Information processing apparatus, information processing method and computer program

The information processing device enhances electricity market price prediction by identifying power generation and weather events, ensuring accurate market price estimation despite rapid changes.

JP2024135406AActive Publication Date: 2024-10-04KK TOSHIBA
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2023046066
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-22
Publication Date
2024-10-04
Estimated Expiration
2043-03-22

AI Technical Summary

Technical Problem

Existing methods for predicting electricity market prices struggle with accuracy, particularly in rapid market changes due to factors like seasonal circumstances, power generation equipment issues, and weather fluctuations, as they rely heavily on weather condition similarities.

Method used

An information processing device that estimates market price fluctuations by detecting events such as power generation equipment changes and weather conditions, using planned data to predict market price increases or decreases with high accuracy.

Benefits of technology

Enables precise prediction of market prices even in the face of unexpected power generation issues or weather changes, improving business decision-making and profit margins in electricity supply and demand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024135406000001_ABST
    Figure 2024135406000001_ABST
Patent Text Reader

Abstract

To provide an information processing apparatus, an information processing method and a computer program which can improve the precision of power market price estimation.SOLUTION: An information processing apparatus includes a processing unit which acquires the planning data of the power generation amount of a power generation facility for generating power tradable in a power market, and, when a first event related to the change of the power generation amount in a target date is detected based on the planning data, estimates the market price fluctuation amount of the power market caused by the first event on the target date.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an information processing device, an information processing method, and a computer program. [Background technology]

[0002] When promoting and operating renewable energy, it may be necessary to probabilistically estimate future prices and bids in the electricity market to meet the requirements of various applications. Since the demand and supply of electricity are mainly affected by the weather, good accuracy can be achieved by estimating electricity market prices using weather forecasts from a numerical weather simulator. As a specific example, there is a method of obtaining past market prices with weather conditions similar to the weather forecast value for the target day and estimating various quantities related to the electricity market (price and bids).

[0003] However, this method cannot predict sudden changes in the electricity market (price hikes, etc.) in advance. Market prices are determined by a variety of factors, including seasonal circumstances, problems with power generation facilities, recent world events, and natural disasters, and methods that focus on similarities in weather conditions may not be able to make accurate predictions. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] JP 2019-96164 A Summary of the Invention [Problem to be solved by the invention]

[0005] The present embodiment provides an information processing device, an information processing method, and a computer program that improve the accuracy of estimating market prices in the electricity market. [Means for solving the problem]

[0006] The information processing device disclosed herein includes a processing unit that acquires planned data on the amount of electricity generated by a power generation facility that generates electricity that can be traded in an electricity market, and when a first event related to a change in the amount of electricity generated on a target day is detected based on the planned data, estimates the amount of fluctuation in the market price in the electricity market on the target day due to the first event. [Brief description of the drawings]

[0007] [Figure 1] FIG. 2 is a functional block diagram of a price rise prediction device which is an information processing device according to the present embodiment. [Diagram 2] A diagram showing a specific example of an electricity market performance data area. [Diagram 3] Electricity market performance data - A chart showing specific examples from across the country. [Figure 4] FIG. 4 is a diagram showing a specific example of weather forecast data. [Diagram 5] FIG. 4 is a diagram showing a specific example of power generation facility shutdown plan data. [Figure 6] FIG. 13 is a diagram showing an example of output data from a price rise prediction device (prediction result calculation unit). [Figure 7] 2 is a flowchart of an example of the overall operation of the price rise prediction device of FIG. 1. [Figure 8] 11 is a flowchart showing an example of the operations of a data extraction range determination unit, a normal price prediction unit, and a prediction result calculation unit. [Figure 9] FIG. 13 is a diagram showing an example of changing the data extraction range. [Figure 10] FIG. 11 is a diagram showing an example of creating search target data. [Figure 11] FIG. 4 is a diagram showing a schematic diagram of a normal price prediction operation performed by a normal price prediction unit. [Figure 12] FIG. 13 is a diagram illustrating an example of calculation by a prediction result calculation unit when a data extraction range is changed. [Figure 13] FIG. 13 is a diagram showing another example of output data from the prediction result calculation unit. [Figure 14] FIG. 2 is a diagram showing an example of the hardware configuration of a price rise prediction device as an information processing device according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0008] Hereinafter, the present embodiment will be described with reference to the drawings.

[0009] 1 is a functional block diagram of a price rise prediction device 10, which is an information processing device according to this embodiment. The price rise prediction device 10 mainly comprises a processing unit 100, a data acquisition unit 200, a data storage unit 300, and an input unit 400. The processing unit 100 comprises a price rise prediction function 100A, a normal time prediction function 100B, and an electricity market prediction function 100C.

[0010] In this embodiment, it is determined whether the market price in the electricity market will soar on a target date based on the operating status of a power plant (power generation facility), specifically, based on planned data on the amount of power generated by the power generation facility. For example, data on the planned value of the power generation reduction (stoppage amount) of the power plant (power generation facility) published on the Power Generation Information Publication Website (HJKS) is periodically or intermittently acquired, and an event related to a change in the amount of power generation (a first event or an event caused by the power generation facility) is detected based on the amount of reduction or the change in the amount of reduction from the previous day. Depending on whether an event caused by the power generation facility is detected, it is estimated whether a price hike will occur.

[0011] If the first event is detected, it is determined that a price rise will occur, and if the first event is not detected, it is determined that a price rise will not occur. If it is determined that a price rise will occur, the amount of fluctuation in the market price in the electricity market due to the first event on the target day is estimated, and the market price on the target day is estimated based on this amount of fluctuation. This makes it possible to estimate the market price with high accuracy even if the market price rises on the target day. For example, even if power generation is stopped or the amount of power generation is reduced on the target day due to a sudden cause in the power generation status of a power generation facility, it is possible to estimate the market price on the target day with high accuracy.

[0012] The reduction in power generation at a power plant is also called the amount of shutdown, since power generation is stopped by the amount of the reduction. When a power generation facility is shut down, the amount of power generation is reduced by the rated output. When the output of a power generation facility is reduced, the amount of reduction is the amount of reduction. In the following explanation, the expression "shutdown of power generation facility" is mainly used, but the shutdown of power generation facility may also include the reduction in the output of the power generation facility.

[0013] In this embodiment, in addition to the operating status of the power plant (power generation facility), a weather-related event (second event or weather-related event) is detected based on the weather forecast value for the prediction target day. Whether a weather-related event is detected is used to determine whether a weather-related market price surge will occur. If the second event is detected, it is determined that a weather-related price surge will occur, and if the second event is not detected, it is determined that a weather-related price surge will not occur. If it is determined that a price surge will occur, the market price is estimated using past data (weather forecast data and electricity market performance data from past years) with weather conditions similar to those of the prediction target day. This allows the market price on the target day to be estimated with high accuracy even if the amount of power generation decreases (including the suspension of power generation) due to a sudden change in weather conditions.

[0014] As described above, according to this embodiment, the market price can be estimated with high accuracy even when the amount of power generation decreases due to a problem with the power generation equipment or when the market price rises due to a sudden change in weather conditions.

[0015] In the following explanation, a future date (prediction target date) is mainly assumed as the target date for estimating the market price, and a case will be shown in which the market price on the prediction target date is estimated. In this embodiment, estimating the market price on a future date is particularly called predicting the market price, and hereinafter, estimating the market price etc. will be mainly described as predicting the market price. Below, this embodiment will be explained in more detail.

[0016] The data acquiring unit 200 includes a weather forecast acquiring unit 210 , an electricity market performance acquiring unit 220 , and a power generation facility shutdown plan acquiring unit 230 .

[0017] The weather forecast acquisition unit 210 acquires weather forecast data including weather forecast results (e.g., calculation results of the WRF numerical weather simulator) at AMeDAS locations nationwide from the weather forecast system 1, and sends the weather forecast data to the data storage unit 300. The weather forecast data may be acquired at any time interval, such as every hour, every day, or every week, or may be acquired by sending an acquisition request to the weather forecast system 1 at a required timing.

[0018] The electricity market performance acquisition unit 220 acquires data such as market prices and transaction volume (contract volume) results in the electricity market, bidding volume in the trading market, and virtual system price from the electricity market performance value management system 2 as electricity market performance data, and sends the electricity market performance data to the data storage unit 300. Examples of information that can be acquired from the electricity market performance value management system 2 include that disclosed on the website of the Japan Electric Power Exchange (JEPX), a general incorporated association, http: / / www.jepx.org / market / index.html. The electricity market performance data may be acquired at any interval such as once a day or once an hour, which is the unit of trading time in the electricity market, or may be acquired by sending an acquisition request to the electricity market performance value management system 2 at the required timing.

[0019] The power generation equipment shutdown plan acquisition unit 230 acquires data (power generation equipment shutdown plan data) on the operation status and shutdown status of power plants (power generation equipment) by power source type nationwide from the power plant operation status management system 3, and sends the power generation equipment shutdown plan data to the data storage unit 300. Examples of information that can be acquired from the power plant operation status management system 3 include information disclosed on the power generation information disclosure system and the HJKS website https: / / hjks.jepx.or.jp / hjks / top. There are no particular limitations on the timing of acquisition of the power generation equipment shutdown plan data, so long as it can be acquired intermittently. The data may be acquired at any time interval, such as every hour, every day, or every week, or may be acquired by sending an acquisition request to the power plant operation status management system 3 at the required timing.

[0020] The data storage unit 300 includes a weather forecast storage unit 310 , an electricity market performance storage unit 320 , and a power generation facility shutdown plan storage unit 330 .

[0021] The weather forecast storage unit 310 receives weather forecast data from the weather forecast acquisition unit 210 and stores the weather forecast data. The weather forecast storage unit 310 also stores weather forecast data acquired in the past. The stored weather forecast data is sent to the price hike prediction function 100A and also to the normal price prediction data storage unit 180 of the normal time prediction function 100B. The normal price prediction data storage unit 180 stores the weather forecast data received from the weather forecast storage unit 310.

[0022] The electricity market performance storage unit 320 receives electricity market performance data from the electricity market performance acquisition unit 220 and stores the electricity market performance data. The electricity market performance storage unit 320 also stores electricity market performance data acquired in the past. The stored electricity market performance data is sent to the price hike prediction function 100A and also to the normal price prediction data storage unit 180 of the normal time prediction function 100B. The normal price prediction data storage unit 180 stores the electricity market performance data received from the electricity market performance storage unit 320.

[0023] The power generation equipment shutdown plan storage unit 330 receives power generation equipment shutdown plan data from the power generation equipment shutdown plan acquisition unit 230 and stores the power generation equipment shutdown plan data. The power market performance storage unit 320 also stores power market performance data acquired in the past. The power generation equipment shutdown plan storage unit 330 also stores power market performance data acquired in the past. The stored power generation equipment shutdown plan data is sent to the price hike prediction function 100A.

[0024] The input unit 400 receives input from a user and sends the input information to the price rise prediction function 100A. The input unit 400 is a device that can input information by any method, such as a keyboard, a mouse, a touch panel, a voice input unit, or a gesture input unit. The types of information received by the input unit 400 are shown below as [1] to [3].

[0025] [1] Information (aggregation item information) on items (e.g., cause of shutdown, type of shutdown (planned shutdown, unplanned shutdown)) to be aggregated to determine whether a price rise caused by a power generation equipment trouble has occurred. As described later, the planned shutdown value of the power generation equipment at the power plant (the planned value of the amount of decrease or shutdown, which is the amount of power generation that is decreased from the planned amount of power generation (e.g., rated output)) for the input items is summed up in units of areas corresponding to the electricity market, and the summed value is used to determine whether a price rise has occurred in the electricity market. More specifically, based on the summed value, it is determined whether an event related to a change in the amount of power generation (a first event or an event caused by the power generation equipment) is detected. If a power generation equipment cause event is detected, it is determined that a price rise caused by the power generation equipment will occur, and if a power generation equipment cause event is not detected, it is determined that a price rise caused by the power generation equipment will not occur. In this way, the occurrence of a price rise is determined. In addition to the cause of shutdown and the type of shutdown, the item to be aggregated may be the type of power generation equipment.

[0026] [2] Information showing the judgment conditions (power generation equipment cause judgment conditions) for judging whether or not there is a price rise. Examples of the judgment conditions include a threshold for the decrease in power generation (power generation decrease amount) and a threshold for the change in the amount of power generation decrease from the previous day's value.

[0027] [3] Information indicating the items to be judged for determining whether a price hike is due to weather and the judgment conditions (weather-caused judgment conditions). Specifically, information regarding the items on which weather (weather forecast) to focus and threshold information for comparing with the weather forecast value for that weather. As described below, it is determined whether a weather-related event (second event or weather-related event) is detected based on the weather forecast value indicated by the weather forecast item. If a weather-related event is detected, it is determined that a weather-caused price hike will occur, and if it is not detected, it is determined that a weather-caused price hike will not occur.

[0028] The price increase prediction function 100A will be outlined below. The price hike prediction function 100A receives electricity market performance data and power generation equipment shutdown plan data from the data storage unit 300, and receives aggregation item information and judgment conditions (power generation equipment cause judgment conditions) from the input unit 400. The price hike prediction function 100A judges whether or not a hike in the electricity market price caused by power generation equipment (hereinafter, a price hike) will occur, and calculates the amount of the hike if a price hike does occur. The price hike prediction function 100A sends data indicating the calculated price hike amount to the output unit 500.

[0029] In this embodiment, a price increase is defined as, for example, a reference price being determined for each area and the price is equal to or higher than the reference price. The method of determining the reference price may be arbitrary. Based on the most recent market price, the normal price when there is no increase and the price when there is an increase (normal price + increase amount) may be respectively identified, and the price that divides these prices in half may be set as the reference price. Other methods of determination are also possible. An example of a method of determining the reference price is shown below. Example 1: When a day subject to trading in the electricity market is divided into 48-hour time slots of 30 minutes each and a commodity (electricity) is traded for each time slot, the base price for each time slot is set at a uniform price of 40 yen / kWh. Example 2: Based on the electricity market performance data for the past year, the 75th percentile value is set as the base price for each time slot.

[0030] The price hike prediction function 100A also receives weather forecast data from the weather forecast storage unit 310, and receives weather forecast items and judgment conditions (weather cause judgment conditions) from the input unit 400. The price hike prediction function 100A judges whether or not a weather-related price hike will occur. If it is determined that a price hike will not occur, it determines a data extraction range required to calculate the market price in the case where a weather-related price hike does not occur (for example, 7 days from the day before the prediction target date), and sends information indicating the specified data extraction range to the normal time prediction function 100B. If it is determined that a price hike will occur, it specifies the range of the data period (data extraction range) required to calculate the market price in the case where a price hike occurs due to weather from the weather forecast data and the electricity market performance data (for example, a period in the past year when the weather conditions are similar), and sends information indicating the specified data extraction range to the normal time prediction function 100B. In this way, if it is determined that a weather-related price hike will occur, the data extraction range is changed from the normal time. The market price when a weather-induced price spike occurs and the market price when a weather-induced price spike does not occur are calculated by normal time forecasting function 100B.

[0031] The price hike prediction function 100A will now be described in further detail. The price rise prediction function 100A is a function for predicting price rises caused by power generation equipment, and includes a power generation equipment shutdown plan data pre-processing unit 110 (hereinafter referred to as pre-processing unit 110), a trend analysis unit 120, a price rise determination unit (caused by power generation equipment) 130, a price sensitivity calculation unit 140, and a price rise amount prediction unit 150.

[0032] The pre-processing unit 110 pre-processes the power generation equipment shutdown plan data. More specifically, the pre-processing unit 110 receives the power generation equipment shutdown plan data from the data storage unit 300, and receives the tally item information from the input unit 400. The pre-processing unit 110 tally (sums up) the planned values ​​of the reduction amounts for the items indicated in the tally item information in the power generation equipment shutdown plan data for each area, and sends the tally data of the reduction amounts to the trend analysis unit 120.

[0033] The trend analysis unit 120 receives the decline amount data for each area from the preprocessing unit 110 and the electricity market performance data from the electricity market performance storage unit 320, and performs trend analysis of the electricity market price based on the fluctuation of the decline amount for each area (time series change) and the fluctuation of the electricity market price (time series change). More specifically, the trend analysis unit 120 receives the decline amount data for each area from the preprocessing unit 110 and the electricity market performance data from the electricity market performance storage unit 320, analyzes the fluctuation trend of the decline amount for each area and the fluctuation trend of the electricity market price, and calculates the change in the decline amount for each area (e.g., the change from the previous day) and the change rate of the electricity market price relative to the change in the decline amount. The trend analysis unit 120 sends the power generation stop change amount data including the calculated information to the price hike determination unit (power generation equipment cause) 130. The change in the decrease amount may be calculated, for example, as the difference between the decrease amount calculated based on first planning data acquired at a first point in time (e.g., the day before the prediction target day) for the amount of power generated by the power generation facility on the prediction target day, and the decrease amount calculated based on second planning data acquired at a second point in time prior to the first point in time (e.g., the day before the first point in time) for the amount of power generated by the power generation facility on the prediction target day. In other words, the fluctuation in the decrease amount can be calculated by comparing the first planning data with the second planning data.

[0034] The price hike determination unit (cause of power generation equipment) 130 determines whether a price hike caused by the shutdown of a power plant (power generation equipment) will occur (price hike caused by power generation equipment). More specifically, the price hike determination unit (cause of power generation equipment) 130 uses the power generation shutdown change amount data for each area received from the tendency analysis unit 120 and a threshold value (at least one of the threshold value of the amount of decrease (threshold value of the amount of shutdown) and the amount of change in the amount of decrease (amount of change in the amount of decrease)) received from the input unit 400 to determine whether an event related to a change in the amount of power generation (a first event or an event caused by power generation equipment) is detected. If an event caused by power generation equipment is detected, it is determined that a price hike caused by power generation equipment will occur, and if an event caused by power generation equipment is not detected, it is determined that a price hike caused by power generation equipment will not occur. Whether an event caused by power generation equipment is detected is determined, for example, by whether the amount of decrease in the amount of power generation for each area on the prediction target day exceeds a threshold value, and whether the amount of change in the amount of decrease (the amount of change in the amount of decrease from the day before the prediction target day (the day before one trading day)) exceeds a threshold value. If any of the thresholds are exceeded, a power generation equipment-related event is detected, and it is determined that a price rise due to power generation equipment will occur. The price rise determination unit (power generation equipment-related cause) 130 sends information on whether a price rise due to power generation equipment will occur to the price rise amount prediction unit 150, and further, if it determines that a price rise will occur, sends information indicating the amount of decrease in the amount of power generation and the amount of change in the amount of decrease (decrease amount / change amount information) to the price rise amount prediction unit 150.

[0035] The price sensitivity calculation unit 140 calculates price sensitivity, which is an index for converting the amount of change in the amount of decrease in power generation (amount of change in the shutdown of power generation facilities) into the amount of price change in the electricity market. More specifically, the price sensitivity calculation unit 140 calculates price sensitivity, which is an index for converting the amount of change in the amount of decrease into the amount of change in the electricity market price, using the electricity market performance data received from the electricity market performance storage unit 320. The price sensitivity calculation unit 140 sends data indicating the calculated price sensitivity (price sensitivity data) to the price increase prediction unit 150.

[0036] The price surge prediction unit 150 predicts the price surge amount (price difference from the normal price on the assumption that there is no price surge caused by the power generation equipment) when the price surge determination unit (power generation equipment cause) 130 determines that a price surge will occur. More specifically, when the price surge determination unit (power generation equipment cause) 130 determines that a price surge will occur due to the power generation equipment, the price surge prediction unit 150 receives the change amount data of the power generation decrease amount and the price sensitivity data, and predicts the price surge amount on the prediction target date. The price surge prediction unit 150 sends data (price surge data) indicating the predicted price surge amount to the prediction result calculation unit 182. When the price surge determination unit (power generation equipment cause) 130 determines that a price surge will not occur due to the power generation equipment, the price surge prediction unit 150 may send price surge data indicating 0 yen as the price surge amount to the prediction result calculation unit 182.

[0037] The price hike prediction function 100A includes a price hike determination unit (weather cause) 160 and a data extraction range determination unit 170 as a function for predicting a weather-related price hike.

[0038] The price rise determination unit (weather cause) 160 receives weather forecast data and electricity market performance data from the data storage unit 300, and receives information indicating the weather forecast item and threshold value from the input unit 400. The price rise determination unit (weather cause) 160 identifies the weather forecast value indicated by the weather forecast item in the weather forecast data, and detects a weather-related event (a second event or a weather-related event) based on the weather forecast value. If a weather-related event is detected, it determines that a weather-related price rise will occur, and if not, it determines that a weather-related price rise will not occur. Whether or not a weather-related event will occur is determined, for example, by whether or not the weather forecast value exceeds the threshold value. In this case, if the weather forecast value meets the threshold value, it determines that a weather-related price rise will occur. Meeting the threshold value may mean either exceeding the threshold value or falling below the threshold value, depending on the type of weather. The price rise determination unit (weather cause) 160 sends information on whether or not a weather-related price rise will occur to the data extraction range determination unit 170.

[0039] The data extraction range determination unit 170 determines the data extraction range (data period) used in the normal price prediction unit 181 based on information from the price increase determination unit (weather cause) 160 on whether or not a weather-caused price increase will occur. For example, if it is determined that a weather-caused price increase will not occur, the data extraction range indicating a certain period (e.g., one week) from the day before the prediction target date (the trading day one day before) is determined. If it is determined that a weather-caused price increase will occur, a similar past period including a day similar to the weather conditions indicated by the weather forecast value (or a certain period before or after that may be included) is identified from the past weather forecast data, and a data extraction range indicating the identified period is determined. The similar past period may be any length, for example, 30 days. The data extraction range determination unit 170 sends information indicating the determined data extraction range to the normal price prediction unit 181 of the normal prediction function 100B.

[0040] The normal time prediction function 100B includes a normal price prediction data storage unit 180, a normal price prediction unit 181, and a prediction result calculation unit 182.

[0041] The normal price prediction data storage unit 180 receives and stores the electricity market price record data and the weather forecast data from the data storage unit 300. The normal price prediction data storage unit 180 may also store data received from the data storage unit 300 in the past.

[0042] The normal price prediction unit 181 extracts weather forecast data and electricity market price actual data from the storage unit 180 based on the data extraction range information received from the data extraction range determination unit 170. The normal price prediction unit 181 predicts the market price based on the extracted data. The prediction made by the normal price prediction unit 181 is called normal price prediction. When it is determined that a price rise due to weather will occur, the normal price prediction unit 181 can perform price prediction that takes into account the price rise due to weather, using data from a similar period in the past, by using data within the range indicated in the data extraction range information received from the data extraction range determination unit 170. When it is determined that a price rise due to weather will not occur, it can perform price prediction as usual, for example, using the most recent data (for example, data for one week before the prediction target date). The price predicted by the normal price prediction unit 181 is the price (normal price or first market price) assuming that there is no price rise due to power generation equipment, and when there is a price rise due to weather, the normal price reflects this price rise. The normal price prediction unit 181 calculates a predicted value of the electricity market price (predicted value of the normal price), and sends data including the predicted value (normal price data) to the prediction result calculation unit 182.

[0043] The prediction result calculation unit 182 receives the normal price data from the normal price prediction unit 181 and the price hike data from the price hike prediction unit 150, and calculates the final prediction result of the electricity market price. For example, the final prediction result of the electricity market price is calculated by adding the price hike indicated by the price hike data (if there is no price hike due to the power generation equipment, the price hike can be 0 yen) to the normal price indicated by the normal price data. Calculating the final electricity market price by adding the normal price and the price hike is only one example, and other methods may be used as long as they can be calculated using a function including the normal price and the price hike. For example, the final electricity market price may be calculated by a weighted sum of the normal price and the price hike. The prediction result calculation unit 182 sends output data including the calculated prediction result, etc. to the output unit 500. The output data may include information other than the prediction result, such as a date, the normal price, and the price hike.

[0044] The output unit 500 outputs the output data received from the prediction result calculation unit 182. The output unit 500 is, for example, a display, and displays the output data on a screen. The output unit 500 may be a communication device. In this case, the output unit 500 may transmit the output data to a device of a company that uses the output data to carry out business.

[0045] For example, the output unit 500 may transmit the output data to a bidding device that generates bidding data for the electricity market and provides it to an electricity market trading system. When the bidding device determines based on the output data that the market price will be higher than a threshold on the prediction target date, the bidding device may submit a buy bid for the required amount of electricity to the electricity market trading system before the prediction target date in order to buy electricity before the prediction target date. Alternatively, in order to sell electricity at a high price on the prediction target date, the bidding device may refrain from submitting a sell bid for the required amount of electricity until before the prediction target date, and then submit a sell bid on the prediction target date to sell electricity at a high price.

[0046] The output unit 500 may also transmit the output data to a device (DR device) that controls demand response (DR) of a demand response (DR) business operator. When the DR device determines that the market price will be higher than a threshold on the prediction target date, the DR device may plan to perform downward DR to suppress the use of electricity by consumers on the prediction target date. There are various other possible uses for the output data.

[0047] Prior to describing the operation of this embodiment, definitions and specific examples of various parameters, various data, and various mathematical expressions will be given below.

[0048] TIFF2024135406000002.tif29170

[0049] TIFF2024135406000003.tif17170

[0050] TIFF2024135406000004.tif19170

[0051] TIFF2024135406000005.tif51170

[0052] Figure 2 shows a specific example of an electricity market performance data area. The actual spot market data for the electricity market includes the system price (yen / kWh) for each 30-minute time frame and the price (market price) for each area (yen / kWh). The time code is an integer value between 1 and 48 that labels each 30-minute time frame. The spot hourly average price (yen / kWh) may also be recorded.

[0053] Figure 3 shows actual electricity market data and specific examples nationwide. Virtual system prices are recorded. Virtual system prices have been published on the JEPX website since January 2022. Here, the virtual system price refers to the price at the intersection of the supply and demand curves when the selling bid volume and buying bid volume are increased by 0.5 GW, 1 GW, and 5 GW, respectively, using the supply and demand curve data of the system price for each time frame. For example, "virtual system price selling 500 MW" is the price at the intersection of the supply and demand curves when the selling bid volume is increased by 0.5 GW. "Virtual system price buying 1000 MW" is the price at the intersection of the supply and demand curves when the buying bid volume is increased by 1 GW. The price of the intersection corresponds to the contract price, for example.

[0054] TIFF2024135406000006.tif21170

[0055] FIG. 4 shows a specific example of weather forecast data. For numerical weather prediction data, we use Weather Research and Forecasting (WRF) numerical weather forecasts at 10-minute intervals at the AMeDAS locations used for observations by the Japan Meteorological Agency. In the example shown in the figure, average values ​​every 30 minutes are shown. For each area to be predicted, we use the temperature (T2: ℃) and solar radiation intensity (AVG4: W / m2) of all AMeDAS locations contained within the area. The column names are "T2_code" and "AVG4_code" using the code number. For example, "T2_00001" is the temperature at AMeDAS location 00001, and "AVG4_00001" is the solar radiation intensity at AMeDAS location 00001.

[0056] TIFF2024135406000007.tif22170

[0057] FIG. 5 shows a specific example of power generation facility shutdown plan data. Power generation facility outage information is published on HJKS. HJKS centrally manages operation and outage information for power generation facilities (generators) in each area. Power generation facility outage information allows you to understand the operation plans for power generation facilities in each area. Information includes the area, power generation company, power plant code, power plant name, power generation type, unit name (generator identifier), authorized output, outage category (planned outage, unplanned outage, reduced output), type, reduction amount (amount of reduction in power generation), outage date and time, recovery outlook, planned recovery date, cause of outage, and last update date and time.

[0058] TIFF2024135406000008.tif84170

[0059] TIFF2024135406000009.tif50170

[0060] TIFF2024135406000010.tif52170

number

[0061] TIFF2024135406000013.tif44170

number

[0062] TIFF2024135406000016.tif63170

number

number

[0063] TIFF2024135406000020.tif24170

number

[0064] TIFF2024135406000022.tif41170

number

[0065] TIFF2024135406000024.tif44170

number

[0066] TIFF2024135406000026.tif34170

[0067] For example, the similar year is selected from the year with the closest average price performance value from the day before the prediction target date t to one week before. For example, when the prediction target date t=2022 / 03 / 17, the average price for this year is calculated from the data for the period 2022 / 03 / 10-2022 / 03 / 16. Similarly, for years prior to 2022, the average price is calculated from the data for the period 20XX / 03 / 10-20XX / 03 / 16. "XX" is, for example, "21", "20", "19", "18", and "17". Here, the number of years going back is 5, but it may be less than 5 or 6 or more. The year that is closest to the average price for this year among these XXs is determined as the similar year. Here, the same period for each year is targeted, but the time series of the price performance value from the day before the prediction target date t to one week before may be detected and used as the similar period. In this case, the past period may be the same year as the prediction target date, or it may be a year prior to the year to which the prediction target date belongs. The number of years to go back can be arbitrary.

[0068] TIFF2024135406000027.tif24170

number

[0069] TIFF2024135406000030.tif30170

[0070] TIFF2024135406000031.tif18170

[0071] TIFF2024135406000032.tif25170

[0072] TIFF2024135406000033.tif23170

[0073] TIFF2024135406000034.tif34170

[0074] TIFF2024135406000035.tif21170

[0075] TIFF2024135406000036.tif40170

[0076] TIFF2024135406000037.tif89170

[0077] TIFF2024135406000038.tif28170

[0078] TIFF2024135406000039.tif13170

[0079] The operation example of the flowchart in Fig. 7 is one example, and other operations are possible. For example, if it is determined that no price hike due to weather will occur, the data extraction range determination unit 170 may send information specifying a certain period (e.g., one week) from the day before the prediction target date to the normal price prediction data storage unit 180, and the normal price prediction data storage unit 180 may extract data based on the information. Also, the information or the above-mentioned data extraction range change information may be sent to the normal price prediction unit 181 instead of the normal price prediction data storage unit 180, and the normal price prediction unit 182 may specify the range of data in the normal price prediction data storage unit 180 and read it out.

[0080] TIFF2024135406000040.tif73170

[0081] TIFF2024135406000041.tif29170

[0082] TIFF2024135406000042.tif23170

[0083] TIFF2024135406000043.tif30170

number

[0084] TIFF2024135406000046.tif35170

[0085] TIFF2024135406000047.tif17170

number

number

[0086] TIFF2024135406000051.tif30170

[0087] TIFF2024135406000052.tif42170

number

[0088] TIFF2024135406000054.tif24170

[0089] TIFF2024135406000055.tif43170

number

[0090] (Step S15) The prediction result calculation unit 182 calculates the predicted value of the market price (area price) based on the predicted value of the normal price and the predicted value of the price hike. The following will explain the case where the data extraction range is not changed and the case where it is changed.

[0091] TIFF2024135406000058.tif55170

[0092] TIFF2024135406000059.tif46170

[0093] TIFF2024135406000060.tif51170

number

number

[0094] TIFF2024135406000065.tif39170

[0095] As described above, according to this embodiment, it is determined whether a market price surge will occur on the prediction target date based on the operating status of the power plant, specifically, based on the planned data of the power generation amount of the power generation facility, and if it is determined that a surge will occur, the amount of fluctuation in the market price is estimated based on the planned data. By estimating the market price based on this amount of fluctuation, the market price can be estimated with high accuracy even when the market price surges.

[0096] In this embodiment, in addition to the operating status of the power generation facilities of the power plant, it is determined whether a weather-related market price surge will occur based on the weather forecast value for the prediction target day, and if it is determined that a weather-related price surge will occur, the market price is estimated using past data (weather forecast data and electricity market performance data) with weather conditions similar to those of the prediction target day. This makes it possible to estimate the market price with high accuracy even if the amount of power generation decreases or stops due to a sudden change in weather conditions.

[0097] In this way, according to this embodiment, even if the amount of power generation decreases due to a problem with the power generation equipment or the market price rises due to a sudden change in weather conditions, the market price can be estimated with high accuracy. This embodiment can improve the profits of businesses involved in the supply and demand of electricity, and can be used for fuel cell usage planning, etc.

[0098] (Modification) In the above embodiment, a market price surge is determined based on the amount of decrease in the amount of power generation, but a similar process can be performed to determine a market price crash and predict the market price in the case of an increase in the amount of power generation. In this case, the above description should be read as a crash, and the amount of decrease should be read as an increase, etc.

[0099] TIFF2024135406000066.tif35170

[0100] TIFF2024135406000067.tif29170

[0101] [1] Similarity search hyperparameters used below [Table 1]

[0102] TIFF2024135406000069.tif17170

number

number

[0103] TIFF2024135406000074.tif18170

number

number

[0104] TIFF2024135406000079.tif13170

number

number

[0105] TIFF2024135406000084.tif18170

number

number

[0106] TIFF2024135406000089.tif17170

number

number

number

[0107] TIFF2024135406000096.tif12170

number

[0108] TIFF2024135406000099.tif18170

number

[0109] (Hardware configuration) 14 shows the hardware configuration of a price rise prediction device 10 as an information processing device according to this embodiment. The price rise prediction device 10 is configured with a computer device 600. The computer device 600 includes a CPU 601, which is a processor, an input interface 602, a display device 603, a communication device 604, a main storage device 605, and an external storage device 606, which are interconnected by a bus 607.

[0110] A CPU (Central Processing Unit) 601 executes an information processing program, which is a computer program, on a main memory device 605. The information processing program is a program that realizes each of the above-mentioned functional configurations of the present device. The information processing program may be realized not as a single program, but as a combination of multiple programs and scripts. Each functional configuration is realized by the CPU 601 executing the information processing program.

[0111] The input interface 602 is a circuit for inputting operation signals from input devices such as a keyboard, a mouse, and a touch panel to this device.

[0112] The display device 603 displays data output from the device. The display device 603 is, for example, but not limited to, an LCD (liquid crystal display), an organic electroluminescence display, a CRT (cathode ray tube), or a PDP (plasma display). Data output from the computer device 600 can be displayed on the display device 603.

[0113] The communication device 604 is a circuit for the device to communicate with an external device wirelessly or via wire. Data can be input from the external device via the communication device 604. The data input from the external device can be stored in the main memory device 605 or the external memory device 606.

[0114] The main memory device 605 stores an information processing program, data required for executing the information processing program, data generated by executing the information processing program, etc. The information processing program is deployed and executed on the main memory device 605. The main memory device 605 is, for example, a RAM, a DRAM, or an SRAM, but is not limited to these. Each storage unit or database in FIG. 1 may be constructed on the main memory device 605.

[0115] The external storage device 606 stores an information processing program, data required for executing the information processing program, data generated by executing the information processing program, etc. These information processing programs and data are read into the main storage device 605 when the information processing program is executed. The external storage device 606 is, for example, a hard disk, an optical disk, a flash memory, and a magnetic tape, but is not limited to these. Each storage unit or database of the information processing device may be constructed on the external storage device 606.

[0116] The information processing program may be pre-installed in the computer device 600, or may be stored in a storage medium such as a CD-ROM. The information processing program may also be uploaded onto the Internet.

[0117] Furthermore, this apparatus may be configured as a single computer apparatus 600, or may be configured as a system made up of multiple computer apparatuses 600 connected to each other.

[0118] The present invention is not limited to the above-described embodiments as they are, and the components can be modified and embodied in the implementation stage without departing from the gist of the invention. Various inventions can be formed by appropriately combining multiple components disclosed in the above-described embodiments. For example, a configuration in which some components are deleted from all the components shown in each embodiment can also be considered. Furthermore, the components described in different embodiments can be appropriately combined.

[0119] This embodiment can also have the following configuration. [Note] [Item 1] a processing unit that acquires planned data of the amount of power generated by a power generation facility that generates power that can be traded in the power market, and when a first event related to a change in the amount of power generated on a target day is detected based on the planned data, estimates an amount of fluctuation in the market price of the power market due to the first event on the target day. An information processing device comprising: [Item 2] The first event is that the change in the amount of power generation on the target day exceeds a threshold. Item 1. An information processing device according to item 1. [Item 3] The first event is that a difference between a change in the amount of power generation on the target date and a change in the amount of power generation on a trading date prior to the target date exceeds a threshold. 3. The information processing device according to item 1 or 2. [Item 4] The processing unit estimates a first market price, which is a market price in the case where the first event does not occur on the target date, based on performance data of the market price in the electricity market; The processing unit estimates a second market price, which is a market price when the first event occurs on the target date, based on the first market price and the fluctuation amount. 4. The information processing device according to any one of items 1 to 3. [Item 5] The processing unit calculates the second market price using a function including the first market price and the fluctuation amount. Item 5. An information processing device according to item 4. [Item 6] The plan data includes at least one of a cause of a fluctuation in the amount of power generated by the power generation facility, a type of the fluctuation, and a type of the power generation facility; an input unit for allowing a user to specify at least one piece of information including a cause of the fluctuation, a type of the fluctuation, and a type of the power generation facility; the processing unit determines whether the first event will occur based on a change in the total amount of power generation of the power generation facility that matches the information specified by the user. 6. The information processing device according to any one of items 1 to 5. [Item 7] The first event is an event related to a change in the total amount of power generated by a plurality of power generation facilities existing within an area covered by the electricity market. 7. The information processing device according to any one of items 1 to 6. [Item 8] The first event is that the change in the total amount of power generation exceeds a threshold. Item 8. An information processing device according to item 7. [Item 9] The first event is that a difference between a sum of changes in the amount of power generation on the target date and a sum of changes in the amount of power generation on a trading date prior to the target date exceeds a threshold. Item 9. The information processing device according to item 7 or 8. [Item 10] the processing unit calculates a coefficient representing an estimated value of a fluctuation amount of the market price when an electricity trading volume increases by a unit amount based on actual data of the market price; The processing unit calculates the fluctuation amount by multiplying the difference between the amount of change in the amount of power generation on the target date and the amount of change in the amount of power generation on a trading date prior to the target date by the coefficient. 10. The information processing device according to any one of items 1 to 9. [Item 11] The processing unit acquires the market price performance data and weather forecast data for a period prior to the target date, The processing unit acquires a weather forecast value for the target day, and calculates the first market price for the target day based on the acquired weather forecast value, the performance data, and the weather forecast data. Item 6. The information processing device according to item 4 or 5. [Item 12] the processing unit acquires actual market price data and weather forecast data, each of the actual market price data and the weather forecast data including a first period before the target date and a second period before the first period; The processing unit acquires a weather forecast value for the target date, and, when a second weather-related event is detected based on the weather forecast value, calculates the first market price based on the performance data for the second period and the weather forecast data for the second period, and, when the second event is not detected, calculates the first market price based on the performance data for the first period and the weather forecast data for the first period. Item 6. The information processing device according to item 4 or 5. [Item 13] The processing unit acquires first plan data acquired at a first time point regarding the amount of power generated by the power generation facility on the target day, and acquires the plan data acquired at a second time point prior to the first time point regarding the amount of power generated by the power generation facility on the target day, and calculates the difference based on the first plan data and the second plan data. Item 3. An information processing device according to item 3. [Item 14] The change amount of the power generation amount is the decrease amount of the power generation amount. Item 2. The information processing device according to item 2 or 3. [Item 15] The change amount of the power generation amount is the decrease amount of the power generation amount. Item 3. An information processing device according to item 3. [Item 16] The change in the total amount of power generation is the decrease in the total amount of power generation. Item 9. An information processing device according to item 8. [Item 17] The change in the total amount of power generation is the decrease in the total amount of power generation. Item 10. The information processing device according to item 9. [Item 18] Obtaining planned data on the amount of electricity generated by power generation facilities that generate electricity that can be traded in the electricity market; When a first event related to a change in the amount of power generation on a target day is detected based on the planning data, a fluctuation amount of the market price of the electricity market caused by the first event on the target day is estimated. Information processing methods. [Item 19] Obtaining planned data on the amount of power generated by a power generation facility that generates power that can be traded in the power market; When a first event related to a change in the amount of power generation on a target day is detected based on the planning data, estimating a fluctuation amount of the market price of the electricity market on the target day caused by the first event; A computer program for causing a computer to execute the above. [Explanation of symbols]

[0120] 1. Weather Forecasting System 2. Electricity market performance data management system 3. Power Plant Operation Status Management System 10 Price Rise Prediction Device 100 Processing section 100A price rise prediction function 100B Normal prediction function 100C Power Market Forecasting Function 110 Power generation equipment shutdown plan data preprocessing unit (preprocessing unit) 120 Trend Analysis Department 130 Price Increase Judgment Section (Power Generation Equipment Causes) 140 Price Sensitivity Calculation Unit 150 Price Increase Prediction Department 160 Price Increase Judgment Section (Weather Causes) 170 Data extraction range determination unit 180 Data storage unit for normal price prediction 181 Regular Price Prediction Department 182 Prediction result calculation unit 200 Data Acquisition Department 210 Weather Forecast Acquisition Unit 220 Electricity Market Performance Acquisition Department 230 Power Generation Equipment Shutdown Plan Acquisition Department 300 Data storage unit 310 Weather forecast memory unit 320 Electricity Market Performance Memory Unit 330 Power Generation Equipment Shutdown Plan Memory Unit 400 Input section 500 Output section 600 Computer equipment 601 CPU (processor) 602 Input Interface 603 Display device 604 Communication equipment 605 Main storage 606 External storage device 607 Bus

Claims

1. a processing unit that acquires planned data of the amount of power generated by a power generation facility that generates power that can be traded in the power market, and when a first event related to a change in the amount of power generated on a target day is detected based on the planned data, estimates an amount of fluctuation in the market price of the power market due to the first event on the target day. An information processing device comprising:

2. The first event is that a change in the amount of power generation on the target day exceeds a threshold. The information processing device according to claim 1 .

3. The first event is that a difference between a change in the amount of power generation on the target date and a change in the amount of power generation on a trading date prior to the target date exceeds a threshold. The information processing device according to claim 1 .

4. The processing unit estimates a first market price, which is a market price in the case where the first event does not occur on the target date, based on performance data of the market price in the electricity market; The processing unit estimates a second market price, which is a market price when the first event occurs on the target date, based on the first market price and the fluctuation amount. The information processing device according to claim 1 .

5. The processing unit calculates the second market price using a function including the first market price and the fluctuation amount. The information processing device according to claim 4.

6. The plan data includes at least one of a cause of a fluctuation in the amount of power generated by the power generation facility, a type of the fluctuation, and a type of the power generation facility; an input unit for allowing a user to specify at least one piece of information including a cause of the fluctuation, a type of the fluctuation, and a type of the power generation facility; The processing unit determines whether the first event will occur based on a change in the total amount of power generation of the power generation facility that matches the information specified by the user. The information processing device according to claim 1 .

7. The first event is an event related to a change in the total amount of power generated by a plurality of power generation facilities existing within an area covered by the electricity market. The information processing device according to claim 1 .

8. The first event is that the change in the total amount of power generation exceeds a threshold. The information processing device according to claim 7.

9. The first event is that a difference between a sum of the changes in the amount of power generation on the target date and a sum of the changes in the amount of power generation on a trading date prior to the target date exceeds a threshold. The information processing device according to claim 7.

10. the processing unit calculates a coefficient representing an estimated value of a fluctuation amount of the market price when an electricity trading volume increases by a unit amount based on actual data of the market price; The processing unit calculates the fluctuation amount by multiplying the difference between the amount of change in the amount of power generation on the target date and the amount of change in the amount of power generation on a trading date prior to the target date by the coefficient. The information processing device according to claim 1 .

11. The processing unit acquires the market price performance data and weather forecast data for a period prior to the target date, The processing unit acquires a weather forecast value for the target day, and calculates the first market price for the target day based on the acquired weather forecast value, the performance data, and the weather forecast data. The information processing device according to claim 4.

12. the processing unit acquires actual market price data and weather forecast data, each of the actual market price data and the weather forecast data including a first period before the target date and a second period before the first period; The processing unit acquires a weather forecast value for the target date, and when a second weather-related event is detected based on the weather forecast value, calculates the first market price based on the performance data for the second period and the weather forecast data for the second period, and when the second event is not detected, calculates the first market price based on the performance data for the first period and the weather forecast data for the first period. The information processing device according to claim 4.

13. The processing unit acquires first plan data acquired at a first time point regarding the amount of power generated by the power generation facility on the target day, and acquires the plan data acquired at a second time point prior to the first time point regarding the amount of power generated by the power generation facility on the target day, and calculates the difference based on the first plan data and the second plan data. The information processing device according to claim 3 .

14. The change amount of the power generation amount is the decrease amount of the power generation amount.

4. The information processing device according to claim 2 or 3.

15. The change amount of the power generation amount is the decrease amount of the power generation amount. The information processing device according to claim 3 .

16. The change in the total amount of power generation is the decrease in the total amount of power generation. The information processing device according to claim 8.

17. The change in the total amount of power generation is the decrease in the total amount of power generation. The information processing device according to claim 9.

18. Obtaining planned data on the amount of electricity generated by power generation facilities that generate electricity that can be traded in the electricity market; When a first event related to a change in the amount of power generation on a target date is detected based on the planning data, a fluctuation amount of the market price of the electricity market caused by the first event on the target date is estimated. Information processing methods.

19. Obtaining planned data on the amount of power generated by a power generation facility that generates power that can be traded in the power market; When a first event related to a change in the amount of power generation on a target day is detected based on the planning data, estimating a fluctuation amount of the market price of the electricity market on the target day due to the first event; A computer program for causing a computer to execute the above.

Citation Information

Patent Citations

  • Power transaction prediction system and power transaction prediction program

    JP2008225755A

  • Electric power market price prediction method

    JP2010224832A

  • Electric power market price predicting device, electric power market price predicting method, and electric power market price predicting program

    JP2019096164A

  • Management device and management method

    JP2022090134A

  • JP96164A