Guide device for drawing in rehabilitation pipe
The guide device with adjustable components and a unique support frame configuration allows for efficient and stable pipe pulling, overcoming limitations of existing devices by accommodating various pipe arrangements and preventing damage.
Patent Information
- Application Number
- JP2023047015
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-23
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-23
AI Technical Summary
Existing guide devices for drawing rehabilitation pipes into aging pipes are limited in application when other connected pipes are arranged at 180° or have unsuitable heights or shapes, as they require a vertical load receiver on an opposing pipe.
A guide device with a support frame spanning across manhole walls, featuring first and second guide rollers and a vertical load receiver, allowing the cable to span and extend upward, with adjustable components to accommodate various pipe configurations.
Enables the guide device to be used regardless of the angular relationship and height differences between pipes, ensuring stable and efficient pulling of rehabilitation pipes without damaging the existing pipes.
Smart Images

Figure 2024136058000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a guide device used when pulling a rehabilitation pipe for lining into an aged existing pipe. [Background technology]
[0002] It is well known that in order to rehabilitate deteriorated existing pipes such as sewer pipes buried underground, a rehabilitation pipe is lined around the inside of the existing pipe. The rehabilitation pipe is made of, for example, a thermoplastic resin and is originally circular in cross section, but is flattened and pulled into the existing pipe. The rehabilitating pipe that has been pulled in returns to its original circular cross section when high-temperature steam is supplied to the inside, and then expands when compressed air is supplied, so that it is tightly attached to the inner wall surface of the existing pipe.
[0003] The process of pulling the rehabilitating pipe into the existing pipe will be briefly explained. A drum around which the flattened rehabilitating pipe is wound is placed on the ground near the starting manhole connected to one end of the existing pipe, and a winch is placed on the ground near the arrival manhole connected to the other end of the existing pipe. The winch wire is passed through the existing pipe and its tip is connected to the tip of the rehabilitating pipe at the starting manhole. The wire is then wound up by the winch, and the rehabilitating pipe pulled out of the drum is pulled from the starting manhole into the existing pipe and reaches the arrival manhole.
[0004] In the above-mentioned pulling process, the upward pulling force of the winch is converted into a horizontal pulling force by the guide rollers of the pulling guide device installed in the arrival manhole, and this horizontal pulling force is converted into a downward pulling force by the guide rollers of the feed guide device installed in the departure manhole. The pulling guide device receives a horizontal load and an upward vertical load from the wire, so a structure that can withstand these loads is required.
[0005] The guide device disclosed in Patent Document 1 is equipped with a support frame that is disposed in a reach-side manhole above the existing pipe to be rehabilitated and that is spanned between the manhole walls that face each other in the axial direction of the existing pipe. The guide roller on which the wire is hung is disposed near one end of the support frame that is farther from the existing pipe to be rehabilitated and is disposed at a position lower than the top of the existing pipe.
[0006] In the guide device of Patent Document 1, the end of the support frame facing the existing pipe to be rehabilitated hits the manhole wall to receive the horizontal load. Also, a vertical load receiving part is provided on the end of the support frame farther from the existing pipe to be rehabilitated, and this vertical load receiving part is hung on the top of the existing pipe that is 180° opposite to the existing pipe to be rehabilitated to receive the vertical load. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] Patent Publication No. 2022-123270 Summary of the Invention [Problem to be solved by the invention]
[0008] The guide device for pull-in in Patent Document 1 has a limited scope of application because it is necessary to hang the vertical load receiving part on an existing pipe that is located at a position 180° opposite to the existing pipe to be rehabilitated. In other words, if another existing pipe that is connected to the existing pipe to be rehabilitated through a manhole is located at a position other than 180°, the vertical load receiving part cannot be hung on it, and the device cannot be applied. [Means for solving the problem]
[0009] In order to solve the above problems, the present invention provides a guide device for guiding a cable connected to a tip of a rehabilitation pipe when the cable is pulled upward at a destination manhole in order to pull the rehabilitation pipe from a starting manhole into an existing pipe to be rehabilitated and to bring the tip of the rehabilitation pipe to a destination manhole, the guide device comprising: a support frame that is disposed in a bottom space of the reach-side manhole above the top of the existing pipe to be rehabilitated, and that is spanned such that a first end portion thereof abuts against a wall surface of the first manhole on the opposite side of the existing pipe to be rehabilitated, and a second end portion thereof abuts against a wall surface of the second manhole on the side of the existing pipe to be rehabilitated; A first guide roller supported near the first end of the support frame and disposed at a position lower than a pipe top of the existing pipe to be rehabilitated; a second guide roller supported by the support frame and disposed closer to the second end than the first guide roller and at a higher position than the first guide roller; a vertical load receiving portion that is supported by the second end portion of the support frame and is hung on a top portion of the existing pipe to be rehabilitated, thereby receiving an upward vertical load; Equipped with The arrangement of the first and second guide rollers enables the cable extending from the existing pipe to be rehabilitated to be stretched across the first guide roller and the second guide roller in turn and extend upward.
[0010] According to the above-mentioned configuration, since the vertical load receiving portion is applied to the existing pipe to be rehabilitated, other existing pipes connected to the existing pipe to be rehabilitated through the manhole do not contribute to the guide of the rehabilitated pipe. Therefore, the guide device can be used not only when the other existing pipe is 180° opposite to the existing pipe to be rehabilitated, but also when the other existing pipe is located at a position other than 180°, or when the pipe opening is at a height, shape, or condition that is not suitable for receiving a vertical load even if the other existing pipe is 180° opposite to the existing pipe to be rehabilitated.
[0011] Preferably, the second guide roller is disposed closer to the vertical load receiving portion than the center of the support frame. According to this configuration, it is possible to reduce the rotational moment applied to the support frame due to an upward load acting on the second guide roller, and the spanning state of the support frame can be maintained stably.
[0012] Preferably, the roller support means for supporting the first guide roller has a pair of first members extending downward from the support frame and a pair of second members each supported on the pair of first members in a height-adjustable manner, and the first guide roller is rotatably supported between the lower ends of the pair of second members. According to this configuration, the height of the first guide roller can be adjusted in accordance with the size of the existing pipe to be rehabilitated.
[0013] Preferably, the support frame has a pair of stays extending in the pipe axis direction of the existing pipe to be rehabilitated and arranged on an approximately horizontal plane, and a connecting rod connecting the ends of the pair of stays on the existing pipe side to be rehabilitated, and the vertical load receiving portion has a hanging portion extending downward from the connecting rod and a hook portion extending from the lower end of the hanging portion in the pipe axis direction of the existing pipe to be rehabilitated and inserted into the existing pipe to be rehabilitated and hooked onto the top of the pipe. According to this configuration, the hook portion of the vertical load receiving portion can be securely hooked onto the pipe top of the existing pipe to be rehabilitated.
[0014] Preferably, the support frame has a frame body, a jack provided on the opposite side of the frame body from the existing pipe to be rehabilitated, and a wall abutment member supported by a support bracket at the tip of the jack and abutting the first manhole wall surface, and the first guide roller is rotatably supported by a roller support means fixed to the support bracket. According to this configuration, the first guide roller can be moved as far as possible from the pipe opening of the existing pipe to be rehabilitated, and a sufficient pulling allowance for the rehabilitated pipe can be secured within the arrival side manhole. Effect of the Invention
[0015] According to the guide device of the present invention, the guide device can be used regardless of the positional relationship between the existing pipe to be rehabilitated and other existing pipes connected via a manhole. [Brief description of the drawings]
[0016] [Figure 1] 4 is a schematic vertical cross-sectional view showing the process of pulling a rehabilitation pipe into an existing pipe. FIG. [Diagram 2] A cross-sectional view of a rehabilitating pipe being retracted. [Diagram 3] 1 is a side view of a rehabilitation pipe pulling-in guide device according to an embodiment of the present invention. [Figure 4] 4 is a diagram showing a partial configuration of the rehabilitation pipe pulling-in guide device as viewed from the direction A in FIG. 3. [Diagram 5] FIG. 2 is a plan view of the rehabilitation pipe pulling-in guide device. [Figure 6] 4 is a plan view showing a frame body of the support frame of the rehabilitation pipe pulling-in guide device. FIG. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0017] An embodiment of the present invention will be described below with reference to the drawings. As shown in Fig. 1, an existing pipe 1 such as a sewer pipe buried underground and deteriorated is to be rehabilitated. The existing pipe 1 extends between two manholes 2A and 2B. The existing pipe 1 is rehabilitated by lining its inside with a rehabilitation pipe 3.
[0018] The rehabilitating pipe 3 of this embodiment is made of thermoplastic resin and has a shape memory function of a circular cross section. The rehabilitating pipe 3 is flattened in advance as shown in Fig. 2, and is pulled into the existing pipe 1 in this flattened state. After the pulling process is completed, the rehabilitating pipe 3, with both ends protruding a predetermined length from the pipe opening of the existing pipe 1 into the manholes 2A and 2B, is supplied with high-temperature steam inside to return to its original circular cross section, and then compressed air is supplied inside to expand it and make contact with the inner wall surface of the existing pipe 1. Finally, the protruding portion of the rehabilitating pipe 3 is cut off, and the rehabilitating process of the existing pipe 1 by lining is completed.
[0019] The process of pulling the rehabilitating pipe 3 into the existing pipe 1 will be briefly described with reference to Figure 1. A drum 4 around which the rehabilitating pipe 3 with a flat cross-sectional shape is wound is placed on the ground near the starting manhole 2A, and a feed guide device 5 (not shown in detail) including a guide roller is placed in the bottom space of the manhole 2A. A winch 6 is placed on the ground near the arrival manhole 2B, and a pull-in guide device 7 including two guide rollers, as described later, is placed in the bottom space of the manhole 2B.
[0020] A wire 8 (rope) of the winch 6 is hung over the pull-in guide device 7 in the arrival manhole 2B and passed through the existing pipe 1, and its end is connected to the end of the rehabilitating pipe 3 via a connecting fitting 9 in the departure manhole 2A. When the wire 8 is wound up by the winch 6 with the rehabilitating pipe 3 hung on the pull-in guide device 5, the rehabilitating pipe 3 is pulled into the existing pipe 1.
[0021] <Outline of the configuration of the retraction guide device> The configuration of the guide device 7 for pulling in will be described below with reference to Fig. 3 to Fig. 6. The guide device 7 for pulling in mainly comprises a support frame 10 arranged substantially horizontally across manhole wall surfaces 2x and 2y that face each other in the pipe axis direction of the existing pipe 1, a height adjustment mechanism 20 for adjusting the height of the support frame 10, a first wire hooking section 30 (first cable hooking section) provided on the support frame 10 near the end (first end) on the opposite side of the existing pipe 1, a second wire hooking section 40 (second cable hooking section) provided on the support frame 10 near the end (second end) on the existing pipe 1 side, and a vertical load receiving section 50 provided on the second end of the support frame 10.
[0022] <Support frame configuration> The support frame 10 has a frame body 11 made of a hollow steel material with a rectangular cross section as shown in Fig. 6. The frame body 11 has two stays 11a extending in the axial direction of the existing pipe 1 in parallel with each other on the same horizontal plane, and a connecting rod 11b suspended perpendicularly to the stays 11 between the ends of the stays 11a on the existing pipe 1 side, and has a U-shaped planar shape.
[0023] The support frame 10 further includes wall contact members 12 detachably attached to the ends of the two stays 11a of the frame body 11 on the existing pipe 1 side. The wall contact members 12 include an insertion rod 12a inserted into the stay 11a and a contact portion 12b fixed to the tip of the insertion rod 12a. The insertion rod 12a is made of a hollow steel material with a rectangular cross section, and a plurality of engagement holes 12x are formed in the upper wall of the insertion rod 12a at equal intervals in the longitudinal direction. The amount of protrusion from the stay 11 is adjusted by selectively inserting a pin 13 penetrating the upper wall near the base end of the stay 11a into these engagement holes 12x.
[0024] The support frame 10 further includes two jacks 15 and a wall contact member 16 detachably attached to each of the two stays 11. The jack 15 includes a receiving member 15a inserted into the stay 11, a threaded rod 15b inserted into the receiving member 15a, a nut 15c with a handle screwed onto the threaded rod 15b, and a support bracket 15d with a U-shaped cross section fixed to the tip of the threaded rod 15b. The wall contact member 16 is supported by being stretched across the two support brackets 15d.
[0025] <Height adjustment mechanism configuration> The height adjustment mechanism 20 is detachably provided on each of the two stays 11a of the frame main body 11. The height adjustment mechanism 20 adjusts the height of the support frame 10 from the bottom surface of the destination manhole 2B, and includes a bracket 21, a threaded rod 22, and a ground plate 23. The bracket 21 is fixed to the stay 11a by fitting the U-shaped mounting portion 21a at its upper end into the stay 11a and fastening it with a screw. The threaded rod 22 is screwed into the horizontal plate portion 21b at the lower end of the bracket 21, and the height of the support frame 10 is adjusted by turning the threaded rod 22a.
[0026] <Configuration of the first wire hooking portion> The first wire hooking section 30 has a pair of roller support members 31 (roller support means) that extend vertically downward from the support metal fittings 15d of the two jacks 15, respectively, and a first guide roller 35. Each roller support member 31 has a vertical first member 31a made of a hollow steel material with a rectangular cross section, the upper end of which is fixed to the lower side of the support metal fitting 15d by welding or the like, and a second member 31b made of a thin steel plate, the upper part of which is connected to the first member 31a. A number of engagement holes (not shown) are formed in the wall of the first member 31a at equal intervals in the vertical direction, and two through holes (not shown) are formed in the second member 31b at the top and bottom. The second member 31b is connected to the first member 31a so that the height can be adjusted by inserting two pins 31c into the two through holes and engaging them with the selected engagement holes. A grooved first guide roller 35 is rotatably supported between the lower ends of the second members 31b of the pair of roller support members 31. The first guide roller 35 is disposed at a maximum distance from the existing pipe 1 in the pipe axis direction, and is located lower than the top of the existing pipe 1. In this embodiment, the first guide roller 35 is located on approximately an extension of the pipe axis of the existing pipe 1.
[0027] <Configuration of the second wire hooking portion> The second wire hooking section 40 has a pair of roller support members 41 that extend vertically upward from the two stays 11a of the frame body 11, and a second guide roller 45. Each roller support member 41 has a first member 41a made of a hollow steel material with a rectangular cross section, which is vertical and has its lower end fixed to the side of the stay 11a by welding or the like, and a second member 41b made of a thin steel plate and has its upper part fixed to the first member 41a by welding or the like. A grooved second guide roller 45 is rotatably supported between the upper ends of the second members 41b of the pair of roller support members 41. The second guide roller 45 is located above the support frame 10 and the first guide roller 35.
[0028] <Configuration of vertical load receiving portion 50> Vertical load receiving portion 50 has a generally L-shaped configuration including a cylindrical mounting portion 51 having a rectangular cross section attached with a screw to the center of connecting rod 11b of frame body 11, hanging portion 52 having its upper end welded to the underside of mounting portion 51 and extending vertically downward, and hook portion 53 welded to the lower end of hanging portion 52 and protruding horizontally to the opposite side of second guide roller 45. Hanging portion 52 and hook portion 53 are also made of hollow steel material having a rectangular cross section.
[0029] A protective member 55 made of, for example, steel is removably attached to the hook portion 53. The protective member 55 has an arc-shaped abutting portion 55a and a receiving portion 55b formed on the central lower surface of the abutting portion 55a. The hook portion 53 of the vertical load receiving portion 50 is adapted to be inserted into the receiving portion 55b. The outer diameter of the arc of the abutting portion 55a is smaller than the inner diameter of the existing pipe 1.
[0030] <Installation process of the guide device for retraction> The process of installing the guide device 7 in the bottom space of the arrival manhole 2B will be described. As shown in Figures 3 to 5, with the height adjustment mechanism 20, the first wire hooking portion 30, the second wire hooking portion 40, and the vertical load receiving portion 50 attached to the support frame 10, the height adjustment mechanism 20 positions the support frame 10 at a position higher than the existing pipe 1. With this positioning, the hook portion 53 of the vertical load receiving portion 50 is hooked onto the top of the existing pipe 1 via the protective member 55. The first guide roller 35 is located lower than the top of the existing pipe 1. By adjusting the height of the second member 31b of the roller support member 31, the height of the guide roller 35 can be appropriately adjusted according to the size of the existing pipe 1 so that the existing pipe 1 and the rehabilitating pipe 3 do not rub against each other.
[0031] The amount of protrusion of the wall adjustment member 50 is adjusted to position the support frame 10 in the horizontal direction. Next, the jack 15 is extended so that the wall abutment member 12 presses the manhole wall 2x (second manhole wall) on the existing pipe 1 side among the walls of the manhole 2B facing the existing pipe 1 in the pipe axis direction, and the wall abutment member 16 presses the manhole wall 2y (first manhole wall) on the opposite side of the existing pipe 1, thereby fixing the support frame 10. Preferably, while watching an inclinometer installed on the support frame 10, the end of the support frame 10 on the existing pipe 1 side to be rehabilitated is tilted slightly (1 to 5°) higher.
[0032] <Rehabilitation pipe installation process> Next, the process of pulling in the rehabilitating pipe 3 will be described. As shown in Figures 1 and 3, the wire 8 of the winch 6 is hung in sequence over the guide rollers 45, 35 of the pull-in guide device 7 and passed through the existing pipe 1, and its tip is connected via a connecting fitting 9 to the tip of the rehabilitating pipe 3 pulled out from the drum 4 at the starting manhole 2A. The connecting fitting 9 is provided with a cover that covers the connection portion to prevent the tip of the rehabilitating pipe 3 from rubbing against the existing pipe 1.
[0033] Next, the winch 6 is driven to pull the wire 8, thereby pulling the rehabilitating pipe 3 into the existing pipe 1. At this time, horizontal and vertical loads are applied to the support frame 10 via the guide rollers 35, 45. The horizontal load can be received by the wall abutment member 12 coming into contact with the manhole wall surface 2x. The upward vertical load can be received by the hook portion 53 of the vertical load receiving portion 50 hooking onto the top of the existing pipe 1. The hook portion 53 hooks onto the top of the existing pipe 1 via the arc-shaped protective member 55, so damage to the existing pipe 1 can be avoided.
[0034] The vertical load applied to the second roller 45 generates a rotational moment (counterclockwise rotational moment in FIG. 3) in the support frame 10 about the contact point between the top of the existing pipe 1 and the hook portion 53 of the vertical load receiving portion 50, but since the second guide roller 45 is close to the vertical load receiving portion 50, this rotational moment is relatively small and can be countered by the frictional resistance between the wall surface contact member 16 and the wall surface 2y. In this embodiment, by slightly tilting the support frame 10, it is possible to more reliably prevent the horizontal load receiving portion 40 from coming off the wall surface.
[0035] By positioning the support frame 10 at a position higher than the top of the existing pipe 1, interference with the connecting fitting 9 and the tip of the rehabilitation pipe 3 can be avoided when the existing pipe 1 is pulled into the arrival manhole 2B. In addition, since the first guide roller 35 is supported by the lower end of the roller support member 31 hanging down from the support frame 10 and is located lower than the top of the existing pipe, the wire 8 inside the existing pipe 1 can be pulled efficiently and it is possible to reliably avoid interference between the tip of the rehabilitation pipe 3, the connecting fitting 9 and the wire 8 with the top of the existing pipe 1 and the support frame 10 in the final stage of the pulling-in process of the rehabilitation pipe 3.
[0036] Since the first guide roller 35 is located as far away as possible from the pipe opening of the existing pipe 1, the tip of the rehabilitating pipe 3 can be pulled out from the pipe opening of the existing pipe 1 with sufficient pulling allowance in the final stage of the pulling process of the rehabilitating pipe 3.
[0037] As described above, the vertical load receiving portion 50 is hung on the existing pipe 1 to be rehabilitated and receives the vertical load, so that the other existing pipe 1A connected to the existing pipe 1 to be rehabilitated via the arrival manhole 2B does not contribute at all to the action of the guide device 7 and is unrelated. Therefore, the existing pipe 1A may be installed at a position facing the existing pipe 1 to be rehabilitated at an angle of 180° as shown in the figure, or may be installed at an angle of, for example, 100° away from 180°. In this way, the guide device 7 for guide of the present invention can be used regardless of the relative angular relationship between the existing pipes 1, 1A. Furthermore, even if another existing pipe 1A is opposed to the existing pipe 1 to be rehabilitated at 180°, if the difference in height between the pipe tops of the existing pipes 1, 1A is approximately 15 cm or more, if the mouth of the existing pipe 1A is corroded, or if the mouth of the existing pipe 1A is trumpet-shaped, it is not possible to use a conventional guide device for pulling in which the existing pipe 1A bears a vertical load, but the guide device for pulling in 7 of the present invention can be used.
[0038] When the connecting fitting 9 approaches the first guide roller 35 and the tip of the rehabilitating pipe 3 is pulled out a predetermined length from the existing pipe 1, the pulling process of the rehabilitating pipe 3 is completed. After this, the tip of the rehabilitating pipe 3 is cut and separated from the connecting fitting 9. After the guide rollers 35, 45 are removed from the roller support members 31, 41, the wire 8 is pulled up with the connecting fitting 9 still attached. Finally, the pulling guide device 7 is disassembled and removed from the manhole 2B.
[0039] The present invention is not limited to the above embodiment, and various modifications can be made without departing from the spirit of the present invention. The first guide roller 35 may be provided at the end of the frame body 10. In this case, it is preferable to shorten the jack 14 and lengthen the frame body 10, and to place it as far away as possible from the existing pipe 1 to be rehabilitated. The cables to be connected to the rehabilitating pipe may be ropes or the like other than wires. The existing pipe to be rehabilitated is not limited to a sewer pipe, but may be a water pipe or the like. [Industrial Applicability]
[0040] The present invention can be applied to the rehabilitation of sewer pipes and the like buried underground. [Explanation of symbols]
[0041] 1 Existing pipes to be rehabilitated 2A Starting manhole 2B Reach manhole 2x Second manhole wall 2y No. 1 manhole wall 3 Rehabilitation pipe 6. Winch 7. Guide device for rehabilitating pipes 8 Wire 10 Support frame 11 Frame body 11a Stay 11b Connecting rod 15 Jack 15d Support bracket 16 Wall contact member 30 First wire hook portion (first cable hook portion) 31 Roller support member (roller support means) 31a First member 31b Second member 35 First guide roller 40 Second wire hook portion (second cable hook portion) 45 Second guide roller 50 Vertical load receiving part 52 Drooping part 53 Hook section
Claims
1. In order to pull a rehabilitating pipe from a starting manhole into an existing pipe to be rehabilitated and to bring the end of the pipe to a destination manhole, a guide device is provided for guiding a cable connected to the end of the rehabilitating pipe when the cable is pulled upward at the destination manhole, a support frame that is disposed in a bottom space of the reach-side manhole above the top of the existing pipe to be rehabilitated, and that is spanned such that a first end abuts against a wall surface of the first manhole on the opposite side of the existing pipe to be rehabilitated, and a second end abuts against a wall surface of the second manhole on the side of the existing pipe to be rehabilitated; A first guide roller is supported near the first end of the support frame and disposed at a position lower than a top of the existing pipe to be rehabilitated; a second guide roller supported by the support frame and disposed closer to the second end than the first guide roller and at a higher position than the first guide roller; a vertical load receiving portion that is supported by the second end portion of the support frame and is hung on a top portion of the existing pipe to be rehabilitated, thereby receiving an upward vertical load; Equipped with A guide device for pulling in a rehabilitation pipe, characterized in that the arrangement of the first and second guide rollers enables the cable leading out from the existing pipe to be rehabilitated to be stretched across the first guide roller and the second guide roller in sequence and extend upward.
2. 2. The rehabilitating pipe pulling guide device according to claim 1, wherein the second guide roller is disposed closer to the vertical load receiving portion than the center of the support frame.
3. The guide device for pulling in a rehabilitation pipe as described in claim 1, characterized in that the roller support means for supporting the first guide roller has a pair of first members extending downward from the support frame and a pair of second members each supported on the pair of first members in a height-adjustable manner, and the first guide roller is rotatably supported between the lower ends of the pair of second members.
4. the support frame includes a pair of stays extending in a pipe axial direction of the existing pipe to be rehabilitated and disposed on a substantially horizontal plane, and a connecting rod connecting end portions of the pair of stays on the existing pipe to be rehabilitated side, The rehabilitating pipe pulling-in guide device according to claim 1, characterized in that the vertical load receiving portion has a hanging portion extending downward from the connecting rod, and a hook portion extending from the lower end of the hanging portion in the pipe axial direction of the existing pipe to be rehabilitated and inserted into the existing pipe to be rehabilitated and hooked onto the top of the pipe.
5. The support frame has a frame body, a jack provided on the opposite side of the frame body from the existing pipe to be rehabilitated, and a wall abutment member supported by a support bracket at the tip of the jack and abutting the first manhole wall surface, and the first guide roller is rotatably supported by a roller support means fixed to the support bracket.
Citation Information
Patent Citations
Ultraviolet curing pipeline non-excavation repairing system and processing method
CN114658953A
Storage device for instruction manuals, etc. for home equipment
JP1994024191U
Drawing tool of regeneration material
JP2011102625A
Wire take-over device
JP2015068014A
Regeneration pipe lead-in guiding device
JP2022123270A