Information processing apparatus, information processing method, and program

A hybrid model combining physical and machine learning models addresses the accuracy issues in machine learning by using physical models for initial predictions and machine learning to correct residual errors, ensuring accurate and adaptable forecasting.

JP2024134376AActive Publication Date: 2024-10-03KK TOSHIBA
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
JP2023044642
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-20
Publication Date
2024-10-03
Estimated Expiration
2043-03-20

AI Technical Summary

Technical Problem

Machine learning models suffer from deteriorating predictive performance due to correlations between explanatory variables and the presence of noise, leading to increased prediction errors, especially over longer periods.

Method used

A hybrid approach combining a physical model with a machine learning model, where the physical model provides initial predictions, and the machine learning model corrects for residual errors using time-series and control data, enhancing accuracy by constructing a prediction model that accounts for external control information.

Benefits of technology

The combined model maintains high prediction accuracy even when explanatory variables include noise and correlations, and adapts to changes over time, providing reliable forecasts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024134376000001_ABST
    Figure 2024134376000001_ABST
Patent Text Reader

Abstract

To predict an objective variable with high accuracy.SOLUTION: An information processing apparatus comprises: a first predicted value calculation unit which inputs first training data including time-series data to a first model and calculates a predicted value of an objective variable; a first predicted residual amount calculation unit which calculates a first predicted residual amount that is a deviation of the predicted value by using second training data including control data; and a model construction unit which constructs a second model for predicting the first predicted residual amount by machine learning based on the second training data and the first predicted residual amount.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to an information processing device, an information processing method, and a program. [Background technology]

[0002] Machine learning models (hereafter referred to as machine learning models) are used in a variety of fields. Machine learning models can input not only time series data but also control data, which allows for higher prediction accuracy than physical models that cannot handle control data.

[0003] However, the predictive performance of machine learning models declines when explanatory variables are correlated or contain noise. In addition, the prediction error increases as the prediction period becomes longer. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2020-30686 A [Patent Document 2] JP 2020-166622 A [Patent Document 3] Patent Publication No. 2022-76416 [Non-patent literature]

[0005] [Non-Patent Document 1] Isihara, Y. and S. Kobatake (1979); Runoff Model for Flood Forecasting, Bull. DPRI, Kyoto Univ., 29, 27-43 Summary of the Invention [Problem to be solved by the invention]

[0006] An embodiment of the present invention provides an information processing device, an information processing method, and a program capable of predicting a dependent variable with high accuracy. [Means for solving the problem]

[0007] In order to solve the above problems, according to one embodiment of the present invention, there is provided a method for predicting a prediction value of a response variable to be predicted by inputting first learning data including time-series data into a first model, the method comprising: a first prediction residual amount calculation unit that calculates a first prediction residual amount, which is a deviation of the prediction value, by using second learning data; An information processing device is provided, comprising: a model construction unit that constructs a second model that predicts the first prediction residual amount by machine learning based on the second learning data and the first prediction residual amount. [Brief description of the drawings]

[0008] [Figure 1] FIG. 1 is a block diagram showing a schematic configuration of an information processing apparatus according to an embodiment. [Diagram 2] FIG. 13 is a diagram showing an example of data division of learning data for predicting a dam inflow. [Diagram 3] FIG. 13 is a diagram showing an example of data division of learning data for predicting wind power generation. [Figure 4] FIG. 13 is a diagram showing an example of performing classification based on the shape characteristics of time-series data of a response variable and dividing the data into characteristic intervals based on clustering. [Diagram 5] 11A and 11B are diagrams showing an example of calculating the contribution of a physical model for each characteristic section based on a correlation coefficient. [Figure 6] 11 is a flowchart showing the procedure of a learning process of a prediction model. [Figure 7] 4 is a flowchart showing the processing operation of a prediction unit 3 that predicts a future state value or output value of a system, device, or equipment of interest. [Figure 8] FIG. 2 is a diagram for explaining construction of a prediction model for predicting dam inflow according to a first specific example. [Figure 9]FIG. 11 is a diagram for explaining construction of a prediction model for predicting wind power generation amount according to a second specific example. [Figure 10] FIG. 11 is a diagram for explaining construction of a prediction model for predicting a river flow rate or a river water level according to a third specific example. [Figure 11] FIG. 13 is a diagram showing an example of an HQ curve showing the relationship between flow rate and water level. [Figure 12] FIG. 13 is a diagram for explaining construction of a prediction model for predicting a river flow rate or a river water level according to a fourth specific example. [Figure 13] FIG. 13 is a diagram for explaining construction of a prediction model for weather forecasting according to a fifth specific example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0009] Hereinafter, an embodiment of an information processing device, an information processing method, and a program will be described with reference to the drawings. The following description will focus on the main components of the information processing device, but the information processing device may include components and functions that are not shown or described. The following description does not exclude components and functions that are not shown or described.

[0010] Although the physical model can calculate a highly reliable prediction value, it is necessary to perform accurate system calibration and input accurate parameters to the physical model. If the system calibration or parameters are inaccurate, or if the prediction value of the physical model changes over time, the prediction error will be large.

[0011] Furthermore, since physical models cannot take into account external control information (for example, the amount of water discharged from an upstream dam or the amount of water used by a power plant), they cannot make predictions that reflect control operations.

[0012] On the other hand, machine learning models can calculate predicted values ​​taking into account external control information, and can calculate accurate predicted values ​​using past data and the current characteristics of the system or equipment. However, machine learning models have poor predictive performance when there is correlation between input variables or when the input variables contain noise.

[0013] Therefore, an information processing device according to one embodiment is characterized in that it constructs a prediction model that combines a physical model and a machine learning model, and calculates predicted values ​​up to a prediction period using the prediction model.

[0014] Fig. 1 is a block diagram showing a schematic configuration of an information processing device 1 according to an embodiment. The information processing device 1 in Fig. 1 is characterized in that it is capable of predicting various prediction targets using a prediction model that combines a physical model and a machine learning model. As shown in Fig. 1, the information processing device 1 according to an embodiment includes a prediction model learning unit 2 and a prediction unit 3.

[0015] The prediction model learning unit 2 constructs a prediction model that combines a physical model and a machine learning model. In this specification, the physical model may be referred to as a first model, and the prediction model may be referred to as a second model. Also, in this specification, the physical model data input to the physical model (first model) may be referred to as first learning data, and the machine learning data input to the prediction model (second model) may be referred to as second learning data.

[0016] The prediction model learning unit 2 includes a learning data DB (database) 4, a first data division unit 5, a data DB for physical models 6, a data DB for machine learning 7, a physical model memory unit 8, a first predicted value calculation unit 9, a first prediction residual calculation unit 10, a prediction model construction unit 11, a prediction model memory unit 12, and a physical model selection unit 13.

[0017] The learning data DB4 stores learning data. The learning data includes time series data of the state or output of a system, device, or equipment of interest, or time series data of external factors that affect the system, device, or equipment. The time series data is, for example, past measurement values ​​(actual values), values ​​obtained by simulation, future predicted values, or data used in a simulation. All the time series data in the learning data may be past measurement values ​​(actual values), future predicted values, values ​​used in a simulation, or any combination of these values. Furthermore, the past measurement values ​​may be sensor data.

[0018] The learning data DB4 holds time series data of the objective variable to be predicted and time series data of the explanatory variables. Of the time series data, time series data corresponding to the target item of the state or output of a system, device, or equipment is treated as time series data of the objective variable. In other words, the time series data of the objective variable is the state value or output value of the target system, device, or equipment. The time series data of the explanatory variable is time series data of internal or external factors that affect the state value or output value of the target system, device, or equipment. The value of the explanatory variable directly or indirectly affects the value of the objective variable.

[0019] The first data division unit 5 divides the time-series data in the learning data DB4 into data for a physical model and data for machine learning, and stores them separately in the data for a physical model DB6 or the data for machine learning DB7. For example, the first data division unit 5 sets the time-series data required for the physical model as data for a physical model, and sets the remaining data as data for machine learning. The data for a physical model and the data for machine learning may be mutually exclusive, or at least some of the data may overlap.

[0020] The first data division unit 5 may select machine learning data from the learning data using a correlation coefficient between the time series data of the objective variable and the time series data of the explanatory variable, may select machine learning data using a feature selection method, may select machine learning data using an information method (e.g., Akaike Information Criterion, Bayes Information Criterion, etc.), or may select machine learning data using a prediction method. When selecting machine learning data using a prediction method, the time series data of each explanatory variable and objective variable may be divided into teacher data and verification data, a temporary prediction model may be constructed using the teacher data, the prediction error of the verification data may be calculated using the constructed temporary prediction model, and the time series data of some of the top explanatory variables with the smaller prediction error may be selected based on the ascending order of the prediction error. The information processing device 1 of FIG. 1 may construct a prediction model using the selected data for the physical model and data for machine learning.

[0021] The explanatory variables can also be selected using combinatorial optimization. For example, when the objective variables are {X1, X2, X3}, there are combinations of {X1}, {X2}, {X3}, {X1, X2}, {X2, X3}, {X1, X3}, and {X1, X2, X3}. A temporary prediction model can be constructed using data of explanatory variables that are each combined, and the time series data of the explanatory variables of the combination with the lowest prediction error can be used as the machine learning data. The data DB6 for the physical model holds the explanatory variables or the time series data of the objective variables used in the physical model of the objective variables.

[0022] The machine learning data DB 7 stores time-series data of the objective variables and explanatory variables used in machine learning. The machine learning data may include data for a physical model.

[0023] When multiple physical models exist, the physical model selection unit 13 selects the best physical model based on the evaluation scale. The data for the physical models is input to each physical model to calculate the predicted value of the objective variable. The predicted value and actual value of the objective variable are used to calculate the prediction error, which can be used as the evaluation scale. The root mean square error (RMSE), coefficient of determination (R2), mean absolute error (MAE), mean absolute percentage error (MAPE), etc. can be used as the evaluation scale.

[0024] The above-mentioned learning data DB4, first data division unit 5, physical model data DB6, and machine learning data DB7 are not necessarily essential components of the information processing device 1, and for example, the physical model data and machine learning data may be input from outside the information processing device 1.

[0025] The first predicted value calculation unit 9 calculates a predicted value of the dependent variable in the physical model by inputting the physical model data acquired from the physical model data DB 6 into the physical model. The dependent variable is, for example, a dam inflow amount, a wind power generation amount, or a river flow rate. The predicted value calculated by the first predicted value calculation unit 9 may be a predicted value that directly predicts the dependent variable, or may be a predicted value that indirectly predicts the dependent variable.

[0026] The physical model used varies depending on the application of the information processing device 1 according to an embodiment, and in some cases, a plurality of physical models may be used to calculate the predicted value of the objective variable. The physical model may be a formula for calculating the predicted value of the objective variable, or may be configured as a complex simulator. For example, when predicting the inflow amount of a dam or the flow rate of a river, a tank model and a snowmelt model are used as the physical models. Also, when predicting the amount of wind power generation, a wind turbine power generation model is used as the physical model.

[0027] The data input to the physical model varies depending on the physical model used. For example, when a tank model is used to predict dam inflow, the height of the outflow hole (L1, L2, L3), runoff coefficient (α1, α2, α3, α4), and infiltration coefficient (β1, β2, β3) are used as the data for the physical model. When a snowmelt model is used, digital elevation model data, temperature lapse rate, and temperature snowmelt rate are used as the data for the physical model. When predicting wind power generation, the power generation curve, wind turbine parameters, and topographical information are used as the data for the physical model.

[0028] The first prediction residual calculation unit 10 calculates a prediction residual of the physical model (hereinafter referred to as the first prediction residual). The first prediction residual calculation unit 10 calculates the first prediction residual of the physical model by subtracting the predicted value of the objective variable calculated by the first predicted value calculation unit 9 from the objective variable. More specifically, the first prediction residual calculation unit 10 extracts time series data of the objective variable from the machine learning data, and calculates the first prediction residual of the physical model using the extracted time series data of the objective variable, the predicted value of the objective variable calculated by the first predicted value calculation unit 9, and the contribution of the physical model for each characteristic section described later.

[0029] The prediction model construction unit 11 constructs a prediction model for predicting the first prediction residual amount of the physical model by machine learning from the machine learning data, based on the machine learning data and the first prediction residual amount of the physical model calculated by the first prediction residual amount calculation unit 10.

[0030] The prediction model construction unit 11 uses the machine learning data to construct, by machine learning, a prediction model for predicting the first prediction residual amount of the physical model calculated by the first prediction residual amount calculation unit.

[0031] The prediction model may be, for example, a regression model, a model based on deep learning, or a model based on graph deep learning. The regression model may be, for example, linear regression, ridge regression, LASSO, regression tree, support vector regression, gradient boosting regression, or random forest regression. The deep learning model may be, for example, a long short-term memory (LSTM), a recurrent neural network (RNN), a gated recurrent unit (GRU), or a convolutional neural network (CNN). The graph deep learning model may be, for example, a graph neural network (GNN), which is a graph deep learning algorithm. When the prediction model is a classification task, machine learning may be applied, for example, a logistic regression, a support vector machine (SVM), a decision tree, a CNN, an autoencoder, a neural network, or the like.

[0032] The prediction model storage unit 12 stores the prediction model constructed by the prediction model construction unit 11.

[0033] In addition, the prediction model learning unit 2 may have a physical model contribution degree calculation unit 14. The physical model contribution degree calculation unit 14 has a characteristic section division unit 15 and a contribution degree calculation unit 16.

[0034] The characteristic interval division unit 15 divides the prediction period into a plurality of characteristic intervals using a pattern of the time series data of the objective variable. The contribution calculation unit 16 calculates the contribution of the physical model for each characteristic interval. That is, when the physical model selection unit 13 selects two or more physical models, the contribution calculation unit 16 calculates the contribution of each physical model for each characteristic interval. The contribution calculation unit 16 may give the contribution of each physical model for each characteristic interval based on the knowledge of an expert, may set a correlation coefficient between the predicted value calculated by each physical model and the time series data of the objective variable, or may have the user set the contribution in advance. In addition, the contribution of each physical model may be set based on the error between the predicted value calculated by each physical model and the time series data of the objective variable. For example, the inverse value of the normalized absolute error may be used as the contribution of the physical model.

[0035] In the case of dam inflow prediction, the inflow into the dam depends on the runoff generated by snowmelt and rainfall, and the runoff output by the tank model, which is the physical model for dam inflow prediction, and the snowmelt model changes depending on the season, so the respective contributions during the snow accumulation period, snowmelt period, and rainfall period can be set to (0.5, 0.1), (0.2, 0.9), and (0.9, 0.0).

[0036] Alternatively, a method may be adopted that automatically calculates the contributions of the tank model and the snowmelt model, which are physical models for predicting dam inflow. First, from the learning data, actual rainfall data, snowfall, temperature, and dam inflow are extracted for each snowfall period, snowmelt period, and rainfall period, the actual rainfall data is input to the tank model, and the snowfall and temperature are input to the snowmelt model to calculate the respective runoffs, and the correlation coefficient between the calculated runoff and the dam inflow for that section is taken as the contributions of the tank model and the snowmelt model.

[0037] In wind power generation forecasts, the amount of power generated varies depending on the wind speed, so depending on the expert's knowledge, the contribution of the wind turbine power generation model (physical model) in the ranges of 5 m / s or less, 5-10 m / s, 10-15 m / s, 15-25 m / s, and 25 m / s or more can be set, for example, as follows.

[0038] An example of the contribution of the wind turbine power generation model (physical model) can be set to {0.7 for less than 5 m / s, 0.8 for 5-10 m / s, 0.9 for 10-15 m / s, 0.8 for 15-25 m / s, and 0.1 for over 25 m / s}.

[0039] Alternatively, a method of automatically calculating the contribution of the wind turbine power generation model may be adopted. First, the observed wind speed in a certain section and the corresponding observed power generation amount are extracted from the learning data, and the observed wind speed is input into the wind turbine power generation model to calculate the power generation amount. The correlation coefficient between the calculated power generation amount and the observed power generation amount is calculated, and this correlation coefficient is used as the contribution of the wind turbine power generation model (physical model) in that section. The correlation coefficient may be used as it is as the contribution amount, or it may be converted to another scale before being used.

[0040] The first prediction residual calculation unit 10 extracts time series data of the dependent variable from the machine learning data, and calculates a first prediction residual of the physical model using the predicted value calculated by the first predicted value calculation unit 9 using the physical model and the contribution of the physical model for each characteristic interval calculated by the physical model contribution calculation unit 14. The first prediction residual of the physical model is modeled using machine learning. The first prediction residual of the physical model is expressed as a function of the time series data of the dependent variable, the predicted value calculated by the physical model, and the contribution of the physical model for each characteristic interval.

[0041] Prediction residual of physical model = f (time series data of the objective variable, predicted value calculated by the physical model, contribution of the physical model for each characteristic interval)

[0042] The time series data of the explanatory variables may be added to the input parameters of this function. In the example of dam inflow forecast, the first forecast residual is expressed by Equation (1). First prediction residual of physical model = Dam inflow - c t ×Outflow amount t -c s ×Outflow amount s …(1)

[0043] Here, c t and runoff volume tis the contribution and outflow of the tank model, and c s and runoff volume s is the contribution of the snowmelt model and the runoff volume.

[0044] In the example of wind power forecast, First prediction residual of physical model = Wind turbine power generation - c p ×Windmill power generation amount p …(2)

[0045] where c p and wind power generation p are the contributions of the wind turbine power generation model and the amount of wind turbine power generation.

[0046] In this way, the first prediction residual amount is calculated based on the dependent variable and a value obtained by multiplying the dependent variable by the contribution degree corresponding to the first predicted value of each physical model. In a more specific example, the first prediction residual amount is calculated by subtracting the value obtained by multiplying the dependent variable by the contribution degree corresponding to the first predicted value of each physical model from the dependent variable.

[0047] 1 , the prediction unit 3 has a prediction data DB 21, a second data division unit 22, a physical model data DB 23, a machine learning data DB 24, a physical model contribution extraction unit 25, a second predicted value calculation unit 26, a second prediction residual amount calculation unit 27, a third predicted value calculation unit 28, and a predicted value storage unit 29. The physical model contribution extraction unit 25 has a characteristic section identification unit 30 and a contribution extraction unit 31.

[0048] The prediction unit 3 uses the prediction model constructed by the prediction model learning unit 2 to calculate a predicted value of the dependent variable up to the prediction period.

[0049] The prediction data DB 21 stores prediction data. The prediction data includes physical model data including time-series data and machine learning data. The machine learning data may include control data in addition to the time-series data.

[0050] The second data division unit 22 divides the prediction data into data for a physical model and data for machine learning. In this specification, the data for a physical model divided by the second data division unit 22 may be referred to as first prediction data, and the data for machine learning divided by the second data division unit 22 may be referred to as second prediction data. The data for the physical model (first prediction data) is stored in a data DB 23 for a physical model, and the data for machine learning (second prediction data) is stored in a data DB 24 for machine learning.

[0051] The prediction data DB 21, the second data division section 22, the physical model data DB 6, and the machine learning data DB 7 in the prediction section 3 are not essential components of the prediction section 3 and can be omitted as necessary.

[0052] The second predicted value calculation unit 26 inputs the data for the physical model (first prediction data) to the physical model, and calculates a predicted value of the dependent variable in the physical model. The physical model is the same as the physical model used in the prediction model learning unit 2. The second predicted value calculation unit 26 may calculate a predicted value using two or more physical models selected by the physical model selection unit 13.

[0053] The second prediction residual calculation unit 27 inputs the machine learning data (second prediction data) to a prediction model and calculates, using the prediction model, a second prediction residual which is a deviation from the predicted value calculated by the second predicted value calculation unit 26. More specifically, the second prediction residual calculation unit 27 calculates a second prediction residual which is a deviation between the objective variable included in the machine learning data (second prediction data) and the predicted value calculated by the second predicted value calculation unit 26.

[0054] The third predicted value calculation unit 28 calculates a predicted value of the dependent variable based on the predicted value calculated by the second predicted value calculation unit 26 and the second prediction residual amount calculated by the second prediction residual amount calculation unit 27. The calculated predicted value is stored in the predicted value storage unit 29.

[0055] The characteristic interval identification unit 30 identifies the data for physical model (first prediction data) into a plurality of characteristic intervals. The criteria for identifying the data into a plurality of characteristic intervals are the same as the criteria for dividing the data into a plurality of characteristic intervals by the characteristic interval division unit 15 in the prediction model learning unit 2.

[0056] The contribution extraction unit 31 extracts the contribution of the physical model for each of the plurality of characteristic sections. The third predicted value calculation unit 28 predicts the response variable for each of the two or more physical models based on the contribution of the first model for each characteristic section.

[0057] FIG. 2 is a diagram showing an example of data division of learning data for predicting dam inflow. The learning data for predicting dam inflow includes dam inflow, upstream dam discharge, river flow, snowfall, temperature, and actual rainfall data, which are past measured values ​​(actual values), and forecast rainfall data, which is a future predicted value. Here, the dam inflow is a response variable, and the upstream dam discharge, river flow, snowfall, temperature, and actual rainfall data and the forecast rainfall data are explanatory variables. Furthermore, the dam inflow, upstream dam discharge, river flow, snowfall, and temperature are values ​​measured by sensors. The actual rainfall data is rain gauge data installed at an observation point or radar analysis rainfall data.

[0058] In FIG. 2, the snowfall amount, temperature, actual rainfall data, and forecast rainfall data are data for a physical model for predicting dam inflow.

[0059] In Figure 2, {dam inflow, upstream dam discharge, river flow} or this plus {snowfall, temperature, actual rainfall data, predicted rainfall data} may be used as machine learning data for predicting dam inflow.

[0060] 3 is a diagram showing an example of data division of learning data for predicting wind power generation. The learning data for predicting wind power generation includes past measurement values ​​(actual values) such as observed temperature, observed wind speed, observed wind direction, observed power generation, and observed power supply, and future predicted values ​​such as predicted wind speed, predicted wind direction, and predicted temperature. Here, the power generation is the objective variable, the value measured by the sensor is the observed power generation, and the value to be predicted is the predicted power generation. The observed temperature, observed wind speed, observed wind direction, observed power supply, predicted wind speed, predicted wind direction, and predicted temperature are explanatory variables. The observed temperature, observed wind speed, observed wind direction, observed power generation, and observed power supply are values ​​measured by the sensor.

[0061] In Fig. 3, the predicted wind speed, predicted wind direction, and predicted temperature are data for a physical model for predicting wind power generation. In Fig. 3, {observed temperature, observed wind speed, observed wind direction, observed power generation, observed power supply} or {predicted wind speed, predicted wind direction, predicted temperature} may be added to these and used as machine learning data for predicting wind power generation.

[0062] 4 is a diagram showing an example of classifying the time series data of the objective variable according to the shape features and dividing it into characteristic intervals based on clustering. In this example, the time series data of the objective variable is divided into intervals A, B, C, D, E, F, and G in the time direction, and clustering is performed to divide it into three characteristic intervals 1, 2, and 3.

[0063] The time series data of the objective variable is divided by a sliding window to generate multiple samples of the time series data, and clustering is performed based on each sample. K-means, DBA, etc. can be used as a clustering method for time series data. On the other hand, the time series data of the objective variable can be divided by a sliding window, the statistics of each window are calculated, and the data can be divided into several characteristic intervals based on the clustering of the statistics.

[0064] FIG. 5 is a diagram showing an example of calculating the contribution of a physical model for each characteristic section based on a correlation coefficient. Here, first, learning data for a certain characteristic section is extracted from learning data, and the extracted learning data for a physical model is input to the first predicted value calculation unit 9 by the physical model to predict the value of the objective variable (Y'(t)). After that, a correlation coefficient between the objective variable value Y(t) and the predicted value Y'(t) calculated by the physical model is calculated, and the correlation coefficient is converted into the contribution of the physical model. As a conversion method, normalization of the correlation coefficient can be used. Also, instead of the correlation coefficient, an error between the objective variable value Y(t) and the predicted value Y'(t) calculated by the physical model can be calculated, and the inverse value of the absolute value of the error can be used as the contribution of the physical model for each characteristic section.

[0065] 6 is a flowchart showing the procedure of the learning process of the prediction model. First, the first data division unit 5 acquires learning data from the learning data DB 4 (step S11), divides the learning data into data for a physical model and data for machine learning, and stores the divided data in the data DB 6 for a physical model and the data DB 7 for machine learning (step S12).

[0066] Next, the first predicted value calculation unit 9 acquires physical model data from the physical model data DB 17 (step S13). The characteristic interval division unit 15 acquires learning data from the learning data DB 4, and divides the time series data of interest into characteristic intervals using the learning data (step S14).

[0067] The contribution degree calculation unit 16 calculates the contribution degree of the physical model for each characteristic section divided by the characteristic section division unit 15 (step S15). The first predicted value calculation unit 9 inputs the physical model data to the physical model and calculates a predicted value by the physical model (step S16).

[0068] The first prediction residual calculation unit 10 extracts time series data of the dependent variable from the machine learning data DB7, and calculates a first prediction residual of the physical model based on the predicted value calculated by the first predicted value calculation unit 9 based on the physical model and the contribution of the physical model for each characteristic section calculated by the contribution calculation unit 16 (step S17).

[0069] The prediction model construction unit 11 constructs a prediction model of the first prediction residual amount of the physical model by machine learning (step S18). The prediction model constructed by the prediction model construction unit 11 is stored in the prediction model storage unit 12. The prediction model learning unit 2 outputs the constructed prediction model, the physical model, the characteristic intervals, and the contribution degree of the physical model for each characteristic interval (step S19). With the above, the processing of the prediction model learning unit 2 ends.

[0070] 7 is a flowchart showing the processing operation of the prediction unit 3 for predicting a future state value or output value of a system, device, or equipment of interest. First, the second data division unit 22 acquires prediction data from the prediction data DB 21 (step S21), divides the prediction data into data for a physical model and data for machine learning, and stores them in the data for a physical model DB 23 and the data for machine learning DB 24 (step S22).

[0071] Next, the second predicted value calculation unit 26 acquires the physical model data from the physical model data DB 17 (step S23). Next, the characteristic section identification unit 30 acquires the prediction data from the prediction data DB 21, and identifies the characteristic section using the prediction data (step S24).

[0072] Next, the contribution extraction unit 31 extracts the contribution of the physical model in the characteristic section identified by the characteristic section identification unit (step S25). The second predicted value calculation unit 26 inputs the physical model data (first prediction data) to the physical model and calculates a predicted value by the physical model (step S26).

[0073] The second prediction residual prediction unit 27 calculates the second prediction residual of the physical model by the prediction model using the machine learning data (second prediction data) (step S27). The third predicted value calculation unit 28 calculates the final predicted value of the response variable (step S28) using the predicted value calculated by the second predicted value calculation unit 26 by the physical model, the second prediction residual of the physical model calculated by the second prediction residual prediction unit 27 of the physical model by the prediction model, and the contribution extracted by the contribution extraction unit 31 of the physical model. The calculated predicted value is stored in the predicted value storage unit 29 (step S29).

[0074] In step S28, the third predicted value calculation unit 28 calculates a final predicted value based on equation (3) using the predicted value calculated by the second predicted value calculation unit 26 using the physical model, the prediction residual amount of the physical model calculated by the second prediction residual amount prediction unit 27, and the contribution degree extracted by the contribution degree extraction unit 31, and outputs the final predicted value to the predicted value memory unit 29. Final predicted value = f (predicted value calculated by the physical model, prediction residual amount of the physical model calculated by the prediction model, contribution rate) ... (3)

[0075] When the second prediction residual calculation unit 27 uses time-series data of explanatory variables when calculating the prediction residual of the physical model, the explanatory variables become arguments of the function f in equation (3).

[0076] For example, when predicting a dam inflow, the third predicted value calculation unit 28 calculates a final predicted value based on the formula (4). Dam inflow prediction value = prediction residual of physical model + c t ×Outflow amount +c s ×Outflow amount s …(4)

[0077] where c t and outflow t are the contribution and outflow of the tank model, and c s and runoff s are the contributions and runoff of the snowmelt model.

[0078] For example, when predicting the amount of wind power generation, the third predicted value calculation unit 28 predicts the final amount of wind power generation based on the formula (5). Wind power generation forecast value = physical model forecast residual + c p ×Windmill power generation amount p …(5)

[0079] where c p and wind turbine power generation amount p are the contribution of the wind turbine power generation model and the wind turbine power generation amount.

[0080] (First concrete example) 8 is a diagram for explaining construction of a prediction model for predicting dam inflow according to a first specific example. In the first specific example, the learning data includes dam inflow, upstream dam discharge, river flow, snowfall, temperature, actual precipitation data, and predicted precipitation data.

[0081] The first data division unit 5 divides the learning data, such as snowfall, temperature, actual rainfall data, and predicted rainfall data, into data for a physics model, and the dam inflow, upstream dam discharge, and river flow into data for machine learning. In addition, a tank model and a snowmelt model are used as the physics models. Of the data for the physics model, the actual rainfall data and predicted rainfall data are input to the tank model, and the snowfall and temperature are input to the snowmelt model.

[0082] The characteristic interval division unit 15 divides the prediction period into a snow accumulation period, a snow melting period, and a rainfall period, and outputs a mapping table of characteristic intervals {December 1st to March 15th: snow accumulation period, March 16th to May 31st: snow melting period, June 1st to November 30th: rainfall period}.

[0083] The contribution calculation unit 16 outputs a mapping table of characteristic intervals of contribution for each period {snowfall period: [0.5, 0.1]; snowmelt period: [0.2, 0.9], rainfall period: [0.9, 0.0]}. Here, the contribution [a, b] is the contribution a of the tank model and the contribution b of the snowmelt model. The physical model data of the tank model are the height of the outflow hole (L1, L2, L3), the outflow coefficient (α1, α2, α3, α4), and the infiltration coefficient (β1, β2, β3). The physical model data of the snowmelt model are the digital elevation model data, the temperature lapse rate, and the temperature snowmelt rate.

[0084] The tank model and the snowmelt model calculate the respective runoff amounts. The first prediction residual amount calculation unit 10 calculates the prediction residual amount of the physical model as shown in formula (6). Prediction residual of physical model = Dam inflow - c t ×Outflow amount t -c s ×Outflow amount s …(6)

[0085] where c t and runoff volume t is the contribution and outflow of the tank model, and c s and runoff volume s is the contribution of the snowmelt model and the runoff volume.

[0086] Thereafter, the prediction model construction unit 11 constructs a prediction model of the prediction residual amount of the physical model by machine learning, stores the prediction model in the prediction model storage unit 12, and ends the process.

[0087] (Second concrete example) FIG. 9 is a diagram for explaining the construction of a prediction model for wind power generation prediction according to a second specific example. In the second specific example, the learning data includes observed temperature, observed wind speed, observed wind direction, observed power generation, observed power supply, predicted wind speed, predicted wind direction, and predicted temperature. The first data division unit 5 divides the predicted wind speed, predicted wind direction, and predicted temperature of the learning data into data for a physical model, and the observed temperature, observed wind speed, observed wind direction, observed power generation, and observed power supply into data for machine learning. A power generation curve is used as the physical model. The characteristic section division unit 15 divides the prediction period into characteristic sections of {5 m / s or less, 5-10 m / s, 10-15 m / s, 15-25 m / s, and 25 m / s or more}. Furthermore, for each characteristic section, the physical model contribution calculation unit 16 outputs a mapping table of characteristic sections of contribution for each wind speed: {5m / s or less: 0.7, 5-10m / s: 0.8, 10-15m / s: 0.9, 15-25m / s: 0.8, 25m / s or more: 0.1}. A power generation curve, wind turbine parameters, and topographical information are used as data for the physical model. The wind turbine power generation model calculates the amount of power generated by the wind turbine for the predicted wind speed, predicted wind direction, and predicted temperature based on the power generation curve, wind turbine parameters, and topographical information. The first prediction residual calculation unit 10 calculates the prediction residual of the physical model as follows. Prediction residual of physical model = Wind turbine power generation - c p ×Windmill power generation amount p …(7)

[0088] where c p and wind power generation p are the contributions of the wind turbine power generation model and the amount of wind turbine power generation.

[0089] Thereafter, the prediction model construction unit 11 constructs a prediction model of the prediction residual amount of the physical model by machine learning, stores the prediction model in the prediction model storage unit 12, and ends the process.

[0090] (Third Specific Example) FIG. 10 is a diagram explaining the construction of a prediction model for predicting river flow rate or river water level in a third specific example, and FIG. 11 is a diagram showing an example of an HQ curve showing the relationship between flow rate Q and water level H.

[0091] When predicting river water levels, the river flow rate is predicted and then converted to river water levels in post-processing. To do this, the river flow rate is converted to river water levels using an HQ curve showing the relationship between water level and flow rate in the target river section, as shown in Figure 11. The HQ curve showing the relationship between water level and flow rate can also be used for dam water level prediction.

[0092] In the example of river flow forecasting, the learning data includes river water level, upstream river flow, river flow, snowfall, temperature, actual rainfall data, and predicted rainfall data. The first data division unit 5 divides the snowfall, temperature, actual rainfall data, and predicted rainfall data of the learning data into data for the physical model, and the river water level, upstream river flow, and river flow into data for machine learning. A tank model and a snowmelt model are used as the physical models. From the data for the physical model, the actual rainfall data and predicted rainfall data are input to the tank model, and the snowfall and temperature are input to the snowmelt model. The characteristic section division unit 15 divides the forecast period into snowfall period, snowmelt period, and rainfall period, and outputs a mapping table of characteristic sections {December 1st to March 15th: snowfall, March 16th to May 31st: snowmelt period, June 1st to November 30th: rainfall period}. In addition, for each characteristic section, the physical model contribution calculation unit 16 outputs a mapping table of characteristic sections of contributions for each period {snowfall period: [0.5, 0.1]; snowmelt period: [0.2, 0.9], rainfall period: [0.9, 0.0]}. Here, the contributions [a, b] are the contributions a of the tank model and the contributions b of the snowmelt model. The physical model data of the tank model are the height of the outflow hole (L1, L2, L3), the outflow coefficient (α1, α2, α3, α4), and the infiltration coefficient (β1, β2, β3). The physical model data of the snowmelt model are the digital elevation model data, the temperature lapse rate, and the temperature snowmelt rate.

[0093] The tank model and the snowmelt model calculate the respective runoff amounts. The first prediction residual amount calculation unit 10 calculates the prediction residual amount of the physical model as follows. Prediction residual of physical model = river flow rate - c t ×Outflow amount t -c s ×Outflow amount s …(8)

[0094] where c t and runoff volume t is the contribution and outflow of the tank model, and c s and runoff volume s are the contribution rate of the snowmelt model and the runoff amount. After that, the prediction model construction unit 11 constructs a prediction model of the prediction residual amount of the physical model by machine learning, stores the prediction model in the prediction model storage unit 12, and ends the process.

[0095] (Fourth Specific Example) Fig. 12 is a diagram for explaining construction of a prediction model for predicting a river flow rate or a river water level according to a fourth specific example. Fig. 12 is a modified example of Fig. 11. In the fourth specific example, instead of the tank model and the snowmelt model as a physical model, a hydrological model tool, for example, WRF-Hydro (R) Modeling System, Soil & Water Assessment Tool (SWAT), Hydrological Simulation Program-Fortran (HSPF), etc. can be used.

[0096] In the example of river flow forecasting, the learning data includes river water level, upstream river flow, river flow, snowfall, temperature, rainfall, air pressure, wind speed and direction, specific humidity, and irradiance. The first data division unit 5 divides the snowfall, temperature, rainfall, air pressure, wind speed and direction, specific humidity, and irradiance of the learning data into data for physical models, and the river water level, upstream river flow, and river flow into data for machine learning. Grid point information and digital elevation model data are used as data for physical models. The characteristic section division unit 15 divides the prediction period into snowfall period, snowmelt period, and rainfall period, and outputs a mapping table of characteristic sections {December 1st to March 15th: snowfall, March 16th to May 31st: snowmelt period, June 1st to November 30th: rainfall period}. In addition, for each characteristic section, the physical model contribution calculation unit 16 outputs a mapping table of characteristic sections of contributions for each period {snowfall period: 0.5; snowmelt period: 0.2, rainfall period: 0.9}. The hydrological model calculates the runoff. The first prediction residual calculation unit 10 calculates the prediction residual of the physical model as follows. Prediction residual of physical model = river flow rate - c h ×Outflow amount h …(9)

[0097] where c h and runoff volume h is the contribution rate of the hydrological model and the runoff amount. After that, the prediction model construction unit 11 constructs a prediction model of the prediction residual amount of the physical model by machine learning, stores the prediction model in the prediction model storage unit 12, and ends the process.

[0098] (Fifth Specific Example) 13 is a diagram for explaining the construction of a forecast model for weather forecasting according to the fifth specific example. In the fifth specific example, a numerical forecast model is used as a physical model, for example, a local model (LFM), a meso model (MSM), a mesoensemble model (MEPS), a global model (GSM), a global ensemble forecast model (GEPS), a global forecast system (GFS), or a Weather Research and Forecasting (WRF) Model, or a Computational Fluid Dynamics (CFD) tool.

[0099] In the fifth specific example, the learning data includes observed weather data and predicted weather data such as temperature, wind speed and direction, rainfall, atmospheric pressure, and humidity. In the fifth specific example, temperature is the prediction target, and temperature, wind speed and direction, rainfall, atmospheric pressure, and humidity are separated into data for the physical model, and temperature, wind speed and direction, atmospheric pressure, and rainfall are separated into data for machine learning. Grid point information, topography and land use data, sea surface temperature data, and digital elevation model data are used as data for the physical model. The prediction residual of the physical model is calculated as follows. Prediction residual of physical model = temperature - cp × temperature p … (10)

[0100] c pand temperature p are the contribution of the numerical forecast model and the temperature calculated by the numerical forecast model. After that, the prediction model construction unit 11 constructs a prediction model of the prediction residual amount of the physical model by machine learning, stores the prediction model in the prediction model storage unit 12, and ends the process.

[0101] In this manner, in this embodiment, a prediction model that combines a physical model and a machine learning model is constructed to predict the dependent variable, so that the dependent variable can be predicted with high accuracy even if the explanatory variables include both time-series data and control data, or even if the dependent variable fluctuates significantly over time.

[0102] [Note] At least a part of the information processing device 1 described in the above embodiment may be configured with hardware or software. When configured with software, a program that realizes at least a part of the functions of the information processing device 1 may be stored in a recording medium such as a flexible disk or a CD-ROM, and may be read and executed by a computer. The recording medium is not limited to a removable one such as a magnetic disk or an optical disk, and may be a fixed recording medium such as a hard disk device or a memory. Also, a program that realizes at least a part of the functions of the information processing device 1 may be distributed via a communication line (including wireless communication) such as the Internet. Furthermore, the program may be encrypted, modulated, or compressed and distributed via a wired line or wireless line such as the Internet, or stored in a recording medium.

[0103] [Note] [Item 1] a first predicted value calculation unit that inputs first learning data including time series data into a first model and calculates a predicted value of a dependent variable; a first prediction residual amount calculation unit that calculates a first prediction residual amount, which is a deviation of the prediction value, by using second learning data including control data; and a model construction unit that constructs a second model that predicts the first prediction residual amount by machine learning based on the second learning data and the first prediction residual amount. Information processing device. [Item 2] a model selection unit that selects one or more first models from a plurality of the first models; the first predicted value calculation unit inputs the first learning data into the one or more first models selected by the model selection unit to calculate a predicted value of the dependent variable; Item 1. An information processing device according to item 1. [Item 3] when the model selection unit selects two or more first models, the first predicted value calculation unit calculates the predicted value of the dependent variable based on the first learning data corresponding to each of the two or more first models; the first prediction residual amount calculation unit calculates the first prediction residual amount based on the predicted values ​​calculated by each of the two or more first models; Item 3. An information processing device according to item 2. [Item 4] a contribution calculation unit that calculates a contribution of each of the two or more first models to the predicted value; the first prediction residual amount calculation unit calculates the first prediction residual amount by subtracting a value obtained by multiplying the predicted value calculated for each of the two or more first models by the contribution degree corresponding to the predicted value from a dependent variable included in the second learning data; Item 3. An information processing device according to item 3. [Item 5] the contribution degree calculation unit divides the time-series data into a plurality of characteristic intervals for each of the two or more first models, and calculates a contribution degree of the first model for each of the characteristic intervals; the first prediction residual amount calculation unit calculates the first prediction residual amount for each of the two or more first models based on a contribution degree of the first model for each of the characteristic sections; Item 5. An information processing device according to item 4. [Item 6] the contribution degree calculation unit calculates, for each of the characteristic intervals, a correlation coefficient between the predicted value calculated by the first model and the dependent variable, and calculates the contribution degree based on the calculated correlation coefficient. Item 5. An information processing device according to item 5. [Item 7] The contribution degree calculation unit increases the contribution degree as the correlation coefficient increases. Item 7. An information processing device according to item 6. [Item 8] a model learning unit including the first predicted value calculation unit, the first prediction residual amount calculation unit, and the model construction unit; A prediction unit that predicts the dependent variable based on the second model learned by the model learning unit. 8. An information processing device according to any one of items 3 to 7. [Item 9] The prediction unit is a second predicted value calculation unit that inputs first prediction data corresponding to the first learning data into the first model and calculates a predicted value of the dependent variable in the first model; a second prediction residual calculation unit that inputs second prediction data corresponding to the second learning data into the second model and calculates, by the second model, a second prediction residual that is a deviation between the dependent variable and the predicted value calculated by the second predicted value calculation unit; a third predicted value calculation unit that predicts the dependent variable based on the predicted value calculated by the second predicted value calculation unit and the second prediction residual amount calculated by the second prediction residual amount calculation unit, Item 9. An information processing device according to item 8. [Item 10] when the model selection unit selects the two or more first models, the second predicted value calculation unit calculates the predicted value of the dependent variable based on the first prediction data corresponding to each of the two or more first models. Item 10. The information processing device according to item 9. [Item 11] a characteristic interval identification unit that identifies the first prediction data into a plurality of characteristic intervals; a contribution extraction unit that extracts a contribution of the first model for each of the plurality of characteristic sections; the third predicted value calculation unit predicts the dependent variable for each of the two or more first models based on a contribution degree of the first model for each of the characteristic intervals. Item 11. An information processing device according to item 10. [Item 12] The objective variable is a dam inflow amount, the model selection unit selects a tank model and a snow melting model as the first model; The second predicted value calculation unit calculates a dam outflow of the tank model and a dam outflow of the snowmelt model, Item 12. The information processing device according to any one of items 9 to 11. [Item 13] The objective variable is wind power generation, The first model is a wind turbine power generation model, The second predicted value calculation unit calculates the power generation amount of the power generation model of the wind turbine based on the wind speed and the power generation curve. Item 12. The information processing device according to any one of items 9 to 11. [Item 14] The objective variable is a river flow rate, the first model is a hydrological model; The second predicted value calculation unit calculates the runoff amount of the hydrological model. Item 12. The information processing device according to any one of items 9 to 11. [Item 15] the dependent variable is meteorological data, The model selection unit selects a Weather Research and Forecasting (WRF) model and a Computational Fluid Dynamics (CFD) model as the first model, The second forecast value calculation unit calculates meteorological data of the WRF model and meteorological data of the CFD model, Item 12. The information processing device according to any one of items 9 to 11. [Item 16] a first data division unit that divides learning data into the first learning data and the second learning data; a first learning data storage unit that stores the first learning data divided by the first data division unit; a second learning data storage unit that stores the second learning data divided by the first data division unit, the first predicted value calculation unit calculates a predicted value of the dependent variable based on the first learning data stored in the first learning data storage unit; the first prediction residual amount calculation unit calculates the first prediction residual amount by using the second learning data stored in the second learning data storage unit; the model construction unit constructs the second model by machine learning based on the second learning data stored in the second learning data storage unit and the first prediction residual amount. 16. An information processing device according to any one of items 1 to 15. [Item 17] On the computer, A step of inputting first learning data including time series data into a first model and calculating a predicted value of a dependent variable; calculating a first prediction residual amount, which is a deviation of the prediction value, by using second learning data including control data; constructing a second model that predicts the first prediction residual amount by machine learning based on the second learning data and the first prediction residual amount; Information processing methods. [Item 18] On the computer, A step of inputting first learning data including time series data into a first model and calculating a predicted value of a dependent variable; calculating a first prediction residual amount, which is a deviation of the prediction value, by using second learning data including control data; constructing a second model that predicts the first prediction residual amount by machine learning based on the second learning data and the first prediction residual amount; program.

[0104] Although some embodiments of the present invention have been described, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0105] 1 Information processing device, 2 Prediction model learning unit, 3 Prediction unit, 5 First data division unit, 8 Physical model storage unit, 9 First predicted value calculation unit, 10 First prediction residual amount calculation unit, 11 Prediction model construction unit, 12 Prediction model storage unit, 13 Physical model selection unit, 14 Physical model contribution calculation unit, 15 Characteristic section division unit, 16 Contribution calculation unit, 22 Second data division unit, 25 Physical model contribution extraction unit, 26 Second predicted value calculation unit, 27 Second prediction residual amount calculation unit, 28 Third predicted value calculation unit, 29 Prediction value storage unit, 30 Characteristic section identification unit, 31 Contribution extraction unit, 38 Second prediction residual amount prediction unit

Claims

1. a first predicted value calculation unit that inputs first learning data including time series data to a first model and calculates a predicted value of a dependent variable that is a prediction target; a first prediction residual amount calculation unit that calculates a first prediction residual amount, which is a deviation of the prediction value, by using second learning data; a model construction unit that constructs a second model that predicts the first prediction residual amount by machine learning based on the second learning data and the first prediction residual amount, Information processing device.

2. a model selection unit that selects one or more first models from a plurality of the first models; the first predicted value calculation unit inputs the first learning data into the one or more first models selected by the model selection unit to calculate a predicted value of the dependent variable; The information processing device according to claim 1 .

3. when the model selection unit selects two or more first models, the first predicted value calculation unit calculates the predicted value of the dependent variable based on the first learning data corresponding to each of the two or more first models; the first prediction residual amount calculation unit calculates the first prediction residual amount based on the predicted values ​​calculated by each of the two or more first models; The information processing device according to claim 2 .

4. a contribution calculation unit that calculates a contribution of each of the two or more first models to the predicted value; the first prediction residual amount calculation unit calculates the first prediction residual amount based on a response variable included in the second learning data and a value obtained by multiplying the predicted value calculated for each of the two or more first models by the contribution degree corresponding to the predicted value; The information processing device according to claim 3 .

5. the first prediction residual amount calculation unit calculates the first prediction residual amount by subtracting, from a dependent variable included in the second learning data, a value multiplied by the contribution degree corresponding to the predicted value calculated for each of the two or more first models; The information processing device according to claim 4.

6. the contribution degree calculation unit divides the time-series data into a plurality of characteristic intervals for each of the two or more first models, and calculates a contribution degree of the first model for each of the characteristic intervals; the first prediction residual amount calculation unit calculates the first prediction residual amount for each of the two or more first models based on a contribution degree of the first model for each of the characteristic sections; The information processing device according to claim 4.

7. the contribution degree calculation unit calculates, for each of the characteristic intervals, a correlation coefficient between the predicted value calculated by the first model and the dependent variable, and calculates the contribution degree based on the calculated correlation coefficient. The information processing device according to claim 6.

8. The contribution degree calculation unit increases the contribution degree as the correlation coefficient increases. The information processing device according to claim 7.

9. a model learning unit including the first predicted value calculation unit, the first prediction residual amount calculation unit, and the model construction unit; A prediction unit that predicts the dependent variable based on the second model learned by the model learning unit. The information processing device according to claim 3 .

10. The prediction unit is a second predicted value calculation unit that inputs first prediction data corresponding to the first learning data into the first model and calculates a predicted value of the dependent variable in the first model; a second prediction residual calculation unit that inputs second prediction data corresponding to the second learning data into the second model and calculates, by the second model, a second prediction residual that is a deviation between the dependent variable and the predicted value calculated by the second predicted value calculation unit; a third predicted value calculation unit that predicts the dependent variable based on the predicted value calculated by the second predicted value calculation unit and the second prediction residual amount calculated by the second prediction residual amount calculation unit, The information processing device according to claim 9.

11. the second predicted value calculation unit, when the model selection unit selects the two or more first models, calculates the predicted value of the dependent variable based on the first prediction data corresponding to each of the two or more first models. The information processing device according to claim 10.

12. a characteristic interval identification unit that identifies the first prediction data into a plurality of characteristic intervals; a contribution extraction unit that extracts a contribution of the first model for each of the plurality of characteristic sections; the third predicted value calculation unit predicts the dependent variable for each of the two or more first models based on a contribution degree of the first model for each of the characteristic intervals. The information processing device according to claim 11.

13. The objective variable is a dam inflow amount, the model selection unit selects a tank model and a snow melting model as the first model; The second predicted value calculation unit calculates a dam outflow of the tank model and a dam outflow of the snowmelt model. The information processing device according to claim 10.

14. The objective variable is wind power generation, The first model is a wind turbine power generation model, The second predicted value calculation unit calculates a power generation amount of the power generation model of the wind turbine based on a wind speed and a power generation curve. The information processing device according to claim 10.

15. The objective variable is a river flow rate, the first model is a hydrological model; The second predicted value calculation unit calculates the runoff amount of the hydrological model. The information processing device according to claim 10.

16. the dependent variable is meteorological data, The model selection unit selects a Weather Research and Forecasting (WRF) model and a Computational Fluid Dynamics (CFD) model as the first model; The second forecast value calculation unit calculates meteorological data of the WRF model and meteorological data of the CFD model. The information processing device according to claim 10.

17. a first data division unit that divides learning data into the first learning data and the second learning data; a first learning data storage unit that stores the first learning data divided by the first data division unit; a second learning data storage unit that stores the second learning data divided by the first data division unit, the first predicted value calculation unit calculates a predicted value of the dependent variable based on the first learning data stored in the first learning data storage unit; the first prediction residual amount calculation unit calculates the first prediction residual amount by using the second learning data stored in the second learning data storage unit; the model construction unit constructs the second model by machine learning based on the second learning data stored in the second learning data storage unit and the first prediction residual amount. The information processing device according to claim 1 .

18. On the computer, A step of inputting first learning data including time series data into a first model and calculating a predicted value of a dependent variable that is a prediction target; calculating a first prediction residual amount, which is a deviation of the predicted value, by using second learning data; constructing a second model that predicts the first prediction residual amount by machine learning based on the second learning data and the first prediction residual amount; Information processing methods.

19. On the computer, A step of inputting first learning data including time series data into a first model and calculating a predicted value of a dependent variable that is a prediction target; calculating a first prediction residual amount, which is a deviation of the predicted value, by using second learning data; constructing a second model that predicts the first prediction residual amount by machine learning based on the second learning data and the first prediction residual amount; program.

Citation Information

Patent Citations

  • Underground water level prediction method and device and electronic equipment

    CN115600749A

  • Device for forecasting total power demand

    JP1993018995A

  • Prediction device, method, and program

    JP2005135287A

  • Residual characteristic estimation model creation method and residual characteristic estimation model creation system

    JP2020149209A

  • Prediction device, prediction method, and program

    WO2021250838A1