Wire fixation system

The wire fixing system for the earth bucket in pneumatic caisson construction addresses the issue of wire recognition and fixation, ensuring safe and automated loading operations by using slide rails and a movable slide bar to prevent equipment damage.

JP2024137589APending Publication Date: 2024-10-07ORIENTAL CONCRETE
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023102839
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-06-22
Publication Date
2024-10-07

AI Technical Summary

Technical Problem

The existing pneumatic caisson construction method lacks a system for automatically recognizing and fixing the wire of the earth bucket, which can lead to equipment damage or malfunction due to human error in loading operations.

Method used

A wire fixing system is introduced, comprising two or more slide rails installed in the working chamber of a pneumatic caisson, with a movable slide bar that can tilt and fix the wire of the earth bucket at any position, ensuring safe and automated loading operations.

Benefits of technology

The system allows for the safe and automated fixing of the earth bucket wire, preventing collisions with excavation equipment and enhancing the efficiency and safety of the loading process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024137589000001_ABST
    Figure 2024137589000001_ABST
Patent Text Reader

Abstract

To provide a wire fixation system capable of fixing wires of an earth bucket to any position.SOLUTION: A wire fixation system is provided with two or more slide rails arranged on an opening at a ceiling side of a work room of a pneumatic caisson of a material shaft connecting the work room and the ground surface, and slide bars installed on the two or more slide rails and capable of moving on the slide rails.SELECTED DRAWING: Figure 16
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a wire anchoring system. [Background technology]

[0002] Pneumatic caisson construction is known as a method for constructing underground structures such as bridges, building foundations, and shield tunnel starting shafts. In pneumatic caisson construction, a work chamber is set up under the main body of the caisson, compressed air is pumped into it to create a high-pressure state, and excavation work is carried out there. Because this high-pressure work chamber is in a high-pressure state, the time that workers can enter it is limited. For this reason, in pneumatic caisson construction, unmanned construction is adopted in underwater and high-pressure construction work, in which construction is carried out by remote control from the ground, from the viewpoint of improving work efficiency and ensuring the safety of the work environment. In addition, in recent years, the construction industry has been promoting "i-Construction," which aims to improve safety and productivity by utilizing digital technology, mainly by the government and large companies. As a result, full automation using ICT technology is also required in pneumatic caisson construction.

[0003] On the other hand, in the pneumatic caisson method, there is a process in which the excavated soil generated when a caisson shovel is used to excavate in an underground caisson workroom is loaded into an earth bucket that is used to transport the soil to the surface. This loading operation is performed by the workers. Therefore, the loading direction and operation timing are judged based on the experience of the workers. For this reason, if an inexperienced worker performs the loading operation, there is a possibility that the equipment will be damaged or broken by touching the caisson shovel with a wire, etc.

[0004] For these reasons, there is a demand for full automation of the earth bucket loading process in the pneumatic caisson construction method. As part of the full automation of the earth bucket loading process, there is a demand for detecting and automatically recognizing the earth bucket. As a technology for detecting this earth bucket, for example, a technology for an earth bucket recognition system shown in Patent Document 1 is disclosed.

[0005] The technology disclosed in Patent Document 1 discloses a method for recognizing the posture of an earth bucket based on the error when a mathematical model consisting of a set of coordinates that satisfy an equation representing the side surface is superimposed on coordinate data that has been transformed by a transformation means. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Patent No. 7014930 Summary of the Invention [Problem to be solved by the invention]

[0007] However, the technology disclosed in Patent Document 1 does not take into consideration the recognition of the wire of the earth bucket. Therefore, the technology disclosed in Patent Document 1 has a problem in that the wire of the earth bucket cannot be recognized and may hit the caisson shovel.

[0008] The present invention has been devised in consideration of the above-mentioned problems, and its object is to provide a wire fixing system that can fix the wire of an earth bucket at any position. [Means for solving the problem]

[0009] The wire fixing system of the first invention is characterized in that it comprises two or more slide rails installed in an opening on the ceiling side of a work chamber of a material shaft connecting a work chamber of a pneumatic caisson to the ground, and a slide bar that is mounted on the two or more slide rails and is movable on the slide rails. Effect of the Invention

[0010] According to the first aspect of the present invention, the wire fixing system of the present invention comprises two or more slide rails arranged in the opening and a slide bar movable on the slide rails. This makes it possible to tilt the earth bucket's hanger in any direction by pushing the wire that suspends the earth bucket through the opening with the slide bar. This allows the wire of the earth bucket to be fixed in any position. [Brief description of the drawings]

[0011] [Figure 1] Figure 1 is a vertical cross-sectional view showing the main equipment of the pneumatic caisson construction method. [Diagram 2] FIG. 2 is a diagram showing an excavator. [Diagram 3] FIG. 3 is a block diagram showing a control system in the excavator. [Figure 4] FIG. 4 is a diagram showing a material shaft. [Diagram 5] FIG. 5 is a diagram showing the entrance of the material shaft. [Figure 6] Fig. 6(a) is a diagram showing the earth bucket, and Fig. 6(b) is a diagram showing a side view of the earth bucket. [Figure 7] FIG. 7 is a diagram showing a material lock. [Figure 8] FIG. 8 is a diagram showing the loading of soil and sand into the earth bucket. [Figure 9] FIG. 9 is a diagram showing a wire fixing device. [Figure 10] FIG. 10 is a block diagram showing the overall configuration of an automatic earth bucket lifting system to which the present invention is applied. [Figure 11] Fig. 11(a) is a flow chart showing the operation of carrying the earth bucket of the earth bucket automatic lifting system to the working room according to the present invention. Fig. 11(b) is a flow chart showing the operation of carrying the earth bucket of the earth bucket automatic lifting system to the ground according to the present invention. [Figure 12] FIG. 12 is a diagram showing a mathematical model. [Figure 13] FIG. 13 is a flowchart showing a process for determining the position of the earth bucket. [Figure 14] FIG. 14 shows how the earth bucket is carried into the material lock from the carrying entrance. [Figure 15] FIG. 15 is a diagram showing an operation for generating trajectory information. [Figure 16] Fig. 16(a) is a diagram showing the operation of the wire fastening device when the earth bucket is carried into the work chamber, and Fig. 16(b) is a diagram showing the operation of the wire fastening device when the earth bucket is carried out from the work chamber. [Figure 17] FIG. 17 shows the state in which the earth bucket is carried out from the material lock to the entrance. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] First, the main equipment of the pneumatic caisson construction method using the automatic earth bucket lifting weight system 6 according to the present invention will be described with reference to the drawings. Fig. 1 is a diagram showing an example of the main equipment of the pneumatic caisson construction method using the automatic earth bucket lifting weight system 6 according to the present invention. The pneumatic caisson construction method is configured to construct an underground structure by sinking a reinforced concrete caisson 1 into the ground using excavation equipment E1, rigging equipment E2, soil removal equipment E3, air supply equipment E4, and standby / safety equipment E5.

[0013] The excavation equipment E1 includes, for example, an excavator 100 (hereinafter referred to as the caisson shovel 100), an automatic soil loading device 11, and a ground remote control room 13. The caisson shovel 100 is installed in a work room 2 provided at the bottom of the caisson 1. The automatic soil loading device 11 loads soil excavated by the caisson shovel 100 into a cylindrical earth bucket 31. The ground remote control room 13 includes a remote control device 12 that remotely controls the operation of various pieces of equipment such as the caisson shovel 100 from the ground.

[0014] The outfitting equipment E2 includes, for example, a man shaft 21, a man lock 22 (airlock), a material shaft 23, and a material lock 24 (airlock). The man shaft 21 is a cylindrical passageway connecting the ground T and the work chamber 2 so that workers can enter and exit the work chamber 2, and is provided with, for example, a spiral staircase 25. The man lock 22 is an airtight door with a double door structure that is provided in the man shaft 21 and adjusts the pressure difference between the atmospheric pressure on the ground T and the work chamber 2. The material shaft 23 is a cylindrical passageway connecting the ground T and the work chamber 2 so that the earth bucket 31 or materials, etc. can be transported to and from the ground T. The material lock 24 is an airtight door with a double door structure that is provided in the material shaft 23 and adjusts the pressure difference between the atmospheric pressure on the ground T and the work chamber 2. The man lock 22 and the material lock 24 are configured to suppress changes in the air pressure in the work chamber 2 and allow workers and the earth bucket 31 to enter and exit the work chamber 2.

[0015] The soil discharge equipment E3 includes, for example, an earth bucket 31, a carrier device 32, a soil hopper 33, and a load meter 35. The earth bucket 31 is a metal cylindrical container with a bottom into which soil excavated by the caisson shovel 100 is loaded. The carrier device 32 is a device that lifts the earth bucket 31 to the ground through the material shaft 23 and carries it out. The soil hopper 33 is a device that temporarily stores the soil carried out to the ground by the earth bucket 31 and the carrier device 32. The load meter 35 is a sensor for acquiring mass information indicating the mass of the earth bucket 31 by measuring the load on a hook (not shown) that suspends the earth bucket 31. The soil discharge equipment E3 may also include a crawler crane 5 for carrying in and out the earth bucket 31.

[0016] The air supply equipment E4 includes, for example, an air compressor 42, an air purifier 43, an air supply pressure regulator 44, and an automatic pressure reducing device 45. The air compressor 42 is a device that sends compressed air into the work chamber 2 via the air supply pipe 41 and the air supply path 3 formed in the caisson 1. The air purifier 43 is a device that purifies the compressed air sent by the air compressor 42. The air supply pressure regulator 44 is a device that adjusts the amount (pressure) of compressed air sent from the air compressor 42 into the work chamber 2 so that the air pressure in the work chamber 2 becomes equal to the groundwater pressure. The automatic pressure reducing device 45 is a device that reduces the air pressure in the manlock 22.

[0017] The standby / safety equipment E5 includes, for example, an emergency air compressor 51 and a hospital lock 53. The emergency air compressor 51 is a device that can send compressed air into the work room 2 in place of the air compressor 42 when the air compressor 42 breaks down or is under inspection. The hospital lock 53 is a decompression chamber into which a worker who has completed work in the work room 2 enters to gradually acclimate the worker's body to atmospheric pressure.

[0018] Next, the caisson excavator 100 will be described with reference to Figs. 2 and 3. As shown in Fig. 2, the caisson excavator 100 includes, for example, a traveling body 110, a boom 130, and a bucket attachment 150. The traveling body 110 is attached to a pair of left and right traveling rails 4 provided on the ceiling of the work chamber 2, and travels along the traveling rails 4 while suspended from the left and right traveling rails 4. The boom 130 is pivotally connected to a rotating frame 121 of the traveling body 110 so as to be swingable up and down. The bucket attachment 150 is attached to the tip of the boom 130.

[0019] The traveling body 110 includes a traveling frame 111, a swivel frame 121, and traveling rollers 113. The swivel frame 121 is provided on the underside of the traveling frame 111 so as to be able to rotate freely. The traveling rollers 113 are four rollers provided on the front, rear, left and right sides of the upper surface of the traveling frame 111. The traveling body 110 is configured to travel along the left and right traveling rails 4 by rotating the front, rear, left and right traveling rollers 113.

[0020] The boom 130 includes, for example, a base boom 131, a tip boom 132, a telescopic cylinder 133, and a hoisting cylinder 134. The base boom 131 is attached to the swivel frame 121 so as to be able to rise and fall or swing up and down. The tip boom 132 is nested and assembled with the base boom 131. The telescopic cylinder 133 is provided inside the base boom 131. Two hoisting cylinders 134 are provided on the left and right of the base boom 131. The boom 130 is configured so that when the telescopic cylinder 133 is extended or retracted, the tip boom 132 moves in the longitudinal direction relative to the base boom 131, thereby extending or retracting the boom 130. The base ends of the two hoisting cylinders 134 are rotatably attached to the left and right sides of the base boom 131, respectively.

[0021] The bucket attachment 150 includes a base member 151, a bucket 152, and a bucket cylinder 153. The base member 151 is attached to the tip boom 132. The bucket 152 is attached to the tip of the base member 151 so as to be able to swing up and down. The bucket cylinder 153 is configured to swing the bucket 152 up and down relative to the base member 151.

[0022] As shown in FIG. 3, the control unit 165 includes a main controller 165a, a traveling body controller 165b, and a boom bucket controller 165c. The control unit 165 may be connected to the caisson excavator 100 and the remote control device 12. The control unit 165 may be built into the remote control device 12. The main controller 165a is connected to the traveling body controller 165b and the boom bucket controller 165c, and receives an operation signal from the remote control device 12 to output a drive control signal corresponding to the operation signal to the traveling body controller 165b and the boom bucket controller 165c. The traveling body controller 165b is configured to drive the traveling body 110 in response to the drive control signal output from the main controller 165a. The main controller 165a and the traveling body controller 165b are disposed in the revolving frame 121 of the traveling body 110. The boom-bucket controller 165c is configured to drive the boom 130 and the bucket attachment 150 in response to a drive control signal output from the main controller 165a. The boom-bucket controller 165c is disposed on the side of the base end boom 131 of the boom 130.

[0023] As shown in Fig. 3, the caisson excavator 100 includes a traveling body position sensor 201, a slewing angle sensor 202, a boom hoisting angle sensor 203, a boom extension amount sensor 204, a bucket swing angle sensor 205, and an external sensor 206. The traveling body position sensor 201 detects where the traveling body 110 is located on the traveling rail 4. The slewing angle sensor 202 detects the slewing angle of the slewing frame 121 relative to the traveling frame 111. The boom hoisting angle sensor 203 detects the hoisting angle of the boom 130 relative to the slewing frame 121. The boom extension amount sensor 204 detects the extension amount of the boom 130. The bucket swing angle sensor 205 detects the swing angle of the bucket 152 relative to the boom 130 or the base member 151 of the bucket attachment 150. The external sensor 206 is provided on the traveling body 110 and acquires information such as the distance to the excavated ground in the working chamber 2 and the shape of the ground. In addition, the caisson excavator 100 may communicate with the remote control device 12 and the control unit 165 and transmit data acquired by each of the sensors 201 to 206 to the remote control device 12 and the control unit 165.

[0024] The running body position sensor 201 is, for example, a laser sensor arranged on the running frame 111 of the running body 110. The running body position sensor 201 irradiates a laser beam toward the end of the running rail 4 or the wall of the working room 2, and measures the time it takes for the laser beam to be reflected at the end of the running rail 4 or the wall of the working room 2 and return. The running body position sensor 201 detects the distance from the end of the running rail 4 or the wall of the working room 2 to the running body 110 based on this time. The turning angle sensor 202 is, for example, an optical rotary encoder arranged on the rotating frame 121 of the running body 110. The turning angle sensor 202 converts the amount of turning of the turning frame 121 relative to the running frame 111 into an electric signal. The turning angle sensor 202 processes the signal to detect the turning angle including the turning direction and position of the turning frame 121. Note that the running body position sensor 201 and the turning angle sensor 202 are merely examples, and other sensors that detect the two-dimensional position of the running body and other sensors that detect the turning angle of the turning frame 121 may also be used.

[0025] The boom hoist angle sensor 203 is composed of, for example, a laser sensor disposed on the side of the cylinder bottom of the hoist cylinder 134. The boom hoist angle sensor 203 shines laser light toward the revolving frame 121 and measures the time it takes for the light to be reflected by the revolving frame 121 and return. The boom hoist angle sensor 203 detects the amount of extension of the hoist cylinder 134 based on this time, and detects the hoist angle or hoist position of the boom 130 relative to the revolving frame 121 based on the amount of extension of the hoist cylinder 134. The boom hoist angle sensor 203 is merely one example, and other sensors that directly detect the hoist angle of the boom 130 using an optical rotary encoder, potentiometer, etc. may also be used.

[0026] The boom extension amount sensor 204 is configured, for example, by a laser sensor disposed on the base end boom 131 of the boom 130. The boom extension amount sensor 204 measures the time it takes for laser light to be irradiated toward the base member 151 of the bucket attachment 150 attached to the tip of the tip boom 132 and reflected by the base member 151 and returned. Based on this time, the boom extension amount sensor 204 detects the extension amount of the tip boom 132 relative to the base end boom 131 as the extension amount of the boom 130. The boom extension amount sensor 204 is also merely one example, and another sensor that directly measures the extension amount of the cable that expands and contracts along with the boom extension and contraction may be used.

[0027] The bucket swing angle sensor 205 is configured by, for example, a flow rate sensor disposed in an oil passage of the bucket cylinder 153. The bucket swing angle sensor 205 detects the flow rate of hydraulic oil supplied to the bucket cylinder 153 and calculates an integral value of the flow rate. The bucket swing angle sensor 205 determines the extension amount of the piston rod of the bucket cylinder 153 based on this flow rate integral value, and detects the swing angle or swing position of the bucket 152 relative to the base member 151 of the bucket attachment 150 or the boom 130 based on the extension amount of the bucket cylinder 153. The bucket swing angle sensor 205 is also merely one example, and other sensors that directly detect the swing angle of the bucket 152 using an optical rotary encoder, a potentiometer, or the like, or other sensors that determine the extension amount of the bucket cylinder 153 using a laser sensor may also be used.

[0028] The external sensor 206 is configured, for example, by an RGB-D sensor disposed on the revolving frame 121 of the traveling body 110. The external sensor 206 acquires an RGB image or a color image and a distance image or point cloud data of the excavated ground, and acquires distance information to the excavated ground, shape information of the excavated ground, or point cloud data of the inside of the work chamber 2 including the earth bucket 31 based on those images. The external sensor 206 may be a stereo camera, an ultrasonic range finder, a laser sensor, or the like, as other examples of the RGB-D sensor.

[0029] The information detected by the traveling body position sensor 201, the swing angle sensor 202, the boom hoisting angle sensor 203, the boom extension amount sensor 204, the bucket swing angle sensor 205, and the external sensor 206 is transmitted to the main controller 165a of the control unit 165. The main controller 165a includes a traveling body position measuring unit 211, a bucket position measuring unit 212, and a ground shape measuring unit 213.

[0030] The running body position measurement unit 211 calculates where the running body 110 is located in the work room 2 by using distance information from the end of the running rail 4 or the wall of the work room 2 detected by the running body position sensor 201 to the running body 110 and information on the position of the running rail 4 in the work room 2. The information on the position of the running rail 4 in the work room 2 is information on the running rail 4 to which the running body 110 is attached, and may be set in the running body position measurement unit 211 when the running body 110 is attached. The two-dimensional position of the running body 110 in the ceiling or the position including the orientation of the running body 110 may be detected by detecting distance information from a plurality of surrounding points by the running body position sensor 201.

[0031] The bucket position measurement unit 212 calculates the position of the bucket 152 relative to the traveling frame 111 of the traveling body 110 using the rotation angle, including the rotation direction and position of the rotating frame 121 relative to the traveling frame 111, detected by the rotation angle sensor 202, the hoisting angle or hoisting position of the boom 130 relative to the rotating frame 121, detected by the boom hoisting angle sensor 203, the extension amount of the boom 130 detected by the boom extension amount sensor 204, and the swing angle or swing position of the bucket 152 relative to the boom 130, detected by the bucket swing angle sensor 205.

[0032] The ground shape measurement unit 213 uses the position of the running body 110 within the work chamber 2 determined by the running body position measurement unit 211 and the rotation angle including the rotation direction and position of the rotating frame 121 relative to the running frame 111 detected by the rotation angle sensor 202 to calculate the position of the external sensor 206 provided on the rotating frame 121, the direction in which distance information is obtained by the external sensor 206, and the position of the excavated ground surface from which distance information is obtained by the external sensor 206.

[0033] Next, the material shaft 23 and the earth bucket 31 will be described with reference to Fig. 4. Fig. 4 is a diagram showing the material shaft. The material shaft 23 includes a material lock 24, a first sensor 90 provided between the material lock 24 and the ground T, a second sensor 91 provided between the ceiling 2a of the work chamber 2 and the material lock 24, and a third sensor 92 provided on the ceiling 2a of the work chamber 2.

[0034] The first sensor 90, the second sensor 91, and the third sensor 92 are sensors for detecting the earth bucket 31 that has passed through the material shaft 23. The first sensor 90, the second sensor 91, and the third sensor 92 may be sensors for reading information from the small recording medium 34, for example. The first sensor 90, the second sensor 91, and the third sensor 92 may be sensors using a non-contact type automatic recognition technology that reads information via radio waves from a tag or a card-shaped small recording medium in which an IC and a small antenna are incorporated. The first sensor 90, the second sensor 91, and the third sensor 92 may be loop coil sensors. The loop coil sensor is a sensor that can detect metals without contact by detecting an inductance that changes when a metal enters a magnetic field generated by a current flowing through a looped coil. The first sensor 90, the second sensor 91, and the third sensor 92 may be optical sensors using a laser or the like. The first sensor 90, the second sensor 91, and the third sensor 92 are not limited to this, and any sensor that can detect metals without contact may be used.

[0035] The first sensor 90 is provided between the material lock 24 and the ground T. The first sensor 90 may also be provided, for example, at the entrance 23a of the material shaft 23. The first sensor 90 may also be provided, for example, between the entrance 23a of the material shaft 23 and the material lock 24. The second sensor 91 is provided between the ceiling 2a of the work room 2 and the material lock 24. The second sensor 91 may also be provided, for example, at the exit of the material lock 24 in the underground G direction. The second sensor 91 may also be provided near the lower door 27 described later. The third sensor 92 is provided on the ceiling 2a of the work room 2. The third sensor 92 may also be provided between the slab pressure M of the ceiling 2a of the work room 2.

[0036] The distance between the lifting start point P of the earth bucket 31 and the first sensor 90 is defined as the rock-to-traverse start point distance, the distance between the first sensor 90 and the second sensor 91 is defined as the upper and lower material rock distance, the distance between the second sensor 91 and the third sensor 92 is defined as the rock-slab distance, and the distance from the third sensor 92 to the ground is defined as the slab-ground distance. The lengths between the rock-to-traverse start point distance, the upper and lower material rock distance, and the slab-ground distance are fixed. The length between the rock-to-slab distance varies depending on the process of the pneumatic caisson construction method.

[0037] 5 is a diagram showing the carry-in entrance 23a of the material shaft 23. As shown in FIG. 5, the material shaft 23 includes the carry-in entrance 23a and a ground sensor 93. The carry-in entrance 23a is an entrance provided on the ground for carrying the earth bucket 31 into the material shaft 23.

[0038] The ground sensor 93 is a sensor provided on the ground to detect bucket position information and entrance position information indicating the respective positions of the earth bucket 31 and the entrance 23a of the material shaft 23. The ground sensor 93 may be, for example, a LiDAR (Light Detection And Ranging) sensor. The ground sensor 93 may also be a camera. A plurality of ground sensors 93 may be provided so that the angles at which the earth bucket 31 and the entrance 23a of the material shaft 23 are imaged are different. The LiDAR (Light Detection And Ranging) sensor is a sensor that irradiates an object with light using near-infrared light, visible light, or ultraviolet light, captures the reflected light with an optical sensor, and measures the distance.

[0039] The carrier device 32 also includes the earth bucket 31, a wire 38 for suspending the earth bucket 31, and a reel 39 for controlling the length of the wire 38. The reel 39 controls the length of the wire 38 by winding up or down the wire 38 in response to a signal sent from the remote control device 12, for example.

[0040] The earth bucket 31 includes a chain 36 on the bottom surface and an anchor 37 provided at the tip of the chain 36. As shown in FIG. 6(a), the earth bucket 31 includes a temple 40 on the upper surface 31a of the earth bucket 31 and a wire 38 provided on the temple 40. The connection point between the temple 40 and the earth bucket 31 is defined as a fulcrum A. The connection point between the temple 40 and the wire 38 is defined as a fulcrum B. A point on the wire 38 is defined as a fulcrum C. The range E included in the angle θ from the center point D of the upper surface 31a of the earth bucket 31 to the fulcrum B is defined as a shovel-prohibited range. The angle θ may be any value, but the angle θ may be set so that, for example, the length of the arc of the outer periphery of the upper surface 31a of the earth bucket 31 included in the range E is greater than the dimensions of the bucket 152. The shovel no-entry range indicates a range in which the bucket 152 is prohibited from entering when the caisson shovel 100 loads earth into the earth bucket 31.

[0041] FIG. 7 is a diagram showing the material lock 24. The material lock 24 is provided with an airtight door having a double door structure of an upper door 26 and a lower door 27 for adjusting the pressure difference between the atmospheric pressure on the ground T and the pressure inside the work chamber 2. The material lock 24 may be provided with a material sensor 95 for detecting the earth bucket 31 carried into the material lock 24. The material lock 24 may also be provided with two or more material sensors 95 so that the interval b between the material sensors 95 is smaller than the height a of the side of the earth bucket 31. The material sensor 95 is a sensor for detecting the earth bucket 31 carried into the material lock 24. The material sensor 95 may be a sensor for reading information from, for example, a small recording medium 34. The material sensor 95 may be a sensor using a non-contact automatic recognition technology that reads information via radio waves from a tag or a card-shaped small recording medium incorporating an IC and a small antenna. The material sensor 95 may also be a loop coil sensor. The material sensor 95 may also be an optical sensor using a laser or the like. Furthermore, the material sensor 95 is not limited to this, and any sensor capable of detecting metal in a non-contact manner may be used.

[0042] 8 is a diagram showing the loading of soil and sand in the earth bucket 31. The work chamber 2 may be equipped with a work chamber sensor 94 for acquiring loading information indicating the loading state of the earth bucket 31, for example. The work chamber sensor 94 may be, for example, a LiDAR (Light Detection And Ranging) sensor. The work chamber sensor 94 may also be a camera.

[0043] FIG. 9 is a diagram showing the wire fixing device 240. The wire fixing device 240 includes two or more slide rails 241 arranged in the opening 23b of the material shaft 23 on the ceiling 2a side of the work chamber 2, and a slide bar 242 that is installed on the two or more slide rails 241 and can move on the slide rails 241. The wire fixing device 240 may be arranged at any position of the material shaft 23. The slide rails 241 are rails that are installed on the ceiling 2a of the work chamber 2 so as to form a pair on the left and right, for example. The two or more slide rails 241 may be arranged to surround the opening 23b and be parallel to each other, but this is not limited to this. The two or more slide rails 241 may be arranged side by side so as to sandwich the opening 23b. The slide bar 242 is installed on the two or more slide rails 241 and is arranged so as to straddle the opening 23b. For example, the slide bar 242 travels along the slide rails 241 while being suspended from the two or more slide rails 241. The slide bar 242 may be connected to the slide rail 241 by engaging a small-diameter circular gear (not shown) provided on the slide bar 242 such as a rack and pinion with a rack (not shown) having teeth cut into a flat bar provided on the slide rail 241. The slide bar 242 may be made to travel to any position on the slide rail 241 using, for example, a motor (not shown). The slide bar 242 may be attached to the slide rail 241 so that the wire 38 for suspending the earth bucket 31 passing through the opening 23b can be pushed in and fixed.

[0044] Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Fig. 10 is a block diagram showing the overall configuration of an earth bucket automatic lifting system 6 to which the present invention is applied. The earth bucket automatic lifting system 6 detects the position of an earth bucket 31 used in a pneumatic caisson construction method. The earth bucket automatic lifting system 6 includes the above-mentioned first sensor 90, second sensor 91, third sensor 92, ground sensor 93, work chamber sensor 94, material sensor 95, remote control device 12 that acquires information detected by various sensors, and reel 39 that controls wire 38 according to a signal transmitted from remote control device 12.

[0045] The remote control device 12 is configured with electronic devices such as a personal computer (PC), but may be embodied by any other electronic devices such as a mobile phone, a smartphone, a tablet terminal, a wearable terminal, etc., other than a PC. The remote control device 12 may calculate the position of the earth bucket 31 based on data input from various sensors. The remote control device 12 has the functions of an acquisition unit 80, a calculation unit 81 connected to the acquisition unit 80, and a control unit 82 and a presentation unit 83 connected to the calculation unit 81.

[0046] The acquisition unit 80 acquires information detected from various sensors. The acquisition unit 80 acquires, for example, detection information detected from a first sensor 90, a second sensor 91, and a third sensor 92. The acquisition unit 80 may also acquire load information related to the load associated with the wire 38 measured by the load meter 35. The acquisition unit 80 may acquire, for example, bucket position information and entrance position information indicating the respective positions of the earth bucket 31 and the entrance 23a of the material shaft 23 detected by a ground sensor 93. The acquisition unit 80 may acquire, for example, image information and first point cloud data from a work chamber sensor 94. The acquisition unit 80 may also acquire detection information from a material sensor 95. The acquisition unit 80 may also acquire various information input by a user who uses the earth bucket automatic lifting system 6. The acquisition unit 80 outputs the acquired various data to the calculation unit 81.

[0047] The calculation unit 81 calculates position information indicating the position of the earth bucket 31 based on the various information input from the acquisition unit 80. The calculation unit 81 outputs the calculated position information to the control unit .

[0048] The control unit 82 controls the reel 39 based on the position information input from the calculation unit 81. The control unit 82 may output a control signal to the reel 39. The control unit 82 may also control the caisson shovel 100, the material lock 24, the wire fixing device 240, and other components.

[0049] Next, the operation of the automatic earth bucket lifting system 6 to which the present invention is applied will be described with reference to FIG. 11. FIG. 11(a) is a flowchart of the operation of carrying the earth bucket 31 of the automatic earth bucket lifting system 6 to which the present invention is applied into the working chamber 2. FIG. 11(b) is a flowchart of the operation of carrying the earth bucket 31 of the automatic earth bucket lifting system 6 to which the present invention is applied to the ground T. As shown in FIG. 11(a), when carrying the earth bucket 31 into the working chamber 2, first, in step S10, the ground sensor 93 detects the earth bucket 31 at the lifting start point P. The ground sensor 93 detects bucket position information and entrance position information indicating the respective positions of the earth bucket 31 to be carried into the material shaft 23 and the entrance 23a of the material shaft 23. The bucket position information is information indicating the position of the earth bucket 31 on the ground T. The bucket position information may be point cloud data including the earth bucket 31 detected by, for example, a LiDAR sensor. The point cloud data is data configured of a point cloud indicating coordinates in a three-dimensional space. The point cloud data is data consisting of a point cloud indicating distance information from the position of the sensor to the acquisition target, for example. The bucket position information may be an image captured by a camera, for example. The carry-in entrance position information is information indicating the position of the carry-in entrance 23a of the material shaft 23. The carry-in entrance position information may be point cloud data including the carry-in entrance 23a detected by a LiDAR sensor, for example. The carry-in entrance position information may also be an image captured by a camera, for example. In such a case, the carry-in entrance position information may be information indicating the position of the carry-in entrance 23a in a three-dimensional space calculated based on images captured by a plurality of cameras provided so that the angles at which the earth bucket 31 and the carry-in entrance 23a of the material shaft 23 are captured are different. The ground sensor 93 transmits the detected information to the acquisition unit 80.

[0050] Next, in step S11, the acquisition unit 80 acquires the bucket position information and the carry-in entrance position information transmitted from the ground sensor 93. The acquisition unit 80 outputs the acquired bucket position information and the carry-in entrance position information to the calculation unit 81.

[0051] Next, in step S12, the calculation unit 81 determines whether the earth bucket 31 can be carried into the carry-in entrance 23a based on the bucket position information and the carry-in entrance position information transmitted from the acquisition unit 80. For example, when the bucket position information is point cloud data including the earth bucket 31, the calculation unit 81 first extracts a point cloud indicating the earth bucket 31 from the point cloud data. In this case, the point cloud indicating the earth bucket 31 is extracted using a mathematical model consisting of a set of coordinates that satisfy an equation indicating the side surface of a cylinder in a three-dimensional space.

[0052] The mathematical model will be described with reference to FIG. 12. The mathematical model is a model consisting of a set of coordinates that satisfy an equation that indicates the side of a cylinder in a three-dimensional space. As shown in FIG. 12, a cylinder having a bottom surface parallel to the xy plane in a three-dimensional space of perpendicularly intersecting xyz axes and having the origin as the center of the bottom surface is defined as a reference cylinder 220. When a three-dimensional space with the xyz axes as its axes is rotated by a pitch rotation (rotation on the y axis) by an angle θ and then rotated by a roll rotation (rotation on the x axis) by an angle φ, the changes in the x, y, and z axes are defined as the x', y', and z' axes, respectively. Yaw rotation (rotation on the z axis) does not change even if the cylinder is rotated, so it is not necessary to consider it. In a three-dimensional space with perpendicularly intersecting x', y', and z' axes, a cylinder having a bottom surface parallel to the x'y' plane and a point translated by X, Y, and Z in the x direction, y direction, and z direction from the above-mentioned origin, respectively, is defined as the center of the bottom surface. The cylinder is called a generalized cylinder 221.

[0053] The mathematical model is a set of coordinates that satisfy a fundamental equation for the side of the reference cylinder 220, for example, Equation 1.

number

[0054] r is a constant representing the radius of the earth bucket 31 to be recognized, and h is a constant representing the axial length of the earth bucket 31 described above.

[0055] A point (x', y', z') on the generalized cylinder 221 is expressed as in Equation 2 using a point (x, y, z) on the reference cylinder 220.

number

[0056] The point (x', y', z') on this generalized cylinder 221 is assumed to be coordinate data, and the coordinate data is translated in the x, y, and z directions, the coordinate axes are rotated, and the position and orientation of the earth bucket 31 in three-dimensional space is determined by comparing it with the above-mentioned mathematical model.

[0057] The mathematical model expressed by this formula 1 and the coordinate data of the point (x p , y p , z p ) in the procedure shown in FIG. 13, the position and orientation of the earth bucket 31 in the three-dimensional space are recognized. The recognition of the earth bucket 31 is performed by, for example, using the equation 3 showing the error function, p , y p , z p ) and the mathematical model, and find the five variables X, Y, Z, θ, and φ that minimize the error E when they are overlaid.

number

[0058] Specifically, in step S110, the five coordinates X, Y, Z, θ, and φ are The variables are set as temporary variables, and then in step S111, an error E is calculated using the temporary variables and Equation 3, for example, as described above.

[0059] Next, in step S112, the temporary variables are corrected based on the error E calculated earlier so that the error E becomes smaller. After the temporary variables are corrected in step S112, the process returns to step S110 again, and the error E is calculated in step S111. By repeating the above procedure, temporary variables that minimize the error E are calculated. The temporary variables when the error is smallest may be used as the position and orientation of the earth bucket 31 in the three-dimensional space.

[0060] For example, if the error E is calculated as in Equation 4, the minimum error E is the temporary variable corrected the tth time, so the temporary variable corrected the tth time may be used as the position and orientation of the earth bucket 31 in the three-dimensional space. For example, when the error E is minimum, the temporary variables are X = Y = Z = 2 cm, θ = φ = 5 deg, then the earth bucket 31 can be determined to be in a position and orientation in three-dimensional space that is rotated 5 deg in pitch and 5 deg in roll from the state of the reference cylinder 220, with the center of its bottom surface being a position that is shifted 2 cm in each of the x, y, and z directions from the reference point.

number

[0061] To calculate the minimum error E, for example, in Equation 5, the first temporary variable is X=Y=Z. =θ=φ=0, and the calculation may be performed using the steepest descent method with the error E as the objective function. In addition, in formula 5, as a method of calculating Z, for example, the lowest point of the coordinate data may be set to 0, and Z may be estimated from θ=φ. Also, for example, when θ=0, Z may be estimated because Z=rcosφ.

number

[0062] In addition, since the mathematical model and the earth bucket 31 are cylindrical, yaw rotation can be ignored, and the calculation time required for repeated calculations can be shortened.

[0063] In addition, since the earth bucket 31 is suspended from the wire 38, pitch rotation and roll rotation hardly occur, and therefore the initial posture can be easily estimated, thereby shortening the calculation time required when performing repeated calculations.

[0064] In addition, since the earth bucket 31 is suspended by the wire 38, it can be inferred that the earth bucket 31 is directly below the wire 38. Therefore, the initial posture of the X and Y translations is Since it is easy to estimate, the calculation time required for repeated calculations can be shortened.

[0065] For the reasons described above, it is necessary to recognize and accurately estimate the bottom or top surface of the earth bucket only in the Z direction. In this case, by estimating the point with the highest z coordinate among the coordinate data as the top surface of the earth bucket 31, the calculation time required for repeated calculations can be shortened.

[0066] The above calculation method involves repeatedly calculating five degrees of freedom consisting of five variables: X, Y, Z, θ, and φ. Since it is necessary to perform multiple calculations, it is expected that the calculations will take time, but these methods can significantly speed up the calculations. As a result, the point cloud indicating the earth bucket 31 can be extracted from the point cloud data.

[0067] Furthermore, in step S12, for example, when the carry-in entrance position information is point cloud data including the carry-in entrance 23a, the calculation unit 81 extracts a point cloud indicating the carry-in entrance 23a from the point cloud data. In this case, similar to the extraction of the earth bucket 31 from the point cloud data, the calculation unit 81 extracts a point cloud indicating the carry-in entrance 23a using a mathematical model consisting of a set of coordinates that satisfy an equation indicating the side surface of a cylinder in a three-dimensional space.

[0068] The xy coordinates of the point cloud representing the earth bucket 31 extracted by the above-mentioned method are compared with the point cloud representing the delivery entrance 23a, and if the xy coordinates of the point cloud representing the earth bucket 31 are included in the xy coordinates of the point cloud representing the delivery entrance 23a, it is determined that the earth bucket 31 can be delivered.

[0069] Furthermore, in step S12, when the bucket position information is a plurality of images including the earth bucket 31, the calculation unit 81 determines the position of the earth bucket 31 from the plurality of images. In this case, the position of the earth bucket 31 is determined from images captured by cameras provided at different angles for capturing images of the earth bucket 31 and the entrance 23a of the material shaft 23, and when the position is within a preset reference position, it is determined that the earth bucket 31 can be brought in.

[0070] If it is determined in step S12 that the earth bucket 31 can be delivered, the control unit 82 sends a control signal to the reel 39 to wind down the wire 38. This makes it possible to automatically and safely deliver the earth bucket 31.

[0071] Next, in step S13, the first sensor 90 detects the earth bucket 31. The first sensor 90 transmits the detected detection information to the acquisition unit 80. The detection information is information on the detection of the earth bucket 31 by any of the first sensor 90, the second sensor 91, the third sensor 92, etc. The detection information may include, for example, number information on the number of times the earth bucket 31 has passed through the material shaft 23. The detection information may include, for example, time information on the time when the earth bucket 31 was detected by any of the first sensor 90, the second sensor 91, or the third sensor 92. The detection information may include, for example, identification information for identifying the earth bucket 31. The number information may be, for example, information on the number of times the earth bucket 31 was detected by any of the first sensor 90, the second sensor 91, or the third sensor 92. The time information may be, for example, information on the order in which the earth bucket 31 was detected by any of the first sensor 90, the second sensor 91, or the third sensor 92. The identification information may be, for example, information of an identification number given to each earth bucket 31. The identification information may also be empty load information indicating that the inside of the earth bucket 31 is empty.

[0072] Next, in step S14, the earth bucket 31 is carried into the material lock 24. In step S14, the acquisition unit 80 outputs the detection information transmitted in step S13 to the calculation unit 81. The calculation unit 81 calculates position information indicating the position of the earth bucket 31 based on the output detection information. The position information is information indicating the position of the earth bucket 31, and may be, for example, information indicating that the earth bucket 31 is on the ground T. The position information may be, for example, information indicating that the earth bucket 31 is between the upper and lower material locks. The position information may be, for example, information indicating that the earth bucket 31 is between the rock and the slab. The position information may be, for example, information indicating that the earth bucket 31 is between the slab and the ground. The position information may be, for example, information indicating that the earth bucket 31 is at the position of any one of the first sensor 90, the second sensor 91, or the third sensor 92. The calculation unit 81 outputs the calculated position information to the control unit 82.

[0073] The control unit 82 controls the reel 39 based on the position information output from the calculation unit 81. In this case, when the position information indicates that the position is the position of the first sensor 90, the control unit 82 controls the reel 39 to wind down by a preset length. The control unit 82 may also control the reel 39 based on the position information output from the calculation unit 81 and progress information indicating the progress of the earth bucket 31. The progress information is, for example, information indicating the destination position of the earth bucket 31. The destination position is, for example, the ground T or the work chamber 2. When the progress information indicates that the work chamber 2 is the destination position and the position information indicates that the position is the position of the first sensor 90, the control unit 82 controls the reel 39 to wind down by a preset length. The control unit 82 may acquire progress information input by, for example, a user using the earth bucket automatic lifting system 6. By step S14, it becomes possible to automatically transport the earth bucket 31 to a specific position of the material lock 24.

[0074] The control unit 82 may also control the reel 39 based on material lock information related to the state of the material lock 24. The material lock information is, for example, information related to the air pressure inside the material lock 24. The material lock information is, for example, information related to the open / closed state of the upper door 26 and the lower door 27. When the control unit 82 receives material lock information indicating that the upper door 26 is open and the lower door 27 is closed, the control unit 82 may control the reel to transport the earth bucket 31 into the material lock 24. The control unit 82 may also obtain the material lock information from information detected by, for example, a sensor, a camera, a barometer measuring the air pressure inside the material lock 24, or the like (not shown) provided in the material lock 24. The control unit 82 may also obtain the material lock information from information on the air pressure detected by, for example, a barometer (not shown) provided in the material lock 24. The control unit 82 may also obtain the material lock information from, for example, information on the upper door 26 and the lower door 2 detected by, for example, a camera or a sensor (not shown) provided in the material lock 24. The control unit 82 may obtain material lock information indicating whether the upper door 26 and the lower door 2 are fully open or fully closed from information detected by a distance sensor (not shown) provided in a drive mechanism (not shown) of the upper door 26 and the lower door 2 of the material lock 24. This makes it possible to automatically perform an appropriate operation according to the state of the material lock.

[0075] The control unit 82 may also calculate position information indicating the position of the earth bucket based on the detection information, and control the opening and closing of the upper door 26 or the lower door 27 of the material lock 24 based on the position information. The control unit 82 may also control the reel 39 and the material lock 24 to transport the earth bucket 31 into and out of the material lock 24 based on the material lock information and detection information in which the earth bucket 31 is detected by the material sensor 95. In this case, as shown in FIG. 14, for example, the control unit 82 first opens the upper door 26 in step S41 based on the material lock information if the upper door 26 is closed. In this case, the control unit 82 may control the upper door 26 to be opened if the lower door 27 is closed.

[0076] Next, in step S42, the control unit 82 lowers the reel 39 and carries the earth bucket 31 into the material lock 24. In addition, in step S42, if the material sensor 95 is not provided in the material lock 24, the control unit 82 may lower the reel 39 by a preset fixed length.

[0077] Next, in step S43, the acquisition unit 80 acquires detection information indicating that the material sensor 95 has detected the earth bucket 31, the calculation unit 81 calculates position information based on the detection information acquired by the acquisition unit 80, and the control unit 82 controls the reel 39 to stop operating based on the calculated position information. In this case, when two or more material sensors 95 are provided, the control unit 82 may control the reel 39 to wind down until two or more material sensors 95 simultaneously detect the earth bucket 31. This makes it possible to automatically stop the earth bucket 31 at a specific position within the material lock 24.

[0078] Next, in step S44, the acquisition unit 80 may acquire detection information indicating that the material sensor 95 detects the earth bucket 31, the calculation unit 81 may calculate position information based on the detection information acquired by the acquisition unit 80, and the control unit 82 may control the opening and closing of the upper door 26 or the lower door 27 of the material lock 24 based on the calculated position information. In this case, for example, the acquisition unit 80 may acquire detection information indicating that the material sensor 95 detects the earth bucket 31, the calculation unit 81 may calculate position information indicating that the earth bucket 31 is inside the material lock 24 based on the detection information acquired by the acquisition unit 80, and the control unit 82 may control the upper door 26 to be closed based on the position information calculated by the calculation unit 81. In addition, at this time, the acquisition unit 80 may acquire material lock information indicating that the upper door 26 is closed based on a control signal sent from the control unit 82 to the material lock 24. This makes it possible to calculate the position of the earth bucket 31 inside the material lock 24. In addition, it is possible to automate the control of the appropriate opening and closing of the door of the material lock 24 according to the position of the earth bucket 31.

[0079] Also, in step S44, the acquisition unit 80 may acquire each of the detection information indicating that the two or more material sensors 95 have detected the earth bucket 31, the calculation unit 81 may calculate the position information based on each of the detection information acquired by the acquisition unit 80, and the control unit 82 may control the opening and closing of the upper door 26 or the lower door 27 of the material lock 24 based on the calculated position information. In this case, for example, the acquisition unit 80 may acquire each of the detection information indicating that the two or more material sensors 95 have detected the earth bucket 31, the calculation unit 81 may calculate the position information indicating that the earth bucket 31 is in a position in the material lock 24 where it is detected by the two or more material sensors 95 based on each of the detection information acquired by the acquisition unit 80, and the control unit 82 may control to close the upper door 26 based on the position information calculated by the calculation unit 81. This makes it possible to calculate the position of the earth bucket 31 in the material lock 24 with higher accuracy.

[0080] In step S44, the two or more material sensors 95 acquire respective detection information of the detection of the earth bucket 31, the calculation unit 81 calculates position information and passing direction information regarding the direction in which the earth bucket 31 passes through the material lock 24 based on the respective detection information acquired by the acquisition unit 80, and the control unit 82 may control the opening and closing of the upper door 26 or the lower door 27 of the material lock 24 based on the calculated position information and passing direction information. The passing direction information is information indicating the direction in which the earth bucket 31 passes, for example, information indicating that the passing direction of the earth bucket 31 is the direction of the work chamber 2 or the direction of the ground T. In this case, for example, the acquisition unit 80 acquires respective detection information indicating that the two or more material sensors 95 detect the earth bucket 31, and the calculation unit 81 calculates the order in which the two or more material sensors 95 detected the earth bucket 31 based on the time at which the earth bucket 31 was detected indicated by the respective detection information acquired by the acquisition unit 80, and calculates passing direction information indicating that the passing direction of the earth bucket 31 is the direction of the work chamber 2 from the calculated order. The control unit 82 may obtain the material lock information from information on air pressure detected by, for example, a barometer (not shown) provided in the material lock 24. The control unit 82 may obtain the material lock information from information on the upper door 26 and the lower door 2 detected by, for example, a camera or sensor (not shown) provided in the material lock 24. The control unit 82 may obtain the material lock information indicating whether the upper door 26 and the lower door 2 are fully open or fully closed from information detected by, for example, a distance sensor (not shown) provided in a drive mechanism (not shown) of the upper door 26 and the lower door 2 of the material lock 24. The control unit 82 controls the material lock 24 to close the upper door 26 based on the position information and the passing direction information. This makes it possible to automatically calculate the passing direction of the earth bucket 31, so that appropriate control according to the passing direction can be automatically performed.

[0081] Furthermore, in step S44, the control unit 82 closes the upper door 26 and controls the air pressure in the material lock 24 so that the air pressure in the material lock 24 becomes the working air pressure, which is the air pressure in the work chamber 2. In this case, the control unit 82 may control the air pressure in the material lock 24 when detection information indicating that the material sensor 95 has detected the earth bucket 31 and material lock information indicating that the upper door 26 and the lower door 27 are closed are input. At this time, the acquisition unit 80 may acquire material lock information indicating that the air pressure in the material lock 24 is the working air pressure, based on the control signal sent from the control unit 82 to the material lock 24.

[0082] Next, in step S45, the control unit 82 controls the material lock 24 to open the lower door 27. In this case, when the control unit 82 receives material lock information indicating that the upper door 26 and the lower door 27 are closed, the control unit 82 may control the material lock 24 to open the lower door 27. Also, in step S45, the control unit 82 may control the lower door 27 to open based on the material lock information indicating that the air pressure inside the material lock 24 is the working air pressure and the passing direction information calculated in step S44.

[0083] Next, in step S46, the control unit 82 controls the reel 39 to transport the earth bucket 31 out of the material lock 24. By performing the above-mentioned steps S41 to S46, the operation of transporting the earth bucket 31 into and out of the material lock 24 is completed. This makes it possible to automatically transport the earth bucket 31 into and out of the material lock 24.

[0084] Next, in step S15, the second sensor 91 detects the earth bucket 31. In step S46, the earth bucket 31 is transported out of the material lock 24, the pressure is adjusted within the material lock 24, and then the reel 39 is wound down and reaches the position of the second sensor 91, whereupon the second sensor 91 detects the earth bucket 31. The second sensor 91 transmits the detected detection information to the acquisition unit 80.

[0085] Next, in step S16, the acquisition unit 80 outputs the detection information transmitted in step S15 to the calculation unit 81. The calculation unit 81 calculates position information based on the output detection information. The calculation unit 81 outputs the calculated position information to the control unit 82.

[0086] The control unit 82 controls the reel 39 based on the position information output from the calculation unit 81. In this case, when the position information indicates the position of the second sensor 91, the control unit 82 controls the reel 39 to wind down the wire 38 until the earth bucket 31 is detected by the third sensor 92. The control unit 82 may also control the reel 39 based on the position information and progress information output from the calculation unit 81. When the progress information indicates that the working chamber 2 is the target position and the position information indicates the position of the second sensor 91, the control unit 82 controls the reel 39 to wind down the wire 38 until the earth bucket 31 is detected by the third sensor 92.

[0087] Next, in step S17, the landing control of the earth bucket 31 is performed. In this case, the third sensor 93 first detects the earth bucket 31 that has been wound down in step S16. The third sensor 93 transmits the detected detection information to the acquisition unit 80, and the acquisition unit 80 outputs the output detection information to the calculation unit 81. The calculation unit 81 calculates position information based on the output detection information. The calculation unit 81 outputs the calculated position information to the control unit 82. The control unit 82 controls the reel 39 based on the position information output from the calculation unit 81. In this case, when the position information indicates the position of the third sensor 92, the control unit 82 controls the reel 39 so as to wind down the wire 38 by a preset length. The control unit 82 may also control the reel 39 based on the position information and progress information output from the calculation unit 81. When the progress information indicates that the working chamber 2 is the destination position and the position information indicates that it is the position of the third sensor 92, the control unit 82 controls the reel 39 to wind down the wire 38 by a preset length.

[0088] The control unit 82 may also control the reel 39 based on the load information and position information transmitted from the load meter 35. When the position information indicates the position of the third sensor 92, the control unit 82 may control the reel 39 to wind down the wire 38 until the load on the wire 38 indicated by the load information becomes equal to or less than a threshold value. The control unit 82 may also control the reel 39 based on the load information transmitted from the load meter 35. When the load indicated by the load information transmitted from the load meter 35 becomes equal to or less than a reference value, for example, the control unit 82 may control the reel 39 to wind up the wire 38 by a preset length and then to wind it down again. This makes it possible to automatically and appropriately respond even if the earth bucket 31 gets caught during winding down.

[0089] Furthermore, when the position information indicates the position of the third sensor 92, the control unit 82 may slow down the speed at which the reel 39 winds down the wire 38.

[0090] Also, the control unit 82 may control the wire fixing device 240 in step S17. In this case, for example, as shown in FIG. 16(a), the control unit 82 may run the slide bar 242 in the direction of S1 to fix the wire 38 at the position of the opening 23b of the material shaft 23. Also, the control unit 82 may control the slide bar 242 based on the detection information detected in step S16. In this case, for example, when the control unit 82 acquires detection information indicating that the earth bucket 31 detected in step S16 has been detected by the third sensor 92, the control unit 82 may control the slide bar 242 in the direction of S1. This makes it possible to tilt the vine 40 of the earth bucket 31 in a specific direction. Therefore, since it is possible to bias the vine 40 and the wire 38 in a specific direction, it is possible to prevent the caisson shovel 100 and the wire 38 from colliding with each other when the earth bucket 31 is loaded with sand by the caisson shovel 100.

[0091] By carrying out each of the above-mentioned steps, the operation of carrying the earth bucket 31 into the working chamber 2 is completed. This makes it possible to carry the earth bucket 31 into the working chamber 2 automatically and safely.

[0092] Next, the operation of loading earth and sand into the earth bucket 31 will be described. The automatic earth bucket lifting system 6 may generate trajectory information indicating the trajectory of the caisson excavator 100 loading earth and sand into the earth bucket 31, as shown in FIG. 15. In this case, first, in step S30, the work chamber sensor 94 detects first point cloud data in the work chamber 2 including the earth bucket 31. The first point cloud data is data consisting of a cloud of points in the work chamber 2 including the earth bucket. The work chamber sensor 94 transmits the first point cloud data to the acquisition unit 80.

[0093] Next, in step S31, the acquisition unit 80 acquires the first point cloud data. The acquisition unit 80 outputs the transmitted first point cloud data to the calculation unit 81.

[0094] Next, in step S32, the calculation unit 81 extracts second point cloud data indicating the earth bucket 31 in the work chamber 2 from the output first point cloud data. The second point cloud data is data consisting of a point cloud indicating the earth bucket 31. The calculation unit 81 may also calculate the position of the earth bucket 31 from the second point cloud data.

[0095] Next, in step S33, the calculation unit 81 extracts third point cloud data indicating the wire 38 provided on the earth bucket 31. The third point cloud data is data consisting of a point cloud indicating the wire 38. In this case, the calculation unit 81 may set the point cloud on the straight line in the first point cloud data extracted in step S31 as the third point cloud data. The calculation unit 81 may also set the point cloud on the straight line located at a distance within a threshold from the earth bucket 31 indicated by the second point cloud data extracted in step S32 as the third point cloud data. The calculation unit 81 may also set the point cloud whose difference from the estimated straight line 230 shown in FIG. 6(b) is equal to or less than a threshold as the third point cloud data. The estimated straight line 230 is a model consisting of a set of coordinates that satisfy an equation indicating a straight line in a three-dimensional space.

[0096] Furthermore, in step S33, the calculation unit 81 may extract fourth point cloud data indicating the vine 40 of the earth bucket 31 based on the second point cloud data extracted in step S32, and may extract third point cloud data based on the extracted fourth point cloud data. In this case, the calculation unit 81 may extract point cloud data that matches or approximates a preset model of the matching shape 231 from the second point cloud data as the fourth point cloud data. The model of the matching shape 231 is a model consisting of a set of coordinates that satisfy an equation indicating the vine 40 in a three-dimensional space. In this case, the point cloud data may be extracted using, for example, RANSAC (Random Sample Consensus) or the like.

[0097] In step S33, third point cloud data may be extracted based on the extracted fourth point cloud data. In this case, point cloud data that satisfies estimated straight line 230 adjacent to the fourth point cloud data may be extracted as the third point cloud data. Also, from each point cloud data, the contact point between upper surface 31a of earth bucket 31 and temple 40 may be extracted as fulcrum A, the contact point between temple 40 and wire 38 may be extracted as fulcrum B, and the upper end of wire 38 may be extracted as fulcrum C.

[0098] Next, in step S34, loading information indicating the loading state of the earth bucket 31 is calculated based on the first point cloud data acquired in step S31 and the second point cloud data extracted in step S32. The calculation unit 81 may extract point cloud data indicating the load loaded inside the earth bucket 31 by, for example, deleting the extracted second point cloud data from the first point cloud data, and may acquire loading information indicating the load amount based on the point cloud data indicating the extracted load. The loading information is information indicating the loading state of the earth bucket 31, and may be information indicating, for example, the amount of earth and sand loaded inside the earth bucket 31.

[0099] Next, in step S35, based on the loading information calculated in step S34, it is determined whether or not earth and sand can be loaded into the earth bucket 31. In this case, the calculation unit 81 determines that loading is possible when the amount or height of earth and sand indicated by the loading information is equal to or less than a reference value, and determines that loading is not possible when the amount or height is equal to or more than the reference value.

[0100] Next, in step S36, wire position information indicating the position of the wire is calculated based on the third point cloud data extracted in step S33. The wire position information is information indicating the position of the wire 38 in three-dimensional space. The wire position information may also be information indicating the relative position of the wire 38 with respect to the earth bucket 31. The wire position information may also be information indicating whether the wire 38 is on the direction x side of the fulcrum A or on the opposite side of the direction x, as shown in FIG. 6(b). In step S36, the presentation unit 83 may also present each piece of information, such as the wire position information, to the user.

[0101] Next, in step S37, direction information indicating a direction in which the caisson shovel 100 in the working chamber 2 can load earth and sand into the earth bucket 31 is calculated based on the third point cloud data. The direction information may be information indicating that the caisson shovel 100 can load earth and sand into the earth bucket 31 from the direction x, as shown in FIG. 6(b), for example. In such a case, for example, the calculation unit 81 may calculate wire position information based on the third point cloud data, and calculate the direction information based on the calculated wire position information. For example, when the wire position information indicates that the wire 38 is on the direction x side of the fulcrum A, the calculation unit 81 may calculate direction information indicating that loading is possible in the direction x. Also, in step S37, the presentation unit 83 may present each piece of information such as the direction information to the user. This makes it possible to automatically load earth and sand into the earth bucket 31 without contacting the wire 38 with the caisson shovel 100.

[0102] Next, in step S38, based on the direction information calculated in step S37, trajectory information is generated that indicates the trajectory of the caisson shovel 100 loading earth and sand into the earth bucket 31. The trajectory information may be, for example, information that indicates the trajectory of the bucket 152 of the caisson shovel 100. The trajectory information may also be information that indicates the operation of each component of the caisson shovel 100, such as the traveling body 110, the boom 130, and the bucket attachment 150. The calculation unit 81 generates trajectory information so that the caisson shovel 100 loads earth and sand into the earth bucket 31 from a direction that is indicated by the direction information and in which the caisson shovel 100 can load earth and sand into the earth bucket 31.

[0103] The above-mentioned steps S30 to S38 complete the operation of loading earth and sand into the earth bucket 31. This makes it possible to load earth and sand into the earth bucket 31 automatically.

[0104] Next, an operation of transporting the earth bucket 31 to the ground T will be described. As shown in FIG. 11(b), first, in step S20, the work chamber sensor 94 detects the earth bucket 31. The work chamber sensor 94 acquires first point cloud data within the work chamber 2. The work chamber sensor 94 transmits the acquired first point cloud data to the acquisition unit 80.

[0105] Next, in step S21, the acquisition unit 80 outputs the transmitted first point cloud data to the calculation unit 81. The calculation unit 81 extracts second point cloud data indicating the earth bucket 31 in the working chamber 2 from the output first point cloud data. In this case, the calculation unit 81 may extract the second point cloud data indicating the earth bucket 31 using the above-mentioned mathematical model. The calculation unit 81 calculates loading information indicating the loading state of the earth bucket 31 based on the first point cloud data and the second point cloud data. The calculation unit 81 may output the calculated loading information to the control unit 82.

[0106] Next, in step S22, the control unit 82 controls the reel 39 to wind up the wire to the position of the third sensor 93. The control unit 82 controls the reel 39 to wind up the wire 38 based on the loading information calculated, for example, in step S21 or step S34. In this case, the control unit 82 may control the reel 39 to wind up the wire 38 when the loading information indicates that the load of earth and sand is equal to or greater than a reference value. This makes it possible to appropriately determine and automatically start the removal operation of the earth bucket 31.

[0107] Furthermore, in step S22, when a control signal for winding up the wire is input, control unit 82 may control reel 39 to wind up wire 38. In this case, the control signal may be input by the user.

[0108] Furthermore, in step S22, the control unit 82 may control the wire fixing device 240 if the wire fixing device 240 has been controlled in step S17. In this case, for example, the control unit 82 may control the slide bar 242 to travel in the direction of S2, as shown in FIG. 16(b), so that the wire 38 is located at the center of the opening 23b. Furthermore, in step S22, when a control signal for winding up the wire is input, the control unit 82 may control the slide bar 242 to travel in the direction of S2, so that the wire 38 is located at the center of the opening 23b. Furthermore, in step S22, when the loading information indicates that the amount of earth and sand loaded is equal to or greater than a reference value, the control unit 82 may control the slide bar 242 to travel in the direction of S2, so that the wire 38 is located at the center of the opening 23b.

[0109] Next, in step S23, the control unit 82 controls the reel 39 to wind up the wire 38 until the second sensor 91 detects the earth bucket 31. In step S23, the control unit 82 controls the reel 39 based on the position information output from the calculation unit 81. In this case, when the position information indicates that the third sensor 92 is located, the control unit 82 controls the reel 39 to wind up the wire 38 until the second sensor 91 detects the earth bucket 31. The control unit 82 may also control the reel 39 based on the position information and progress information output from the calculation unit 81. When the progress information indicates that the ground T is the destination position and the position information indicates that the third sensor 92 is located, the control unit 82 controls the reel 39 to wind up the wire 38 until the second sensor 91 detects the earth bucket 31. The control unit 82 may also control the reel 39 based on the load information transmitted from the load meter 35. For example, when the load indicated by the load information transmitted from the load meter 35 is equal to or greater than a reference value, the control unit 82 may control the reel 39 to wind down the wire 38 by a preset length and then wind it up again. This makes it possible to automatically and appropriately respond even if the earth bucket 31 gets caught during winding.

[0110] Next, in step S24, the earth bucket 31 is carried into the material lock 24. In step S24, the acquisition unit 80 outputs the detection information transmitted in step S23 to the calculation unit 81. The calculation unit 81 calculates position information indicating the position of the earth bucket 31 based on the output detection information. The calculation unit 81 outputs the calculated position information to the control unit 82.

[0111] The control unit 82 controls the reel 39 based on the position information output from the calculation unit 81. In this case, when the position information indicates that the position is the position of the second sensor 91, the control unit 82 controls the reel 39 to reel in a preset length. The control unit 82 may also control the reel 39 based on the position information and progress information output from the calculation unit 81. When the progress information indicates that the ground T is the destination position and the position information indicates that the position is the position of the second sensor 91, the control unit 82 controls the reel 39 to reel in a preset length. By step S24, it becomes possible to automatically transport the earth bucket 31 to a specific position of the material lock 24.

[0112] Furthermore, the control unit 82 may control the reel 39 based on the material lock information. When the material lock information is output indicating that the upper door 26 is closed and the lower door 27 is open, the control unit 82 may control the reel to carry the earth bucket 31 into the material lock 24. This makes it possible to automatically perform an appropriate operation according to the state of the material lock.

[0113] Furthermore, the control unit 82 may control the reel 39 and the material lock 24 to transport the earth bucket 31 into and out of the material lock 24 based on the material lock information and detection information indicating that the earth bucket 31 has been detected by the material sensor 95. In this case, the control unit 82 first opens the lower door 27 in step S51 based on the material lock information if the lower door 27 is closed, as shown in Fig. 17 for example. In this case, the control unit 82 may control the lower door 27 to open if the upper door 26 is closed.

[0114] Next, in step S52, the control unit 82 winds up the reel 39 and carries the earth bucket 31 into the material lock 24. Also, in step S52, if the material sensor 95 is not provided in the material lock 24, the control unit 82 may wind up the reel 39 by a preset fixed length.

[0115] Next, in step S53, the acquisition unit 80 acquires detection information indicating that the material sensor 95 has detected the earth bucket 31, the calculation unit 81 calculates position information based on the detection information acquired by the acquisition unit 80, and the control unit 82 controls the reel 39 to stop operating based on the calculated position information. In this case, when two or more material sensors 95 are provided, the control unit 82 may control the reel 39 to reel up until two or more material sensors 95 simultaneously detect the earth bucket 31. This makes it possible to automatically stop the earth bucket 31 at a specific position within the material lock 24.

[0116] Next, in step S54, the acquisition unit 80 may acquire detection information indicating that the material sensor 95 detects the earth bucket 31, the calculation unit 81 may calculate position information based on the detection information acquired by the acquisition unit 80, and the control unit 82 may control the opening and closing of the upper door 26 or the lower door 27 of the material lock 24 based on the calculated position information. In this case, for example, the acquisition unit 80 may acquire detection information indicating that the material sensor 95 detects the earth bucket 31, the calculation unit 81 may calculate position information indicating that the earth bucket 31 is inside the material lock 24 based on the detection information acquired by the acquisition unit 80, and the control unit 82 may control to close the lower door 27 based on the position information calculated by the calculation unit 81. In addition, at this time, the acquisition unit 80 may acquire material lock information indicating that the lower door 27 is closed based on a control signal sent from the control unit 82 to the material lock 24. This makes it possible to calculate the position of the earth bucket 31 inside the material lock 24. In addition, it is possible to automate the control of the appropriate opening and closing of the door of the material lock 24 according to the position of the earth bucket 31.

[0117] Also, in step S54, the acquisition unit 80 may acquire each of the detection information indicating that the two or more material sensors 95 have detected the earth bucket 31, the calculation unit 81 may calculate the position information based on each of the detection information acquired by the acquisition unit 80, and the control unit 82 may control the opening and closing of the upper door 26 or the lower door 27 of the material lock 24 based on the calculated position information. In this case, for example, the acquisition unit 80 may acquire each of the detection information indicating that the two or more material sensors 95 have detected the earth bucket 31, the calculation unit 81 may calculate the position information indicating that the earth bucket 31 is in a position in the material lock 24 where it is detected by the two or more material sensors 95 based on each of the detection information acquired by the acquisition unit 80, and the control unit 82 may control to close the lower door 27 based on the position information calculated by the calculation unit 81. This makes it possible to calculate the position of the earth bucket 31 in the material lock 24 with higher accuracy. Also, in step S54, the two or more material sensors 95 acquire respective detection information indicating that they have detected the earth bucket 31, the calculation unit 81 calculates position information and passing direction information regarding the direction in which the earth bucket 31 passes through the material lock 24 based on the respective detection information acquired by the acquisition unit 80, and the control unit 82 may control the opening and closing of the upper door 26 or the lower door 27 of the material lock 24 based on the calculated position information and passing direction information. In such a case, for example, the acquisition unit 80 acquires respective detection information indicating that the two or more material sensors 95 have detected the earth bucket 31, and the calculation unit 81 calculates the order in which the two or more material sensors 95 detected the earth bucket 31 based on the time at which the earth bucket 31 was detected indicated by the respective detection information acquired by the acquisition unit 80, and calculates passing direction information indicating that the passing direction of the earth bucket 31 is the ground T direction from the calculated order. The control unit 82 controls the material lock 24 to close the lower door 27 based on the position information and passing direction information. This makes it possible to automatically calculate the passing direction of the earth bucket 31, and therefore makes it possible to automatically perform appropriate control according to the passing direction.

[0118] Furthermore, in step S54, the control unit 82 closes the lower door 27 and controls the air pressure in the material lock 24 so that the air pressure in the material lock 24 becomes the working air pressure, which is the air pressure in the work chamber 2. In this case, the control unit 82 may control the air pressure in the material lock 24 when detection information indicating that the material sensor 95 has detected the earth bucket 31 and material lock information indicating that the upper door 26 and the lower door 27 are closed are input. At this time, the acquisition unit 80 may acquire material lock information indicating that the air pressure in the material lock 24 is atmospheric pressure, based on the control signal sent from the control unit 82 to the material lock 24.

[0119] Next, in step S45, the control unit 82 controls the material lock 24 to open the upper door 26. In this case, when the control unit 82 receives material lock information indicating that the upper door 26 and the lower door 27 are closed, the control unit 82 may control the material lock 24 to open the upper door 26. Also, in step S45, the control unit 82 may control the upper door 26 to open based on the material lock information indicating that the air pressure inside the material lock 24 is atmospheric pressure and the passing direction information calculated in step S44.

[0120] By carrying out the above-mentioned steps S51 to S56, the operation of carrying the earth bucket 31 into and out of the material lock 24 is completed. This makes it possible to carry the earth bucket 31 into and out of the material lock 24 automatically.

[0121] Next, in step S25, the first sensor 90 detects the earth bucket 31. In step S56, the earth bucket 31, which has been transported to the material lock 24, arrives at the position of the first sensor 90, and the first sensor 90 detects the earth bucket 31. The first sensor 90 transmits the detected detection information to the acquisition unit 80. The acquisition unit 80 outputs the transmitted detection information to the calculation unit 81. The calculation unit 81 calculates position information based on the output detection information. The calculation unit 81 outputs the calculated position information to the control unit 82.

[0122] Next, in step S26, the earth bucket 31 is carried out from the material shaft 23. In step S26, the control unit 82 controls the reel 39 based on the position information output from the calculation unit 81 in step S25. In this case, when the position information indicates the position of the first sensor 90, the control unit 82 controls the reel 39 to wind up the wire 38 by a preset length. The control unit 82 may also control the reel 39 based on the position information and progress information output from the calculation unit 81. When the progress information indicates that the ground T is the destination position and the position information indicates the position of the first sensor 90, the control unit 82 controls the reel 39 to wind up the wire 38 by a preset length.

[0123] By carrying out each of the above-mentioned steps, the operation of carrying out the earth bucket 31 to the ground T is completed. This makes it possible to carry out the earth bucket 31 to the ground T automatically and safely.

[0124] Although the embodiment of the present invention has been described, this embodiment is presented as an example and is not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0125] 1 Caisson 2. Workroom 3 Air supply path 4 Running rail 5. Crawler crane 6. Earth bucket automatic lifting system 11 Automatic soil loading device 12 Remote control device 13 Ground Remote Control Room 21 Manschaft 22 Manrock 23 Material Shaft 24 Material Rock 25 spiral staircase 26 Upper Door 27 Lower Door 31 Earth Bucket 32 Carrier device 33 Dirt Hopper 34 Small recording media 35 Load cell 36 Chain 37 Anchor 38 Wire 39 Reels 41 Air pipe 42 Air Compressor 43 Air Purifier 44 Air supply pressure adjustment device 45 Automatic pressure reducing device 51 Emergency air compressor 53 Hospital Rock 80 Acquisition Department 81 Calculation section 82 Control section 83 Presentation section 90 First Sensor 91 Second Sensor 92 3rd Sensor 93 Ground Sensor 94 Working Room Sensor 95 Material Sensor 100 Caisson Excavator 110 Vehicle 111 Running frame 113 Traveling roller 121 Swivel Frame 130 Boom 131 Base boom 132 Boom tip 133 Telescopic Cylinder 134 Dinghy cylinder 150 Bucket Attachment 151 Base material 152 Bucket 153 Bucket Cylinder 165 Control Unit 165a Main Controller 165b Vehicle controller 165c Boom Bucket Controller 201 Vehicle position sensor 202 Rotation angle sensor 203 Boom hoisting angle sensor 204 Boom extension sensor 205 Bucket swing angle sensor 206 External Sensor 211 Vehicle position measurement unit 212 Bucket position measurement unit 213 Ground shape measurement section 220 Reference Cylinder 221 Generalized Cylinder 230 Estimated Line 231 Matching Shape 240 Wire Fixing Device 241 Slide Rail 242 Slide bar

Claims

[Claim 1] Two or more slide rails are provided at an opening on the ceiling side of the work room of a material shaft connecting the work room of the pneumatic caisson to the ground; a slide bar that is mounted on the two or more slide rails and is movable on the slide rails; A wire fastening system comprising:

Citation Information

Patent Citations

  • Earth bucket recognition system and program

    JP7014930B1