Charging system
The charging system automates charging control for multiple electric vehicles by determining priorities and output ratios based on SOC, addressing the complexity of manual charging as vehicle numbers increase, ensuring efficient use of contract power and minimizing operational disruptions.
Patent Information
- Application Number
- JP2023048022
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-24
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2043-03-24
AI Technical Summary
As the number of electric vehicles owned by a business increases, the complexity of calculating and switching charging power output increases, making manual charging control difficult.
A charging system that includes a server with a control unit, acquisition unit, setting unit, and calculation unit to automatically determine priorities and output ratios for electric vehicles based on State of Charge (SOC) and operational requirements, allowing for automated charging control within contract power limits.
Enables efficient and automated charging of electric vehicles within contract power limits, reducing operational disruptions by minimizing non-charging vehicles and maintaining optimal vehicle operation.
Smart Images

Figure 2024136782000001_ABST
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a charging system. [Background technology]
[0002] It is necessary to charge the number of electric vehicles (EVs) owned by a business within the scope of the business's contracted power.
[0003] For example, Patent Document 1 describes selecting a target number of electric vehicles from a vehicle group including a plurality of electric vehicles based on the SOC (Stare Of Charge) of the battery.
[0004] Furthermore, for example, Patent Document 2 describes determining a priority order for charging the batteries of multiple plug-in electric vehicles using a charging parking space based on the battery's state of charge (SOC), and charging the plug-in electric vehicles according to the determined priority order.
[0005] Furthermore, for example, Patent Document 3 describes determining the charging priority of power sources based on the state of charge (SOC), and controlling the supply of power generated by an alternator to multiple power sources based on the determined charging priority. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2021-150988 A [Patent Document 2] JP 2012-170273 A [Patent Document 3] JP 2008-37239 A Summary of the Invention [Problem to be solved by the invention]
[0007] Incidentally, in order to charge the number of EVs owned by a business establishment within the contracted power, charging switching is performed by charging control. When the number of owned EVs is small, the complexity of calculating the charging power output does not increase, and charging switching can be performed by charging control with only manual operation.
[0008] However, as the number of vehicles owned increases, the number of charging switching operations also increases, and the complexity of calculating the charging power output increases, making it difficult to perform charging switching operations through charging control using only manual operation.
[0009] An object of the present disclosure is to provide a charging system that enables automatic control of charging of an electric vehicle within the contracted power. [Means for solving the problem]
[0010] In order to achieve the above object, the charging system of the present disclosure includes: an acquisition unit that acquires, when a drive battery mounted on an electric vehicle is charged by a charger, a maximum number of electric vehicles that can be charged at the maximum output of the charger within a contracted power, and a SOC of the drive battery; a setting unit that sets a priority order for each of a plurality of electric vehicles based on the SOC; a calculation unit that calculates a ratio of an output of charging power for each of the plurality of electric vehicles based on a predetermined arithmetic expression that indicates a relationship between the set priority order and the maximum number of electric vehicles; a control unit that controls charging power for each of the plurality of electric vehicles based on the calculated ratio of the output of the charging power; Equipped with. Effect of the Invention
[0011] According to the present disclosure, charging control of an electric vehicle can be automatically performed within the contracted power. [Brief description of the drawings]
[0012] [Figure 1] FIG. 1 is a diagram illustrating an example of a charging system for an electric vehicle according to an embodiment of the present disclosure. [Diagram 2] FIG. 2 is a diagram illustrating an example of the relationship between the SOC and the priority order. [Diagram 3] FIG. 3 is a diagram showing an example of charging power output ratios for each of the EVs. [Figure 4] FIG. 4 is a flowchart showing an example of a charging switching operation by the charging control in this embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0013] Hereinafter, embodiments of the present disclosure will be described with reference to the drawings. FIG. 1 is a diagram showing an example of a charging system 1 for an electric vehicle (EV) according to an embodiment of the present disclosure. In the following description, the present disclosure will be described as being applied to commercial vehicles such as trucks and buses, but the present disclosure is not limited thereto and may be applied to vehicles such as passenger cars. A business establishment owns a predetermined number of EVs. In a predetermined area of the business establishment, a predetermined number of chargers BC are installed for charging the drive batteries (hereinafter simply referred to as "batteries") installed in the EVs. The EVs have charging ports to which the power plugs of the chargers BC are connected.
[0014] As shown in Fig. 1, the charging system 1 is a system in which power is supplied from a charger BC to a battery (not shown) by connecting a power plug to a charging port. Fig. 1 shows a charger BC disposed outside an EV. The charging system 1 includes a charger BC, an EV, and a server 10.
[0015] The EV has a communication unit 2. The server 10 has a communication unit 16. The communication units 2 and 16 are connected via a communication network such as the Internet. This enables data (SOC, charging power output ratio (described later)) to be transmitted and received between the EV and the server 10.
[0016] The EV has a battery management unit 3 and a vehicle control unit 4 (Vehicle Control Unit: VCU). The battery management unit 3 acquires the cell temperature, which is the temperature of the battery, and the cell voltage, which is the voltage of the battery, at regular intervals. The battery management unit 3 controls the on / off of a relay circuit (not shown) based on the acquired cell temperature and cell voltage. The battery management unit 3 also transmits the SOC to the vehicle control unit 4.
[0017] The vehicle control unit 4 (VCU) monitors the battery status such as the battery voltage, current, temperature, and SOC (remaining capacity), and controls the battery for safe and effective use. The vehicle control unit 4 also controls the charger BC based on the charging power output ratio (described later).
[0018] The server 10 includes a control unit 11, an acquisition unit 12, a setting unit 13, a calculation unit 14, and a storage unit 15. In Fig. 1, arrows indicate main data flows, and there may be data flows not shown in Fig. 1. In Fig. 1, each functional block indicates a configuration in function units, not a configuration in hardware (device) units. Therefore, the functional blocks shown in Fig. 1 may be implemented in a single device, or may be implemented separately in multiple devices. Data may be exchanged between functional blocks via any means, such as a data bus or a controller area network (CAN bus).
[0019] The storage unit 15 is a storage device such as a ROM (Read Only Memory) that stores the BIOS (Basic Input Output System) of the computer that realizes the server 10, a RAM (Random Access Memory) that serves as the working area of the control unit 11, an HDD (Hard Disk Drive) or an SSD (Solid State Drive) that stores the OS (Operating System) and application programs, and various information referenced when the application programs are executed. The storage unit 15 stores the number of EVs owned by the establishment, as well as identification information and SOC (remaining capacity), which are unique information of the EVs. The storage unit 15 also stores the maximum number of EVs that can be charged at the maximum output of the charger BC within the contracted power of the establishment.
[0020] (Control unit 11) The control unit 11 is a processor such as a CPU (Central Processing Unit) or GPU (Graphics Processing Unit) of the server 10, and functions as an acquisition unit 12, a setting unit 13, and a calculation unit 14 by executing programs stored in the storage unit 15.
[0021] (Acquisition part 12) The acquisition unit 12 acquires the SOC received by the communication unit 16. The data acquired by the acquisition unit 12 is stored in the storage unit 15.
[0022] (Settings section 13) The setting unit 13 sets a priority order for each of the owned EVs based on the SOC.
[0023] The setting unit 13 further sets priorities for each of the owned EVs based on a predetermined threshold. In this embodiment, the "threshold 1" is determined based on the minimum required SOC when the EV starts operation, for example. The "threshold 2" is determined based on the minimum required SOC when the EV returns home.
[0024] In this manner, the setting unit 13 sets the priority order based on each of the threshold 1 and the threshold 2. The setting unit 13 further sets the priority order based on the earliest EV operation start time. The setting unit 13 further sets the priority order based on the order in which the EVs return.
[0025] FIG. 2 is a diagram showing an example of the relationship between SOC and priority. In FIG. 2, the horizontal axis indicates SOC, and the vertical axis indicates priority. In this embodiment, it is assumed that the business establishment owns 10 EVs. Therefore, priority is set for the 10 EVs. In FIG. 2, the 10 EVs are indicated by symbols "V01" to "V10". "Threshold 1" shown in FIG. 2 is determined based on the minimum required SOC value at the start of EV operation. Furthermore, "Threshold 2" is determined based on the minimum required SOC value at the return of EV. Furthermore, when the thresholds (threshold 1, threshold 2) are less than the same, the priority of the EV that starts operation earlier is higher than the priority of the EV that starts operation later. Furthermore, the priority of the EV that returns earlier is higher than the priority of the EV that returns later. Furthermore, the priority of the EV that has its power plug plugged in earlier may be higher than the priority of the EV that has its power plug plugged in later.
[0026] In Figure 2, the EVs below threshold 1 are "V01," "V05," and "V09." Based on the earliest arrival time and start time of service, the priority of EVs below threshold 1 is "V09," "V01," and "V05," from highest to lowest.
[0027] In addition, in FIG. 2, the EVs that are greater than or equal to threshold 1 and less than threshold 2 are "V02," "V03," "V04," and "V10." However, based on the earliest return time and earliest start time of operation, the priority of EVs that are greater than or equal to threshold 1 and less than threshold 2 is, from highest to lowest, "V03," "V02," "V10," and "V04."
[0028] In addition, in Figure 2, the EVs that are above threshold 1 and above threshold 2 are "V06," "V07," and "V8." However, based on the earliest return time and earliest start time of operation, the priority of EVs that are above threshold 1 and above threshold 2 is "V08," "V06," and "V07," in order of decreasing priority.
[0029] (Calculation unit 14) The calculation unit 14 calculates the ratio of the charging power output for each of a predetermined number of electric vehicles (for example, the number of EVs owned by a business establishment) based on a predetermined formula indicating the relationship between the priority order and the maximum number of vehicles. Here, the "maximum number of vehicles" is the value obtained by dividing the chargeable power [kW] by the maximum charger output [kW].
[0030] For example, if the chargeable power is 20 [kW] and the maximum charger output is 3 [kW], the maximum number of units is FLOOR(20 / 3) = 6 [units]. Here, the FLOOR function rounds down the divided value to the reference value (less than 1).
[0031] When charging EVs owned by a business, if the contracted power is exceeded, a higher fee than normal must be paid, so charging is limited to within the contracted power. In this example, the business owns 10 EVs. The maximum number (the number of EVs that can be charged at the maximum output of the charger BC within the contracted power) is 6. Therefore, if the number of vehicles to be charged were the same as the maximum number, 6, then the number of vehicles not to be charged would be 4 (=10-6). As the number of vehicles not to be charged increases, it causes problems in the operation of the EVs at the business.
[0032] In order to prevent disruptions to the operation of EVs at business sites, it is necessary to enable the operation of as many EVs as possible by implementing charging control-based charging switching operations. However, as the number of EVs owned increases, the number of charging switching operations also increases, and the complexity of calculating the charging power output increases, making it difficult to implement charging control-based charging switching operations using manual operations alone.
[0033] In this embodiment, charging switching is performed automatically through charging control within the contracted power. As an example of charging switching, charging is performed at maximum output for three vehicles (=6 / 2), which is half of the maximum number (six vehicles). This leaves maximum output chargeable power for three vehicles within the contracted power. By determining the output of maximum output chargeable power for the remaining three vehicles to EVs based on the priority order and an arithmetic formula, the number of vehicles not to be charged is reduced as much as possible, preventing any disruption to EV operation.
[0034] An example of the predetermined calculation formula is shown below. Charging power output percentage y [%] =-(xa / 2)*100 / (ba / 2)+100*(ba / 2) / (ba / 2-1) …(1) Here, a is the maximum number of EVs, b is the maximum number of EVs x 1.5, and x is the priority. The value "1.5" in "maximum number of EVs x 1.5" can be changed as appropriate depending on the number of EVs owned by the business establishment and the EV operation status at the business establishment. Also, 100[%] is determined based on the maximum output of the charger BC.
[0035] Next, an example of the case where the charging power output ratio y [%] is calculated based on the above-mentioned calculation formula (1) will be described. Here, the maximum number a is 6, and the priority order x is "V09", "V01", "V05", "V03", "V02", "V10", "V04", "V08", "V06", and "V07" from highest to lowest. In the following calculations, since the charging power output ratio y [%] has a maximum value of 100 [%], any value exceeding 100 [%] is rounded down. Also, any value after the decimal point is rounded down.
[0036] (For V09, x=1) Charging power output ratio y=-(1-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =2*100 / 6+100*6 / 5 =10*100 / 30+100*36 / 30 =46*100 / 30 =153 Since y≦100, y=100[%]
[0037] (For V01, x=2) Charging power output ratio y=-(2-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =1*100 / 6+100*6 / 5 =5*100 / 30+100*36 / 30 =41*100 / 30 =136 Since y≦100, y=100[%].
[0038] (For V05, x=3) Charging power output ratio y=-(3-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =0*100 / 6+100*6 / 5 =100*6 / 5 =120 Since y≦100, y=100[%].
[0039] (For V03, x=4) Charging power output ratio y=-(4-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =-1*100 / 6+100*6 / 5 =-5*100 / 30+100*36 / 30 =31*100 / 30 =103 Since y≦100, y=100[%].
[0040] (For V02, x=5) Charging power output ratio y=-(5-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =-2*100 / 6+100*6 / 5 =-10*100 / 30+100*36 / 30 =26*100 / 30 =86 From the above, y = 86[%].
[0041] (For V10, x=6) Charging power output ratio y=-(6-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =-3*100 / 6+100*6 / 5 =-15*100 / 30+100*36 / 30 =21*100 / 30 =70 From the above, y = 70[%].
[0042] (For V04, x=7) Charging power output ratio y=-(7-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =-4*100 / 6+100*6 / 5 =-20*100 / 30+100*36 / 30 =16*100 / 30 =53 From the above, y = 53[%].
[0043] (For V08, x=8) Charging power output ratio y=-(8-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =-5*100 / 6+100*6 / 5 =-25*100 / 30+100*36 / 30 =11*100 / 30 =36 From the above, y = 36[%].
[0044] (For V06, x=9) Charging power output ratio y=-(9-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =-6*100 / 6+100*6 / 5 =-30*100 / 30+100*36 / 30 =6*100 / 30 =20 From the above, y = 20[%].
[0045] (For V07, x=10) Charging power output ratio y=-(10-6 / 2)*100 / (9-6 / 2)+100*(9-6 / 2) / (9-6 / 2-1) =-7*100 / 6+100*6 / 5 =-35*100 / 30+100*36 / 30 =1*100 / 30 =3 From the above, y=3[%]. In this embodiment, the charging standby target is set.
[0046] An example of the case where the charging power output ratio y [%] is calculated based on a predetermined calculation formula (1) has been described above. Fig. 3 is a diagram showing an example of the charging power output ratio for each EV. The horizontal axis of Fig. 3 shows the priority order, and the vertical axis shows the charging power output ratio [%].
[0047] As shown in Figure 3, vehicles with a charging power output ratio of 100[%] are EVs with no power limit. The EVs with no power limit are "V09", "V01", and "V05", which are half of the maximum number (6). In addition, the EV with no power limit is "V03", for which y = 100[%] in the above formula (1).
[0048] Based on the above formula (1) and the priority order, the power output for "V02" to "V06" is determined. Note that "V03" to "V06" are EVs in the charge restricted range. Also, V07 (x=10) has y=3[%] in formula (1), but in this embodiment, it is placed on standby for charging.
[0049] Communication unit 16 transmits the charging power output ratio for each of the EVs shown in Fig. 3 to communication unit 2 of each EV. The charging power output ratio received by communication unit 2 is stored in a memory unit (not shown) of the EV.
[0050] Next, an example of a charging switching operation by charging control in this embodiment will be described with reference to Fig. 4. Fig. 4 is a flow chart showing an example of a charging switching operation by charging control in this embodiment. An EV in which the power plug of the charger BC is connected to a charging port is called a power plug-connected vehicle. The memory unit 15 of the server 10 also stores the return time and operation start time of the EV.
[0051] In step S1, when a power plug is connected to a charging port of an EV, the identification information and SOC (remaining capacity) of the EV are communicated between the communication units 2, 16 and acquired by the acquisition unit 12 of the server 10.
[0052] In step S2, the setting unit 13 determines whether or not the SOC is less than threshold 1. If the SOC is less than threshold 1 (step S2: YES), the process proceeds to step S3. If the SOC is equal to or greater than threshold 1 (step S2: NO), the process proceeds to step S4.
[0053] In step S3, the setting unit 13 sets priorities based on the return times and operation start times of the EVs among those with SOCs less than threshold 1. After that, the process proceeds to step S6.
[0054] In step S4, the setting unit 13 determines whether or not the SOC is less than threshold 2. If the SOC is less than threshold 2 (step S4: YES), the process proceeds to step S5. If the SOC is equal to or greater than threshold 2 (step S4: NO), the process proceeds to step S7.
[0055] In step S5, the setting unit 13 sets priorities for EVs with SOCs equal to or greater than threshold 1 and less than threshold 2, based on the EV's return time and operation start time, in order of priority from those with SOCs less than threshold 1 onwards. Then, the process proceeds to step S6.
[0056] Next, in step S6, the setting unit 13 determines the priority order.
[0057] In step S7, the setting unit 13 sets the priority order for those with SOCs below threshold 2 based on the EV's return time and operation start time among those with SOCs equal to or greater than threshold 2. Thereafter, the process proceeds to step S6.
[0058] In step S8, the calculation unit 14 determines whether the number of vehicles with power plugs connected is less than the maximum number. If the number of vehicles with power plugs connected is less than the maximum number (step S8: YES), the process proceeds to step S9. If the number of vehicles with power plugs connected is not less than the maximum number (step S8: NO), the process proceeds to step S10.
[0059] In step S9, the information "no power limit" is communicated between the communication units 2 and 16. The vehicle control unit 4 controls the charger BC based on the information "no power limit".
[0060] In step S10, the calculation unit 14 determines whether the priority order is equal to or less than the maximum number of vehicles. If the priority order is equal to or less than the maximum number of vehicles (step S10: YES), the process proceeds to step S11. If the priority order is not equal to or less than the maximum number of vehicles (step S10: NO), the process proceeds to step S12.
[0061] In step S11, the information "no power limit" is communicated between the communication units 2 and 16. The vehicle control unit 4 controls the charger BC based on the information "no power limit".
[0062] In step S12, the calculation unit 14 calculates the charging power output ratio by the above-mentioned calculation formula (1). Information on the "charging power output ratio" is communicated between the communication units 2 and 16. The vehicle control unit 4 controls the charger BC based on the information on the "charging power output ratio". This limits the power.
[0063] The charging system 1 in the above embodiment includes an acquisition unit 12 that acquires the maximum number of EVs that can be charged at the maximum output of the charger BC and the SOC of the batteries when batteries mounted on EVs are charged by the charger BC, a setting unit 13 that sets a priority order for each of the specified number of EVs based on the SOC, a calculation unit that calculates the output ratio of charging power for each of the specified number of EVs based on a predetermined equation indicating the relationship between the set priority order and the maximum number, and a vehicle control unit 4 that controls the charging power for each of the specified number of EVs based on the calculated output ratio of charging power.
[0064] With the above configuration, the charging power output ratio for each of a specified number of EVs is automatically calculated based on an arithmetic formula, making it possible to automatically control the charging of EVs within the contracted power. This prevents the complexity of calculating the charging power output ratio from increasing even if the specified number of EVs increases.
[0065] In addition, in the charging system 1 according to the above embodiment, the calculation unit 14 calculates the output ratio of the charging power based on the following calculation formula: Output ratio of charging power y [%] = -(xa / 2) * 100 / (ba / 2) + 100 * (ba / 2) / (ba / 2-1), where a is the maximum number of vehicles, b is the maximum number of vehicles x 1.5, and x is the priority. For example, if the maximum number of vehicles is six, half of the six, or three vehicles (= 6 / 3), are charged at maximum output. This leaves maximum output chargeable power for three vehicles within the contracted power. The output of the remaining maximum output chargeable power for the three vehicles can be set to the EVs based on the priority and the calculation formula, making it possible to reduce the number of vehicles not to be charged and prevent EV operation from being hindered.
[0066] In the charging system 1 in the above embodiment, the setting unit 13 that sets the priority order for the EVs and the calculation unit 14 that calculates the ratio of the charging power output to the EVs based on an arithmetic formula are provided in the server 10, but the present disclosure is not limited to this. The setting unit 13 and the calculation unit 14 may be provided in the EV, for example. In this case, application programs for executing the respective functions of the setting unit 13 and the calculation unit 14 are downloaded from the server 10 via a communication network to a storage device (not shown) of the EV and executed by the vehicle control unit 4.
[0067] In addition, in the charging system 1 in the above embodiment, the vehicle control unit 4 controls the charging power of the charger BC based on the charging power output ratio, but the present disclosure is not limited to this. For example, the server 10 may control the charging power of the charger BC via the EV (e.g., the vehicle control unit 4).
[0068] In addition, the above-mentioned embodiments are merely examples of the embodiment of the present disclosure, and the technical scope of the present disclosure should not be interpreted as being limited by them. In other words, the present disclosure can be embodied in various forms without departing from the gist or main features thereof. [Industrial Applicability]
[0069] The present disclosure is suitably used for a charging management device equipped with a charging system that is required to automatically control charging of an electric vehicle within a contracted power supply. [Explanation of symbols]
[0070] 1 Charging System 2. Communications Department 3 Battery management unit 4 Vehicle Control Unit (VCU) 10 Server 11 Control section 12 Acquisition Department 13 Setting section 14 Calculation section 15 Storage section 16 Communications Department
Claims
1. an acquisition unit that acquires, when a drive battery mounted on an electric vehicle is charged by a charger, a maximum number of electric vehicles that can be charged at a maximum output of the charger within a contracted power, and an SOC of the drive battery; a setting unit that sets a priority order for each of a plurality of electric vehicles based on the SOC; a calculation unit that calculates a ratio of an output of charging power for each of the plurality of electric vehicles based on a predetermined arithmetic expression that indicates a relationship between the set priority order and the maximum number of electric vehicles; a control unit that controls charging power for each of the plurality of electric vehicles based on the calculated ratio of the output of the charging power; Equipped with Charging system.
2. The calculation unit calculates the ratio of the output of the charging power based on the following calculation formula: Charging power output ratio y [%] =-(x-a / 2)*100 / (ba-a / 2)+100*(ba-a / 2) / (ba-a / 2-1) Here, a is the maximum number of units, b is the maximum number of units x 1.5, and x is the priority. The charging system of claim 1 .
3. The percentage of the charging power output, 100% is determined based on the maximum output of the charger. The charging system according to claim 2 .
4. The setting unit further sets the priority order based on a threshold value. A charging system according to any one of claims 1 to 3.
5. The threshold value is determined based on a minimum required value of the SOC at the start of operation of the electric vehicle. The charging system according to claim 4.
6. The threshold value is determined based on a minimum required value of the SOC at the time of return of the electric vehicle. The charging system according to claim 4.
Citation Information
Patent Citations
System and apparatus for charging battery of vehicle
JP2003333706A
Electric power supplying control device
JP2010110173A
Parking system
JP2011162967A
Vehicle power charge controller
JP2013062918A
Vehicular power source control device
JP2008037239A
