Junction structure between deck composite slab and beam

The joint structure between a deck composite slab and a beam uses a deck plate, flashing, and stress transmission member to transmit shear forces efficiently, reducing construction costs and improving load resistance without specialized equipment.

JP2024139622AActive Publication Date: 2024-10-09NIPPON STEEL METAL PROD CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2023050654
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-27
Publication Date
2024-10-09
Estimated Expiration
2043-03-27

AI Technical Summary

Technical Problem

Existing methods for joining deck composite slabs to beams, such as stud welding and burnout plug welding, increase construction costs due to the need for specialized equipment and materials.

Method used

A joint structure that integrates a deck composite slab with a beam using a deck plate, flashing, and a stress transmission member fixed to the beam and embedded in concrete, where the flashing and stress transmission member span the gap between the deck plate and beam, allowing for in-plane shear force transmission without the need for headed studs or stud welding.

Benefits of technology

This structure reduces construction costs by minimizing the need for specialized equipment, improves load resistance, and facilitates faster construction by optimizing the number of stress transmission members required, while maintaining stability and load-bearing capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024139622000001_ABST
    Figure 2024139622000001_ABST
Patent Text Reader

Abstract

To provide a junction structure between a deck composite slab and a beam, which can reduce construction cost.SOLUTION: In a junction structure 100 between a deck composite slab and a beam according to the embodiment, the beam 81 is provided along a lengthwise direction Y of a deck plate 2. The deck composite slab 1 comprises: a deck plate 2 having a gap between an end 21 in a width direction X of the deck plate 2 and the beam 81; a flushing 3 provided in the gap between the end 21 in the width direction X of the deck plate 2 and the beam 81; a concrete 4 placed on upper side of the deck plate 2 and the flushing 3; and a stress transmission member 5 laid between the flushing 3 and the beam 81. The stress transmission member 5 is fixed to a top face of the beam 81 and embedded in the concrete 4. Minimum distance from an end face of the concrete 4 to the stress transmission member 5 is 350 mm or more.SELECTED DRAWING: Figure 4
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a joint structure between a composite deck slab and a beam. [Background technology]

[0002] Composite deck slabs, which are made by integrating deck plates and concrete, are joined to beams and used in a variety of buildings, including houses, stores, offices, parking lots, warehouses, and large offices. If there is a gap between the deck plates that make up the composite deck slab and the beams, flashing is used to adjust the gap. Flashing is usually not joined to the beams, and only serves to fill the gap between the deck plate and the beams.

[0003] As a technique for joining a deck composite slab to a beam, for example, a technique of stud welding a headed stud to a beam as shown in Non-Patent Documents 1 and 2 is known.

[0004] When headed studs are stud welded to beams, the in-plane shear force acting on the deck composite slab can be transferred from the headed studs to the beams, regardless of whether flashing is used or not. However, stud welding requires headed studs, which increases construction costs.

[0005] Therefore, as a technique for joining a deck composite slab to a beam without stud welding, Patent Document 1 discloses a technique for performing burn-out plug welding on a beam on which flashing is provided. Burn-out plug welding can be performed at the construction site using a general-purpose shielded metal arc welding machine, so the construction can be easily performed. However, the technique disclosed in Patent Document 1 requires processing equipment for processing the flashing. This causes a problem of high construction costs. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] JP 2017-106194 A [Non-patent literature]

[0007] [Non-Patent Document 1] Architectural Institute of Japan, "Guidelines and Commentary on Composite Structure Design", November 2010, pp.8-11, Part 1: Composite Beam Structural Design Guidelines, Chapter 5: Design of Shear Connectors, Chapter 6: Shear Strength of Shear Connectors [Non-Patent Document 2] Architectural Institute of Japan, "Technical Guidelines for Steel Construction - Construction Site Edition", January 2018, pp.316-354, Chapter 7: Deck Plates and Headed Studs Summary of the Invention [Problem to be solved by the invention]

[0008] Therefore, the present invention has been devised in consideration of the above-mentioned problems, and an object of the present invention is to provide a joint structure between a deck composite slab and a beam that can reduce construction costs. [Means for solving the problem]

[0009] The joint structure between a composite deck slab and a beam according to the present invention is a joint structure between a composite deck slab and a beam in which a deck plate and concrete are integrated, the beam being arranged along the longitudinal direction of the deck plate, the composite deck slab comprising: a deck plate having a widthwise end portion intersecting with the longitudinal direction of the deck plate with a gap therebetween; flashing arranged in the gap between the widthwise end portion of the deck plate and the beam; the concrete arranged on the upper side of the deck plate and the flashing; and a stress transfer member arranged between the flashing and the beam, the stress transfer member being fixed to an upper surface of the beam and embedded in the concrete, the concrete having an end surface formed along a surface intersecting with the longitudinal direction, and a clearance distance from the end surface to the stress transfer member being 350 mm or more. Effect of the Invention

[0010] According to the present invention, a joint structure between a deck composite slab and a beam can be provided, which can reduce construction costs. [Brief description of the drawings]

[0011] [Figure 1] FIG. 1 is a plan view showing an example of a joint structure between a deck composite slab and a beam in the first embodiment. [Diagram 2] FIG. 2 is a perspective view showing, in a partially cutaway form, an example of a joint structure between a composite deck slab and a beam in the first embodiment. [Diagram 3] Figure 3 shows an example of a joint structure between a deck composite slab and a beam in the first embodiment, where Figure 3(a) is a plan view showing the joint portion with a beam having flashing at one end in the width direction, and Figure 3(b) is a front view showing the joint portion with a beam having flashing at one end in the width direction. [Figure 4] Figure 4 shows an example of the joint structure between a deck composite slab and a beam in the first embodiment, where Figure 4(a) is a plan view showing the joint portion with a beam having flashing provided at both ends in the width direction, and Figure 4(b) is a front view showing the joint portion with a beam having flashing provided at both ends in the width direction. [Diagram 5] FIG. 5 is a side view showing an example of the deck plate structure in the first embodiment. [Figure 6] FIG. 6 is a side view showing an example of a deck plate structure in the second embodiment. [Figure 7] FIG. 7 is a side view showing an example of a deck plate structure in the third embodiment. [Figure 8] FIG. 8 is a side view showing an example of a deck plate structure in the fourth embodiment. [Figure 9] FIG. 9 is a side view showing an example of a deck plate structure in the fifth embodiment. [Figure 10] FIG. 10 is a diagram for explaining the 0.1 mm offset yield strength. [Figure 11]FIG. 11 is a diagram showing the relationship between the clearance distance and the short-term bearing strength per joint in Case 1. [Figure 12] FIG. 12 is a diagram showing the relationship between the clearance distance and the short-term bearing strength per joint in Case 2. [Figure 13] FIG. 13 is a diagram showing the relationship between the clearance distance and the short-term bearing strength per joint in Case 3. [Figure 14] FIG. 14 is a diagram showing the relationship between the clearance distance and the short-term bearing strength per joint in Case 4. [Figure 15] FIG. 15 is a diagram showing the relationship between the clearance distance and the short-term bearing strength per joint in Case 5. [Figure 16] FIG. 16 is a diagram for explaining the finished thickness of a deck composite slab. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, the embodiment of the joint structure between the composite deck slab and the beam according to the present invention will be described in detail with reference to the drawings. In each drawing, the vertical direction is Z, the width direction of the deck plate intersecting the vertical direction Z is width direction X, and the length direction of the deck plate intersecting the vertical direction Z and width direction X is length direction Y.

[0013] (First embodiment) The joint structure 100 between a deck composite slab and a beam is used in buildings such as houses, stores, offices, parking lots, warehouses, large offices, etc. Hereinafter, the joint structure 100 between a deck composite slab and a beam will also be referred to as a joint structure 100. As shown in Figs. 1 and 2, the joint structure 100 includes a deck composite slab 1 and a beam 8.

[0014] For example, H-shaped steel is used for the beam 8. The beam 8 has a plurality of beams 81 arranged along the length direction Y and a plurality of beams 82 arranged along the width direction X. As shown in FIG. 1, the span length of the beam 81 is Ly, and the span length of the beam 82 is Lx. The span length Ly is the distance between the fulcrums and the distance between the axes of two adjacent beams 82 connected to the beam 81. The span length Lx is the distance between the fulcrums and the distance between the axes of two adjacent beams 81 connected to the beam 82. The plurality of beams 8 are combined in a rectangular shape and joined to the deck composite slab 1. Of the beams 81 arranged along the length direction Y, a pair of beams 81a are arranged on the outer periphery of the deck composite slab 1, and of the beams 81 arranged along the length direction Y, a beam 81b is arranged between the pair of beams 81a.

[0015] As shown in Fig. 2, the deck composite slab 1 is a deck composite slab in which a deck plate 2 and concrete 4 are integrated together. The deck composite slab 1 includes the deck plate 2, a flashing 3, concrete 4, and a stress transfer member 5.

[0016] The deck plate 2 is a known deck plate formed by bending a steel plate into a corrugated shape, as shown in Figures 3(a) and 4(a). The deck plate 2 is disposed with a gap between the end 21 in the width direction X and the beam 81, as shown in Figures 3(b) and 4(b). The deck plate 2 has joints formed at both end parts 21 in the width direction X. The joints formed at the end part 21 of one deck plate 2 can be joined with the joints of the end part 21 of another adjacent deck plate 2. In addition, the joints formed at the end part 21 of one deck plate 2 can be joined with the joint part 31 of the flashing 3.

[0017] The flashing 3 is provided in the gap between the end 21 in the width direction X of the deck plate 2 and the beam 81. A known flashing can be used as the flashing 3. The flashing 3 can fill the gap between the end 21 in the width direction X of the deck plate 2 and the beam 81, and can prevent the concrete 4 poured upward from falling.

[0018] The flashing 3 is formed by bending a thin steel plate, for example with a thickness of about 1.2 mm to 1.6 mm, into a predetermined shape. The flashing 3 has a joint portion 31 that joins with the end portion 21 of the deck plate 2, and a flat plate portion 32 that is continuous with the joint portion 31. The flashing 3 is placed such that the joint portion 31 is placed on the upper surface of the end portion 21 of the deck plate 2, and the flat plate portion 32 is placed on the beam 81.

[0019] As shown in Fig. 3(b), the flashing 3 is placed on one end in the width direction X of a beam 81a that constitutes the outer periphery of the deck composite slab 1. As shown in Fig. 4(b), the flashing 3 is placed on both ends in the width direction X of a beam 81b provided between a pair of beams 81a.

[0020] The concrete 4 is poured onto the deck plate 2, the flashing 3, the stress transfer members 5, and the upper side of the beams 8. The concrete 4 is formed into a rectangular shape in a plan view. As shown in Fig. 5, the concrete 4 has an end face 41 along a plane intersecting with the longitudinal direction Y. As shown in Fig. 3(b), the concrete 4 has a side face 42 along a plane intersecting with the width direction X.

[0021] 3 and 4, the stress transfer member 5 is placed on the upper surface of the flashing 3 and the upper surface of the beam 81, and is bridged between the flashing 3 and the beam 81. The stress transfer member 5 is fixed to the upper surface of the beam 81 by, for example, shielded metal arc welding, and embedded in the concrete 4. This allows the in-plane shear force acting on the deck composite slab 1 to be transferred to the beam 81 via the stress transfer member 5 embedded in the concrete 4.

[0022] The stress transmission member 5 may be further fixed to the upper surface of the flashing 3. In this case, the stress transmission member 5 can function as a displacement stopper for the flashing 3 when the concrete 4 is poured. The stress transmission member 5 and the upper surface of the flashing 3 are fixed to each other by, for example, shielded metal arc welding.

[0023] The length along the width direction X of the stress transfer member 5 fixed to the beam 81 is defined as W1. When the stress transfer member 5 is fixed to the beam 81 and the flashing 3 by shielded metal arc welding, if the length along the width direction X of the stress transfer member 5 provided on the flashing 3 is defined as W2, then the fixed length W along the width direction X at which the stress transfer member 5 is fixed to the beam 81 and the flashing 3 is given by fixed length W=W1+W2.

[0024] It is sufficient that the stress transmission member 5 is fixed at least to the beam 81. Therefore, the stress transmission member 5 may simply be placed on the upper surface of the flashing 3 without being fixed to the upper surface of the flashing 3. When the stress transmission member 5 is fixed only to the beam 81 by shielded metal arc welding, the fixed length W of the stress transmission member 5 is the weld length, and for example, the fixed length W=W1.

[0025] 5, the stress transfer member 5 has a thickness t of, for example, 1.6 mm to 12 mm. The stress transfer member 5 has a height h in the vertical direction Z of, for example, 20 mm to 300 mm.

[0026] For example, an angle iron is used as the stress transfer member 5. The stress transfer member 5 has a first plate portion 51 and a second plate portion 52.

[0027] The first plate portion 51 is provided along a plane intersecting with the longitudinal direction Y and approximately perpendicular to the upper surface of the beam 81.

[0028] The second plate portion 52 is provided approximately parallel to the upper surface of the beam 81 along a plane intersecting with the up-down direction Z. The second plate portion 52 is provided at the lower end of the first plate portion 51 approximately perpendicular to the first plate portion 51. The second plate portion 52 spans between the flashing 3 and the beam 81. The second plate portion 52 is fixed to the upper surface of the beam 81 by, for example, shielded metal arc welding. The second plate portion 52 may be fixed to the upper surface of the flashing 3 by, for example, shielded metal arc welding. The second plate portion 52 may be fixed to the beam 81 and the flashing 3 by welding its entire outer periphery.

[0029] In addition, the second plate portion 52 may be welded to the beam 81, for example, at three sides of the periphery of the portion that directly contacts the beam 81.

[0030] 5, the distance in the longitudinal direction Y from the end face 41 of the concrete 4 to the stress transfer member 5 closest to the end face 41 is defined as the edge clearance e. The edge clearance e can be expressed as the distance from the end face 41 to the center line of the plate thickness of the first plate portion 51 in the longitudinal direction Y.

[0031] The edge clearance e is preferably 350 mm or more. This makes the short-term allowable strength Q per joint where the stress transfer member 5 is provided larger than when the edge clearance e is less than 350 mm. This reduces the number of required stress transfer members 5. As a result, construction costs can be reduced.

[0032] A plurality of stress transfer members 5 are provided at a predetermined interval B in the longitudinal direction Y. The interval B in the longitudinal direction Y can be expressed as the distance from the center line of the plate thickness of the first plate portion 51 of one adjacent stress transfer member 5 to the center line of the plate thickness of the first plate portion 51 of the other adjacent stress transfer member 5.

[0033] The short-term allowable strength Q of each joint where the stress transfer member 5 is provided is calculated by the following formula (1). Here, the short-term allowable strength Q of each joint where the stress transfer member 5 is provided can be calculated by FEM analysis or the like, but the analysis takes time. In contrast, in formula (1), the short-term allowable strength Q of each joint is evaluated as the minimum value of the bearing strength cQbear of the stress transfer member 5, the shear yield strength cQs#shear of the stress transfer member 5, and the bending yield strength cQbend of the stress transfer member 5. This makes it possible to simply evaluate the short-term allowable strength Q of the joint without performing FEM analysis. This allows the joint structure 100 to be designed in a shorter time.

[0034] It is preferable that the interval B satisfies the following formula (2) based on the short-term allowable strength Q per joint calculated by formula (1). This makes it possible to optimize the number of stress transfer members 5 required to transfer the in-plane shear force acting on the deck composite slab 1 to the beams 81. This further reduces construction costs.

[0035]

number

[0036]

number

[0037] According to this embodiment, a stress transfer member 5 is provided that is bridged between the flashing 3 and the beam 81, and the stress transfer member 5 is fixed to the upper surface of the beam 81 and embedded in the concrete 4. As a result, when an in-plane shear force acts on the deck composite slab 1, it can be transferred from the concrete 4 to the beam 81 via the stress transfer member 5. This makes it unnecessary to use headed studs or a stud welding machine, facilitating construction.

[0038] According to this embodiment, the stress transfer member 5 may be further fixed to the flashing 3. This allows the stress transfer member 5 to function as a slip prevention device for the flashing 3 when pouring the concrete 4. This allows the quality of the deck composite slab 1 to be improved.

[0039] According to this embodiment, the stress transfer member 5 has a first plate portion 51 along a plane intersecting with the longitudinal direction Y. As a result, when an in-plane shear force acts on the deck composite slab 1, the first plate portion 51 can resist the force as a bearing surface. Therefore, it can resist even a larger in-plane shear force.

[0040] According to this embodiment, the stress transmission member 5 has a first plate portion 51 along a plane intersecting with the longitudinal direction Y and a second plate portion 52 along a plane intersecting with the vertical direction Z at the lower end of the first plate portion 51, and the second plate portion is fixed to the upper surface of the beam 81. As a result, even if the worker releases the stress transmission member 5 spanning the beam 81 and the flashing 3 when fixing the stress transmission member 5 to the beam 81, the stress transmission member 5 can be maintained in a stable state without falling over. This facilitates the work of fixing the stress transmission member 5 to the beam 81 by shielded metal arc welding or the like.

[0041] According to this embodiment, the stress transmission member 5 is fixed to the beam 81 by shielded metal arc welding. This allows the construction to be completed in a short time compared to stud welding.

[0042] According to this embodiment, as shown in Fig. 2, the flashings 3 are provided on both ends in the width direction X of the upper surface of the beam 81. This makes it possible to transmit the in-plane shear force of the deck composite slab 1 from the concrete 4 via the stress transmission member 5 to the beam 81 having the flashings 3 on both ends in the width direction X of the upper surface. This makes it possible to further increase the live load that the deck composite slab 1 can resist.

[0043] Furthermore, the flashing 3 can be provided at one end of the upper surface of the beam 81 in the width direction X. In this case, the in-plane shear force of the composite deck slab 1 can be transmitted from the concrete 4 to the beam 81 constituting the outer periphery, for example, via the stress transmission member 5. This makes it possible to further increase the live load that the composite deck slab 1 can resist.

[0044] According to this embodiment, the edge clearance e is 350 mm or more. As described later, this makes the short-term allowable strength Q per joint where the stress transfer member 5 is provided larger than when the edge clearance e is less than 350 mm. This makes it possible to reduce the number of locations where the stress transfer members 5 are required. As a result, construction costs can be reduced.

[0045] According to this embodiment, the short-term allowable strength Q per joint where the stress transfer member 5 is provided is calculated by formula (1), and the interval B satisfies formula (2) based on the short-term allowable strength Q calculated by formula (1). This makes it possible to optimize the number of stress transfer members 5 required to transfer the in-plane shear force acting on the deck composite slab 1 to the beams 81. This further reduces construction costs.

[0046] Second embodiment Next, a joint structure 100 according to a second embodiment will be described. Detailed description of the same configuration as the above-mentioned embodiment will be omitted below. As shown in FIG. 6, the joint structure 100 according to the second embodiment is different from the above-mentioned embodiment in that the second plate portion 52 is provided at the upper end of the first plate portion 51.

[0047] For example, an angle iron is used as the stress transfer member 5. The stress transfer member 5 has a first plate portion 51 and a second plate portion 52.

[0048] The first plate portion 51 is provided approximately perpendicular to the upper surface of the beam 81 along a plane intersecting with the longitudinal direction Y. The first plate portion 51 spans between the flashing 3 and the beam 81. The first plate portion 51 is fixed to the upper surface of the beam 81 by, for example, shielded metal arc welding. The first plate portion 51 may be fixed to the upper surface of the flashing 3 by, for example, shielded metal arc welding, as necessary.

[0049] The second plate portion 52 is provided approximately parallel to the upper surface of the beam 81 along a plane intersecting with the vertical direction Z. The second plate portion 52 is provided on the upper end of the first plate portion 51 at a distance from the beam 81.

[0050] The edge distance e in the longitudinal direction Y can be expressed as the distance from the end face 41 to the center line of the plate thickness of the first plate portion 51.

[0051] The interval B in the longitudinal direction Y can be expressed as the distance from the center line of the thickness of the first plate portion 51 of one adjacent stress transfer member 5 to the center line of the thickness of the first plate portion 51 of the other adjacent stress transfer member 5.

[0052] Third embodiment Next, a joint structure 100 according to a third embodiment will be described. As shown in Fig. 7, in the joint structure 100 according to the third embodiment, the stress transfer member 5 differs from the above-described embodiments in that it has a pair of first plate portions 51.

[0053] For example, an angle iron is used as the stress transfer member 5. The stress transfer member 5 has a pair of first plate portions 51 arranged substantially perpendicular to each other.

[0054] The pair of first plate portions 51 are provided at an inclination of approximately 45° with respect to the upper surface of the beam 81 along a plane intersecting with the longitudinal direction Y. The first plate portions 51 are bridged between the flashing 3 and the beam 81. The upper end of one first plate portion 51 is provided on the upper end of the other first plate portion 51. The lower end of the first plate portions 51 is fixed to at least the beam 8.

[0055] The edge distance e in the longitudinal direction Y can be expressed as the distance from the end face 41 to the connecting portion of the pair of first plate portions 51.

[0056] The interval B in the longitudinal direction Y can be expressed as the distance from the connecting portion of the first plate portions 51 of one adjacent stress transmission member 5 to the connecting portion of the first plate portions 51 of the other adjacent stress transmission member 5.

[0057] According to this embodiment, the stress transmission member 5 has a pair of first plate portions 51 along a plane intersecting with the longitudinal direction Y, and the lower ends of the pair of first plate portions 51 are fixed to the upper surface of the beam 81. As a result, even if an operator releases the stress transmission member 5 spanning the beam 81 and the flashing 3 when fixing the stress transmission member 5 to the beam 81, the stress transmission member 5 can be maintained in a stable state without falling over. This facilitates the work of fixing the stress transmission member 5 to the beam 81 by shielded metal arc welding or the like.

[0058] (Fourth embodiment) Next, a joint structure 100 according to a fourth embodiment will be described. As shown in Fig. 8, in the joint structure 100 according to the fourth embodiment, the stress transfer member 5 differs from the above-described embodiments in that a pair of first plate portions 51 are fixed to a beam 81.

[0059] For example, a channel steel is used as the stress transfer member 5. The stress transfer member 5 has a pair of first plate portions 51 spaced apart in the longitudinal direction Y, and a second plate portion 52 connecting the pair of first plate portions 51.

[0060] The first plate portion 51 is provided approximately perpendicular to the upper surface of the beam 81 along a plane intersecting with the longitudinal direction Y. The first plate portion 51 spans between the flashing 3 and the beam 81. The first plate portion 51 has the second plate portion 52 provided at its upper end, and at least the beam 81 is fixed to its lower end.

[0061] The second plate portion 52 is provided along a plane intersecting with the vertical direction Z. The second plate portion 52 is spaced apart from the beam 81 in the vertical direction Z and connects the pair of first plate portions 51 together.

[0062] The edge distance e in the longitudinal direction Y can be expressed as the distance from the end face 41 to the center of the pair of first plate portions 51.

[0063] The interval B in the longitudinal direction Y can be expressed as the distance from the center of a pair of first plate portions 51 in one adjacent stress transmission member 5 to the center of a pair of first plate portions 51 in the other adjacent stress transmission member 5.

[0064] According to this embodiment, the stress transmission member 5 has a pair of first plate portions 51 along a plane intersecting with the longitudinal direction Y, and the lower ends of the pair of first plate portions 51 are fixed to the upper surface of the beam 81. As a result, even if an operator releases the stress transmission member 5 spanning the beam 81 and the flashing 3 when fixing the stress transmission member 5 to the beam 81, the stress transmission member 5 can be maintained in a stable state without falling over. This facilitates the work of fixing the stress transmission member 5 to the beam 81 by shielded metal arc welding or the like.

[0065] Fifth embodiment Next, a joint structure 100 according to a fifth embodiment will be described. As shown in Fig. 9, in the joint structure 100 according to the fifth embodiment, the stress transfer member 5 is different from the above-described embodiments in that it includes a first plate portion 51 connecting a pair of second plate portions 52.

[0066] For example, a channel steel is used as the stress transfer member 5. The stress transfer member 5 has a pair of second plate portions 52 spaced apart in the vertical direction Z, and a first plate portion 51 between the pair of second plate portions 52.

[0067] The first plate portion 51 is provided approximately perpendicular to the upper surface of the beam 81 along a plane intersecting with the longitudinal direction Y. The first plate portion 51 spans between the flashing 3 and the beam 81. The first plate portion 51 connects a pair of second plate portions 52 spaced apart in the vertical direction Z.

[0068] The second plate portion 52 is provided along a plane intersecting with the vertical direction Z. The second plate portion 52 spans between the flashing 3 and the beam 81. A pair of second plate portions 52 are provided spaced apart in the vertical direction Z. The lower second plate portion 52 is fixed to at least the beam 81.

[0069] The edge distance e in the longitudinal direction Y can be expressed as the distance from the end face 41 to the center line of the plate thickness of the first plate portion 51.

[0070] The interval B in the longitudinal direction Y can be expressed as the distance from the center line of the thickness of the first plate portion 51 of one adjacent stress transfer member 5 to the center line of the thickness of the first plate portion 51 of the other adjacent stress transfer member 5.

[0071] According to this embodiment, the stress transmission member 5 has a pair of first plate portions 51 along a plane intersecting with the longitudinal direction Y, and the lower ends of the pair of first plate portions 51 are fixed to the upper surface of the beam 81. As a result, even if an operator releases the stress transmission member 5 spanning the beam 81 and the flashing 3 when fixing the stress transmission member 5 to the beam 81, the stress transmission member 5 can be maintained in a stable state without falling over. This facilitates the work of fixing the stress transmission member 5 to the beam 81 by shielded metal arc welding or the like.

[0072] In the above-described embodiment, the stress transmission member 5 has been described by taking a channel steel and a grooved steel as examples. In addition, the stress transmission member 5 may include at least any one of a flat plate, a square steel pipe, an angle steel, a steel pipe, a round steel, and a reinforcing bar.

[0073] As described above, some embodiments of the present invention have been described. However, these embodiments are presented as examples and are not intended to limit the scope of the invention. Furthermore, the present invention can be implemented in various novel forms in addition to the above-described embodiments. Therefore, the above-described embodiments can be variously omitted, replaced, and changed without departing from the gist of the present invention. Such novel forms and modifications are included in the scope and gist of the present invention, and are also included in the scope of the invention described in the claims and the scope of equivalents of the invention described in the claims.

Example

[0074] Hereinafter, the lap distance e and the interval B between the stress transmission members will be described. Cases 1 to 5 with different shapes and arrangements of the stress transmission member 5 were examined. The stress transmission member 5 was examined when three sides of the portion in contact with the beam were fixed by welding.

[0075]

Table 1

[0076] <Evaluation of the short-term allowable strength Q per joint based on FEM analysis> For Cases 1 to 5, the short-term allowable strength Q per joint where the stress transmission member 5 is provided was evaluated. For Cases 1 to 5, FEM analysis was performed to calculate the history of the shear stress and deformation amount borne by each joint, and the 0.1 mm offset strength analysis value aQ 0.1mm was evaluated as the short-term allowable strength Q per joint.

[0077] As shown in FIG. 9, the 0.1 mm offset strength analysis value aQ0.1mm is the strength value at the intersection of line L2, which is the tangent line L1 with a slope k at the origin offset to a displacement of 0.1 mm, and the relationship between the shear strength P and the deformation δ per joint. Figures 11 to 15 show the relationship between the clearance distance e and the short-term allowable strength Q per joint (0.1 mm offset strength aQ 0.1mm ) is a diagram showing the relationship between

[0078] 11 to 15, it was confirmed that the short-term allowable strength Q per joint in Cases 1 to 5 is greater when the edge clearance e is 350 mm or more than when the edge clearance e is 50 mm. Therefore, when the edge clearance e is 350 mm or more, the short-term allowable strength Q per joint can be effectively exerted.

[0079] In addition, it was confirmed that the short-term allowable strength Q per joint in Cases 1 to 5 remained almost constant when the edge clearance e was 350 mm or more. Therefore, when the edge clearance e was 350 mm or more, the short-term allowable strength Q per joint could be stably exerted.

[0080] <Evaluation of short-term allowable strength Q per joint based on formula (1)> Next, for Cases 1 to 5, the short-term allowable strength Q per joint was calculated based on the above formula (1). The short-term allowable strength Q per joint calculated using formula (1) (referred to as short-term allowable strength (calculated value) Q of joint in Tables 2 and 3 below) and the 0.1 mm offset strength analysis value aQ obtained based on the above FEM analysis were 0.1mm The results of the comparison are shown in Tables 2 and 3.

[0081] [Table 2]

[0082] [Table 3]

[0083] As shown in Tables 2 and 3, aQ 0.1mm When the edge clearance e is 350 mm or more, the short-term allowable strength Q calculated by formula (1) is greater than 1.0 regardless of the edge clearance e. 0.1mm This confirmed that the short-term allowable strength Q per joint can be evaluated as the short-term allowable strength Q calculated by formula (1) to ensure a safe design.

[0084] Here, the short-term allowable strength Q of each joint where the stress transfer member is provided can be calculated by analysis such as FEM analysis, but the analysis takes time. In contrast, in formula (1), the short-term allowable strength Q of each joint is evaluated as the minimum value of the bearing strength cQbear of the stress transfer member 5, the shear yield strength cQs#shear of the stress transfer member 5, and the bending yield strength cQbend of the stress transfer member 5. This makes it possible to simply evaluate the short-term allowable strength Q of each joint without performing FEM analysis. This allows the joint structure 100 to be designed in a shorter time.

[0085] <An example of how to calculate interval B> Next, an example of a method for calculating the interval B of the stress transfer members 5 will be described. In the following example, the arrangement and shape of the stress transfer members 5 correspond to Case 1. In addition, the deck composite slab is a square shape with the span length Lx of the beam in the width direction and the span length Ly of the beam in the length direction each being 7000 mm.

[0086] The calculation conditions are shown in Table 4 below.

[0087] [Table 4]

[0088] The loading conditions are shown in Table 5 below. Here, the deck crest height is S, the finishing thickness is S0, the converted slab thickness of the deck groove is Depth, the unit volume weight of concrete is γ, and the deck plate's own weight is Wdp. As shown in Figure 16, the finishing thickness S0 is the thickness of the finishing concrete 49 provided on the top surface of the concrete 4 of the deck composite slab 1. Note that since the finishing concrete 49 does not contribute to the stress burden of the deck composite slab 1, as shown in Table 5, in this calculation, the finishing thickness S0 = 0.

[0089] [Table 5]

[0090] Referring to Case 1 in Table 2, the short-term allowable strength Q of the joint calculated using formula (1) is shown in Table 6 below.

[0091] [Table 6]

[0092] Based on the formula (2), the calculation results of the interval B of the stress transmission members 5 are shown in Table 7 below. Here, the earthquake shear force coefficient is Ci.

[0093] [Table 7]

[0094] From the above calculation example, by setting the spacing B of the stress transfer members 5 to 1475 mm or less, the deck composite slab can effectively resist the in-plane shear force acting thereon.

[0095] As described above, according to the present invention, the short-term allowable strength Q per joint where the stress transfer member 5 is provided is calculated by the formula (1), and the interval B satisfies the formula (2) based on the short-term allowable strength Q calculated by the formula (1). This makes it possible to optimize the number of stress transfer members 5 required to transfer the in-plane shear force acting on the deck composite slab 1 to the beams 81. This further reduces the construction costs. [Explanation of symbols]

[0096] 100: Joint structure between deck composite slab and beam 1: Deck composite slab 2: Deck plate 21: End 3: Flashing 31: Engagement part 32: Flat plate part 4: Concrete 41: End face 42: Side 5: Stress transmission member 51: 1st plate part 52:Second plate part 8: Beam 81: Beam 82: Beam X: Width direction Y : Direction Z: Vertical direction

Claims

1. A joint structure between a deck composite slab in which the deck plate and concrete are integrated and a beam, The beam is provided along the longitudinal direction of the deck plate, The deck composite slab is The deck plate has a width direction end portion intersecting with a length direction of the deck plate, the width direction end portion being spaced from the beam; A flashing provided in a gap between the end portion in the width direction of the deck plate and the beam; The concrete provided on the upper side of the deck plate and the flashing; A stress transmission member is provided between the flashing and the beam, the stress transfer member is fixed to an upper surface of the beam and embedded in the concrete; The concrete has an end surface formed along a surface intersecting the longitudinal direction, The clearance distance from the end face to the stress transmission member is 350 mm or more. A joint structure between a composite deck slab and a beam.

2. The stress transfer member includes at least one of a flat plate, an angle iron, a channel iron, a square steel pipe, a square steel, a steel pipe, a round steel, and a reinforcing bar.

2. The joint structure between a composite deck slab and a beam according to claim 1.

3. The stress transmission members are provided in a plurality of positions spaced apart from one another in the longitudinal direction, The short-term allowable strength of the joint in which the stress transfer member is provided is calculated by the following formula (1): The interval satisfies the following formula (2):

2. The joint structure between a composite deck slab and a beam according to claim 1. [0030] [0045] Where, B: Spacing, Ly: Span length of beam in longitudinal direction, Q: Short-term allowable strength per joint, Qv: Design horizontal shear force

Citation Information

Patent Citations

  • Fire-resistant coating structure of synthetic fire-resistant beam

    JP2006328821A

  • Flashing for composite slab, joining structure of composite slab and beam material and composite slab

    JP2017106194A

  • Flashing

    JP2021143471A

  • Junction structure of beam and slab

    JP2022069920A

  • Composite construction

    JP2022154280A