Beam replacing jig, and beam replacing method using the same
The beam replacement jig facilitates indoor beam replacement in steel frame buildings by using a top plate, vertical members, and hanging means, addressing the challenge of roof openings and reducing construction time.
Patent Information
- Application Number
- JP2023050013
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-03-27
- Publication Date
- 2024-10-09
- Estimated Expiration
- 2043-03-27
AI Technical Summary
Conventional methods for replacing beam members in steel frame buildings require creating openings in the roof, which leads to increased man-hours and potential work suspension due to weather conditions.
A beam replacement jig equipped with a top plate, vertical members, and a bottom plate, utilizing hanging means for lifting, allowing indoor replacement without roof openings, comprising bolt holes and suspender locking holes for secure engagement.
Enables easy replacement of beam members indoors, reducing man-hours and construction period by eliminating the need for roof openings.
Smart Images

Figure 2024139184000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a beam replacement jig for replacing beam members in a ceiling portion inside a steel-framed building, and a beam replacement method using the same. [Background technology]
[0002] 2. Description of the Related Art Conventionally, beam members made of H-shaped steel or the like that have been transported to a construction site by truck or the like have generally been hoisted by a crane or the like with wire ropes attached to both ends of the beam members (see, for example, Patent Document 1).
[0003] However, in the method of replacing a beam member by lifting it with a crane inside a steel-framed building, the top of the crane may be higher than the roof when the beam member 6 is lifted to a specified installation position, as shown in Fig. 7. In that case, an opening must be made in the roof to allow the top of the crane to pass through, which increases the number of work steps. In addition, the opening in the roof exposes the work site to rain in rainy weather, forcing the replacement work to be suspended, which also results in an extension of the construction period. [Prior art documents] [Patent documents]
[0004] [Patent Document 1] Japanese Utility Model Application Publication No. 7-11654 Summary of the Invention [Problem to be solved by the invention]
[0005] As mentioned above, in the past, when replacing beam members in the ceiling of a steel-framed building, it was sometimes difficult to perform the replacement work unless an opening was made in the roof. The present invention aims to overcome this difficulty and provide a beam replacement jig that allows beam members to be easily replaced indoors without making an opening in the roof of a steel-framed building, and a beam replacement method using the same. [Means for solving the problem]
[0006] The inventors of the present invention have conducted extensive research to achieve the above object. As a result, they have come up with the idea that by attaching a dedicated jig to the lower part of a beam member and lifting the jig with a lifting means, it is possible to easily replace a beam member indoors without making an opening in the roof, and have thus completed the present invention. That is, the present invention is as follows. [1] A beam replacement jig for replacing beam members using a lifting means inside a steel-framed building, It has a top plate, vertical members, horizontal members and a bottom plate, The top plate includes a means for connecting to the beam member, The vertical member is fixed vertically to the top plate and the bottom plate, The cross member is fixed perpendicularly to the bottom plate and includes means for engaging the suspension means. A beam replacement jig characterized by the above. [2] The beam replacement jig described in [1], characterized in that the means for connecting the top plate to the beam member comprises a plurality of bolt holes, and the means for engaging the hanging means of the cross member comprises a pair of hanging device engagement holes on the left and right. [3] The beam replacement jig described in [1] or [2], characterized in that the vertical member has a vertical member height that ensures a lifting allowance. [4] A beam replacement method for replacing a beam member in a steel-framed building using the beam replacement jig according to any one of [1] to [3], A beam replacement method characterized by placing one beam replacement jig at each end of the beam member, fixing the beam replacement jig to the bottom surface of the beam member, engaging it with the hanging means, and raising and lowering the beam member using the hanging means. [5] The beam replacement method according to [4], characterized in that the hanging means is supported by an existing beam member adjacent to the beam member. [6] In paragraph [4] or [5] above, A beam replacement method characterized by comprising an installation step of connecting an uninstalled beam member to a splice plate and the top plate to integrate it with the beam replacement jig, engaging the hanging means, hoisting the uninstalled beam member to a position adjacent to the existing beam member, connecting the splice plate to the existing beam member, separating the top plate and the splice plate, lowering the beam replacement jig, and connecting the splice plate to the existing beam member. [7] In paragraph [4] or [5] above, A beam replacement method characterized by comprising a removal process of engaging the beam replacement jig with the hanging means, lifting it up to a position where it will be connected to the beam member to be removed, preparing to connect the splice plate of the beam member to be removed to the top plate, connecting the splice plate to the top plate, releasing the connection between the beam member to be removed and an adjacent beam member, and suspending the beam member to be removed. [8] In paragraph [7] above: A beam replacement method characterized by comprising an installation step of connecting an uninstalled beam member to the splice plate and the top plate to integrate it with the beam replacement jig, engaging the hanging means, hoisting the uninstalled beam member to a position adjacent to the existing beam member, connecting the splice plate to the existing beam member, separating the top plate and the splice plate, lowering the beam replacement jig, and connecting the splice plate to the uninstalled beam member. Effect of the Invention
[0007] According to the present invention, beam members can be easily replaced inside a steel-framed building without creating an opening in the roof, thereby reducing the number of work steps and shortening the construction period. [Brief description of the drawings]
[0008] [Figure 1] FIG. 2 is a three-dimensional view showing an example of a beam replacement jig according to the present invention. [Diagram 2] 1 is a schematic diagram showing an example of a beam member replacement method according to the present invention. [Diagram 3] 1 is a three-dimensional view showing step 1 of the installation process or step 4 of the removal process in the beam replacement method according to the present invention. [Figure 4] 1 is a three-dimensional view showing step 2 of the installation process or step 3 of the removal process in the beam replacement method according to the present invention. [Diagram 5] 1 is a three-dimensional view showing step 3 of the installation process or step 2 of the removal process in the beam replacement method according to the present invention. [Figure 6] 1 is a three-dimensional view showing step 4 of the installation step or step 1 of the removal step in the beam replacement method according to the present invention. [Figure 7] FIG. 1 is a schematic diagram showing an example of a conventional beam member replacement method. [Figure 8] FIG. 2 is a schematic diagram showing the structure of a chain block. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] The present invention is an invention for replacing beam members inside a steel frame building. [Steel construction] Steel-frame construction is a building that uses steel frames for the beams, columns, etc. Steel-frame construction is often used in factories and warehouses, and is also used in relatively large residential buildings such as condominiums, apartments, and buildings.
[0010] [Beam member] A beam component is a component that constitutes a beam installed in an indoor ceiling, and is also called a "main beam" or a "minor beam."
[0011] [Replacement of beam members] The replacement of a beam member means either or both of installing an uninstalled beam member in a predetermined installation location and removing an existing beam member from a predetermined installation location. The removal of beam members is carried out at installation sites that have existing beam members. The timing of removal is determined based on the degree of deterioration of the existing beam members due to damage, corrosion, etc. Meanwhile, installation of beam members is not only carried out at installation sites after the existing beam members have been removed, but also involves the installation of uninstalled beam members at new installation sites that do not have any beam members to be removed.
[0012] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0013] [Beam replacement jig] An example of a beam replacement jig of the present invention (hereinafter also referred to as the "jig of the present invention") is shown in Figure 1. As shown in the figure, the jig of the present invention 1 is a jig that can be lifted and lowered by a lifting means such as a chain block 10, and comprises a top plate 2, vertical members 3, horizontal members 4, and a bottom plate 5, and it is preferable that each of these members is joined by welding. The lifting means is a means that can raise and lower the jig of the present invention 1 in a suspended state, and examples of such means include a hoist and a winch. The chain block 10 is one type of the hoist. An example of using the chain block 10 as the lifting means will be described below. The jig 1 of the present invention is used as a suspender, and is preferably made of steel in order to ensure strength.
[0014] [Chain block] A chain block 10 generally has a structure comprising, from top to bottom, an upper hook 20, a pulley section 21, a chain 22, and a lower hook 23 when suspended, as shown in Fig. 8. In use, the upper hook 20 is supported directly or indirectly by a fixed material such as a steel frame inside a building, the lower hook 23 is directly or indirectly engaged with a suspended load, and the chain 22 is manually operated to raise or lower the suspended load. For the sake of simplicity, in figures other than Figure 8 (e.g., Figure 1), the entire chain block 10 is represented by a single line, and the support means for supporting the upper hook of the chain block 10 is represented by a single fulcrum as shown in Figure 1, and is called the upper hook fulcrum 30.
[0015] [Tabletop] The top plate 2 preferably has a plurality of bolt holes 8 as a means for connecting to the underside of the beam member 6, preferably via a splice plate 7. The beam member 6 in the installed state is generally made up of a plurality of beam members rigidly connected to each other, and this rigid connection is a method of fastening a plurality of beam members 6 connected in the longitudinal direction to each other at a plurality of locations via the splice plate 7. Therefore, if a plurality of bolt holes 8 of the same type as the splice plate 7 are provided in the top plate 2, it is preferable that the bolts for rigid connection can also be used to connect the jig 1 of the present invention to the beam member 6 via the splice plate 7. In the example of FIG. 1, the beam member 6 has three bolt holes 8 on each side on the lower side of each end, so that the top plate 2 also has three bolt holes 8 on each side. The splice plate may be omitted.
[0016] [Vertical material] The vertical member 3 is fixed vertically to the top plate 2 and the bottom plate 5. The role of the vertical member 3 is to position the fulcrum (hereinafter also referred to as the "suspension fulcrum") when lifting the beam member at a certain height distance Δh lower than the lower end of the beam member. This makes lifting easier by reducing the vertical movement distance by Δh when lifting the upper end of the beam member to the same height position. The Δh is also called the “lifting allowance.” To ensure the lifting allowance (i.e., Δh≧0), it is preferable that the height of the vertical member 3 (vertical member height) is vertical member height≧Δh-(thickness of the splice plate+thickness of the top plate).
[0017] [Horizontal material] The cross member 4 is fixed vertically to the bottom plate 5, and is provided with preferably a pair of hoisting gear locking holes 9 on the left and right as means for engaging with a chain block 10. The uppermost portion of the hoisting gear locking holes 9 serves as a fulcrum for hanging the beam member 6. Providing a pair of hoisting tool locking holes 9 on the left and right makes it easy to hoist the object while maintaining horizontality in the left-right direction (width direction of the beam member). The chain block 10 may be engaged with the hoisting tool locking holes 9 either by directly engaging the lower hook or by engaging the lower hook via a connecting metal fitting (not shown) such as a shackle. The pair of hoisting tool engaging holes 9 are positioned relative to the top plate 2 so that the chain block 10 engaged therewith does not interfere with the top plate 2.
[0018] [Bottom plate] The bottom plate 5 serves to prevent the beam replacement jig 1, which is placed upright on the work floor surface, from falling over.
[0019] [Beam replacement method] Next, an embodiment of the beam replacement method according to the present invention (hereinafter, also referred to as the "method of the present invention") will be described. In the following, an example will be described in which the top plate 2 has a bolt hole 8 and the cross member 4 has a pair of left and right suspension tool locking holes 9 (see FIG. 1).
[0020] The method of the present invention is a beam replacement method for replacing a beam member 6 in a ceiling part in a steel frame building using a beam replacement jig 1, for example, as shown in Fig. 2. In the method of the present invention, first, one beam replacement jig 1 is placed on each end of the beam member 6. As a result, the beam member 6 is supported and hung at both ends in the longitudinal direction, making it easy to keep it horizontal in the longitudinal direction.
[0021] Next, the beam replacement jig 1 is fixed to the bottom surface of the beam member 6 via a splice plate 7 . Next, the beam member 6 is engaged with the chain block 10, and the beam member 6 is raised and lowered by the chain block 10. Thus, the method of the present invention allows replacement of beam members without creating openings in the roof.
[0022] [Number of chain blocks used] One or two chain blocks 10 can be used per beam replacement jig 1. When one chain block is used, both of the connecting hoists (wire ropes with hooks, not shown) that engage with the left and right hoist locking holes 9, one each, are engaged with the lower hooks 23 of one chain block 10. When two chain blocks are used, one of the connecting hoists (wire ropes with hooks, not shown) that engage with the left and right hoist locking holes 9, one each, is engaged with the lower hooks 23 of one chain block 10. The use of two chain blocks is preferable because it is easier to align the lifting heights on the left and right sides than when one chain block is used.
[0023] [Fixing material for supporting chain block] As a fixing material for supporting the chain block 10, i.e., a fixing material for engaging the upper hook fulcrum 30, from the viewpoint of the ease of preparatory work of attaching a fastener or the like (not shown) to the fixing material, an existing beam member 13 adjacent to the beam member 6 is preferable (see Figure 2).
[0024] When two chain blocks 10 are used per beam replacement jig 1, it is preferable to select the locking positions of the upper hook fulcrums 30 at both widthwise positions on the upper end face side of the existing beam member 13 as the locking positions of the upper hook fulcrums 30 (see FIG. 1). This can reduce the vertical movement distance of the beam member 6.
[0025] When one chain block 10 is used per beam replacement jig 1, the upper hook fulcrum 30 may be engaged at the widthwise center of the lower end surface of the existing beam member 13.
[0026] [Installation process] In the method of the present invention, a preferred embodiment of the step (installation step) of installing beam member 6 will be described with reference to Figs. (Step 1) An uninstalled beam member 6 is connected to the splice plate 7 and the top plate (temporarily fastened with bolts) to integrate it with the beam replacement jig 1, and a chain block 10 is engaged with the hoisting fixture engagement hole 9 (Figure 3). (Step 2) The uninstalled beam member 6 is lifted to a position adjacent to the existing beam member 13, and the splice plate 7 is bolted to the existing beam member 13 (FIG. 4). (Step 3) Separate the top plate 2 and the splice plate 7, and hang down the beam replacement jig 1 (Figure 5). (Step 4) The splice plate 7 and the uninstalled beam member 6 are bolted together (FIG. 5). This completes the rigid connection between the adjacent beam members.
[0027] [Removal process] In the method of the present invention, a preferred embodiment of the step of removing beam member 6 (removal step) will be described with reference to Figs. (Step 1) The beam replacement jig 1 is engaged with the chain block 10 and lifted up to a position where it will connect with the beam member 6 to be removed (Figure 6). (Step 2) Prepare to join the splice plate 7 of the beam member 6 to be removed to the top plate 2 (FIG. 5). That is, align the bolt holes of the splice plate 7 and the top plate 2. (Step 3) Attach the splice plate 7 to the top plate 2 (Figure 4). This attachment can be done temporarily. (Step 4) The connection between the splice plate 7 and the adjacent beam member 13 is released, and the beam member 6 to be removed is hung down (FIG. 3).
[0028] Using the splice plate 7 in the above installation and removal processes is advantageous in that it makes it easy to align the existing beam member 13 with the uninstalled or to-be-removed beam member 6 and to securely fix the beam members, and furthermore the splice plate 7 itself can be used to join the beam members together. However, it is also possible to carry out the installation and removal processes without using the splice plate 7, for example, by directly joining the beam member 6 and the top plate 2. EXAMPLES
[0029] In a steel-framed factory building, an H-shaped steel beam (H-250×125×6×9: unit is mm, cross-sectional area: 37 cm 2 In this replacement work, 24 beam members (made of 1000 mm steel, length: 7.5 m, weight: 0.22 ton) were replaced. Since the beam members to be removed had already been removed, the installation work was carried out according to steps 1 to 4 of the installation process of the method of the present invention when installing the unused beam members. The plate thickness of the beam replacement jig 1 used was 5.5 to 9.0 mm, and each member was fixed by welding. The height from the underside of the bottom plate to the underside of the top plate was 400 mm. As a result, the work period was shortened by 33% compared to the conventional method (when the same number of beams were installed in the configuration of Figure 7). [Explanation of symbols]
[0030] 1. Jig of the present invention (beam replacement jig of the present invention) 2. Tabletop 3 Vertical timber 4 Crosspiece 5 Bottom plate 6 Beam members (to be installed or removed) 7 Attachment plate 8 Bolt holes 9. Hanging attachment hole 10 Chain block (suspension means) 13 Adjacent existing beam members 20 Upper Hook 21 Pulley section 22 Chain 23 Bottom Hook 30 Upper hook fulcrum
Claims
1. A beam replacement jig for replacing a beam member by a lifting means in a steel frame building, It has a top plate, vertical members, horizontal members and a bottom plate, The top plate includes a means for connecting to the beam member, The vertical member is fixed vertically to the top plate and the bottom plate, The cross member is fixed perpendicularly to the bottom plate and includes means for engaging the suspension means. A beam replacement jig characterized by the above.
2. A beam replacement jig as described in claim 1, characterized in that the means for connecting the top plate to the beam member consists of a plurality of bolt holes, and the means for engaging the hanging means of the cross member consists of a pair of hanging device engagement holes on the left and right, or further, the vertical member has a vertical member height that ensures a lifting allowance.
3. A beam replacement method for replacing a beam member inside a steel-framed building using the beam replacement jig according to claim 1 or 2, The beam replacement jig is disposed at each end of the beam member, the beam replacement jig is fixed to the bottom surface of the beam member, and engaged with the hanging means, and the beam member is raised and lowered by the hanging means. Alternatively, the beam replacement method is characterized in that the suspension means is supported by an existing beam member adjacent to the beam member.
4. The beam replacement method described in claim 3, characterized in that it includes an installation process of connecting an uninstalled beam member to a splice plate and the top plate to integrate it with the beam replacement jig, engaging the hanging means, hoisting the uninstalled beam member to a position adjacent to the existing beam member, connecting the splice plate to the existing beam member, separating the top plate and the splice plate, lowering the beam replacement jig, and connecting the splice plate to the existing beam member.
5. The beam replacement method described in claim 3, characterized in that it includes a removal process of engaging the beam replacement jig with the hanging means, lifting it up to a position where it will be connected to the beam member to be removed, preparing to connect the splice plate of the beam member to be removed to the top plate, connecting the splice plate to the top plate, releasing the connection between the beam member to be removed and an adjacent beam member, and suspending the beam member to be removed.
6. The beam replacement method described in claim 5, characterized in that it includes an installation step of connecting an uninstalled beam member to the splice plate and the top plate to integrate it with the beam replacement jig, engaging the hanging means, hoisting the uninstalled beam member to a position adjacent to the existing beam member, connecting the splice plate to the existing beam member, separating the top plate and the splice plate, lowering the beam replacement jig, and connecting the splice plate to the uninstalled beam member.
Citation Information
Patent Citations
JP1973004527U
Lift-up method unnecessary for temporary frame
JP1999210089A
Load lifting device
JP2021011349A
Beams and girders
JP3010736U
Beam member sling
JP1995011654U