Manufacturing method and application method of reuse battery system
By verifying and accurately storing characteristic map data using error detection codes, the method addresses the issue of incorrect data storage in reused batteries, enhancing operational reliability in secondary applications.
Patent Information
- Application Number
- JP2023049550
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-27
- Publication Date
- 2024-10-09
AI Technical Summary
Existing methods for reusing batteries, particularly lithium ion batteries, do not adequately account for the changed state of health (SOH) of batteries after primary use, leading to incorrect characteristic map data storage and impaired operational reliability in secondary applications.
A method for manufacturing reusable battery systems involves receiving and verifying characteristic map data using error detection codes to ensure accurate storage in management units, preparing data based on measurement and simulation technologies, and transmitting appropriate data to management units within the system.
This approach enhances the operational reliability of reused battery systems by ensuring correct storage and utilization of characteristic map data, improving system performance and reliability.
Smart Images

Figure 2024138845000001_ABST
Abstract
Description
[Technical field]
[0001] One aspect of the present invention relates to a manufacturing method (construction method) of a reuse battery system. [Background technology]
[0002] Patent Document 1 discloses a method for reusing secondary batteries that enables batteries unsuitable for reuse to be detected (sorted) before removal from a vehicle, before transportation to a factory, before dismantling at the factory, or before capacity measurement. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-53167 A Summary of the Invention [Problem to be solved by the invention]
[0004] In recent years, attempts have been made to apply batteries (mainly lithium-ion batteries) that have been used for primary purposes to secondary uses such as backup power systems and power storage systems. In order to improve the reliability of the operation of such secondary use battery systems (reused battery systems), various technological developments are being carried out.
[0005] One aspect of the present invention provides a manufacturing method for a reuse battery system to improve the operational reliability of the system. [Means for solving the problem]
[0006] A manufacturing method for a reused battery system according to one embodiment of the present invention comprises a management unit for used batteries receiving characteristic map data corresponding to the state of a used battery after the start of reuse, the management unit verifying the received characteristic map data using an error detection code added to the characteristic map data, and if the received characteristic map data is correct, the management unit stores the characteristic map data in a memory unit. Effect of the Invention
[0007] According to the above aspect, by correctly storing characteristic map data, which has a large amount of data, in the memory section of the management unit, a reuse battery system with improved operational reliability can be manufactured. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a block diagram showing an example of a reuse battery system. [Diagram 2] 10 is a diagram showing an example of the arrangement of used batteries and a management unit in a power storage section. FIG. [Diagram 3] FIG. 2 is a perspective view showing an example of a battery module. [Figure 4] 1 is a graph showing an example of a characteristic map (SOC-OCV map). [Diagram 5] 4 is a conceptual diagram illustrating an example of characteristic map data (SOC-OCV map data) received by the management unit. FIG. [Figure 6] 10 is a flowchart showing a procedure in which the management unit stores the received characteristic map data in a storage unit. [Figure 7] 10 is a flowchart showing a procedure in which the management unit reads out characteristic map data from a storage unit. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] An outline of the embodiment will be described below. (1) A manufacturing method for a reused battery system includes a management unit for used batteries receiving characteristic map data corresponding to the state of the used battery after the start of reuse, the management unit verifying the received characteristic map data using an error detection code added to the characteristic map data, and if the received characteristic map data is correct, the management unit stores the characteristic map data in a memory unit.
[0010] Here, the used battery may be a single battery cell, a battery module in which battery cells are connected in series and / or parallel, or a battery pack in which battery cells or battery modules are connected in series and / or parallel. From the viewpoint of reducing the labor required for dismantling, it is preferable that the used battery is applied to the reuse battery system with as little change as possible from the form (e.g., battery pack, battery module) of its primary use (e.g., in-vehicle battery system). The used battery may be, but is not limited to, a lithium ion secondary battery. The start of reuse includes the time when the reuse battery system is manufactured (constructed) and the time when the performance of used batteries is measured. The start of reuse may be the time when reuse for secondary use or the time when reuse for tertiary or subsequent uses is started.
[0011] According to the method (1) above, characteristic map data with a large amount of data (e.g., state of charge-open circuit voltage map data, hereinafter referred to as SOC-OCV map data) can be correctly stored in the management unit of the used battery, thereby making it possible to manufacture a reuse battery system with improved operational reliability.
[0012] When manufacturing a reuse battery system without changing the configuration of the battery from its primary use, the initial characteristic map data is stored in the management unit of the battery pack or battery module that was used for the primary use. However, the map data stored there often does not correspond to the state of the used battery at the start of reuse, such as its state of health (SOH).
[0013] Figure 4 shows the SOC-OCV maps of batteries with different SOHs. Each curve (profile) contains a large number of data points, for example, about 100 data points.
[0014] To control the battery, in addition to the SOC-OCV map (an example of a characteristics map) for estimating the SOC from the measured voltage of the battery, the upper limit charging voltage and the lower limit discharging voltage are also necessary. The upper limit voltage and the lower limit voltage are each a single point of data. Compared to these numerical values (so-called set values), the data that forms a characteristics map such as the SOC-OCV map is extremely large in number, and errors are likely to occur when writing this data to the management unit during the manufacture of the reuse battery system, for example.
[0015] In Fig. 4, the curve marked 100% is the initial SOC-OCV map (when the SOH is 100%) in the primary use of the battery, and the curve marked 70% is the SOC-OCV map to be referred to when the battery is used and the SOH drops to 70%.
[0016] If only SOC-OCV map data corresponding to SOH 100% is stored in the management unit of the battery pack or battery module for primary use, that map data does not correspond to the state of the used battery at the start of reuse. Therefore, it is necessary to write SOC-OCV map data corresponding to the state of the used battery at the start of reuse (e.g., SOH 70%) into the management unit. Such writing is also necessary when managing used batteries with a new management unit instead of the management unit used for the primary purpose.
[0017] If an error occurs when writing map data for forming a curve corresponding to SOH 70% to the management unit, an outlier will be stored, or a curve with a different shape than the intended curve will be stored. If this happens, the management unit will not be able to correctly estimate the SOC of the battery after the reuse battery system begins operating, and the operational reliability of the system will be compromised. The same thing can happen with other characteristic map data other than SOC-OCV map data.
[0018] The condition (eg, SOH) of a used battery at the start of reuse is determined by measurement (eg, measuring the capacity by discharging the battery from a full charge). Battery states other than SOH include degradation states corresponding to various battery degradation mechanisms (isolation of active materials, reduction in charge carriers (e.g., lithium ions Li+) involved in charging and discharging, increase in electrical resistance, reduction in conductivity in the electrolyte, etc.). Battery degradation states corresponding to these various degradation mechanisms can be determined or estimated by simulation based on operation history data (current history, voltage history, temperature history, etc.) in the primary use (or past uses up to the present).
[0019] According to the method (1) above, characteristic map data (such as SOC-OCV map data with a large amount of data) corresponding to the state of used batteries obtained by measurement or estimation can be verified using an error detection code and then correctly stored in the memory of the management unit. This makes it possible to manufacture a reuse battery system with improved operational reliability.
[0020] (2) In the method (1) above, a communication unit of the reuse battery system may receive the characteristic map data from a higher-level device, and a plurality of the management units provided in each of a plurality of groups of the used batteries may receive the characteristic map data from the communication unit.
[0021] According to the above method, the configuration of the reuse battery system can be simplified, and each of the multiple management units can receive characteristic map data appropriate for the battery group that it manages. It is difficult to prepare a large number of used batteries with uniform remaining performance. Therefore, different characteristic map data may be provided to the management units of the multiple groups of batteries via the communication unit of the reuse battery system. In secondary applications such as backup power supply systems and power storage systems, a large number of used batteries are often connected in parallel to ensure the required electrical capacity. It is possible to provide the management units provided for each battery group connected in parallel with characteristic map data appropriate for each battery group.
[0022] (3) In the method of (1) or (2) above, a higher-level device may prepare the characteristic map data based on measurement data of the used battery and / or simulation results based on historical data of past applications.
[0023] Battery measurement and simulation technologies are still in the development stage. Measurement and simulation accuracy is improving year by year, and previously unknown battery degradation phenomena are being elucidated and modeled. By applying measurement data based on the latest technology and the latest simulation technology to a host device and having that host device estimate the state of used batteries at the start of reuse and prepare characteristic map data, the operational reliability of the reuse battery system that is manufactured can be further improved.
[0024] (4) A method of operating a reuse battery system includes a host device monitoring the state of a used battery after reuse has begun, a management unit for the used battery receiving characteristic map data corresponding to the state prepared by the host device, the management unit verifying the received characteristic map data using an error detection code added to the characteristic map data, and, if the received characteristic map data is correct, the management unit storing the characteristic map data in a memory unit.
[0025] According to the above-described operating method, the higher-level device monitors the state of a used battery after reuse has begun, prepares characteristic map data, and correctly stores the characteristic map data, which has a large amount of data, in the memory unit of the management unit, thereby improving operational reliability.
[0026] (5) In the method of (4) above, the higher-level device may prepare the characteristic map data based on measurement data after the start of reuse of the used battery and / or simulation results based on historical data after the start of reuse.
[0027] After the start of reuse, charging and discharging is often performed in a manner different from the previous operation pattern (e.g., during primary use). According to the operation method of (5) above, appropriate characteristic map data can be prepared based on the measurement data after the start of reuse and / or the operation history data after the start of reuse, for example, using the results of a simulation using the latest technology.
[0028] Hereinafter, an embodiment will be described with reference to the drawings, but the present invention is not limited to the embodiment described below. Fig. 1 shows the configuration of an energy storage system (ESS) 1 as a reuse battery system. The ESS 1 includes a battery management unit (BMU) 10, an energy storage unit 11, a power conditioner (PCS) 12 as an example of a charge / discharge unit, and a communication unit 13. The ESS 1 may be a so-called power conditioner with a storage battery. Instead of the ESS 1, the reuse battery system may be a backup power supply system or another system (for example, a battery system for driving a mobile body).
[0029] The BMU 10 includes a CPU (Central Processing Unit) 100, a ROM (Read Only Memory) 101, a RAM (Random Access Memory) 102, and an I / O (Input / Output) 103.
[0030] The CPU 100 is an execution unit, which sequentially reads firmware stored in the ROM 101 and executes control processing according to a control procedure defined in the firmware. The ROM 101 is a non-transient memory that is read-only from the CPU 100 in principle. The ROM 101 is, for example, an EEPROM (Electrically Erasable Programmable Read-Only Memory). The ROM 101 stores a default SOC-OCV map 2P and a reuse SOC-OCV map 1P. The default SOC-OCV map 2P may be continuously stored in the ROM built into the CPU 100.
[0031] The RAM 102 is a temporary memory used for calculations by the CPU 100. The CPU 100 writes the results of calculations to the RAM 102 and proceeds with processing while reading them out. The data stored in the RAM 102 is volatilized when the BMU 10 is restarted.
[0032] The power storage unit 11 includes a used battery. The power storage unit 11 is connected to a system power source E via a PCS 12. The power storage unit 11 may be connected to a power generation source (not shown) (for example, a solar panel or other renewable energy generator) via the PCS 12. The BMU 10 may receive power supply from the power storage unit 11.
[0033] The PCS 12 includes an inverter and / or a converter as a power conversion unit 12a (see FIG. 2). The PCS 12 is connected to an electric load, and performs operations such as supplying electric power from the system power supply E to the electric load, charging the power storage unit 11 from the system power supply E, and supplying electric power from the power storage unit 11 to the electric load (including assisting discharging when supplying electric power from the system power supply E to the electric load). The PCS 12 may be connected to an alternating current power grid (AC grid) or a direct current power grid (DC grid).
[0034] The communication unit 13 is a communication device for communicating with the higher-level device 2. The higher-level device 2 may be an external storage medium (e.g., a USB memory). The communication unit 13 may be, for example, a network interface card, or may be configured to allow an external storage medium to be attached. The BMU 10 receives data (e.g., SOC-OCV map data for reuse) from the higher-level device 2 via the communication unit 13.
[0035] The higher-level device 2 may be a terminal device (e.g., a maintenance terminal device) that transmits update data of the SOC-OCV map to the ESS 1 via a local network. Alternatively, the higher-level device 2 may be a server device (e.g., a remote monitoring server) that issues instructions to the ESS 1 and collects data from the ESS 1 via a communication network including the Internet.
[0036] FIG. 2 shows an example of the arrangement of used batteries and the BMU 10 in the power storage unit 11. The power storage unit 11 is configured by storing a plurality of groups U1, U2, ... of used batteries in a battery panel or container. The plurality of battery groups U are connected in parallel to a common current path Lo extending from a power conversion unit 12a of the PCS 12. In this embodiment, five used battery groups U1 to U5 are connected in parallel, but the number of parallel connections is not limited to this. As shown in FIG. 2, the PCS may be arranged outside the container.
[0037] Each battery group U includes a plurality of battery modules M connected in series, a current sensor 41, and a current interruption device 45. Each battery module M may be configured by connecting battery cells (also referred to as cells) in series. A group in which a plurality of battery modules M are connected in series will be referred to as a bank hereinafter.
[0038] In the power storage unit 11 of this embodiment, a bank BMU 10B is provided in each bank U, and a domain BMU 10D is provided in a group (hereinafter referred to as a domain) in which a plurality of banks U are connected in parallel. The domain BMU 10D can communicate with the bank BMU 10B via a communication bus (for example, a CAN bus).
[0039] In each bank U, a cell management unit (CMU) 33 provided in each battery module M communicates with the bank BMU 10B connected to the CMU 33 via a serial communication interface such as RS-232C. The CMU 33 may include a voltage sensor (not shown) that measures the voltage of each cell, and a temperature sensor 37 (see FIG. 3). The bank BMU 10B acquires current data measured for each bank, and voltage data and temperature data measured by the CMU 33 of each battery module M.
[0040] The domain BMU 10D may aggregate the battery state data acquired by each bank BMU 10B and store it in the storage unit 25. The storage unit 25 may be located outside the domain BMU 10D.
[0041] 2 shows an example in which the domain BMU 10D is connected to the control unit 12b of the PCS 12, but the domain BMU 10D may be connected to the communication unit 13 (see FIG. 1). Alternatively, the bank BMU 10B may be connected to the communication unit 13 via a CAN bus, not via the domain BMU 10D.
[0042] As shown in FIG. 3, the battery module M in this embodiment has a case 31 that houses a plurality of adjacent battery cells 60, and a plurality of temperature sensors 37A, 37B that measure the temperature of the battery cells 60. The battery cells 60 are prismatic cells that house an electrode body and a non-aqueous electrolyte in a rectangular parallelepiped case. Alternatively, the battery cells may be pouch cells or cylindrical cells. The battery cells 60 in this embodiment are lithium-ion secondary battery cells. The battery module M in this embodiment is applied to the reuse battery system in almost the same form as in the previous use (for example, primary use). That is, the battery module M is applied to the reuse battery system without dismantling the CMU 33 and the temperature sensor 37 used in the previous use.
[0043] In this embodiment, the higher-level device 2 (see FIG. 1) prepares characteristic map data corresponding to the state of the used battery after the start of reuse, and the bank BMU 10B provided in each bank U (see FIG. 2) receives the data. The higher-level device 2 may prepare multiple pieces of characteristic map data corresponding to expected states at multiple points in time (in the future) after the start of reuse of the used battery.
[0044] When a battery for primary use (e.g., a drive battery system mounted on an electric vehicle) is shipped, characteristic map data corresponding to various battery states is not sufficiently prepared. For example, it takes a long time and a lot of effort to prepare SOC-OCV map data corresponding to various SOH (e.g., 80%, 75%, 70%, 65%, 60%, ...). In addition, when a battery for primary use is shipped, reuse is not even considered. Therefore, when a battery for primary use is shipped, only a limited number of characteristic data, including SOC-OCV map data corresponding to SOH 100%, is stored in the management unit for primary use. Even when a BMU 10 other than the BMU used for the primary purpose is used (when the BMU is replaced), only a limited number of pieces of characteristic data are stored in the replaced BMU 10.
[0045] As the SOH of the battery decreases, it is necessary to switch the SOC-OCV map to be referenced for SOC estimation. In this embodiment, the higher-level device 2 (see FIG. 1) prepares characteristic map data corresponding to the state of the used battery after the start of reuse, and transmits it to the domain BMU 10D or the bank BMU 10B.
[0046] 5 shows SOC-OCV map data as an example of characteristic map data prepared by the higher-level device 2. This map data includes a table management number, table data in which SOC and OCV are associated with each other and stored in a table, and an error detection code.
[0047] Examples of the error detection code include a checksum and a cyclic redundancy code (CRC). From the viewpoint of verification accuracy, CRC-16 can be adopted, but is not limited to this.
[0048] The table management number may be any number that can identify the table data. The table management number makes it possible to confirm whether new map data is being adopted in the bank BMU 10B or whether the default map data is still being used in the bank BMU 10B.
[0049] FIG. 6 shows a procedure in which the bank BMU 10B stores the SOC-OCV map data received from the higher-level device 2 in the ROM 101. In FIG. The bank BMU 10B calculates collation data from the table management number to the table data using a calculation method corresponding to the error detection code (step S10).
[0050] The bank BMU 10B judges whether the calculated collation data matches the error detection code (step S20). If they match (S20: YES), the bank BMU 10B stores the received SOC-OCV map data in the ROM 101 as being correct (step S30).
[0051] If the bank BMU 10B determines that the calculated collation data does not match the error detection code (S20: NO), it discards the received SOC-OCV map data. In this case, the bank BMU 10B continues to use the default SOC-OCV map data.
[0052] FIG. 7 shows a procedure for reading the SOC-OCV table stored in the ROM 101. The bank BMU 10B calculates collation data from the table management number to the table data using a calculation method corresponding to the error detection code (step S60).
[0053] The bank BMU 10B judges whether the calculated collation data matches the error detection code (step S70). If they match (S70: YES), the newly read SOC-OCV map data is deemed to be correct and is used to estimate the SOC from the measured voltage of the used battery.
[0054] If the bank BMU 10B determines that the calculated collation data does not match the error detection code (S70: NO), the bank BMU 10B uses the default SOC-OCV map data.
[0055] An embodiment of a method for manufacturing a reuse battery system has been described above. Next, an embodiment of a method for operating a reuse battery system will be described.
[0056] In the method of operating the reuse battery system (ESS1), a higher-level device 2 (for example, a remote monitoring server) monitors the state of a used battery (electricity storage unit 11) shown in FIG. 1 after the start of reuse.
[0057] The used battery management unit (bank BMU10B) receives characteristic map data (see FIG. 5) prepared by the higher-level device 2 and corresponding to the state of the used battery after the start of reuse.
[0058] The management unit verifies the received characteristic map data using the error detection code added to the characteristic map data.
[0059] If the received characteristic map data is correct, the management unit stores the characteristic map data in the storage unit (ROM 101). The management unit uses the new characteristic map data to control the used battery.
[0060] In a reuse battery system, since the batteries have deteriorated compared to their previous use, it is necessary to apply various technologies to improve operational reliability. In the above embodiment, remote monitoring is achieved using the communication unit 13 provided in the ESS 1 and the higher-level device 2. Furthermore, in the above embodiment, the higher-level device 2 prepares characteristic map data corresponding to the state of the used batteries after the start of reuse, and the management unit receives the data, verifies it using an error detection code, and then stores it. By correctly storing the characteristic map data, which has a large amount of data, in the storage unit of the management unit, the operational reliability of the reuse battery system can be improved.
[0061] Through remote monitoring, the host device can detect any deviations from the load pattern assumed when the reuse battery system was manufactured, allowing appropriate measures to be taken quickly, such as reviewing the operation of the reuse battery system, adding more banks, or replacing deteriorated battery modules M or banks U. [Explanation of symbols]
[0062] 1 ESS (Reused Battery System) 10 BMU (Budget Management Unit) 11 Storage unit (used batteries) 101 ROM (memory section)
Claims
1. A management unit for the used battery receives characteristic map data corresponding to a state of the used battery after the start of reuse of the used battery; The management unit verifies the received characteristic map data using an error detection code added to the characteristic map data; When the received characteristic map data is appropriate, the management unit stores the characteristic map data in a storage unit. A method for manufacturing a reused battery system comprising the steps of:
2. The manufacturing method of a reused battery system as described in claim 1, wherein a communication unit of the reused battery system receives the characteristic map data from a higher-level device, and a plurality of management units provided in each of a plurality of groups of the used batteries receive the characteristic map data from the communication unit.
3. A manufacturing method for a reuse battery system as described in claim 1 or claim 2, wherein a higher-level device prepares the characteristic map data based on measurement data of the used batteries and / or simulation results based on historical data of past uses.
4. The host device monitors the status of the used battery after the reuse starts. A management unit of the used battery receives characteristic map data corresponding to the state prepared by the higher-level device; The management unit verifies the received characteristic map data using an error detection code added to the characteristic map data; When the received characteristic map data is appropriate, the management unit stores the characteristic map data in a storage unit. A method for operating a reuse battery system comprising the steps of:
5. The method of operating a reuse battery system as described in claim 4, wherein the higher-level device prepares the characteristic map data based on measurement data after the start of reuse of the used batteries and / or simulation results based on historical data after the start of reuse.
Citation Information
Patent Citations
Battery pack, and control method of battery pack
JP2008098056A
Battery information update system
JP2013024725A
Battery information management system, node, management method, recording method, and computer program
WO2021010092A1
Method for reusing secondary battery and computer program
JP2020053167A