Plant management apparatus, plant management method, and program

The plant management device optimizes harvest timing and yield by predicting market prices and demand, adjusting environmental factors to synchronize with market peaks, ensuring high-quality plant production.

JP2024136475AActive Publication Date: 2024-10-04YOKOGAWA ELECTRIC CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023047602
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-24
Publication Date
2024-10-04
Estimated Expiration
2043-03-24

AI Technical Summary

Technical Problem

In plant factories, there is a challenge in harvesting plants at the optimal timing considering market prices and demand, which affects yield and quality.

Method used

A plant management device that determines harvest time based on predicted market prices and demand, controlling environmental factors like temperature, humidity, and light to synchronize harvesting with market peaks, adjusting conditions to maintain plant quality and yield.

Benefits of technology

Ensures plants are harvested at the highest market value while maintaining quality by dynamically adjusting environmental conditions based on real-time market data, optimizing yield and timing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024136475000001_ABST
    Figure 2024136475000001_ABST
Patent Text Reader

Abstract

To provide a plant management apparatus, a plant management method, and a program that enable plants to be harvested at appropriate times in a plant factory where plants are cultivated.SOLUTION: A plant management apparatus may include a determination unit for determining a harvest time for a plant based on prediction information indicating at least one of a predicted market price of the plant and a predicted demand amount for the plant. The plant management apparatus may include an environmental control unit for controlling environmental control equipment for controlling environment within a plant factory in which the plants are cultivated so that the plants can be harvested at the harvest time. The determination unit may determine, as the harvest time for the plant, the time when the predicted market price is highest within a target period.SELECTED DRAWING: Figure 6
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a plant management device, a plant management method, and a program. [Background technology]

[0002] Patent Document 1 describes the provision of a plant cultivation facility, a plant cultivation method, an LED lighting device for plant cultivation, a shelf board for a plant cultivation shelf, and a plant cultivation shelf that are capable of improving plant production. [Prior art document] [Patent documents] [Patent Document 1] JP 2022-122672 A Summary of the Invention [Problem to be solved by the invention]

[0003] In a plant factory where plants are cultivated, it is desirable to harvest the plants at an appropriate time. [Means for solving the problem]

[0004] A plant management device according to an aspect of the present invention may include a determination unit that determines a harvest time for the plant based on forecast information indicating at least one of a predicted market price of the plant and a predicted demand for the plant. The plant management device may include an environmental control unit that controls an environmental control device that controls an environment in a plant factory where the plant is cultivated so that the plant can be harvested at the harvest time. The determination unit may determine the time when the predicted market price is highest within a target period as the harvest time for the plant.

[0005] In the plant management device, the prediction information may at least indicate a predicted market price of the plant. The determination unit may further determine a yield of the plant at the harvest time based on the prediction information. The environmental control unit may control the environmental control equipment so that the plant can be harvested at the harvest time with the yield.

[0006] In any of the plant management devices, the forecast information may indicate a relationship between the forecast market price and the forecast demand, and the determination unit may determine the yield by multiplying the forecast demand at the harvest time indicated in the forecast information by a predetermined ratio.

[0007] In any of the plant management devices, the plant factory may include a plurality of cultivation shelves for cultivating the plants, and the determination unit may further determine a number of sets of cultivation shelves for harvesting the plants at the harvest time based on the yield.

[0008] In any of the plant management devices, the environmental control equipment may include an air conditioning equipment that adjusts at least one of a temperature and a humidity in the plant factory. The environmental control unit may control the air conditioning equipment based on temperature and humidity information indicating a relationship between a growing period and a temperature and humidity condition so that at least one of a temperature and a humidity in the plant factory satisfies a temperature and humidity condition that matches a harvest time of the plant.

[0009] In any of the plant management devices, the temperature and humidity conditions may be predetermined within a range capable of maintaining a predetermined quality of the plant.

[0010] In any of the plant management devices, the environmental control equipment may further include a blower equipment that controls at least one of a volume and a direction of airflow supplied to the plant factory. The environmental control unit may control the blower equipment so that at least one of a temperature and a humidity in the plant factory satisfies a temperature and humidity condition suitable for a harvest time of the plant.

[0011] In any of the plant management devices, the environmental control facility may include a light source facility having a light source that irradiates the plant with artificial light. The environmental control unit may control the light source facility based on light amount information indicating a relationship between a growth period and a light amount condition so that the light amount of the light source satisfies a light amount condition that matches the harvest time of the plant.

[0012] In any of the plant management devices, the light amount condition may be predetermined within a range capable of maintaining a predetermined quality of the plant.

[0013] In any of the plant management devices, the determination unit may determine an updated harvest time of the plant based on the updated prediction information when the prediction information is updated. The environmental control unit may further control the environmental control equipment so that the harvest time of the plant coincides with the updated harvest time.

[0014] In any of the plant management devices, when the prediction information is updated, the determination unit may further determine a post-update yield of the plant based on the updated prediction information. When the post-update yield is greater than the pre-update yield, the environmental control unit may control the environmental control equipment so that a cultivation period of the increased cultivation shelf is shorter than a cultivation period of the existing controlled cultivation shelf, thereby adjusting the plants so that the existing controlled cultivation shelf and the increased cultivation shelf can be harvested at the same time. When the post-update yield is less than the pre-update yield, the environmental control unit may control the environmental control equipment so that a cultivation period of the decreased cultivation shelf is longer, thereby adjusting the plants on the decreased cultivation shelf to match the next harvest time.

[0015] A plant management method according to an aspect of the present invention may include a step of determining a harvest time for the plant based on forecast information indicating at least one of a forecast market price of the plant and a forecast demand for the plant, and a step of controlling an environmental control device that controls an environment in a plant factory where the plant is cultivated so that the plant can be harvested at the harvest time.

[0016] A program according to an aspect of the present invention may cause a computer to execute a step of determining a harvest time for the plant based on forecast information indicating at least one of a forecast market price of the plant and a forecast demand for the plant. The program may cause the computer to execute a step of controlling an environmental control equipment that controls an environment in a plant factory where the plant is cultivated so that the plant can be harvested at the harvest time.

[0017] The above summary of the invention does not list all of the features of the present invention. Also, subcombinations of these features may also be inventions. [Brief description of the drawings]

[0018] [Figure 1] 1 is a diagram showing an example of functional blocks of an overall configuration of a plant management system according to an embodiment of the present invention; [Diagram 2] FIG. 2 is a diagram illustrating an example of functional blocks of the plant management device. [Diagram 3] FIG. 13 is a diagram illustrating an example of forecast information indicating a relationship between a forecast market price and a forecast demand amount. [Figure 4] FIG. 11 is a diagram showing an example of temperature and humidity information indicating the relationship between temperature and a growing period according to humidity. [Diagram 5] FIG. 11 is a diagram showing an example of light amount information showing the relationship between light amount and a growth period. [Figure 6] 10 is a flowchart showing an example of a procedure for controlling the environment of a plant based on prediction information. [Figure 7] FIG. 2 illustrates an example of a hardware configuration. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0019] The present invention will be described below through embodiments of the invention, but the following embodiments do not limit the scope of the invention according to the claims. Furthermore, not all of the combinations of features described in the embodiments are necessarily essential to the solution of the invention.

[0020] 1 is a diagram showing an example of functional blocks of the overall configuration of a plant management system according to this embodiment. The plant management system manages the growth state of plants 30 cultivated in a plant factory 10. The plant management system includes a plurality of cultivation shelves 20, a light source facility 40, a nutrient solution supply facility 50, a carbon dioxide supply facility 60, an air conditioning facility 70, a ventilation facility 80, a sensor 90, and a plant management device 100. The light source facility 40, the nutrient solution supply facility 50, the carbon dioxide supply facility 60, the air conditioning facility 70, and the ventilation facility 80 are examples of environmental control facilities.

[0021] The cultivation shelves 20 cultivate plants 30 such as vegetables, fruits, or flowers. The sowing date is shifted for each set of one or more cultivation shelves 20, so that the plants 30 can be harvested at different harvest times. In addition, the multiple cultivation shelves 20 may be installed in separate spaces 12 for each one or more cultivation shelves 20, and the environment in the space 12 may be individually controlled by an environmental control device, so that the plants 30 are cultivated in different environmental conditions for each space 12. The space may be a space with high thermal insulation and airtightness. In this embodiment, the plant management device 100 individually controls the environmental condition for each set of the cultivation shelves 20. However, the plant management device 100 may individually control the environmental condition for each of the multiple stages of one cultivation shelf 20.

[0022] The light source equipment 40 includes a plurality of light sources 42 that emit artificial light, such as LEDs or incandescent lamps, and emits artificial light from each of the plurality of light sources 42 to the plant 30. The plurality of light sources 42 may be disposed facing the cultivation surface of the cultivation shelf 20.

[0023] The nutrient solution supplying equipment 50 has a pump 52 and a pipe 54, and supplies a nutrient solution containing each fertilizer component such as potassium or calcium to the cultivation shelf 20 via the pump 52 and the pipe 54. The nutrient solution supplying equipment 50 appropriately adjusts the fertilizer concentration and supplies the nutrient solution with the adjusted fertilizer concentration to the plant 30. The nutrient solution supplying equipment 50 may supply the nutrient solution to the plant 30 by spraying the nutrient solution with the adjusted fertilizer concentration in the form of a mist onto the roots of the plant 30. The nutrient solution supplying equipment 50 may function as an irrigation equipment that supplies moisture to the medium in which the plant 30 is grown. The amount of irrigation water supplied to the cultivation shelf 20 may be adjusted by adjusting the amount of nutrient solution supplied from the nutrient solution supplying equipment 50 to the cultivation shelf 20.

[0024] The carbon dioxide supplying equipment 60 has a tank 62 and a nozzle 64. The tank 62 stores carbon dioxide. The carbon dioxide supplying equipment 60 supplies the carbon dioxide stored in the tank 62 to each space 12 in the plant factory 10 via the nozzle 64.

[0025] The air conditioning equipment 70 adjusts the temperature and humidity of the air in the plant factory 10, and circulates the temperature- and humidity-adjusted air in each space. The ventilation equipment 80 includes a circulator or an electric fan that supplies wind to the inside of the plant factory 10. The sensor 90 includes various sensors that measure the environmental conditions around the plant 30 and the growth condition of the plant 30. The sensor 90 includes various sensors that measure the temperature, humidity, light amount, and carbon dioxide concentration of the stems, leaves, and fruit of the plant 30.

[0026] The plant management device 100 controls the growth state of the plant 30 by controlling the light source equipment 40, the nutrient solution supplying equipment 50, the carbon dioxide supplying equipment 60, the air conditioning equipment 70, and the air blowing equipment 80. The plant management device 100 communicates with the light source equipment 40, the nutrient solution supplying equipment 50, the carbon dioxide supplying equipment 60, the air conditioning equipment 70, and the air blowing equipment 80 via a wireless network or a wired network. The plant management device 100 is an example of a growth state estimation device.

[0027] The plant management device 100 may be a computer having a central processing unit (CPU) and a memory. The light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the ventilation equipment 80 may each be equipped with a computer having a central processing unit (CPU) and a memory.

[0028] The computer may be a personal computer, a tablet computer, a smartphone, a workstation, a server computer, a general-purpose computer, or a computer system in which multiple computers are connected. Such a computer system is also a computer in a broad sense. The computer may be a dedicated computer designed for environmental control of a plant factory, or may be dedicated hardware realized by a dedicated circuit. The computer may be implemented by a virtual computer environment. When a computer is used, the plant management device 100, the light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the air blowing equipment 80 are realized by executing a program by the computer.

[0029] In a plant management system configured in this manner, it is desirable to be able to harvest an appropriate amount of plants 30 at an appropriate time, taking into account market prices and demand.

[0030] 2 is a diagram showing an example of functional blocks of the plant management device 100. The plant management device 100 includes an acquisition unit 102, a determination unit 104, an environment control unit 110, and a storage unit 120. The storage unit 120 stores programs that run on the plant management device 100. The programs are executed on a processor included in the plant management device 100 to cause the processor to function as the acquisition unit 102, the determination unit 104, and the environment control unit 110.

[0031] The acquisition unit 102 acquires prediction information indicating a relationship between a predicted market price of the plant 30 cultivated in the plant factory 10 and a predicted demand for the plant 30. The acquisition unit 102 may acquire the prediction information from a prediction server that generates prediction information using a learning model that predicts a future market price and demand from the past market price and demand of the plant 30. The prediction server may predict a predicted market price and a predicted demand for each type of plant 30 using a learning model for each type of plant 30. The prediction server may generate a learned prediction model by performing machine learning according to a supervised learning algorithm, for example, with daily weather information, event information such as events, etc. as explanatory variables, and with the market price and demand as objective variables. The algorithm may be any algorithm such as a neural network, a support vector machine, a multiple regression analysis, or a decision tree. The acquisition unit 102 may acquire the prediction information from a server provided by an organization that provides forecast information on the market price and demand.

[0032] The determination unit 104 determines the harvest time of the plant 30 based on the prediction information. The prediction information may be, for example, information indicating the relationship between the predicted market price (yen) and the predicted demand (t) for each day, as shown in Fig. 3. The prediction information may be information indicating the relationship between the predicted market price (yen) and the predicted demand (t) for each week. The prediction information may be information indicating the relationship between the predicted market price (yen) and the predicted demand (t) for each predetermined period other than a day or a week.

[0033] The determination unit 104 may determine the time when the predicted market price is highest within the target period as the harvest time T of the plant 30. At least one set of cultivation shelves 20 with the same sowing date is assigned to the target period. The set of cultivation shelves 20 may include multiple cultivation shelves 20 with the same sowing date. The set of cultivation shelves 20 may include multiple cultivation shelves 20 with the same sowing date that are present in the space 12 in which the environmental condition can be individually controlled. For example, the determination unit 104 may determine "September 10th", when the predicted market price is highest, as the harvest time T of the plant 30 for the target periods A to H. The determination unit 104 may determine "September 12th" as the harvest time T of the plant 30 for the target periods I to G.

[0034] The determination unit 104 may further determine a yield S of the plant at the harvest time T of the plant 30 based on the prediction information. The determination unit 104 may determine the yield S of the plant 30 by multiplying the predicted demand at the harvest time T of the plant 30 indicated in the prediction information by a predetermined ratio. The predetermined ratio may be determined in advance according to the market size of the plant 30 and the maximum yield of the plant 30 that can be cultivated in the plant factory 10. The determination unit 104 may further determine the number of sets of the cultivation shelves 20 on which the plant 30 is to be cultivated at the harvest time T so as to satisfy the yield S. The yield of the plant 30 per set of the cultivation shelves 20 may be determined in advance from an actual measurement value and stored in the memory unit 120.

[0035] The environmental control unit 110 controls at least one of the light source equipment 40, the nutrient solution supplying equipment 50, the carbon dioxide supplying equipment 60, the air conditioning equipment 70, and the ventilation equipment 80 that control the environment in the plant factory 10 so that the plants 30 can be harvested at the harvest time T. The environmental control unit 110 controls at least one of the light source equipment 40, the nutrient solution supplying equipment 50, the carbon dioxide supplying equipment 60, the air conditioning equipment 70, and the ventilation equipment 80 so that the plants 30 with a yield S can be harvested at the harvest time T.

[0036] The environmental control unit 110 may control the air conditioning equipment 70 based on temperature and humidity information indicating the relationship between the growth period and temperature and humidity conditions so that at least one of the temperature and humidity within the plant factory 10 satisfies the temperature and humidity conditions at which the plant 30 can be harvested at the harvest time T.

[0037] In the case of a variety of plant 30 such as leaf lettuce whose growing period can be shortened as the temperature is higher, if the harvest time T is earlier than the harvest time scheduled for the current growing period, the environmental control unit 110 may control the air conditioning equipment 70 to increase the temperature of the space, thereby advancing the harvest time of the plant 30. Alternatively, if the harvest time T is later than the harvest time scheduled for the current growing period, the environmental control unit 110 may control the air conditioning equipment 70 to decrease the temperature of the space, thereby delaying the harvest time of the plant 30.

[0038] However, if the temperature of the space is made too high, physiological disorders such as tip burn may occur in the plant 30. Therefore, the temperature and humidity conditions may be predetermined within a range in which a predetermined quality of the plant 30 can be maintained. The plant management device 100 may determine the humidity and temperature corresponding to the growth period so that the plant 30 can be harvested at the harvest time T, based on, for example, temperature and humidity information indicating the relationship between the temperature according to humidity and the growth period as shown in FIG. 4 stored in the memory unit 120.

[0039] The environmental control unit 110 may control the air blowing equipment 80 to adjust at least one of the volume (wind speed) and direction of the air supplied into the plant factory 10 so that at least one of the temperature and humidity within the plant factory 10 satisfies the temperature and humidity conditions under which the plant 30 can be harvested at the harvest time T.

[0040] The environmental control unit 110 may control the light source equipment 40 so that the amount of light from the light source 42 satisfies the light condition that allows the plant 30 to be harvested at the harvest time T, based on light amount information indicating the relationship between the growth period and the light amount conditions.

[0041] In the case of a variety of plant 30 such as leaf lettuce in which the greater the amount of light, the shorter the growing period, if the harvest time T is earlier than the harvest time scheduled for the current growing period when the plant can be harvested, the environmental control unit 110 may control the light source equipment 40 to increase the amount of light in the space, thereby bringing forward the harvest time of the plant 30. Alternatively, if the harvest time T is later than the harvest time scheduled for the current growing period when the plant can be harvested, the environmental control unit 110 may control the light source equipment 40 to decrease the amount of light in the space, thereby bringing forward the harvest time of the plant 30.

[0042] However, if the amount of light in the space is too large, physiological disorders such as tip burn may occur in the plant 30. Therefore, the light amount condition may be determined in advance within a range in which a predetermined quality of the plant 30 can be maintained.

[0043] The plant management device 100 may determine the amount of light corresponding to the growth period so that the plant 30 can be harvested at the harvest time T, for example, based on light amount information indicating the relationship between the amount of light and the growth period, as shown in FIG. 5, stored in the memory unit 120.

[0044] The temperature and humidity information and light intensity information may be generated in advance based on statistical data obtained by actually measuring the temperature and humidity conditions or light intensity conditions for each variety of plant 30, and may be stored in the memory unit 120.

[0045] A gentle breeze is effective in suppressing tip burn. Therefore, the environmental control unit 110 may adjust at least one of the volume and speed of the air supplied to the plant 30 by controlling the air blowing equipment 80 so as to satisfy predetermined air blowing conditions for suppressing the occurrence of tip burn according to at least one of the temperature and humidity conditions and the light amount conditions.

[0046] Here, the accuracy of the prediction information may become higher as the time until the prediction point becomes shorter. Therefore, the acquisition unit 102 may periodically acquire updated prediction information from the prediction server. When the prediction information is updated, the determination unit 104 may determine an updated harvest time for the plant 30 based on the updated prediction information. The environment control unit 110 further controls at least one of the light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the ventilation equipment 80 so that the plant 30 can be harvested at the updated harvest time.

[0047] When the prediction information is updated, the determination unit 104 may determine the updated harvest time and yield of the plants 30 based on the updated prediction information. The environmental control unit 110 may further control at least one of the light source equipment 40, the nutrient solution supply equipment 50, the carbon dioxide supply equipment 60, the air conditioning equipment 70, and the ventilation equipment 80 for each set of the cultivation shelves 20 to be controlled so that the harvest time of the plants 30 coincides with the updated harvest time and the plants 30 can be harvested by the updated yield.

[0048] FIG. 6 is a flowchart showing an example of a procedure for controlling the environment of the plant 30 based on the prediction information.

[0049] The acquisition unit 102 acquires prediction information corresponding to the type of the target plant 30 from the prediction server (S100). The determination unit 104 determines the time when the predicted market price is highest within the target period as the harvest time T of the plant 30 in the target period based on the prediction information, and further determines the yield S based on the predicted demand at the harvest time T (S102). The determination unit 104 determines the number of sets of the cultivation shelves 20 that will satisfy the yield S (S104). The determination unit 104 determines the cultivation period of the plant 30 from the current time that allows it to be harvested within the harvest period T (S106).

[0050] The environmental control unit 110 determines the environmental conditions that satisfy the cultivation period (S108). The environmental control unit 110 controls the environmental control equipment based on the determined environmental conditions (S110).

[0051] Next, if the acquisition unit 102 has not acquired updated prediction information from the prediction server ("N" in S112), the environmental control unit 110 maintains the current environmental conditions and controls the environmental control equipment.

[0052] On the other hand, when the acquisition unit 102 acquires the updated prediction information from the prediction server ("Y" in S112), the determination unit 104 re-determines the harvest time T' and the yield S' based on the updated prediction information (S114). If the harvest time T' is earlier than the harvest time T, the environment control unit 110 may control the air conditioning equipment 70 to increase the temperature of the space, thereby bringing forward the harvest time of the plant 30. Alternatively, if the harvest time T' is later than the harvest time T, the environment control unit 110 may control the air conditioning equipment 70 to decrease the temperature of the space, thereby bringing forward the harvest time of the plant 30. If the harvest time T' is earlier than the harvest time T, the environment control unit 110 may control the light source equipment 40 to increase the amount of light in the space, thereby bringing forward the harvest time of the plant 30. Alternatively, if the harvest time T' is later than the harvest time T, the environment control unit 110 may control the light source equipment 40 to decrease the amount of light in the space, thereby bringing forward the harvest time of the plant 30.

[0053] If the yield S' becomes greater than the yield S, the environmental control unit 110 may control the environmental control equipment so that the cultivation period of the additional cultivation shelf 20 is shorter than the cultivation period of the existing controlled cultivation shelf 20, thereby making adjustments so that plants 30 can be harvested at the same time on each of the existing controlled cultivation shelf 20 and the additional cultivation shelf 20.

[0054] If the yield S' becomes less than the yield S, the environmental control unit 110 may control the environmental control equipment so that the cultivation period of the reduced cultivation shelf 20 is longer, preferably so that the cultivation period of the reduced cultivation shelf 20 is the longest, thereby adjusting the plants 30 on the reduced cultivation shelf 20 so that they are in time for the next harvest.

[0055] 7 shows an example of a computer 1200 that may embody aspects of the present embodiment in whole or in part. A program installed on the computer 1200 may cause the computer 1200 to perform operations associated with an apparatus according to an embodiment of the present invention or one or more "parts" of the apparatus. Alternatively, the program may cause the computer 1200 to execute the operations or one or more "parts". The program may cause the computer 1200 to execute a process or steps of the process according to an embodiment of the present invention. Such a program may be executed by the CPU 1212 to cause the computer 1200 to execute specific operations associated with some or all of the blocks of the flowcharts and block diagrams described herein.

[0056] The computer 1200 according to this embodiment includes a CPU 1212 and a RAM 1214, which are connected to each other by a host controller 1210. The computer 1200 also includes a communication interface 1222 and an input / output unit, which are connected to the host controller 1210 via an input / output controller 1220. The computer 1200 also includes a ROM 1230. The CPU 1212 operates according to programs stored in the ROM 1230 and the RAM 1214, thereby controlling each unit.

[0057] The communication interface 1222 communicates with other electronic devices via a network. The hard disk drive may store programs and data used by the CPU 1212 in the computer 1200. The ROM 1230 stores a boot program executed by the computer 1200 when activated and / or a program that depends on the hardware of the computer 1200. The programs are provided via a computer-readable storage medium such as a CR-ROM, a USB memory, or an IC card, or a network. The programs are installed in the RAM 1214, which is also an example of a computer-readable storage medium, or the ROM 1230, and executed by the CPU 1212. The information processing described in these programs is read by the computer 1200, and brings about cooperation between the programs and the various types of hardware resources. An apparatus or method may be configured by implementing an operation or processing of information according to the use of the computer 1200.

[0058] For example, when communication is performed between the computer 1200 and an external device, the CPU 1212 may execute a communication program loaded in the RAM 1214 and instruct the communication interface 1222 to perform communication processing based on the processing described in the communication program. Under the control of the CPU 1212, the communication interface 1222 reads transmission data stored in a transmission buffer area provided in the RAM 1214 or a storage medium such as a USB memory, transmits the read transmission data to a network, or writes reception data received from the network to a reception buffer area or the like provided on the storage medium.

[0059] Furthermore, the CPU 1212 may cause all or a necessary portion of a file or database stored in an external storage medium such as a USB memory to be read into the RAM 1214, and perform various types of processing on the data on the RAM 1214. The CPU 1212 may then write back the processed data to the external storage medium.

[0060] Various types of information, such as various types of programs, data, tables, and databases, may be stored in the storage medium and undergo information processing. The CPU 1212 may perform various types of processing on the data read from the RAM 1214, including various types of operations, information processing, conditional judgment, conditional branching, unconditional branching, information search / replacement, etc., as described throughout this disclosure and specified by the instruction sequence of the program, and writes back the results to the RAM 1214. The CPU 1212 may also search for information in a file, database, etc. in the storage medium. For example, when a plurality of entries each having an attribute value of a first attribute associated with an attribute value of a second attribute are stored in the storage medium, the CPU 1212 may search for an entry that matches a condition, in which the attribute value of the first attribute is specified, from among the plurality of entries, read the attribute value of the second attribute stored in the entry, and thereby obtain the attribute value of the second attribute associated with the first attribute that satisfies a predetermined condition.

[0061] The above-described programs or software modules may be stored in a computer-readable storage medium on the computer 1200 or in the vicinity of the computer 1200. Also, a storage medium such as a hard disk or a RAM provided in a server system connected to a dedicated communication network or the Internet can be used as a computer-readable storage medium, thereby providing the programs to the computer 1200 via the network.

[0062] A computer-readable medium may include any tangible device capable of storing instructions that are executed by a suitable device. As a result, a computer-readable medium having instructions stored thereon comprises an article of manufacture that includes instructions that can be executed to create means for performing the operations specified in the flowchart or block diagram. Examples of computer-readable media may include electronic storage media, magnetic storage media, optical storage media, electromagnetic storage media, semiconductor storage media, and the like. More specific examples of computer-readable media may include floppy disks, diskettes, hard disks, random access memories (RAMs), read-only memories (ROMs), erasable programmable read-only memories (EPROMs or flash memories), electrically erasable programmable read-only memories (EEPROMs), static random access memories (SRAMs), compact disk read-only memories (CD-ROMs), digital versatile disks (DVDs), Blu-ray (RTM) disks, memory sticks, integrated circuit cards, and the like.

[0063] The computer readable instructions may include either source code or object code written in any combination of one or more programming languages. The source code or object code includes conventional procedural programming languages. The conventional procedural programming languages ​​may be assembler instructions, instruction set architecture (ISA) instructions, machine instructions, machine dependent instructions, microcode, firmware instructions, state setting data, or object oriented programming languages ​​such as Smalltalk®, JAVA®, C++, etc., and the “C” programming language or similar programming languages. The computer readable instructions may be provided to a processor or programmable circuitry of a general purpose computer, special purpose computer, or other programmable data processing apparatus locally or over a wide area network (WAN) such as a local area network (LAN), the Internet, etc. The processor or programmable circuitry may execute the computer readable instructions to create means for performing the operations specified in the flowcharts or block diagrams. Examples of processors include computer processors, processing units, microprocessors, digital signal processors, controllers, microcontrollers, etc.

[0064] Although the present invention has been described above using the embodiments, the technical scope of the present invention is not limited to the scope described in the above embodiments. It is clear to those skilled in the art that various modifications and improvements can be made to the above embodiments. It is clear from the description of the claims that such modifications and improvements can also be included in the technical scope of the present invention.

[0065] It should be noted that the order of execution of each process, such as operations, procedures, steps, and stages, in the devices, systems, programs, and methods shown in the claims, specifications, and drawings is not specifically stated as "before," "prior to," etc., and may be realized in any order unless the output of a previous process is used in a later process. Even if the operational flow in the claims, specifications, and drawings is explained using "first," "next," etc. for convenience, it does not mean that it is essential to perform the process in this order. [Explanation of symbols]

[0066] 10 Plant factory 20 cultivation rack 30 plants 40 Light source equipment 42 Light source 50 Nutrient solution supply equipment 52 Pump 54 Pipe 60 Carbon dioxide supply equipment 62 Tank 64 Nozzles 70 Air conditioning equipment 80 Ventilation equipment 90 Sensors 100 Plant management equipment 102 Acquisition Department 104 Decision Section 110 Environmental Control Section 120 Storage section 1200 Computer 1210 Host Controller 1212 CPU 1214 RAM 1220 Input / Output Controller 1222 Communication Interface 1230 ROM

Claims

1. A determination unit that determines a harvest time for the plant based on prediction information indicating at least one of a predicted market price of the plant and a predicted demand amount of the plant; an environmental control unit that controls an environmental control facility that controls an environment in a plant factory in which the plant is cultivated so that the plant can be harvested at the harvest time; A plant management device comprising:

2. the forecast information is indicative of at least a forecasted market price of the plant; The plant management device according to claim 1 , wherein the determination unit determines, as the harvest time for the plant, a time point at which a predicted market price is highest within a target period.

3. The forecast information indicates a relationship between the forecast market price and the forecast demand, The determination unit further determines a yield of the plant at the harvest time based on the prediction information, The plant management device according to claim 1 , wherein the environmental control unit controls the environmental control equipment so that the plant can be harvested at the harvest time and in the yield amount.

4. The plant management device according to claim 3 , wherein the determination unit determines the yield by multiplying a predicted demand amount indicated in the prediction information at the harvest time by a predetermined rate.

5. The plant factory includes a plurality of cultivation shelves for cultivating the plants, The plant management device according to claim 3 , wherein the determination unit further determines a number of sets of cultivation shelves to be targeted for harvesting the plants at the harvest time based on the yield.

6. The environmental control equipment includes an air conditioning equipment that adjusts at least one of a temperature and a humidity in the plant factory, The plant management device according to claim 1, wherein the environmental control unit controls the air conditioning equipment so that at least one of the temperature and humidity in the plant factory satisfies temperature and humidity conditions that correspond to the harvest time of the plant, based on temperature and humidity information indicating the relationship between a growth period and temperature and humidity conditions.

7. The plant management device according to claim 6 , wherein the temperature and humidity conditions are predetermined within a range capable of maintaining a predetermined quality of the plant.

8. The environmental control equipment further includes a blower equipment for controlling at least one of an air volume and a wind direction of the air supplied to the plant factory, The plant management device according to claim 6 , wherein the environmental control unit controls the air blowing equipment so that at least one of a temperature and a humidity in the plant factory satisfies a temperature and humidity condition suitable for a harvest time of the plant.

9. The environmental control facility includes a light source facility having a light source that irradiates the plant with artificial light, The plant management device according to claim 1, wherein the environmental control unit controls the light source equipment so that the amount of light from the light source satisfies the light condition that matches the harvest time of the plant based on light intensity information indicating the relationship between a growth period and light intensity conditions.

10. The plant management device according to claim 9 , wherein the light quantity condition is predetermined within a range capable of maintaining a predetermined quality of the plant.

11. The determination unit determines a new harvest time for the plant based on the updated prediction information when the prediction information is updated, The plant management device according to claim 1 , wherein the environmental control unit further controls the environmental control equipment so that a harvest time of the plant coincides with the updated harvest time.

12. When the prediction information is updated, the determination unit further determines an updated yield of the plant based on the updated prediction information, When the yield after renewal is greater than the yield before renewal, the environmental control unit controls the environmental control equipment so that the cultivation period of the additional cultivation shelf is shorter than the cultivation period of the existing controlled cultivation shelf, and adjusts so that the plants can be harvested at the same time on each of the existing controlled cultivation shelf and the additional cultivation shelf; The plant management device of claim 11, wherein when the yield after renewal is less than the yield before renewal, the environmental control unit controls the environmental control equipment so that the cultivation period of the reduced cultivation shelf is longer, and adjusts the plants on the reduced cultivation shelf so that they are in time for the next harvest.

13. A step of determining a harvest time of the plant based on forecast information indicating at least one of a forecast market price of the plant and a forecast demand amount of the plant by a determination unit; an environmental control unit controlling an environmental control facility that controls an environment in a plant factory in which the plant is cultivated so that the plant can be harvested at the harvest time; A plant management method comprising:

14. determining a harvest time for the plant based on forecast information indicating at least one of a forecast market price of the plant cultivated in the plant factory and a forecast demand for the plant; controlling an environmental control facility for controlling an environment in a plant factory in which the plants are grown so that the plants can be harvested at the harvest time; A program for causing a computer to execute the following.

Citation Information

Patent Citations

  • Air conditioning system

    JP2016138723A

  • Plant cultivation management system and plant cultivation management device

    US20220122007A1

  • Harvest information suggestion system, method and program

    WO2018158821A1