSB measurement timing configuration). It should be noted that the SMTC only instructs the UE when (in time domain) it shall prioritize measurement of e.g. RSRP, while it is left open for UE implementation exactly when to measure, and which antenna panel to be used for conducting such measurement during those “SMTC measurement windows” (if the UE has multiple antenna panels). UE requirements for RRM measurements are specified in 3GPP. This specification also lists related scheduling restrictions for UEs during time-intervals where they may be performing RSRP or RSRQ measurements, as per the SMTC configuration. During time-intervals when the UE may be performing RSRP or RSRQ measurements, as per the SMTC configuration measurements, scheduling restrictions apply. This means that that the network cannot schedule UE data transmissions. What is interesting to note here is that there are no scheduling restrictions for FR1 (i.e. for UEs on 400MHz - 7 GHz bands), while there are some scheduling restrictions for FR2 (24-52 GHz bands) operation, if RSRP is measured on SSBs. In case of inter-frequency measurements, measurement gaps (MGs) may be needed when operating on either FR1 or FR2. From 3GPP, it is known that the primary XR real-time video traffic model generates new frames (payloads) at framerate in the set {30, 60, 90, 120} fps (frames per second), so arriving every {33.33, 16.67, 11.11, 8.33} ms on average. According to 3GPP definitions, 99% of those frames must be successfully delivered to the receiving end (e.g. network) within a certain packet delay budget (PDB), which typically is on the order of 10-15 ms. If operating with standard MG / SMTC settings of performing RRM measurements every 20 ms, with an MG / SMTC window of 5 ms, there is a risk for a significant loss of XR system capacity due to less scheduling opportunities. In particular, the number of satisfied XR UEs for DL traffic (i.e., UEs with fulfilled QoS criteria) may drop by up to 50% when scheduling restrictions are applied due to RRM measurements. This drop may be even more significant in UL since less resources are dedicated to UL than DL for standard TDD radio frame configurations. This XR capacity drop is due to several causes. It may e.g. happen that a UE sends a scheduling request to gNB shortly before a MG / SMTC window is starting, and the gNB must postpone the scheduling of the UL transmission till after the MG / SMTC window. If that happens, an additional delay is introduced in the delivery process over the radio interface. This eventually results in unacceptable latencies that will in many cases cause to violate the PDB constraint. Additionally, it may also happen that the gNB does not know the exact amount of UL resources to be scheduled to the UE when it receives a scheduling request (SR) or a buffer status report (BSR). The UE will transmit the BSR along with the data at the first UL occasion. BSR may also be sent alone on PUSCH. If the gNB has not reserved enough resources, another UL transmission will be needed to fully deliver the XR frame / packet. Therefore, even if the first UL transmission is completed before the next MG / SMTC window, the second transmission, which carries the remaining portion of the XR data that did not fit the first UL transmission, may need to be postponed. For an example TDD configuration of DDDSU, this may result in delaying the UL transmission by 2.5ms to 5 ms for subcarrier spacing of 30 kHz and 15 kHz, respectively. Figure 2 illustrates this problem where the network is configured with SCS=60kHz and the SMTC window lasts 3ms every 20ms (this configuration was agreed in Rel-17 and Rel-18 for XR evaluation in FR2). Term IAT in the figure refers to inter-arrival-time. UL and DL slots are indicated with letters U and D, respectively. The XR video in UL (e.g., for AR application) is generated at 120fps. When the video frame k is generated by the XR application, the UE sends a SR to the gNB to get the radio resources needed for the transmission of the generated frame. The gNB sends scheduling information with DCI. However, the scheduled resources are not enough for the transmission of the whole XR frame. Therefore, in the U slot after the DCI (where radio resources are granted to the UE), the UE transmit part of the XR frame and a BSR report to indicate the size of the buffer (first DATA + BSR in Figure 1). Since the next SMTC / MG window overlaps the next 4 U slots, the gNB must postpone the scheduling of the UL DATA after the MTC / MG window (i.e., the second DCI is sent after the SMTC / MG window). In the following U slot, the UE transmits the DATA and another BSR to communicate to the gNB the size of the buffer since in the meantime another frame (frame k+1) has been generated. We can see that the DATA that carries the remaining part of Frame k (second DATA+BSR) is delivered beyond the PDB and it is counted as lost. Note also that the delay can be larger than the one depicted depending on UE processing capability, the system configuration, and possible HARQ retransmissions due to errors. The example of Figure 2 considers the case where the SMTC / MG partially overlaps with at least one U slots. This may happen in case the granularity of the SMTC / MG configurations may not always be sufficient to match the exact number of D slots / symbols which are used for the transmission of SSB in neighbour cells. Depending on the number of SSBs per cell, it may also be that the SSB transmission needs to span over more than one D bursts. Also, use of dynamic TDD may also increase the probability that the SMTC / MG may partially overlap with one or more U slots. However, it should also be noticed that the problem may also occur in cases where the SMTC / MG only overlaps with D symbols / slots. Take as an example the case with SCS=30kHz, DDDSU TDD configuration, and a MG / SMTC window of 2ms (i.e. 4 slots) every e.g. 20 ms, as illustrated in Figure 3. Also in this case, when video frame k is generated by the XR application, the UE sends an SR to the gNB at the first UL occasion. The gNB then sends an UL grant to the UE (DC1). However, the scheduled resources are not enough for the transmission of the whole XR frame. Therefore, in the U slot where radio resources are granted to the UE, the UE transmits part of the XR frame and a BSR report to indicate the size of the buffer. However, such BSR is transmitted just prior to the start of the MG / SMTC window, which means the gNB has no possibility to issue an UL grant to the UE until the first D slot after the MG / SMTC window. As a consequence, the UE cannot transmit in UL in the first U slot immediately after the MG / SMTC window. Hence the UL transmission need to be delayed by 2.5ms, which may cause the XR frame not to be delivered within the PDB (in case e.g. at least one HARQ retransmission is needed). Network centric solutions to tackle the above-mentioned problems rely on the gNB to inform the UE to skip a certain pattern of SMTC windows for RRM measurements and instead prioritize PDCCH / PDSCH reception and PUSCH / PUCCH transmission. These network centric solutions may have the drawback that they are slow at reacting to sudden traffic arrivals at the UE that the network is unaware of until it has received SR and BSR information. Indeed, the prioritization of RRM measurements over PDCCH decoding may force the network to send the command with the indication to prioritize reception or transmission over RRM measurements after the SMTC window, hence introducing an additional delay for the network-centric solution To at least partially tackle these problems, there is proposed a solution for a UE autonomous method to skip certain SMTC windows for intra-frequency measurements, or measurement gaps (MGs) for inter-frequency RRM measurements, to prioritize the transmission of e.g. delay-critical traffic. This may be beneficial so as to e.g. avoid latencies for uplink transmissions due to restrictions caused by MG / SMTC windows when the UE prioritizes RRM measurements (intra- or inter-frequency). It is noted that other measurements than RRM measurements may still be performed, such as measurements related to CS1 / CQ1, for example. Figure 4 depicts an example method. The method may be computer-implemented. The method may be performed by a user equipment, such as the UE 120 or an apparatus comprised in the UE 120, Accordingly, as shown in Figure 4, the UE 120 may in step 400 receive from a network, such as from the gNB 110, a measurement configuration for performing radio resource management (RRM) measurements. This configuration may be e.g. SMTC or MG configuration. In general, the measurement configuration may indicate one or more measurement periods when the UE should perform RRM measurements (intra- or inter-frequency). The measurement period may comprise at least one of a measurement gap or a synchronization signal block measurement period, for example. In step 402, the UE determines a need to transfer data between the apparatus and the network. In an embodiment, the data is downlink data and the UE may determine such need by reception of a downlink assignment from the gNB 110, or by expecting to receive DL data as a response to first sending UL data to the gNB 110. In an embodiment, the data is uplink data. The need for sending uplink data to network (e.g. to gNB 110) may come from higher layers of the UE (e.g. from an application layer), for example. In step 404, the UE 120 determines whether a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data. In an embodiment, the UE 120 determines that the measurement period indicated by the measurement configuration does at least partially overlap the at least one function associated with the transfer of data. The function associated with data transmission may be transmission / reception of data or transmission / reception of control signaling related to the data, for example. As an example, the at least one function associated with the transfer of data comprises at least one of the following: transmission of a scheduling request (SR), reception of an uplink grant, reception of a downlink assignment, transmission of data, reception of data, transmission of power headroom report (PHR), or transmission of a buffer status report (BSR). Let’s look at these options closer. In an embodiment, the UE 120 may detect a need for uplink data transmission and decide that the UE 120 needs to transmit SR. However, the next subframe with UL possibility (and thus with a possibility of sending the SR) overlaps with the measurement period (SMTC or MG). Transmission of the SR is a (control) signaling function that is associated with data transfer because the UE first transmits SR in order to perform data transfer later. In an embodiment, the UE 120 may detect a need for uplink data transmission, transmit SR to the gNB 110, but then determine that the next subframe with DL possibility (and thus with a possibility of receiving DC1 with an uplink grant) overlaps with the measurement period (SMTC or MG). Reception of DC1 is a (control) signaling function that is associated with data transfer because the UE first receives the DC1 in order to perform data transfer later. In an embodiment, the UE 120 may detect a need for uplink data transmission, transmit SR to the gNB 110, receive DC1, butthen determine that the subframe indicated in the uplink grant overlaps with the measurement period (SMTC or MG). In an embodiment, the UE 120 may detect a need for downlink data reception based on reception of DC1 comprising a DL assignment, and then determine that the subframe indicated in the DL assignment overlaps with the measurement period (SMTC or MG). In an embodiment, reception of DL assignment is known by the UE in advanced, if the UE is configured with semi-persistent-scheduling (SPS) resources. For cases with dynamic scheduling, the UE in an embodiment assumed that if the UE has recently sent back a NACK for DL transmissions, then the gNB is likely to immediately schedule the corresponding HARQ retransmission in the DL. Thus, the UE can before the SMTC / MG detect that DC1 carrying downlink assignment would overlap with the measurement period (SMTC or MG). In an embodiment, transmission of UL data is known by the UE in advanced, if the UE is configured with configured grant (CG) resources. In an embodiment, the UE 120 may detect a need for transmission of PHR in uplink on a subframe that overlaps with the measurement period (SMTC or MG). Transmission of the PHR is a (control) signaling function that is associated with data transfer because the UE indicates in the PHR how much transmission power left for a UE to use in addition to the power being used by past transmissions. In an embodiment, the UE 120 may detect a need for transmission of BSR in uplink on a subframe that overlaps with the measurement period (SMTC or MG). Transmission of the BSR is a (control) signaling function that is associated with data transfer because the UE triggers / continues UL data transmission by transmitting BSR. If the determination of step 404 results in determining that there is an overlap, the method proceeds to step 406. In step 406, the UE 120 determines whether at least one predetermined rule with respect to the data is met. In an embodiment, the UE 120 determines that the at least one predetermined rule with respect to the data is met. In an embodiment, the at least one rule is received from the network (e.g. gNB 110), e.g. the network configures the at least one rule to the UE 120. In another embodiment, the rule is preconfigured to the UE 120. In an embodiment, the at least one predetermined rule requires that priority of the data to be transferred is above a priority threshold. In other words, in this embodiment, the data needs to be of high importance to meet the rule. In an embodiment, priority of the data is defined by at least one of the following: a priority of a logical channel (LCH) or a logical channel group (LCG) associated with the data, a physical layer priority configured for a SR resource associated with the data, the highest priority among the LCHs or LCGs which are associated with the data, the highest priority among the LCHs or LCGs which trigger the transmission of a buffer status report, or a physical layer priority associated with the data. In an embodiment, different LCHs or LCGs may have different priorities. The priority of a data packet (e.g., PDU) may be determined by the priority of the LCH or LCG to which the data is associated with. Such LCH or LCG may be e.g., the LCH / LCG that triggered transmission of the SR. For example, LCHs or LCGs handling XR data may have higher priority than some other LCHs or LCGs handling non-time critical data, such as non-URLLC data. In an embodiment, if there is data to be transmitted from a plurality of LCHs / LCGs, then the highest priority among the LCHs or LCGs which are associated with the data may define the priority for the data. In one embodiment, only those LCHs / LCGs for which non-empty buffer status (or buffer status larger than a predetermined threshold) is reported in the BSR are considered. In an embodiment, the highest priority among the LCHs or LCGs which trigger the transmission of a BSR or PHR may define the priority for the data. Different physical layer resources may have different priorities. In an embodiment, the priority of the resource used for transmission of the SR may define the priority for the data. In another embodiment, the priority of the resource assigned for transmission of the data (e.g. PUSCH) may define the priority for the data. In an embodiment, the at least one predetermined rule requires that delay budget associated with the data to be transferred is less than a delay threshold. For example, there may be a packet delay budget (PDB) associated with the data (e.g. with the PDUs to be transmitted). The delay threshold can be in the form of PDB as signalled as part of the 5Q1 (5G QoS Identifier), which is a pointer to a set of QoS characteristics such as priority level, packet delay, packet error rate, etc. In other embodiments the delay threshold comprises a PDU set delay budget (PSDB), which is measured either in terms of the arrival of the first packet of the PDU Set or the last packet of the PDU Set. If the determination of step 406 results in a determination that the at least one rule is met, then the method proceeds to step 408. In step 408 of Figure 4, based on the determining that the measurement period at least partially overlaps the at least one function (in step 404) and that the at least one predetermined rule is met (in step 406), the UE 120 decides to skip RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period. That is, when both criteria of steps 404 and 406 are met, the UE 120 may decide to prioritize data transmission over RRM measurements. Alternatively, in step 410, based on the determining that the measurement period does not overlap the at least one function associated with the transfer of data (in step 404) or the at least one predetermined rule is not met (in step 406), the UE 120 may perform RRM measurements during the measurement period based on the measurement configuration. That is, when either of the criteria of steps 404 or 406 is not met, the UE 120 may decide to prioritize RRM measurements over data transmission. In an embodiment, there are predetermined at least one criterion for determining that a measurement period at least partially overlaps the at least one function associated with the transfer of data. Such criterion may be e.g. that a SR for data transfer or a BSR associated with the data transfer is transmitted to the network (e.g. to the gNB 110) from the UE 120 within a predetermined time window before the start of the measurement period. In an embodiment, the UE 120 receives an indication of the predetermined time window from the network (e.g. from the gNB 110). Alternatively, the length of the predetermined time window is preconfigured to the UE 120. Let us consider a case where the UE 120 transmits a SR to the gNB 110 to ask for an UL grant to send UL data over PUSCH. Although discussing SR in the examples, similar trigger can be e.g. a transmission of BSR. That is, skipping based on buffer size can also be configured and used in case BSR is transmitted shortly before the start of the MG / SMTC window. If the UE 120 sends the SR shortly (e.g. within the predetermined time window) before the start of a MG / SMTC window and the data fulfils the predetermine rule (e.g. high priority) for skipping MG / SMTC is fulfilled, then both the UE 120 and the gNB 110 assume that the MG / SMTC is skipped such that the UE 120 prioritizes decoding PDCCH and UL transmission. As a consequence, the gNB 110 is expected to transmit the UL grant in the DCI over PDCCH upon the reception of the SR and schedule the transmission at the first UL opportunity after the reception of the SR. In an embodiment, the UE indicates (e.g. in the SR) to the gNB that the data related to the SR is of high priority. For example, different PUCCH resources can be configured for SR with different priorities. Therefore, once SR is received at gNB side, the gNB is aware whether the SR is triggered by high priority data or low priority data. In another embodiment, the gNB is not notified about the priority of the data. In such case, the gNB may listen to potential UL transmissions even if colliding with MG / SMTC windows. If the SR is not sent within the predetermined time window or the data does not meet the rule (e.g. is not high priority data), then the UE 120 follows the standard procedure when entering the MG / SMTC window to prioritize RRM measurements over PDCCH decoding, PUCCH and PUSCH transmission. As a consequence, the gNB 110 considers the UE 120 as unavailable for scheduling during the MG / SMTC window and postpones the transmission of the UL grant in the DCI over PDCCH after the MG / SMTC window. In an embodiment, the UE 120 may send an (explicit) indication to the network (e.g. to the gNB 110), the indication indicating the decision that has been performed in step 408 (i.e. to skip the RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period). This may be called an explicit indication of the decision of step 408 to the network. In an embodiment related to the explicit indication, the gNB 110 may not need to send an indication / configuration of the rule(s) and / or criteria / criterion to the UE 120. This is because the UE may decide to perform the RRM measurement skipping based on UE’s own defined rule(s) and / or criteria / criterion, and then indicate the decision of skipping to the gNB 110. In case of explicit indication of MG / SMTC window skipping, the following steps may be performed for SR by the UE 120. The UE 120 transmits a SR to the gNB 110 to request for an UL grant to send UL data over PUSCH and an indication of whether or not to skip the MG / SMTC window (if the above mentioned criteria and rules for skipping MG / SMTC are fulfilled). The indication may be sent together with SR or as a separate message. The UE 120 shall in this manner indicate its decision whether to skip the MG / SMTC window to the network based on a configuration received from the network, i.e. the network may inform the UE about the rule(s) related to the data and the criterion / criteria related to the overlap determination, and whether or not to send such indication or not. Such configuration may be conveyed e.g., via RRC signaling. If the UE 120 indicates its intention to skip the MG / SMTC window, then the UE 120 prioritizes decoding PDCCH and UL transmission and MG / SMTC is skipped. Else the UE 120 follows the standard procedure when entering the MG / SMTC window to prioritize RRM measurements over PDCCH decoding, PUCCH and PUSCH transmission. The gNB may perform in this case as follows. If the gNB 110 receives the SR and the indication to skip the MG / SMTC window, then the gNB 110 assumes that the MG / SMTC is skipped and that the UE 120 prioritizes decoding PDCCH and UL transmission. The gNB 110 is then expected to transmit the UL grant in the DC1 over PDCCH upon the reception of the SR and schedule the transmission at the first UL opportunity after the reception of the SR. If the gNB 110 is indicated by the UE 120 that the UE 120 is not going to skip the MG / SMTC, then the gNB considers the UE 120 unavailable for scheduling during the MG / SMTC window and postpones the transmission of the UL grant in the DC1 over PDCCH after the MG / SMTC window. In an embodiment the explicit indication is a single bit indicating that the next measurement period of the measurement configuration is to be skipped. In other words, the intention to either skip or maintain the next MG / SMTC window(s) is indicated to the network using for example a single bit (e.g., 0: to indicate that the next MG / SMTC window is not skipped). Alternatively, the UE only indicates when the intention is to skip the next MG / SMTC window(s). In an embodiment, if the UE does not send an explicit indication, the UE and gNB assume the UE prioritizes RRM measurements over PDCCH decoding and PUCCH / PUSCH transmission (implicit indication discussed later). As implementation example, the single bit indication can be carried over e.g. different sequences or different cyclic shifts of the same sequence, different time and / or frequency resources, or with different DMRS (for the case with long PUCCH format or BSR over PUSCH resource). In an embodiment, the explicit indication comprises a bit combination indicating a number of following measurement periods of the measurement configuration to be skipped. That is, the indication can be implemented as a number of MG / SMTC windows in which the RRM measurements are going to be skipped and in which data transfer related functions are prioritised. In yet one embodiment, the explicit indication is represented as a single bit, wherein the number of MG / SMTC windows that are to be skipped, when the single bit skipping indication is received, is configured using RRC signalling (from gNB to UE) at an earlier timer instant. Alternatively, such number is preconfigured or specified. In an embodiment, the explicit indication comprises information related to internal state of the UE 120. Since the UE may decide to perform the RRM measurement skipping based on UE’s own defined rule(s) and / or criteria / criterion, it may be beneficial for the gNB to know which parameters / rules / criteria were used as a basis of the decision, or what was the state of the UE at the time of making the decision in step 408. For example, the skipping of RRM measurements is only applied if mobility state, buffer size and / or remaining delay budget is above / below threshold. In an embodiment the information related to internal state of the UE comprises a mobility state of the UE 120. For example, skipping is only applicable if the either Medium- or High-mobility state is detected. The different mobility state states may be based on different mobility state thresholds known to the UE. In an embodiment the information related to internal state of the UE comprises a buffer size at the UE 120. For example, skipping may be allowed only if SR is transmitted shortly before the start of the MG / SMTC window and buffer size is larger than a buffer threshold. In an embodiment the information related to internal state of the UE comprises a remaining delay budget. For example, skipping may be allowed only if SR is transmitted shortly before the start of the MG / SMTC window and remaining delay budget is smaller than a delay threshold. Or in an embodiment, skipping is allowed only if SR is transmitted shortly before the start of the MG / SMTC window and buffer size is larger than the buffer threshold and remaining delay budget is smaller than the delay threshold. Since the decision to skip RRM measurements during the measurement period is based on UE’s internal variables that may be unknown to the network, the explicit skipping indication of MG / SMTC window(s) may be transmitted by the UE 110. In an embodiment, predetermined thresholds on any of these (mobility state, buffer state, delay budget) are either configured by the gNB 110 during RRC and / or negotiated between the gNB and the UE during a PDU Session setup. As an example, the UE may send an intention not to skip the measurements during the SMTC / MG window and another indication related to e.g. buffer status, to let the gNB 110 decide which priority shall be assigned to the UE in the next scheduling opportunity (e.g., two bits: 01, wherein the first bit indicates not skip RRM measurements and the second bit indicates that buffer state is above threshold). A reason for prioritizing RRM measurements may be that the UE considers measurements to be more important than transmitting data in cases when many measurement opportunities in a row have already been skipped (i.e. deprioritized due to overlapping data transmission. As an alternative to the explicit indication, an implicit indication is possible. In this case, RRC signalling from the gNB to the UE may include the rule(s) and / or criteria / criterion defining what is high-priority or delay critical data and the time window to be used for determining whether there is overlap. This ensures that both parties (UE and gNB) operate with same understanding of when to perform the RRM measurement skipping. For example, the time window (or in general what “shortly before” means) can in an embodiment be expressed in units of OFDMA symbols, slots or subframes. In such embodiment, if there are at maximum X symbols, slots, or subframes between the transmission of the SR or BSR and the start of a MG / SMTC window, then it would be decided by both parties (UE and gNB) that there is overlap. The value of X may be part of the criterion / criteria and may be conveyed by means of RRC configuration / signaling. The value of X may be selected taking into account the gNB and UE processing times, which may all be known at the gNB-side, given the UE’s processing capabilities as already standardized by 3GPP. In another possible implementation, the value of X may be fixed in specifications. In another possible implementation, the value of X may be different for different UEs. In an embodiment of the implicit indication, other parameters related to the information communicated in the SR or BSR can be used by the network to control the MG / SMTC window skipping. For example, in case skipping is triggered based on SR transmission, the network can configure the UE to autonomously (i.e., implicitly) skip the MG / SMTC window only when high priority is configured for the corresponding scheduling request resource (e.g. phy-Priority Index = 1 in SchedulingRequestResourceConfig), or only if the priority of the LCH / LCG the SR corresponds to is above a predefined priority threshold. As another example, in case skipping is triggered based on BSR transmission, the network can configure the UE to autonomously (i.e., implicitly) skip the MG / SMTC window only when the highest priority among the logical channels and / or logical channel groups for which non-empty buffer status (or buffer status larger than a threshold) is reported in the BSR is above a predefined priority threshold. In an embodiment, implicit skipping of MG / SMTC window after BSR report can be controlled and configured by the network by extending the BSR-Config information element with the following: • measurementsSkipping: If enabled, the UE prioritizes decoding of PDCCH and transmission on PUCCH and PUSCH if the time between BSR transmission and beginning of next SMTC window is smaller than measurementsSkipping-DelayTimer. Otherwise UE performs measurements according to SMTC configuration • measurementsSkipping-DelayTimer: Value in number of subframes. Value sfl corresponds to 1 subframe, value sf2 corresponds to 2 subframes and so on. Let us look at operation of UE and gNB in case of the implicit indication. If the UE 120 sends the SR shortly before the start of a MG / SMTC window (i.e. the number of symbols, slots, or subframes before the start of the MG / SMTC window is smaller than or equal to the maximum value X signalled through RRC, as explained above), then both UE and gNB assume that the MG / SMTC is skipped such that the UE will prioritize decoding PDCCH and UL transmission. Consequently, the gNB is expected to transmit the UL grant in the DC1 over PDCCH upon the reception of the SR and schedule the transmission at the first UL opportunity after the reception of the SR. In case the SR is not sent within the time window defined by X, then the UE follows the standard procedure when entering the MG / SMTC window to prioritize RRM measurements over PDCCH decoding, PUCCH and PUSCH transmission, and the gNB considers the UE unavailable for scheduling during the MG / SMTC window and postpone the transmission of the UL grant in the DC1 over PDCCH after the MG / SMTC window. Unlike in network centric solutions, the decision in either of step 408 or 410) is performed autonomously by the UE 120 without assistance, such as a command or approval, from the network. For example, the decision to skip MG / SMTC windows is taken by the UE 120 based on an earlier network configuration, but the network does not tell the UE to skip RRM measurements MG / SMTC specifically. The UE itself makes such decision. This decision to skip a MG / SMTC window reduces the corresponding scheduling restriction, hence avoids unnecessary delays due to unavailability of resources for sending the scheduling DC1 and the corresponding UL transmission. This may be important for XR use cases (and other applications with strict latency requirements) as delaying a transmission due to a MG / SMTC may violate the PDB constraint for most cases. It is worth to point out that the proposed scheme is equally applicable to the cases where the UL data transmission is triggered by either a SR or a BSR. In case of BSR, the procedure and decision to skip the MG / SMTC window may depend on the size of the buffer and / or the priority of the LCG indicated in the BSR, for example. Looking from network point of view, Figure 5 depicts an example method. The method may be computer-implemented. The method may be performed by a network node, such as the gNB 110 or an apparatus comprised in the gNB 110. In step 500 the gNB 110 transmit to a user equipment a measurement configuration for performing radio resource management (RRM) measurements. In step 502, the gNB 110 determines a need to transfer data between the UE and the gNB 110. This may be based on reception of SR / BSR, for example. In step 504 it is determined whether a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data. If the determination of step 504 results in determining that there is an overlap, the method proceeds to step 506. In step 506 it is determined whether at least one predetermined rule with respect to the data is met. If the determination of step 506 results in a determination that the at least one rule is met, then the method proceeds to step 508. Then, in step 508, based on the determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, the gNB 110 assumes that the UE 120 is skipping RRM measurements during the measurement period and is available for the at least one function associated with the transfer of data during the measurement period. This function may be e.g. transmission of DC1 or reception of PUSCH, for example. In step 509, the gNB 110 may then perform at least one function associated with the transfer of data during the measurement period. Alternatively, in step 510, based on the determining that the measurement period does not overlap the at least one function associated with the transfer of data (in step 504) or the at least one predetermined rule is not met (in step 506), the gNB 110 assumes that the UE 120 performs RRM measurements during the measurement period based on the measurement configuration. That is, when either of the criteria is not met, the UE 120 may decide to prioritize RRM measurements over data transmission. In this case, the gNB 110 may in step 511 postpone performing the at least function. The postponing may be until the measurement period has ended. Figure 6 shows an example of a signalling flow diagram for a case when the MG / SMTC window skipping is caused by the SR being sent shortly before the MG / SMTC window. In this example, the network decides the behaviour and configuration that is used to skip the MG / SMTC window via RRC signalling. The configuration can include parameters like the maximum time window (i.e. a predetermined time window, or in other words what “shortly before” means) between the SR (or BSR) transmission and the start of the next MG / SMTC window that triggers the skipping condition (i.e., threshold in Figure 6), the number of MG / SMTC window(s) that can be skipped, whether to use implicit or explicit indication for skipping MG / SMTC window(s). In case of explicit skipping indication, additional parameters that are used in the skipping decision may include e.g. the mobility state(s) for which MG / SMTC window should be skipped and / or the minimum size of the UE buffer for which MG / SMTC window should be skipped in case SR is transmitted shortly before the start of the MG / SMTC window, for example. In Figure 6, the interval of time between the SR transmission performed by the UE and the next MG / SMTC window X is smaller than the threshold (i.e. within the predetermined time window before the start of the measurement period) configured via RRC signalling, the UE then skips the MG / SMTC window and the network schedules the UL data transmission by sending the DC1 over the PDCCH without waiting for the end of the MG / SMTC window. Note that the second MG / SMTC window need not be skipped in this example since the interval of time between the BSR and the MG / SMTC window X is larger than the threshold (i.e. not within the predetermined time window before the start of the measurement period). Thus, in Figure 6, according to the behavior agreed between network and UE, the MG / SMTC window is skipped after the SR transmission. Depending on the implementation, the skip indication can be explicitly transmitted or implicitly inferred by NW (e.g. the gNB 110) and the UE 120, if the time between the UL transmission and the next MG / SMTC window is smaller than the threshold. Figure 7 illustrates an example of a signalling flow diagram when the MG / SMTC window skipping is caused by the BSR being sent shortly before the MG / SMTC window. In this picture, the SR does not cause the skipping of the next MG / SMTC window since the interval of time between the SR and the MG / SMTC window X is larger than the threshold configured via RRC signalling (i.e. SR is not sent within the predetermined time window before the start of the measurement period). However, such interval for the BSR is shorter than the threshold. Thus, in this case of Figure 7, according to the behaviour agreed between network and UE, the MG / SMTC window is skipped after the BSR transmission. Depending on the implementation, the skip indication can be explicitly transmitted or implicitly inferred by NW and UE, if the time between the UL transmission and the next MG / SMTC window is smaller than the threshold. Figure 8 shows the same example as Figure 2 using one of the proposed embodiments. Since the UE explicitly indicates its intention to skip MG / SMTC window after the transmission of the BSR (“skipping indication” in the Figure), the UE is available for scheduling during the measurement period. Therefore, the network can schedule the UL transmission in the first U slot that falls inside the MG / SMTC window (for which RRM measurement are skipped) and the packet is delivered within the PDB. Note that even if explicit indication is assumed in Figure 8, similar advantage could be achieved with e.g. implicit signalling based on nonempty BSR. Basically, the presence of a non-empty BSR in data transmission may be seen as an implicit indication that the UE will skip the MG / SMTC window. An embodiment, as shown in Figure 9, provides an apparatus 10 comprising a control circuitry (CTRL) 12, such as at least one processor, and at least one memory 14 storing instructions that, when executed by the at least one processor, cause the apparatus at least to carry out any one of the above-described processes. In an example, the at least one memory and the computer program code (software), are configured, with the at least one processor, to cause the apparatus to carry out any one of the above-described processes. The memory may be implemented using any suitable data storage technology, such as semiconductorbased memory devices, flash memory, magnetic memory devices and systems, optical memory devices and systems, fixed memory and removable memory. The memory may comprise a database for storing data. In an embodiment, the apparatus 10 may comprise the terminal device of a communication system, e.g. a user terminal (UT), a computer (PC), a laptop, a tabloid computer, a cellular phone, a mobile phone, a communicator, a smart phone, a palm computer, a mobile transportation apparatus (such as a car), a household appliance, or any other communication apparatus, commonly called as UE in the description. Alternatively, the apparatus is comprised in such a terminal device. Further, the apparatus may be or comprise a module (to be attached to the UE) providing connectivity, such as a plug-in unit, an “USB dongle”, or any other kind of unit. The unit may be installed either inside the UE or attached to the UE with a connector or even wirelessly. In an embodiment, the apparatus 10 is or is comprised in the UE 120. The apparatus may be caused to execute some of the functionalities of the above described processes, such as the steps of Figure 4. The apparatus may further comprise a radio interface (TRX) 16 comprising hardware and / or software for realizing communication connectivity according to one or more communication protocols. The TRX may provide the apparatus with communication capabilities to access the radio access network, for example. The apparatus may also comprise a user interface 18 comprising, for example, at least one keypad, a microphone, a touch display, a display, a speaker, etc. The user interface may be used to control the apparatus by the user. The control circuitry 12 may comprise relevant circuitry / ies for performing the functions, according to any of the embodiments. An embodiment, as shown in Figure 10, provides an apparatus 50 comprising a control circuitry (CTRL) 52, such as at least one processor, and at least one memory 54 storing instructions that, when executed by the at least one processor, cause the apparatus at least to carry out any one of the above-described processes. In an example, the at least one memory and the computer program code (software), are configured, with the at least one processor, to cause the apparatus to carry out any one of the above-described processes. The memory may be implemented using any suitable data storage technology, such as semiconductorbased memory devices, flash memory, magnetic memory devices and systems, optical memory devices and systems, fixed memory and removable memory. The memory may comprise a database for storing data. In an embodiment, the apparatus 50 may be or be comprised in a network node, such as in gNB / gNB-CU / gNB-DU of 5G. In an embodiment, the apparatus is or is comprised in the network node 110. The apparatus may be caused to execute some of the functionalities of the above described processes, such as the steps of Figure 5. In an embodiment, a CU-DU (central unit - distributed unit) architecture is implemented. In such case the apparatus 50 may be comprised in a central unit (e.g. a control unit, an edge cloud server, a server) operatively coupled (e.g. via a wireless or wired network) to a distributed unit (e.g. a remote radio head / node). That is, the central unit (e.g. an edge cloud server) and the radio node may be stand-alone apparatuses communicating with each other via a radio path or via a wired connection. Alternatively, they may be in a same entity communicating via a wired connection, etc. The edge cloud or edge cloud server may serve a plurality of radio nodes or a radio access networks. In an embodiment, at least some of the described processes may be performed by the central unit. In another embodiment, the apparatus may be instead comprised in the distributed unit, and at least some of the described processes may be performed by the distributed unit. In an embodiment, the execution of at least some of the functionalities of the apparatus 50 may be shared between two physically separate devices (DU and CU) forming one operational entity. Therefore, the apparatus may be seen to depict the operational entity comprising one or more physically separate devices for executing at least some of the described processes. In an embodiment, the apparatus controls the execution of the processes, regardless of the location of the apparatus and regardless of where the processes / functions are carried out. The apparatus may further comprise communication interface (TRX) 56 comprising hardware and / or software for realizing communication connectivity according to one or more communication protocols. The TRX may provide the apparatus with communication capabilities to access the radio access net-work, for example. The apparatus may also comprise a user interface 58 comprising, for example, at least one keypad, a microphone, a touch display, a display, a speaker, etc. The user interface may be used to control the apparatus by the user. The control circuitry 52 may comprise relevant circuitry / ies for performing the functions, according to any of the embodiments. In an embodiment, an apparatus carrying out at least some of the embodiments described comprises at least one processor and at least one memory including a computer program code, wherein the at least one memory and the computer program code are configured, with the at least one processor, to cause the apparatus to carry out the functionalities according to any one of the embodiments described. According to an aspect, when the at least one processor executes the computer program code, the computer program code causes the apparatus to carry out the functionalities according to any one of the embodiments described. According to another embodiment, the apparatus carrying out at least some of the embodiments comprises the at least one processor and at least one memory including a computer program code, wherein the at least one processor and the computer program code perform at least some of the functionalities according to any one of the embodiments described. Accordingly, the at least one processor, the memory, and the computer program code form processing means for carrying out at least some of the embodiments described. According to yet another embodiment, the apparatus carrying out at least some of the embodiments comprises a circuitry including at least one processor and at least one memory including computer program code. When activated, the circuitry causes the apparatus to perform the at least some of the functionalities according to any one of the embodiments described. As used in this application, the term ‘circuitry’ refers to all of the following: (a) hardware-only circuit implementations, such as implementations in only analog and / or digital circuitry, and (b) combinations of circuits and soft-ware (and / or firmware), such as (as applicable): (i) a combination of processor(s) or (ii) portions of processor(s) / software including digital signal processor(s), software, and memory(ies) that work together to cause an apparatus to perform various functions, and (c) circuits, such as a microprocessor(s) or a portion of a microprocessor(s), that require software or firmware for operation, even if the software or firmware is not physically present. This definition of ‘circuitry’ applies to all uses of this term in this application. As a further example, as used in this application, the term ‘circuitry’ would also cover an implementation of merely a processor (or multiple processors) or a portion of a processor and its (or their) accompanying software and / or firmware. The term ‘circuitry’ would also cover, for example and if applicable to the particular element, a baseband integrated circuit or applications processor integrated circuit for a mobile phone or a similar integrated circuit in a server, a cellular network device, or another network device. In an embodiment, at least some of the processes described may be carried out by an apparatus comprising corresponding means for carrying out at least some of the described processes. Some example means for carrying out the processes may include at least one of the following: detector, processor (including dual-core and multiple-core processors), digital signal processor, controller, receiver, transmitter, encoder, decoder, memory, RAM, ROM, software, firmware, display, user interface, display circuitry, user interface circuitry, user interface software, display software, circuit, antenna, antenna circuitry, and circuitry. A term non-transitory, as used herein, is a limitation of the medium itself (i.e. tangible, not a signal) as opposed to a limitation on data storage persistency (e.g. RAM vs. ROM). As used herein the term “means” is to be construed in singular form, i.e. referring to a single element, or in plural form, i.e. referring to a combination of single elements. Therefore, terminology “means for [performing A, B, C]”, is to be interpreted to cover an apparatus in which there is only one means for performing A, B and C, or where there are separate means for performing A, B and C, or partially or fully overlapping means for performing A, B, C. Further, terminology “means for performing A, means for performing B, means for performing C" is to be interpreted to cover an apparatus in which there is only one means for performing A, B and C, or where there are separate means for performing A, B and C, or partially or fully overlapping means for performing A, B, C. The techniques and methods described herein may be implemented by various means. For example, these techniques may be implemented in hardware (one or more devices), firmware (one or more devices), software (one or more modules), or combinations thereof. For a hardware implementation, the apparatus(es) of embodiments may be implemented within one or more application-specific integrated circuits (ASICs), digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), field programmable gate arrays (FPGAs), processors, controllers, micro-controllers, microprocessors, other electronic units designed to perform the functions described herein, or a combination thereof. For firmware or software, the implementation can be carried out through modules of at least one chip set (e.g. procedures, functions, and so on) that perform the functions described herein. The software codes may be stored in a memory unit and executed by processors. The memory unit may be implemented within the processor or externally to the processor. In the latter case, it can be communicatively coupled to the processor via various means, as is known in the art. Additionally, the components of the systems described herein may be rearranged and / or complemented by additional components in order to facilitate the achievements of the various aspects, etc., described with regard thereto, and they are not limited to the precise configurations set forth in the given figures, as will be appreciated by one skilled in the art. Embodiments as described may also be carried out in the form of a computer process defined by a computer program or portions thereof. Embodiments of the methods described may be carried out by executing at least one portion of a computer program comprising corresponding instructions. The computer program may be in source code form, object code form, or in some intermediate form, and it may be stored in some sort of carrier, which may be any entity or device capable of carrying the program. For example, the computer program may be stored on a computer program distribution medium readable by a computer or a processor. The computer program medium may be, for example but not limited to, a record medium, computer memory, read-only memory, electrical carrier signal, telecommunications signal, and software distribution package, for example. The computer program medium may be a non-transitory medium. Coding of software for carrying out the embodiments as shown and described is well within the scope of a person of ordinary skill in the art. Following is a list of some aspects of the invention. According to a first aspect, there is provided a method for a user equipment, the method comprising: receiving, from a network, a measurement configuration for performing radio resource management (RRM) measurements; determining a need to transfer data between the user equipment and the network; determining whether: a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data, and at least one predetermined rule with respect to the data is met; and based on the determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, deciding to skip RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period. Various embodiments of the first aspect may comprise at least one feature from the following bulleted list: • wherein the measurement period comprises at least one of a measurement gap or a synchronization signal block measurement timing configuration (SMTC). • wherein the at least one function associated with the transfer of data comprises at least one of the following: transmission of a scheduling request; reception of an uplink grant; reception of a downlink assignment; transmission of data reception of data; transmission of power headroom report; or transmission of a buffer status report. • receive the at least one predetermined rule from the network node. • wherein the at least one predetermined rule requires that a priority of the data to be transferred is above a predetermined priority threshold. • wherein the priority of the data is defined by at least one of the following: a priority of a logical channel or a logical channel group associated with the data; a physical layer priority configured for a scheduling request resource associated with the data; the highest priority among the logical channels or logical channel groups which are associated with the data; the highest priority among the logical channels or logical channel groups which trigger the transmission of a buffer status report; or a physical layer priority associated with the data. • wherein the at least one predetermined rule requires that delay budget associated with the data to be transferred is less than a delay threshold. • wherein the measurement period at least partially overlaps the at least one function associated with the transfer of data when a scheduling request for data transfer or a buffer status report associated with the data transfer is transmitted to the network node within a predetermined time window before the start of the measurement period. • receive an indication of the predetermined time window from the network node. • wherein the decision is performed autonomously by the apparatus. • send an indication to the network node indicating the decision to skip the RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period. • wherein the indication is a single bit indicating that next measurement period of the measurement configuration is to be skipped. • wherein the indication comprises a bit combination indicating the number of following measurement periods of the measurement configuration to be skipped. • wherein the indication comprises information related to internal state of the apparatus, the information comprising at least one of the following: a mobility state of the apparatus, a buffer size at the apparatus, or a remaining delay budget. • based on the determining that the measurement period does not overlap the at least one function associated with the transfer of data or the at least one predetermined rule is not met, perform RRM measurements during the measurement period based on the measurement configuration. According to a second aspect, there is provided a method for a network node, comprising: transmitting, to a user equipment, a measurement configuration for performing radio resource management (RRM) measurements; determining a need to transfer data between the apparatus and the network node; determining whether: a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data, and at least one predetermined rule with respect to the data is met; based on the determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, assuming that the user equipment is skipping RRM measurements during the measurement period and is available for the at least one function associated with the transfer of data during the measurement period; and performing the at least one function associated with the transfer of data during the measurement period. Various embodiments of the second aspect may comprise at least one feature from the following bulleted list: • wherein the measurement period comprises at least one of a measurement gap or a synchronization signal block measurement timing configuration (SMTC). • wherein the at least one function associated with the transfer of data comprises at least one of the following: transmission of a scheduling request; reception of an uplink grant; reception of a downlink assignment; transmission of data reception of data; transmission of power headroom report; or transmission of a buffer status report. • transmit the at least one predetermined rule from the network node. • wherein the at least one predetermined rule requires that a priority of the data to be transferred is above a predetermined priority threshold. • wherein the priority of the data is defined by at least one of the following: a priority of a logical channel or a logical channel group associated with the data; a physical layer priority configured for a scheduling request resource associated with the data; the highest priority among the logical channels or logical channel groups which are associated with the data; the highest priority among the logical channels or logical channel groups which trigger the transmission of a buffer status report; or a physical layer priority associated with the data. • wherein the at least one predetermined rule requires that delay budget associated with the data to be transferred is less than a delay threshold. • wherein the measurement period at least partially overlaps the at least one function associated with the transfer of data when a scheduling request for data transfer or a buffer status report associated with the data transfer is transmitted to the network node within a predetermined time window before the start of the measurement period. • transmit an indication of the predetermined time window from the network node. • receive an indication to the network node indicating the decision to skip the RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period. • wherein the indication is a single bit indicating that next measurement period of the measurement configuration is to be skipped. • wherein the indication comprises a bit combination indicating the number of following measurement periods of the measurement configuration to be skipped. • wherein the indication comprises information related to internal state of the apparatus, the information comprising at least one of the following: a mobility state of the apparatus, a buffer size at the apparatus, or a remaining delay budget. • based on the determining that the measurement period does not overlap the at least one function associated with the transfer of data or the at least one predetermined rule is not met, assuming the user equipment perform RRM measurements during the measurement period based on the measurement configuration. According to a third aspect, there is provided an apparatus, comprising: at least one processor; and at least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least to: receive, from a network node, a measurement configuration for performing radio resource management (RRM) measurements; determine a need to transfer data between the apparatus and the network node; determine whether: a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data, and at least one predetermined rule with respect to the data is met; based on the determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, decide to skip RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period. Various embodiments of the third aspect may comprise at least one feature from the bulleted list under the first aspect. According to a fourth aspect, there is provided an apparatus, comprising: at least one processor; and at least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least to: transmit, to a user equipment, a measurement configuration for performing radio resource management (RRM) measurements; determine a need to transfer data between the apparatus and the user equipment; determine whether: a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data, and at least one predetermined rule with respect to the data is met; based on the determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, assume that the user equipment is skipping RRM measurements during the measurement period and is available for the at least one function associated with the transfer of data during the measurement period; and perform the at least one function associated with the transfer of data during the measurement period. Various embodiments of the fourth aspect may comprise at least one feature from the bulleted list under the second aspect. According to a fifth aspect, there is provided a computer program product embodied on a distribution medium and comprising program instructions which, when executed by an apparatus, cause the apparatus to carry out the method according to the first aspect. According to a sixth aspect, there is provided a computer program product embodied on a distribution medium and comprising program instructions which, when executed by an apparatus, cause the apparatus to carry out the method according to the second aspect. According to a seventh aspect, there is provided a computer program product comprising program instructions which, when executed by an apparatus, cause the apparatus to carry out the method according to the first aspect. According to an eight aspect, there is provided a computer program product comprising program instructions which, when executed by an apparatus, cause the apparatus to carry out the method according to the second aspect. According to a ninth aspect, there is provided an apparatus, comprising means for performing the method according to the first aspect, and / or means configured to cause the apparatus to perform the method according to the first aspect. According to a tenth aspect, there is provided an apparatus, comprising means for performing the method according to the second aspect, and / or means configured to cause the apparatus to perform the method according to the second aspect. According to an eleventh aspect, there is provided computer implemented system, comprising: a server and at least one radio node; and at least one processor and at least one memory storing instructions that, when executed by the at least one processor, cause the system at least to carry out the method according to the first aspect and / or the method according to the second aspect. According to a twelfth aspect, there is provided computer implemented system, comprising: one or more processors; at least one data storage, and one or more computer program instructions to be executed by the one or more processors in association with the at least one data storage for carrying out the method according to the first aspect and / or the method according to the second aspect. Even though the invention has been described above with reference to an example according to the accompanying drawings, it is clear that the invention is not restricted thereto but can be modified in several ways within the scope of the appended claims. Therefore, all words and expressions should be interpreted broadly and they are intended to illustrate, not to restrict, the embodiment. It will be obvious to a person skilled in the art that, as technology advances, the inventive concept can be implemented in various ways. Further, it is clear to a person skilled in the art that the described embodiments may, but are not required to, be combined with other embodiments in various ways.
Claims
1. An apparatus, comprising:at least one processor; andat least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least to:receive, from a network node, a measurement configuration for performing radio resource management (RRM) measurements;determine a need to transfer data between the apparatus and the network node;determine whether:• a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data, and• at least one predetermined rule with respect to the data is met; based on determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, decide to skip RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period.
2. The apparatus of claim 1, Wherein the measurement period comprises at least one of a measurement gap or a synchronization signal block measurement timing configuration (SMTC).
3. The apparatus of any of claims 1 to 2, wherein the at least one function associated with the transfer of data comprises at least one of the following: transmission of a scheduling request;reception of an uplink grant;reception of a downlink assignment;transmission of data;reception of data;transmission of power headroom report; or transmission of a buffer status report.
4. The apparatus of any of claims 1 to 3, wherein the apparatus is further caused to: receive the at least one predetermined rule from the network node.
5. The apparatus of any of claims 1 to 4, wherein the at least one predetermined rule requires that a priority of the data to be transferred is above a predetermined priority threshold.
6. The apparatus of claim 5, wherein the priority of the data is defined by at least one of the following:a priority of a logical channel or a logical channel group associated with the data;a physical layer priority configured for a scheduling request resource associated with the data;the highest priority among the logical channels or logical channel groups which are associated with the data;the highest priority among the logical channels or logical channel groups which trigger the transmission of a buffer status report; ora physical layer priority associated with the data.
7. The apparatus of any of claims 1 to 6, wherein the at least one predetermined rule requires that delay budget associated with the data to be transferred is less than a delay threshold.
8. The apparatus of any of claims 1 to 7, wherein the measurement period at least partially overlaps the at least one function associated with the transfer of data when a scheduling request for data transfer or a buffer status report associated with the data transfer is transmitted to the network node within a predetermined time window before the start of the measurement period.
9. The apparatus of claim 8, wherein the apparatus is further caused to: receive an indication of the predetermined time window from the network node.
10. The apparatus of any of claims 1 to 9, wherein the decision is performed autonomously by the apparatus.
11. The apparatus of any of claims 1 to 10, wherein the apparatus is further caused to:send an indication to the network node indicating the decision to skipthe RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period.
12. The apparatus of claim 11, wherein the indication is a single bit indicating that next measurement period of the measurement configuration is to be skipped.
13. The apparatus of claim 11, wherein the indication comprises a bit combination indicating the number of following measurement periods of the measurement configuration to be skipped.
14. The apparatus of any of claims 11 to 13, wherein the indication comprises information related to internal state of the apparatus, the information comprising at least one of the following: a mobility state of the apparatus, a buffer size at the apparatus, or a remaining delay budget.
15. The apparatus of any of claims 1 to 14, wherein the apparatus is further caused to:based on the determining that the measurement period does not overlap the at least one function associated with the transfer of data or the at least one predetermined rule is not met, perform RRM measurements during the measurement period based on the measurement configuration.
16. The apparatus of any of claims 1 to 15, wherein the apparatus is or is comprised in a user equipment operating in a 3GPP communication network.
17. An apparatus, comprising:at least one processor; andat least one memory storing instructions that, when executed by the at least one processor, cause the apparatus at least to:transmit, to a user equipment, a measurement configuration for performing radio resource management (RRM) measurements;determine a need to transfer data between the apparatus and the user equipment;determine whether:• a measurement period indicated by the measurementconfiguration at least partially overlaps at least one function associated with the transfer of data, and• at least one predetermined rule with respect to the data is met; based on determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, assume that the user equipment is skipping RRM measurements during the measurement period and is available for the at least one function associated with the transfer of data during the measurement period; andperform the at least one function associated with the transfer of data during the measurement period.
18. A method for a user equipment, the method comprising:receiving, from a network node, a measurement configuration for performing radio resource management (RRM) measurements;determining a need to transfer data between the user equipment and the network node;determining whether:• a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data, and• at least one predetermined rule with respect to the data is met; based on determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, deciding to skip RRM measurements during the measurement period and to perform the at least one function associated with the transfer of data during the measurement period.
19. A method for a network node, the method comprising:transmitting, to a user equipment, a measurement configuration for performing radio resource management (RRM) measurements;determining a need to transfer data between the user equipment and the network nodedetermining whether:• a measurement period indicated by the measurement configuration at least partially overlaps at least one function associated with the transfer of data, and• at least one predetermined rule with respect to the data is met; based on determining that the measurement period at least partially overlaps the at least one function and that the at least one predetermined rule is met, assuming that the user equipment is skipping RRM measurements during the measurement period and is available for the at least one function associated with the transfer of data during the measurement period; andperforming the at least one function associated with the transfer of data during the measurement period.
20. An apparatus, comprising means for performing the method according to claim 18 or claim 19.
21. A computer program product embodied on a distribution medium readable by a computer and comprising program instructions which, when the program is executed by an apparatus, cause the apparatus to carry out the method according to claim 18 or claim 19.
22. A computer program product comprising program instructions which, when the program is executed by an apparatus, cause the apparatus to carry out the method according claim 18 or claim 19.
Citation Information
Patent Citations
Methods and apparatus for ultra-reliable low latency communication (URLLC) during measurement gap
US20200015246A1
Method and arrangement in a telecommunication system
US8374600B2
Method and apparatus for handling time-sensitive transmission
WO2021258347A1
Dynamic measurement gap control
WO2022026173A1
UE measurement restrictions to protect critical data receptions
WO2022084023A1
