Task notification system, and task notification method

The task notification system addresses the challenge of identifying high-risk tasks in projects by calculating risk based on task scale and inter-project influence, facilitating objective risk management and timely action.

JP2024138887APending Publication Date: 2024-10-09NEC CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
JP2023049601
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09

AI Technical Summary

Technical Problem

Existing technologies fail to identify high-risk tasks in projects due to variations in risk assessment methods, making it difficult to objectively select tasks based on factors other than specification changes, particularly affecting delivery schedules and budgets.

Method used

A task notification system that calculates the risk of tasks by determining the scale, inter-project influence, and deviation from planned man-hours, identifying high-risk tasks through a risk calculation process and notifying relevant project stakeholders.

Benefits of technology

Enables the identification of high-risk tasks in projects beyond specification changes, allowing for objective risk assessment and timely action, particularly in managing schedule and budget impacts.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024138887000001_ABST
    Figure 2024138887000001_ABST
Patent Text Reader

Abstract

To provide a task notification system which can specify a task with large risk when there is any change in a project not limited to specification change.SOLUTION: Risk calculating means 74g calculates risk of a task on a first project based on a size of the task, a degree of mutual affection of the task and the first project, a degree of affection of the task on the first project, and deviation of the current situation from a scheduled entire process number of the first project. The risk calculating means 74g calculates risk of a task on a second project based on a size of the task, a degree of mutual affection of the task and the second project, a degree of affection of the task on the second project, and deviation of the current situation from a scheduled entire process number of the second project.SELECTED DRAWING: Figure 10
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a task notification system, a task notification method, and a task notification program for notifying people involved in a project of a task when a change occurs in the project. [Background technology]

[0002] When starting a project and during the project, selecting tasks is an essential task. For example, when a project member becomes unavailable, it is necessary to consider which task should be prioritized among the tasks that were planned for each project.

[0003] The decision of which tasks to select is sometimes made using, for example, the probability of occurrence and impact matrix, a risk analysis method in PMBOK (Project Management Body of Knowledge). However, the probability of occurrence and impact are not common indicators for a project, and it is necessary to define the probability of occurrence and the impact of risks for each project. Then, a person (for example, a project manager) decides the probability of occurrence and the degree of impact of risks based on past know-how. As a result, the probability of occurrence and the degree of impact of risks differ from person to person, making it difficult to objectively select tasks to be selected.

[0004] Patent Document 1 describes a technique for calculating the risk involved in making changes to project specifications. [Prior art documents] [Patent documents]

[0005] [Patent Document 1] JP 2008-33545 A Summary of the Invention [Problem to be solved by the invention]

[0006] However, the technology described in Patent Document 1 only calculates the risks that arise when changing the specifications of a project, and therefore cannot calculate risks associated with changes other than specification changes.

[0007] It is preferable to be able to identify tasks that have a high risk when changes occur in the project, not limited to changes in specifications. The risks referred to here are risks related to the deadline and budget of each project.

[0008] Therefore, an object of the present invention is to provide a task notification system, a task notification method, and a task notification program that can identify high-risk tasks when changes occur to a project, not limited to changes in specifications. [Means for solving the problem]

[0009] The task notification system according to the present invention is characterized in comprising: a risk calculation means for calculating the risk of a task to a first project based on the scale of the task, the degree to which the task and a first project affect each other, the task's impact on the first project, and the deviation of the current situation from the planned total effort of the first project, and for calculating the risk of a task to a second project based on the scale of the task, the degree to which the task and a second project affect each other, the task's impact on the second project, and the deviation of the current situation from the planned total effort of the second project; and a notification means for selecting a predetermined number of tasks from the tasks of the first project in order of greatest risk, notifying a terminal of a predetermined person involved in the first project of the selected tasks and their risks, and for selecting a predetermined number of tasks from the tasks of the second project in order of greatest risk, and notifying a terminal of a predetermined person involved in the second project of the selected tasks and their risks.

[0010] The task notification method of the present invention is characterized in that a computer calculates a risk of a task to a first project based on the scale of the task, the degree to which the task and a first project affect each other, the task's impact on the first project, and the deviation of the current situation from the planned total effort of the first project, calculates a risk of a task to a second project based on the scale of the task, the degree to which the task and a second project affect each other, the task's impact on the second project, and the deviation of the current situation from the planned total effort of the second project, selects a predetermined number of tasks from the tasks of the first project in order of greatest risk, notifies a terminal of a predetermined person involved in the first project of the selected tasks and their risks, and selects a predetermined number of tasks from the tasks of the second project in order of greatest risk, and notifies a terminal of a predetermined person involved in the second project of the selected tasks and their risks.

[0011] The task notification program according to the present invention is characterized in that it causes a computer to execute a risk calculation process that calculates the risk of a task to a first project based on the scale of the task, the degree to which the task and a first project affect each other, the task's impact on the first project, and the deviation of the current situation from the planned total effort of the first project, and calculates the risk of the task to a second project based on the scale of the task, the degree to which the task and a second project affect each other, the task's impact on the second project, and the deviation of the current situation from the planned total effort of the second project, and a notification process that selects a predetermined number of tasks from the tasks of the first project in order of greatest risk, notifies a terminal of a predetermined person involved in the first project of the selected tasks and their risks, and selects a predetermined number of tasks from the tasks of the second project in order of greatest risk, and notifies a terminal of a predetermined person involved in the second project of the selected tasks and their risks. Effect of the Invention

[0012] According to the present invention, it is possible to identify high-risk tasks when changes occur to the project, including but not limited to changes in specifications. [Brief description of the drawings]

[0013] [Figure 1] 1 is a block diagram showing an example of a configuration of a task notification system according to an embodiment of the present invention. [Diagram 2] FIG. 13 is a schematic diagram showing an example of a deviation degree. [Diagram 3] FIG. 2 is a schematic diagram showing an example of the degree of association between project A and project B. [Figure 4] FIG. 13 is a schematic diagram showing an example of the scale of a task. [Diagram 5] 13 is a schematic diagram showing an example of a task-project A relevance degree and a task-project B relevance degree. FIG. [Figure 6] FIG. 2 is a schematic diagram showing an example of the degree of influence of a task on a project A and the degree of influence of a task on a project B. [Figure 7] This is a schematic diagram showing the task risks to Project A and the task risks to Project B. [Figure 8] 4 is a flowchart showing an example of a processing progress of an embodiment of the present invention. [Figure 9] FIG. 1 is a schematic block diagram showing an example of the configuration of a computer according to a task notification system of the present invention. [Figure 10] 1 is a block diagram showing an overview of a task notification system according to the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0014] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

[0015] 1 is a block diagram showing an example of the configuration of a task notification system according to an embodiment of the present invention. The task notification system according to the present embodiment includes an input unit 11, an input information interpolation unit 13, a control unit 14, a storage unit 15, a notification unit 16, and an output unit 17.

[0016] The control unit 14 also includes a task search unit 14a, a deviation calculation unit 14b, an inter-project relevance calculation unit 14c, a task quantitative evaluation unit 14d, a task-project relevance calculation unit 14e, an impact calculation unit 14f, and a risk calculation unit 14g.

[0017] The storage unit 15 is, for example, a storage device that stores various information generated by the control unit 14.

[0018] The input unit 11 is an input interface (e.g., a keyboard) into which candidate tasks for selection or the current status of a project, the name of the target project A, and the name of project B that may be affected are input. Hereinafter, the current status of a project may be referred to as the project status. Project A may be referred to as the first project, and project B may be referred to as the second project. The candidate tasks for selection are the tasks of project A.

[0019] In this embodiment, an example will be described in which the current status of the projects, the name of the target project A, and the name of project B that may be affected are input to the input unit 11. Specifically, in this embodiment, it is assumed that project member S belonging to projects A and B is suddenly unable to come to work for one month from December 1st to January 1st. In this case, the names of project A and project B are input to the input unit 11, and information that "project member S is suddenly unable to come to work for one month from December 1st to January 1st" is input as the project status.

[0020] The input information interpolation unit 13 interpolates the information input to the input unit 11 using a function for constructing a thesaurus (a dictionary of similar words) that uses statistical processing to extract related words, and semantic technology that allows a computer to judge the meaning of sentences of input information.

[0021] In this example, the input information interpolation unit 13 extracts the official name of project A and the official name of project B by utilizing the function of constructing a thesaurus. Also, the input information interpolation unit 13 extracts information such as "project member S", "between December 1st and January 1st", and "cannot come to work" from the input information "project member S suddenly cannot come to work for one month from December 1st to January 1st". The input information interpolation unit 13 uses semantic technology and the function of constructing a thesaurus to interpolate information such as "vacancy", "man-hours -30h (reduction in total man-hours per month when one member is absent)" from the information "cannot come to work". Then, the input information interpolation unit 13 integrates the information "cannot come to work", "vacancy", and "man-hours -30h (reduction in total man-hours per month when one member is absent)" with the status ID "10001".

[0022] The task search unit 14a searches for a task based on the input information and information interpolated into the input information. The task search unit 14a searches for both tasks of project A and tasks of project B.

[0023] The task search unit 14a searches documents in the shared file server for documents containing each piece of task information and for the locations where the tasks are described. In this example, the task search unit 14a identifies a data group for project A and a data group for project B from the official names of project A and project B. The data groups for each project are stored in the storage unit 15 in advance. The task search unit 14a also searches for a WBS (Work Breakdown Structure) and a schedule from the status ID "10001," and searches for locations from the WBS and schedule that contain descriptions from December 1 to January 1. In this example, the task search unit 14a searches for each task described in the locations, namely "Creating a maintenance manual," "Creating a comprehensive test result report," and "Managing changes to detailed design documents."

[0024] The task notification system needs to determine which data is project A data, which data is project B data, which tasks are project A tasks, etc. To enable such determination, documents are pre-classified, for example, by clustering. Documents may be pre-classified by a learning device that has learned the relationship between documents and classes.

[0025] The deviation calculation unit 14b calculates the deviation of the current situation from the planned total man-hours of the projects A and B. For example, if a project member is absent, the deviation is calculated to be a larger value.

[0026] FIG. 2 is a schematic diagram showing an example of the deviation degree. For example, the planned total man-hours, the planned man-hours per month of the project member S, and the role of the project member shown in FIG. 2 are stored in advance in the storage unit 15. In this example, the weight is set to a value in the range of 2.0 to 5.0. The weight value is determined according to the role of the project member S. When the role of the project member S is newcomer, the weight is set to 2.0 (see FIG. 2).

[0027] In this example, if project member S becomes absent, 10 hours out of 200 hours will be lost in project A, resulting in a deviation from the planned total man-hours by a ratio of 10 / 200=0.05. In project B, 10 hours out of 100 hours will be lost, resulting in a deviation from the planned total man-hours by a ratio of 10 / 100=0.1. The deviation calculation unit 14b multiplies the above ratio by the weight and calculates the deviation. In other words, the deviation for project A is 0.05*2.0=0.1, and the deviation for project B is 0.1*2.0=0.2.

[0028] The deviation calculation unit 14b stores in the storage unit 15 information including the calculated deviation, as exemplified in FIG.

[0029] The inter-project relevance calculation unit 14c calculates the inter-project relevance, which is the degree to which the project A and the project B affect each other. Hereinafter, the inter-project relevance may be referred to as the project A-project B relevance.

[0030] FIG. 3 is a schematic diagram showing an example of the relevance between project A and project B. The inter-project relevance calculation unit 14c groups documents in project A and documents in project B by process (in other words, by document ID), compares documents in the same process from the viewpoints of "document description content", "total period", "major departments", and "customer information", calculates scores, and calculates a subtotal score. In the example shown in FIG. 3, the inter-project relevance calculation unit 14c groups documents in project A and documents in project B into document IDs 11001 to 11023. Then, the inter-project relevance calculation unit 14c compares the document with document ID 11001 of project A and the document with document ID 11001 of project B from the viewpoints of "document description content", "total period", "major departments", and "customer information", determines scores, and calculates a subtotal score. The inter-project relevance calculation unit 14c performs similar processing for other document IDs.

[0031] The inter-project relevance calculation unit 14c determines a higher score for "document description content" as the more similar the content of the document in project A is to the content of the document in project B. In this example, the score for "document description content" is set to a value in the range of 0 to 15.

[0032] With regard to the "overall period," the inter-project relevance calculation unit 14c compares the period required to create a document for project A with the period required to create a document for project B, and sets a higher score for the longer the overlapping period.

[0033] Regarding the "main department," the closer the relationship between the main department of project A and the main department of project B, the higher the score is set. If the main departments are the same, the highest score is given.

[0034] Regarding "customer information," the closer the relationship between the customer information of project A and the customer information of project B, the higher the score is set. If the customer information matches, the highest score is set.

[0035] In this example, the scores for "Main Department" and "Customer Information" are assumed to be determined in advance.

[0036] In this example, the scores for "Overall Period", "Major Departments", and "Customer Information" are set as values ​​ranging from 0 to 5. Therefore, the upper limit of the score subtotal is 15+5+5+5=30.

[0037] The inter-project relevance calculation unit 14c calculates the ratio of the "score subtotal" to the "upper limit of the score subtotal" for each document ID, and determines this ratio as the inter-project relevance (relevance between Project A and Project B). For example, in the case of document ID 11001, if the score subtotal is 23, the inter-project relevance calculation unit 14c calculates (23 / 30)*100=76.7% as the relevance between Project A and Project B. For other document IDs, the relevance between Project A and Project B is calculated in a similar manner.

[0038] The inter-project relevance calculation unit 14c stores in the storage unit 15 information including the calculated project A-project B relevance, as exemplified in FIG.

[0039] The task quantitative evaluation unit 14d searches for each document, "Maintenance manual", "Comprehensive test result report", "Detailed design document", and "Detailed design document change history", from the tasks, "Maintenance manual creation", "Comprehensive test result report creation", and "Detailed design document change management", searched by the task search unit 14a, using the above-mentioned semantic technology. Then, for each task determined from the documents, the task quantitative evaluation unit 14d obtains scores from the viewpoints of "information volume", "cumulative editing time", "customer information", "cooperating department", and "importance", and calculates the total score as the scale of the task. FIG. 4 is a schematic diagram showing an example of the scale of the task.

[0040] The more information a document contains, the higher the "amount of information" score is set. The longer the cumulative editing time of a document, the higher the "cumulative editing time" score is set. The more customer information corresponding to the document, the higher the "customer information" score is set. The more information a cooperating department corresponding to the document, the higher the "cooperating department" score is set. Also, the more important a document is, the higher the "importance" score is set. For example, if a document is submitted to a client, the "importance" score is set high.

[0041] In this example, the scores for "amount of information," "cumulative editing time," "customer information," "cooperating department," and "importance" are set as values ​​in the range of 0-5.

[0042] The task quantitative evaluation unit 14d assigns scores to each of the following items for each task: "information volume," "cumulative editing time," "customer information," "cooperating departments," and "importance," and calculates the total score as the scale of the task. For example, for the task of creating a maintenance manual for document ID 11023, the scale of the task is calculated as 4+4+5+4+5=22. In this example, the maximum task scale is 25.

[0043] As for the "detailed design document," since it is used to manage changes, the information from the time when the change history occurred onwards is the subject of the evaluation score.

[0044] The task quantitative evaluation unit 14d stores in the storage unit 15 information including the calculated task scale, the example of which is shown in FIG.

[0045] The task-project relevance calculation unit 14e calculates the degree to which the task and project A influence each other, and the degree to which the task and project B influence each other. Hereinafter, the degree to which the task and project A influence each other may be referred to as the task-project A relevance, and the degree to which the task and project B influence each other may be referred to as the task-project B relevance. Fig. 5 is a schematic diagram showing an example of the task-project A relevance and the task-project B relevance.

[0046] In this example, the task-project relevance calculation unit 14e calculates the degree of mutual influence between the tasks "Create a maintenance manual," "Create a comprehensive test result report," and "Manage changes to the detailed design document" and project A. The task-project relevance calculation unit 14e also calculates the degree of mutual influence between these tasks and project B.

[0047] The task-project relevance calculation unit 14e calculates the ratio of the task scale to the maximum task scale as the task-project A relevance. As described above, in this example, the maximum task scale is 25. Therefore, when the document ID is 11023, the task-project relevance calculation unit 14e calculates the task-project A relevance as (22 / 25)*100=88.0%. The task-project relevance calculation unit 14e similarly calculates the task-project A relevance for other tasks.

[0048] Furthermore, the task-project relevance calculation unit 14e calculates the product of the task-project A relevance and the project A-project B relevance as the task-project B relevance. For example, when the document ID is 11023, the project A-project B relevance is 80%=0.8. Therefore, the task-project relevance calculation unit 14e calculates the task-project B relevance as 88.0%*0.8=70.4% (see FIG. 5). The task-project relevance calculation unit 14e calculates the task-project B relevance for other tasks in the same manner.

[0049] If there are no tasks or documents common to Project A and Project B, the task-project relevance calculation unit 14e calculates the task-project B relevance using the task-project A relevance (72% in the example shown in FIG. 5) obtained based on the total value of the scale of the tasks (72 in the example shown in FIG. 5). Assume that document ID 11023 is in Project A but not in Project B. In this case, the task-project relevance calculation unit 14e calculates the task-project B relevance using 72.0% as the task-project A relevance.

[0050] Also, when there is a document related to a certain document, the task-project relevance calculation unit 14e may use the project A-project B relevance corresponding to that document. In this example, it is assumed that the "detailed design document revision history" of document ID 12003 exists in project A but does not exist in project B. It is also assumed that the "detailed design document" of document ID 11003 is determined to be highly related to the "detailed design document revision history" of document ID 12003. In this case, the task-project relevance calculation unit 14e uses the project A-project B relevance corresponding to document ID 11003 when calculating the task-project B relevance corresponding to document ID 12003 (see FIG. 5).

[0051] The task-project relevance calculation unit 14e stores the information, which is illustrated in FIG. 5 and includes the task-project A relevance and the task-project B relevance, in the storage unit 15.

[0052] The impact calculation unit 14f calculates the impact of the task on project A and the impact of the task on project B. Fig. 6 is a schematic diagram showing an example of the impact of the task on project A and the impact of the task on project B.

[0053] The impact calculation unit 14f assigns scores to the "work effort ratio," which is the ratio of work time each task takes up in the entire project, the "duration," which is the period from the time of user input until the project is completed, the "total scale of project A," and the "profit and loss," which is the expected profit and loss as a result of the impact of each task. In this example, the scores for the "work effort ratio," "duration," "total scale of project A," and "profit and loss" are set as values ​​in the range of 0 to 5. Therefore, the upper limit of the score total is 5+5+5+5=20.

[0054] An example of the "work effort ratio" is, for example, "creating a maintenance manual occupies 7% of the work time of the entire project A." The impact calculation unit 14f determines the score of the "work effort ratio" according to such content.

[0055] An example of the "duration" is "The ratio of the period from the time of user input to the time of project completion to the total period is 15%." The influence degree calculation unit 14f determines the score of the "duration" according to such content.

[0056] An example of the "scale of the entire project A" is, for example, "the scale of the entire project A is 10 man-months." The impact calculation unit 14f determines the score of the "scale of the entire project A" according to such content.

[0057] An example of the "profit and loss" is, for example, "If the maintenance manual cannot be created by the deadline, a loss of about 10 million yen will occur." The impact calculation unit 14f determines the score of the "profit and loss" according to such content.

[0058] The impact calculation unit 14f calculates a score total for "work effort ratio," "duration," "total scale of project A," and "profit and loss," and regards the score total as the impact of the task on project A. For example, when the document ID is 11023, 4+4+5+4=17 is calculated as the impact on project A. The impact calculation unit 14f similarly calculates the impact on project A for other tasks as well.

[0059] Furthermore, the impact calculation unit 14f calculates the product of the impact of the task on project A and the relevance between project A and project B as the impact of the task on project B. For example, when the document ID is 11023, the impact on project A is "17" as described above. In this case, the relevance between project A and project B is 80%=0.8 (not shown in FIG. 6). Therefore, when the document ID is 11023, the impact calculation unit 14f calculates the impact of the task on project B as 17*0.8=13.6. The impact calculation unit 14f similarly calculates the impact on project B for other tasks as well.

[0060] The influence degree calculation unit 14f stores in the storage unit 15 information, such as the example shown in FIG. 6, including the influence degree of the task on project A and the influence degree of the task on project B.

[0061] The risk calculation unit 14g calculates the risk of the task for project A and the risk of the task for project B.

[0062] The risk calculation unit 14g calculates the risk of the task to project A based on the scale of the task, the task-project A relevance (the degree to which the task and project A affect each other), the impact on project A, and the deviation of project A.

[0063] In addition, the risk calculation unit 14g calculates the risk of the task to project B based on the scale of the task, the task-project B relevance (the degree to which the task and project B affect each other), the impact on project B, and the deviation of project B.

[0064] Fig. 7 is a schematic diagram showing the risk of a task to project A (the risk that the task poses to project A) and the risk of a task to project B (the risk that the task poses to project B). A more specific description will be given with reference to Fig. 7.

[0065] First, the risk of a task to project A will be described. The risk calculation unit 14g obtains the risk to project A (assumed to be P) without considering the deviation by calculating P={(task size*relevance between task and project A)+impact on project A}. In the example of document ID 11023 shown in FIG. 7, P=22*0.88+17=36.4. After calculating P, the risk calculation unit 14g calculates the final risk (risk with deviation considered) by calculating P*(deviation of project A)+P. In the example of document ID 11023 shown in FIG. 7, 36.4*0.1+36.4=40.00 is obtained. The risk calculation unit 14g similarly calculates the final risk to project A for other tasks.

[0066] Next, the risk of the task to project B will be described. The risk calculation unit 14g obtains the risk to project B (Q) without considering the deviation by calculating Q={(task size*task-project B relevance)+impact on project B}. In the example of document ID 11023 shown in FIG. 7, Q=(22*0.704)+(13.6)=29.1. After calculating Q, the risk calculation unit 14g calculates the final risk (risk considering the deviation) by calculating Q*(deviation of project B)+Q. In the example of document ID 11023 shown in FIG. 7, 29.1*0.2+29.1=34.91. The risk calculation unit 14g similarly calculates the final risk to project B for other tasks.

[0067] The risk calculation unit 14g stores in the storage unit 15 the information shown in FIG.

[0068] The notification unit 16 selects a predetermined number (e.g., five) of tasks from among the tasks of project A in order of decreasing risk, and notifies the terminals of the predetermined parties involved in project A of the selected tasks and their risks. The notification unit 16 may notify the terminals of the predetermined parties involved in project A of the task with the highest risk among the tasks of project A and its risk. This corresponds to the case where the above-mentioned predetermined number is 1. Similarly, the notification unit 16 selects a predetermined number (e.g., five) of tasks from among the tasks of project B in order of decreasing risk, and notifies the terminals of the predetermined parties involved in project B of the selected tasks and their risks. The notification unit 16 may notify the terminals of the predetermined parties involved in project B of the task with the highest risk among the tasks of project B and its risk. This corresponds to the case where the above-mentioned predetermined number is 1.

[0069] In this example, in response to an input of information such as "Project member S suddenly cannot come to work for one month from December 1st to January 1st," the notification unit 16 notifies the terminals of the predetermined people involved in project A of the task "Create a change history of the detailed design document" and its risk 18.44 (see FIG. 7). Similarly, the notification unit 16 notifies the terminals of the predetermined people involved in project B of the task "Create a change history of the detailed design document" and its risk 9.94 (see FIG. 7). The task notified to the terminals of the people involved in project A and the task notified to the terminals of the people involved in project B may be different.

[0070] The output unit 17 displays on a display device (not shown) the contents notified by the notification unit 16 to the terminals of the predetermined parties involved in project A and the terminals of the predetermined parties involved in project B, together with the information inputted into the input unit 11, for example.

[0071] The notification unit 16 is realized, for example, by a CPU (Central Processing Unit) of a computer that operates according to a task notification program and a communication interface of the computer. In this case, the CPU reads the task notification program from a program recording medium such as a program storage device of the computer, and operates as the notification unit 16 using the communication interface according to the program.

[0072] Also, the input information interpolation unit 13, the control unit 14, and the output unit 17 are realized by, for example, a CPU of a computer that operates according to a task notification program. In this case, the CPU reads the task notification program from a program recording medium such as a program storage device of the computer as described above, and operates as the input information interpolation unit 13, the control unit 14, and the output unit 17 according to the program.

[0073] The storage unit 15 is realized by, for example, a storage device provided in a computer.

[0074] Next, the process will be described. Fig. 8 is a flow chart showing an example of the process according to the embodiment of the present invention. Detailed description of items that have already been described will be omitted.

[0075] When information is input, the input information interpolation unit 13 interpolates the input information (step S1).

[0076] Next, the task search unit 14a searches for a task (step S2).

[0077] Next, the deviation calculation unit 14b calculates the deviations of the projects A and B (step S3).

[0078] Next, the inter-project relevance calculation unit 14c calculates the relevance between the project A and the project B (step S4).

[0079] Next, the task quantitative evaluation unit 14d calculates the scale of each task (step S5).

[0080] Next, the task-project relevance calculation unit 14e calculates the task-project A relevance and the task-project B relevance (step S6).

[0081] Next, the influence degree calculation unit 14f calculates the influence degree of the task on the project A and the influence degree of the task on the project B (step S7).

[0082] Next, the risk calculation unit 14g calculates the risk of the task to the project A and the risk of the task to the project B (step S8).

[0083] Next, the notification unit 16 selects a predetermined number of tasks for each project in descending order of risk, and notifies the selected tasks and their risks to the terminals of the people involved (step S9).

[0084] Next, the output unit 17 displays the contents notified in step S9 on a display device (not shown) (step S10).

[0085] According to the task notification system of this embodiment, it is possible to identify high-risk tasks when changes occur to the project, not limited to changes in specifications.

[0086] In addition, users can quantitatively grasp which tasks pose a high risk to projects A and B.

[0087] In addition, when changes occur to the project, not limited to changes in specifications, the risk to the project can be calculated.

[0088] It also makes it possible to objectively calculate the risk that tasks in Project A pose to Project B.

[0089] Also, even if a sudden change occurs in the project, action to cancel the project can be taken quickly.

[0090] In addition, the user can quantitatively grasp the degree of relevance between Project A and Project B.

[0091] 9 is a schematic block diagram showing an example of the configuration of a computer related to the task notification system of the present invention. The computer 2000 includes a CPU 2001, a main memory device 2002, an auxiliary memory device 2003, an interface 2004, an input interface 2005, and a communication interface 2006.

[0092] The task notification system according to the embodiment of the present invention is realized, for example, by a computer 2000. The operation of the task notification system is stored in the form of a program (task notification program) in an auxiliary storage device 2003. A CPU 2001 reads the program from the auxiliary storage device 2003, loads the program in a main storage device 2002, and executes the processing described in the above embodiment according to the program.

[0093] The auxiliary storage device 2003 is an example of a non-transient tangible medium. Other examples of non-transient tangible media include a magnetic disk, a magneto-optical disk, a CD-ROM (Compact Disk Read Only Memory), a DVD-ROM (Digital Versatile Disk Read Only Memory), a semiconductor memory, and the like, which are connected via an interface 2004.

[0094] Next, an overview of the present invention will be described. Fig. 10 is a block diagram showing an overview of a task notification system of the present invention. The task notification system of the present invention comprises a risk calculation means 74g and a notification means 76.

[0095] The risk calculation means 74g (e.g., risk calculation unit 14g) calculates the risk of the task to the first project based on the scale of the task, the degree to which the task and the first project affect each other, the impact of the task on the first project, and the deviation of the current situation from the planned total man-hours of the first project, and calculates the risk of the task to the second project based on the scale of the task, the degree to which the task and the second project affect each other, the impact of the task on the second project, and the deviation of the current situation from the planned total man-hours of the second project.

[0096] A notification means 76 (e.g., notification unit 16) selects a predetermined number of tasks from the tasks of the first project in order of decreasing risk, notifies the selected tasks and their risks to terminals of predetermined parties involved in the first project, and selects a predetermined number of tasks from the tasks of the second project in order of decreasing risk, and notifies the selected tasks and their risks to terminals of predetermined parties involved in the second project.

[0097] Such a configuration makes it possible to identify high-risk tasks when changes occur in the project, not just changes in specifications.

[0098] In addition, the risk calculation means 74g If {(task size * degree of mutual influence between the task and the first project) + influence on the first project} = P, calculate the risk of the task to the first project by calculating P * (deviation from the first project) + P. If {(task size * degree to which the task and the second project affect each other) + impact on the second project} = Q, the risk of the task to the second project can be calculated by calculating Q * (deviation from the second project) + Q.

[0099] Furthermore, a task quantitative evaluation means (for example, a task quantitative evaluation unit 14d) for calculating the scale of each task may be provided.

[0100] The system may also include a deviation calculation means (e.g., deviation calculation unit 14b) that calculates the deviation of the first project and the deviation of the second project, a task-project relevance calculation means (e.g., task-project relevance calculation unit 14e) that calculates the degree to which the task and the first project influence each other and the degree to which the task and the second project influence each other, and an impact calculation means (e.g., impact calculation unit 14f) that calculates the impact of the task on the first project and the impact of the task on the second project. [Industrial Applicability]

[0101] The present invention is preferably applied to a task notification system that notifies people involved in a project of a task when a change occurs in the project. [Explanation of symbols]

[0102] 11 Input section 13 Input information interpolation section 14 Control section 14a Task Search Section 14b Deviation calculation section 14c Project correlation calculation section 14d Task Quantitative Evaluation Section 14e Task-project relevance calculation section 14f Impact calculation part 14g Risk Calculation Section 15 Storage section 16 Notification Department 17 Output section

Claims

1. Calculating a risk of the task to the first project based on a scale of the task, a degree of mutual influence between the task and the first project, an impact of the task on the first project, and a deviation of a current situation from a planned total effort of the first project; a risk calculation means for calculating a risk of the task to the second project based on a scale of the task, a degree of mutual influence between the task and the second project, a degree of influence of the task on the second project, and a deviation of a current situation from a planned total man-hours of the second project; a notification means for selecting a predetermined number of tasks from among the tasks of the first project in order of decreasing risk, and notifying a terminal of a predetermined person involved in the first project of the selected tasks and their risks, and for selecting a predetermined number of tasks from among the tasks of the second project in order of decreasing risk, and notifying a terminal of a predetermined person involved in the second project of the selected tasks and their risks. A task notification system comprising:

2. The risk calculation means Calculating the risk of the task to the first project by calculating P*(deviation of the first project)+P, assuming that {(scale of the task*degree of influence between the task and the first project)+impact on the first project}=P; When {(the size of the task*the degree to which the task and the second project affect each other)+the degree of influence on the second project}=Q, the risk of the task to the second project is calculated by calculating Q*(the deviation of the second project)+Q. The task notification system of claim 1 .

3. Equipped with a task quantitative evaluation method to calculate the scale of each task The task notification system according to claim 1 or 2.

4. a deviation calculation means for calculating a deviation of the first project and a deviation of the second project; a task-project relevance calculation means for calculating a degree of mutual influence between the task and the first project and a degree of mutual influence between the task and the second project; an impact calculation means for calculating an impact of the task on the first project and an impact of the task on the second project; The task notification system according to claim 3 .

5. The computer Calculating a risk of the task to the first project based on a scale of the task, a degree of mutual influence between the task and the first project, an impact of the task on the first project, and a deviation of a current situation from a planned total effort of the first project; Calculating a risk of the task to the second project based on a scale of the task, a degree of mutual influence between the task and the second project, an impact of the task on the second project, and a deviation of a current situation from a planned total effort of the second project; Selecting a predetermined number of tasks from among the tasks of the first project in order of decreasing risk, notifying a terminal of a predetermined person involved in the first project of the selected tasks and their risks, and selecting a predetermined number of tasks from among the tasks of the second project in order of decreasing risk, and notifying a terminal of a predetermined person involved in the second project of the selected tasks and their risks. A task notification method comprising:

6. The computer, When calculating risk, Calculating the risk of the task to the first project by calculating P*(deviation of the first project)+P, assuming that {(scale of the task*degree of influence between the task and the first project)+impact on the first project}=P; When {(the size of the task*the degree to which the task and the second project affect each other)+the degree of influence on the second project}=Q, the risk of the task to the second project is calculated by calculating Q*(the deviation of the second project)+Q. The task notification method according to claim 5 .

7. On the computer, Calculating a risk of the task to the first project based on a scale of the task, a degree of mutual influence between the task and the first project, an impact of the task on the first project, and a deviation of a current situation from a planned total effort of the first project; a risk calculation process for calculating a risk of the task to the second project based on a scale of the task, a degree of mutual influence between the task and the second project, a degree of influence of the task on the second project, and a deviation of a current situation from a planned total man-hours of the second project; and A notification process for selecting a predetermined number of tasks from among the tasks of the first project in order of decreasing risk, notifying a terminal of a predetermined person involved in the first project of the selected tasks and their risks, and for selecting a predetermined number of tasks from among the tasks of the second project in order of decreasing risk, and notifying a terminal of a predetermined person involved in the second project of the selected tasks and their risks. A task notification program to execute.

8. The computer includes: In the risk calculation process, When {(the scale of the task*the degree to which the task and the first project affect each other)+the degree of influence on the first project}=P is set, the risk of the task to the first project is calculated by calculating P*(the deviation of the first project)+P; When {(the scale of the task*the degree to which the task and the second project affect each other)+the degree of influence on the second project}=Q, the risk of the task to the second project is calculated by calculating Q*(the deviation of the second project)+Q. The task notification program according to claim 7.