Power supply system and moving body

The power supply system addresses inefficiencies in power management by predicting and correcting power generation to maintain a stable state of charge, ensuring efficient and reliable power delivery in mobile objects.

JP2024134774AActive Publication Date: 2024-10-04HONDA MOTOR CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2023045128
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-22
Publication Date
2024-10-04
Estimated Expiration
2043-03-22

AI Technical Summary

Technical Problem

Existing power supply systems in mobile objects face challenges in efficiently managing power generation and storage, leading to potential power shortages due to delays in responding to changing power demands, which can degrade the state of charge (SOC) of the power storage devices.

Method used

A power supply system that includes a power generation device, a power storage device, and a control unit that predicts the state of charge (SOC) after a predetermined time, correcting the target generated power to maintain optimal operation and reduce the power supplied from the storage device by anticipating power demands.

Benefits of technology

The system effectively manages power supply by quickly adjusting to demand changes, reducing the power supplied from the storage device and maintaining a stable SOC, thereby enhancing the efficiency and reliability of power delivery.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024134774000001_ABST
    Figure 2024134774000001_ABST
Patent Text Reader

Abstract

To provide more satisfactory power supply system and moving body.SOLUTION: In a power supply system, an information processing part 54 of a control device includes: a prediction part 60 for predicting prediction SOC being SOC after prescribed time based on required power, generated power and present SOC of a power storage device; a correction power determination part 62 for determining correction power for reducing a deviation between target SOC being SOC becoming a target and prediction SOC; a target generated power correction part 66 for determining corrected target generated power by correcting target generated power being generated power corresponding to required power by correction power; and a control part 56 which can control a power generation device based on corrected target generated power.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a power supply system and a mobile object. [Background technology]

[0002] In recent years, research and development has been conducted into electrification technologies that contribute to energy efficiency in order to ensure that more people have access to affordable, reliable, sustainable and advanced energy.

[0003] Patent Document 1 shows an aircraft (helicopter) equipped with a hybrid electric propulsion system. The aircraft's propeller is coupled to an output shaft of a gas turbine engine and a rotor of a rotating electric machine. Typically, the gas turbine engine drives the propeller and the rotating electric machine, and the rotating electric machine generates electricity. In other words, the gas turbine engine and the rotating electric machine function as a power generation device. Note that the rotating electric machine functions as a motor as necessary, and is capable of applying force to the output shaft of the gas turbine engine. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2019-77361 A Summary of the Invention [Problem to be solved by the invention]

[0005] Better power supply systems and vehicles are needed.

[0006] The present invention aims to solve the above-mentioned problems. [Means for solving the problem]

[0007] The power supply system of the present invention includes a power generation device having an engine and a generator driven by the engine, a load device that can be operated by power supplied from the power generation device, a power storage device that can be charged by power supplied from the power generation device and can supply power to the load device, a prediction unit that predicts a predicted SOC, which is the SOC a predetermined time later, based on the required power required to operate the load device, the generated power, which is the power generated by the power generation device, and a current SOC, which is the current SOC of the power storage device, a correction power determination unit that determines a correction power to reduce the deviation between a target SOC, which is the SOC to be targeted, and the predicted SOC, a target generated power correction unit that determines a corrected target generated power by correcting a target generated power, which is the generated power according to the required power, with the correction power, and a control unit that can control the power generation device based on the corrected target generated power.

[0008] A mobile object of the present invention includes the above-described power supply system. Effect of the Invention

[0009] According to the present invention, it is possible to provide a good power supply system and a mobile body. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a schematic diagram of a moving object. [Diagram 2] FIG. 2 is a schematic diagram of a power supply system. [Diagram 3] FIG. 3 is a flowchart of the generated power control process performed by the calculation unit. [Figure 4] FIG. 4 is a block diagram showing the configuration of the information processing unit. [Diagram 5] FIG. 5 is a block diagram showing the configuration of the parameter determination unit. [Figure 6] FIG. 6 is a block diagram showing the configuration of the correction power determination unit. [Figure 7] FIG. 7 is a block diagram showing the configuration of the target generated power determination unit. [Figure 8] Fig. 8A is a time chart of required power, Fig. 8B is a time chart of generated power, Fig. 8C is a time chart of the SOC of the power storage device, and Fig. 8D is a time chart of correction power determined by the correction power determination unit. [Figure 9] Fig. 9A is a time chart of required power, Fig. 9B is a time chart of generated power, Fig. 9C is a time chart of the SOC of the power storage device, and Fig. 9D is a time chart of correction power determined by the correction power determination unit. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] For example, in an aircraft equipped with a power generation device and a power storage device, the power generation device normally supplies power to a load device. Meanwhile, the power storage device supplies power to the load device when the power required by the aircraft (required power) exceeds the power generated by the power generation device (generated power). If the state in which the required power exceeds the generated power continues for a long time, the remaining capacity of the power storage device decreases. If the remaining capacity of the power storage device decreases, there is a risk of a power shortage occurring. The embodiment described below can reduce the decrease in the remaining capacity of the power storage device.

[0012] [Mobile 10] FIG. 1 is a schematic diagram of a moving body 10. A power supply system 22 may be mounted on the moving body 10. The moving body 10 is, for example, an electric vertical take-off and landing aircraft (eVTOL aircraft). The moving body 10 includes eight VTOL rotors 12. The VTOL rotors 12 generate upward thrust for the airframe 14. The moving body 10 includes eight electric motors 16. One electric motor 16 drives one VTOL rotor 12. The moving body 10 has two cruise rotors 18. The cruise rotor 18 generates forward thrust for the airframe 14. The moving body 10 includes four electric motors 20. Two electric motors 20 drive one cruise rotor 18.

[0013] The moving body 10 is equipped with a power supply system 22. Each of the electric motors 16, 20 is a load device 28 ( FIG. 2 ) to which power is supplied from the power supply system 22. The load device 28 is not limited to the electric motors 16, 20. The moving body 10 may be provided with a plurality of load devices 28. For ease of explanation, only one load device 28 out of the plurality of load devices 28 is shown in FIG. 2 .

[0014] The mobile object 10 includes a controller 21 that manages information related to power. The controller 21 calculates the power required to operate some or all of the load devices 28 of the mobile object 10, and outputs an operation request to the power supply system 22. The power supply system 22 (control device 30) determines the power required by the mobile object 10 based on the operation request. This power is referred to as the required power. The required power is the power required to operate the load devices 28.

[0015] The moving body 10 is not limited to an aircraft, but may be a ship, an automobile, a train, etc. Furthermore, the power supply system 22 may be used in facilities, factories, etc., other than the moving body 10.

[0016] [Power supply system 22] 2 is a schematic diagram of the power supply system 22. The power supply system 22 includes a power generation device 24, a power storage device 26, a load device 28, and a control device 30. The load device 28 is electrically connected to the power generation device 24 so as to be operated by the power supplied from the power generation device 24. The power storage device 26 is electrically connected to the power generation device 24 and the load device 28 so as to be charged by the power supplied from the power generation device 24 and to be able to supply power to the load device 28.

[0017] The power generation device 24 has a gas turbine engine 32 (engine), a fuel injection device 34, a generator 36, and a power control unit 38. The gas turbine engine 32 drives the generator 36. The fuel injection device 34 has an injector (not shown). The rotation speed of the gas turbine engine 32 can be changed by controlling the injector. The generator 36 is driven by the gas turbine engine 32 to generate three-phase AC power. The power control unit 38 converts the three-phase AC power into DC power. The power control unit 38 has an AC / DC converter 40. The AC / DC converter 40 has a switching element (not shown). By controlling the switching element of the AC / DC converter 40, the power supplied from the power generation device 24 to the power storage device 26 and the power supplied from the power generation device 24 to the load device 28 can be controlled.

[0018] The power storage device 26 includes, for example, a lithium ion battery. The power storage device 26 may include a secondary battery other than a lithium ion battery. The power storage device 26 may include a large-capacity capacitor.

[0019] The load device 28 has an inverter and electric motors 16, 20 (FIG. 1), not shown. The inverter converts input DC power into three-phase AC power. The electric motors 16, 20 are driven by the three-phase AC power supplied from the inverter. The load device 28 may also have a DC / DC converter and a low-voltage drive device, not shown. The DC / DC converter reduces the voltage of the DC power input to the DC / DC converter. The low-voltage drive device is driven by the DC power supplied from the DC / DC converter.

[0020] The power supply system 22 includes a voltage sensor 42, a current sensor 44, a voltage sensor 46, and a current sensor 48. The voltage sensor 42 detects the voltage across the terminals of the power generation device 24. The current sensor 44 detects the current output from the power generation device 24. The voltage sensor 46 detects the voltage across the terminals of the power storage device 26. The current sensor 48 detects the current output from the power storage device 26.

[0021] The power supply system 22 includes a control device 30. The control device 30 obtains signals indicative of voltage from voltage sensors 42, 46. The control device 30 obtains signals indicative of current from current sensors 44, 48. The control device 30 controls an injector provided in a fuel injection device 34 of the power generation device 24. The control device 30 controls a switching element provided in an AC / DC converter 40 of the power generation device 24.

[0022] The control device 30 has a calculation unit 50 and a storage unit 52. The calculation unit 50 is a processor such as a central processing unit (CPU) or a graphics processing unit (GPU). The calculation unit 50 controls each device by executing a program stored in the storage unit 52. At least a part of the calculation unit 50 may be realized by an integrated circuit such as an application specific integrated circuit (ASIC) or a field programmable gate array (FPGA). At least a part of the calculation unit 50 may be realized by an electronic circuit including discrete devices.

[0023] The calculation unit 50 functions as an information processing unit 54 and a control unit 56. The information processing unit 54 sets a target value of the power generated by the power generation device 24. The control unit 56 controls the power generation device 24 based on the set target value of the power.

[0024] The storage unit 52 is configured by a volatile memory (not shown) and a non-volatile memory (not shown) which are computer-readable storage media. The volatile memory is, for example, a random access memory (RAM). The non-volatile memory is, for example, a read only memory (ROM) or a flash memory. Data and the like are stored, for example, in the volatile memory. Programs, tables, maps, and the like are stored, for example, in the non-volatile memory. At least a part of the storage unit 52 may be provided in the above-mentioned processor, integrated circuit, and the like.

[0025] [Power generation control processing] Due to the structure of the machine, the gas turbine engine 32 responds slowly to commands. In addition, the gas turbine engine 32 is usually operated at high efficiency. Even if it is desired to rapidly increase the rotation speed of the gas turbine engine 32, efficiency is usually prioritized. Therefore, the gas turbine engine 32 cannot be driven with high response to commands. In addition, various sensors have a response delay. For these reasons, a time lag occurs from the time when the power required by the mobile body 10 exceeds the power generated by the power generation device 24 until the power generation device 24 is able to output the power required by the mobile body 10. During that time, power is supplied from the power storage device 26 to the load device 28. The generated power control process performed in the power supply system 22 is a process for reducing the power supply from the power storage device 26.

[0026] Fig. 3 is a flowchart of the generated power control process performed by the calculation unit 50. Fig. 4 is a block diagram showing the configuration of the information processing unit 54. As shown in Fig. 4, the information processing unit 54 includes a plurality of processing units (a parameter determination unit 58, a prediction unit 60, a corrected power determination unit 62, a target generated power determination unit 64, and a target generated power correction unit 66). Each processing unit shown in Fig. 4 executes any one of the processes of steps S2 to S6 shown in Fig. 3.

[0027] In step S1, the information processing unit 54 acquires each piece of information for executing the generated power control process. The information processing unit 54 acquires the required power based on the operation request acquired from the controller 21. The information processing unit 54 acquires information (voltage value and current value) indicating the detection result from each of the voltage sensors 42, 46 and the current sensors 44, 48. The information processing unit 54 acquires information (temperature, etc.) necessary for calculating the SOC (State Of Charge) from a sensor (not shown) other than the voltage value and the current value. The information processing unit 54 calculates the current SOC of the power storage device 26 based on the voltage value detected by the voltage sensor 46, the current value detected by the current sensor 48, and information such as the temperature. This SOC is referred to as the current SOC. The information processing unit 54 calculates the generated power currently generated by the power generation device 24 based on the voltage value detected by the voltage sensor 42 and the current value detected by the current sensor 44.

[0028] In step S2, the information processing unit 54 determines an adjustment parameter according to the deterioration state of the power storage device 26. The adjustment parameter is a parameter for reflecting the deterioration state (SOH (State Of Health)) of the power storage device 26 in the calculation result (corrected target power generation power) of the information processing unit 54. The process of step S2 is performed by a parameter determination unit 58 shown in Fig. 4. The parameter determination unit 58 will be described with reference to Fig. 5.

[0029] Fig. 5 is a block diagram showing the configuration of the parameter determination unit 58. The parameter determination unit 58 includes each processing unit shown in Fig. 5 (a weight determination unit 68, a SOC estimator 70, an error calculator 72, an error corrector 74, and a sliding mode controller 78).

[0030] The weight determination unit 68 determines the weight based on a voltage value (BAT voltage) detected by the voltage sensor 46, a current value (BAT current) detected by the current sensor 48, and a weight function 68a. The weight function 68a is a function that associates the BAT current, the BAT voltage, and a weight corresponding to the deterioration degree of the power storage device 26. The weight function 68a can be created based on a deterioration model of the power storage device 26 based on experimental results, simulation results, etc. The weight function 68a can also be created based on a deterioration model using the Arrhenius equation. The weight function 68a is stored in advance in the storage unit 52.

[0031] The SOC estimation unit 70 estimates the current SOC of the power storage device 26. The SOC estimation unit 70 estimates the current SOC based on required power information, which is information indicating required power, and generated power information, which is information indicating generated power. The SOC estimation unit 70 calculates the difference between the required power and the generated power for each predetermined calculation period. The difference between the required power and the generated power in each calculation period corresponds to the input / output power of the power storage device 26 in each calculation period. The SOC estimation unit 70 calculates the total value of the input / output power of the power storage device 26 by adding up all the differences. Furthermore, the SOC estimation unit 70 divides the subtraction value obtained by subtracting the calculated total value from the capacity value (full charge capacity) of the undegraded power storage device 26 by the capacity value of the undegraded power storage device 26. Through the above calculations, the SOC estimation unit 70 calculates an estimate of the SOC of the power storage device 26. This SOC is referred to as an estimated SOC. The past required power and generated power are stored in the storage unit 52. The capacity value of the power storage device 26 is also stored in the storage unit 52.

[0032] The error calculation unit 72 calculates an error value between the current SOC calculated in step S1 and the estimated SOC estimated by the SOC estimator 70. For example, the error calculation unit 72 calculates the error value by subtracting the estimated SOC from the current SOC.

[0033] The error correction unit 74 corrects the error value calculated by the error calculation unit 72 using the weight determined by the weight determination unit 68. For example, the error correction unit 74 calculates the corrected error value by multiplying the error value by the weight.

[0034] The sliding mode control unit 78 performs sliding mode control using the corrected error value as an input value, and calculates an adjustment parameter. The value of the adjustment parameter is greater than 0 and less than 1. The adjustment parameter is used by the prediction unit 60 and the target power generation determination unit 64 shown in FIG. 4. As a result, the deterioration state of the power storage device 26 is reflected in the target power generation (corrected target power generation) finally determined by the information processing unit 54. Note that the adjustment parameter may be calculated by a control other than the sliding mode control.

[0035] When each processing unit of the parameter determination unit 58 has performed the above processing, the processing of step S2 ends.

[0036] The explanation of the generated power control process will continue with reference to Fig. 3. After step S2 is completed, the information processing section 54 executes the process of step S3 and the process of step S5 in parallel.

[0037] In step S3, the information processing unit 54 predicts a predicted SOC. The predicted SOC is the SOC of the power storage device 26 that is calculated in the next calculation cycle if the current operating state of the power generation device 24 and the current input / output state of the load device 28 are continued. The process of step S3 is performed by the prediction unit 60 shown in Fig. 4. The prediction unit 60 calculates the predicted SOC by the following formula (1).

[0038]

number

[0039] SOCpre(k): predicted SOC SOCact(k): Current SOC in this calculation cycle SOCact(k-1): Current SOC in the previous calculation cycle φin(ki): Input / output power of the power storage device 26 in the i-th calculation cycle (required power-generated power) α1: Coefficient of SOCact(k) α2: Coefficient of SOCact(k-1) βi: Coefficient of φin(ki)

[0040] α1, α2, βi (i=1, 2, ..., n-1, n) are determined in the design stage of the prediction unit 60. α1, α2, βi are stored in advance in the storage unit 52. However, α1, α2, βi may be corrected based on the adjustment parameters determined by the parameter determination unit 58 in step S2. That is, the prediction unit 60 may correct each coefficient based on the adjustment parameters and calculate the predicted SOC (SOCpre(k)) using the above formula (1). In this case, the prediction unit 60 uses α1' obtained by multiplying α1 by the adjustment parameter. The prediction unit 60 uses α2' obtained by multiplying α2 by the adjustment parameter. The prediction unit 60 uses βi' obtained by multiplying βi by the adjustment parameter.

[0041] In step S4, the information processing unit 54 determines a correction power. The correction power is a power for reducing the deviation between a target SOC, which is a target SOC, and a predicted SOC. The target SOC is usually a constant value. The target SOC is stored in advance in the storage unit 52. The process of step S4 is performed by a correction power determination unit 62 shown in FIG. 4. The correction power determination unit 62 will be described with reference to FIG. 6.

[0042] Fig. 6 is a block diagram showing the configuration of the correction power determination unit 62. The correction power determination unit 62 includes the processing units (a deviation calculation unit 80 and a PID control unit 82) shown in Fig. 6.

[0043] The deviation calculation unit 80 calculates the deviation between the predicted SOC predicted by the prediction unit 60 in step S3 and a predetermined target SOC. For example, the deviation calculation unit 80 calculates the deviation by subtracting the target SOC from the predicted SOC.

[0044] The PID control unit 82 performs PID (Proportional Integral Differential) control. The PID control unit 82 determines a correction power for reducing the deviation between the target SOC and the predicted SOC. The correction power may be determined by a control other than the PID control (for example, a sliding mode control).

[0045] When each processing unit of the correction power determination unit 62 has performed the above processing, the processing of step S4 ends.

[0046] The explanation of the generated power control process will continue with reference to Fig. 3. The information processing section 54 executes a process of step S5 in parallel with the process of step S3 and the process of step S4.

[0047] In step S5, the information processing unit 54 determines a target generated power. The target generated power is the generated power of the power generation device 24 determined based on the required power and the current SOC. The target generated power is the power that does not take into account the predicted SOC (the amount of fluctuation in SOC). The process of step S5 is performed by the target generated power determination unit 64 shown in FIG. 4. The target generated power determination unit 64 will be described with reference to FIG. 7.

[0048] Fig. 7 is a block diagram showing the configuration of target generated power determination unit 64. Target generated power determination unit 64 includes the respective processing units shown in Fig. 7 (target charging power calculation unit 84, target charging power correction unit 86, and determination unit 88).

[0049] The target charging power calculation unit 84 determines the target charging power based on the current SOC calculated in step S1 and a charging power map 84a. The charging power map 84a is a map that associates the current SOC with the target charging power. The charging power map 84a is stored in the storage unit 52 in advance.

[0050] The target charging power correction unit 86 corrects the target charging power calculated by the target charging power calculation unit 84 in accordance with the deterioration state of the power storage device 26. For example, the target charging power correction unit 86 corrects the target charging power by multiplying the target charging power by an adjustment parameter. In this way, the target charging power correction unit 86 calculates the corrected charging power.

[0051] The determination unit 88 determines the target generation power based on the required power acquired in step S1 and the corrected charging power calculated by the target charging power correction unit 86. For example, the determination unit 88 calculates the target generation power by adding the corrected charging power to the required power.

[0052] When each processing unit of target generated power determination unit 64 has performed the above processing, the processing of step S5 ends.

[0053] The explanation of the generated power control process will continue with reference to Fig. 3. After the process of step S4 and the process of step S5 are completed, the information processing section 54 executes a process of step S6.

[0054] In step S6, the information processing section 54 corrects the target generated power with the correction power to determine a corrected target generated power. The process of step S6 is performed by the target generated power correction section 66 shown in FIG.

[0055] Target generated power correction unit 66 adds the correction power determined by correction power determination unit 62 in step S4 to the target generated power determined by target generated power determination unit 64 in step S5. In this way, target generated power correction unit 66 determines the corrected target generated power.

[0056] As described above, the information processing section 54 executes the processes of steps S1 to S6 to ultimately determine the corrected target generated power.

[0057] In step S7, the control unit 56 controls the power generation device 24 with the corrected target power generation power. For example, the control unit 56 changes the rotation speed of the gas turbine engine 32 by controlling the fuel injector 34. The control unit 56 also controls the torque of the generator 36 to control the power generation by the generator 36. For example, the control unit 56 controls the switching elements of the AC / DC converter 40.

[0058] [Effects of this embodiment] The calculation unit 50 predicts the SOC of the power storage device 26 after a predetermined time, and corrects the target generated power based on the prediction result. This control is called predictive control. The effect of this embodiment will be described by comparing a case where predictive control is executed with a case where predictive control is not executed using Figs. 8A to 8D.

[0059] Fig. 8A is a time chart of required power. Fig. 8B is a time chart of generated power. Fig. 8C is a time chart of the SOC of power storage device 26. Fig. 8D is a time chart of correction power determined by correction power determination unit 62. In Figs. 8B and 8C, the time charts when predictive control is not performed are shown by solid lines, and the time charts when predictive control is performed are shown by dashed lines.

[0060] As shown in Fig. 8A, at time T1, the required power increases from power A to power B. On the other hand, as shown in Fig. 8B, at time T1, the generated power is power A. In this way, at time T1, a power difference BA occurs between the required power and the generated power.

[0061] First, the operation when predictive control is not executed will be described. The power generation device 24 generates power while operating the gas turbine engine 32 at optimal efficiency. As a result, the generated power reaches power B, which is the same as the required power, at time T3. While there is a power difference between the required power and the generated power (time T1 to time T3), the power storage device 26 supplies the difference in power to the load device 28. Therefore, the SOC of the power storage device 26 starts to decrease from time T1, and the decrease in the SOC of the power storage device 26 stops at time T3.

[0062] At time T3, the required power and the generated power become equal, so the input / output power of the power storage device 26 becomes substantially zero. Therefore, the power storage device 26 maintains the SOC at time T3. In this manner, the power storage device 26 maintains a state in which the SOC is reduced. For example, if a larger required power occurs while the SOC of the power storage device 26 remains reduced, there is a risk that the power storage device 26 will not be able to compensate for the required power.

[0063] Next, the operation when predictive control is executed will be described. When the calculation unit 50 detects that the power difference BA becomes equal to or greater than a predetermined difference, the calculation unit 50 starts the generated power control process shown in FIG. 3. Here, the calculation unit 50 starts the generated power control process at time T1. At time T1, the information processing unit 54 of the calculation unit 50 predicts that the SOC of the power storage device 26 after a predetermined time will decrease. For this reason, as shown in FIG. 8D, the information processing unit 54 (corrected power determination unit 62) sets a corrected power (>0) according to the predicted SOC. As a result, as shown in FIG. 8B, the control unit 56 of the calculation unit 50 increases the generated power more than when predictive control is not executed. Then, the power supplied from the power storage device 26 to the power storage device 26 decreases. Therefore, as shown in FIG. 8C, the decrease rate of the power storage device 26 becomes smaller than when predictive control is not executed.

[0064] In this embodiment, the generated power reaches power B, which is the same as the required power, at time T2, which is earlier than time T3. At this time T2, the decrease in the SOC of the power storage device 26 stops. In this embodiment, the calculation unit 50 executes control to bring the SOC of the power storage device 26 after a predetermined time period closer to the target SOC (a [%] in FIG. 8C). Therefore, the information processing unit 54 (correction power determination unit 62) sets the correction power (>0) according to the predicted SOC even after time T2. Then, the generated power exceeds the required power, and surplus power is generated. The surplus power is supplied to the power storage device 26, which is charged. Therefore, the SOC of the power storage device 26 starts to increase from time T2.

[0065] At time T3, the deviation between the predicted SOC predicted by information processing unit 54 (prediction unit 60) and the target SOC becomes smaller. In other words, the SOC of power storage device 26 approaches the target SOC. As shown in FIG. 8D, information processing unit 54 (correction power determination unit 62) sets a correction power (<0) according to the predicted SOC. As a result, as shown in FIG. 8B, control unit 56 of calculation unit 50 reduces the generated power. At time T4, the generated power reaches power B, which is the same as the required power. At this time T4, the SOC of power storage device 26 reaches the target SOC (a [%]).

[0066] In this manner, in this embodiment, the SOC (predicted SOC) of the power storage device 26 after a predetermined time is predicted, and the power generation device 24 is controlled in advance so that the predicted SOC approaches the target SOC (target SOC). This makes it possible to quickly increase the generated power of the power generation device 24 when a difference occurs between the required power and the generated power. This makes it possible to reduce the power supplied from the power storage device 26 to the load device 28. In other words, according to this embodiment, the input / output power amount of the power storage device 26 can be reduced. As a result, according to this embodiment, it is possible to provide a good power supply system 22 and mobile object 10.

[0067] In this embodiment, the target SOC (a [%]) is set lower than the SOC (b [%]) when fully charged. This is to prepare for unexpected charging. When the generated power exceeds the required power, the power storage device 26 in a fully charged state cannot absorb the surplus power. In this embodiment, the target SOC is set lower than the fully charged state so that such surplus power can be absorbed.

[0068] At time T5, the required power decreases from power B to power A. When predictive control is not executed, as shown in FIG. 8C, it is necessary to fully charge the power storage device 26, which has a low SOC. In order to fully charge the power storage device 26, a time period from time T5 to time T7 is required. In contrast, in the case of the present embodiment in which predictive control is executed, as shown in FIG. 8C, the SOC is already close to being fully charged. In order to fully charge the power storage device 26, a time period from time T5 to time T6 is required. This time period is shorter than the time period from time T5 to time T7. Thus, according to this embodiment, when the required power decreases, the rotation speed of the power generation device 24 can be quickly reduced.

[0069] Next, the control when power storage device 26 is not deteriorated and the control when power storage device 26 is deteriorated will be compared with reference to FIGS. 9A to 9D.

[0070] Fig. 9A is a time chart of required power. Fig. 9B is a time chart of generated power. Fig. 9C is a time chart of the SOC of power storage device 26. Fig. 9D is a time chart of correction power determined by correction power determination unit 62. The time charts (dashed lines) for "no deterioration" shown in Figs. 9B to 9D are the same as the time charts (dashed lines) for the case where predictive control is executed shown in Figs. 8B to 8D.

[0071] The deteriorated power storage device 26 has a lower upper limit of SOC than the non-deteriorated power storage device 26. In other words, the deteriorated power storage device 26 has a smaller chargeable capacity than the non-deteriorated power storage device 26, and is more likely to be overcharged. As shown in FIG. 9D, when the power storage device 26 is deteriorated, the information processing unit 54 (correction power determination unit 62) sets the correction power to be smaller than the correction power when the power storage device 26 is not deteriorated (time T1 to time T3). Furthermore, as shown in FIG. 9C, when the power storage device 26 is deteriorated, the target SOC (a' [%]) is set lower than the target SOC (a [%]) when the power storage device 26 is not deteriorated. In this way, the information processing unit 54 slows down the charging speed for the deteriorated power storage device 26.

[0072] In this embodiment, the adjustment parameters are used to perform the generated power control process according to the deterioration state of the power storage device 26. However, regardless of whether the power storage device 26 is deteriorated or not, if the target SOC is set to a value that takes deterioration into account, the adjustment parameters do not need to be used. In other words, the calculation unit 50 does not need to perform the process by the parameter determination unit 58.

[0073] [Note] In addition to the above disclosure, the following notes are also disclosed.

[0074] (Appendix 1) The power supply system (22) comprises a power generation device (24) including an engine (32) and a generator (36) driven by the engine, a load device (28) capable of operating with power supplied from the power generation device, a power storage device (26) capable of being charged with power supplied from the power generation device and supplying power to the load device, a prediction unit (60) that predicts a predicted SOC, which is the SOC after a predetermined time, based on required power required to operate the load device, generated power, which is power generated by the power generation device, and a current SOC, which is the current SOC of the power storage device, a correction power determination unit (62) that determines correction power for reducing a deviation between a target SOC, which is the SOC to be targeted, and the predicted SOC, a target generated power correction unit (66) that determines a corrected target generated power by correcting a target generated power, which is the generated power according to the required power, with the correction power, and a control unit (56) that can control the power generation device based on the corrected target generated power.

[0075] In the above configuration, the SOC (predicted SOC) of the power storage device after a predetermined time is predicted, and the power generation device is controlled in advance so that the predicted SOC approaches a target SOC (target SOC). This makes it possible to quickly increase the power generated by the power generation device when a difference occurs between the required power and the generated power. This makes it possible to reduce the power supplied from the power storage device to the load device. In other words, the above configuration makes it possible to reduce the amount of input / output power of the power storage device. As a result, the above configuration makes it possible to provide an excellent power supply system.

[0076] (Appendix 2) The power supply system according to supplementary note 1 may further comprise a target generated power determination unit (64) that determines the target generated power based on the required power and the current SOC.

[0077] (Appendix 3) The power supply system described in Appendix 2 may further include a parameter determination unit (58) that determines an adjustment parameter according to a degradation state of the power storage device, wherein the prediction unit uses the adjustment parameter to predict the predicted SOC according to the degradation state of the power storage device, and the target power generation determination unit determines the target power generation according to the degradation state of the power storage device by using the adjustment parameter.

[0078] (Appendix 4) The moving object (10) includes the power supply system according to any one of claims 1 to 3.

[0079] The present invention is not limited to the above disclosure, and various configurations can be adopted without departing from the gist of the present invention. [Explanation of symbols]

[0080] 10...Mobile unit 22...Power supply system 24... Power generation device 26... Power storage device 28...Load device 32...Gas turbine engine (engine) 36...Generator 56: control unit 58: parameter determination unit 60... prediction unit 62... correction power determination unit 64: Target power generation determining unit 66: Target power generation correcting unit

Claims

1. A power generation device including an engine and a generator driven by the engine; A load device that can be operated by power supplied from the power generation device; a power storage device that can be charged by power supplied from the power generation device and can supply power to the load device; a prediction unit that predicts a predicted SOC, which is the SOC after a predetermined time, based on a required power required to operate the load device, a generated power that is the power generated by the power generation device, and a current SOC that is the current SOC of the power storage device; a correction power determination unit that determines a correction power for reducing a deviation between a target SOC, which is a target SOC, and the predicted SOC; a target power generation correction unit that determines a corrected target power generation by correcting a target power generation, which is a power generation power corresponding to the required power, with the correction power; a control unit capable of controlling the power generation device based on the corrected target power generation; A power supply system comprising:

2. 2. The power supply system according to claim 1, a target generated power determination unit that determines the target generated power based on the required power and the current SOC.

3. 3. The power supply system according to claim 2, a parameter determination unit that determines an adjustment parameter according to a deterioration state of the power storage device, The prediction unit predicts the predicted SOC according to the deterioration state of the power storage device by using the adjustment parameter; The target generated power determination unit determines the target generated power according to the degradation state of the power storage device by using the adjustment parameter.

4. A mobile object comprising the power supply system according to any one of claims 1 to 3.

Citation Information

Patent Citations

  • Insulation paper sheet for motor

    JP2022070482A

  • Hybrid vehicle control method and hybrid vehicle control device

    JP2022080482A

  • Vehicle control system, vehicle control method, and program

    WO2019073741A1

  • Control system for aircraft, control method for aircraft, control program for aircraft, and aircraft

    JP2019077361A