Device determining soundness of construction machinery

The device uses accelerometer-based vibration analysis to classify and diagnose construction machinery health, addressing inaccuracies in conventional audio signal-dependent methods and user input errors, ensuring precise diagnostic outcomes.

JP2024140330AActive Publication Date: 2024-10-10HITACHI CONSTRUCTION MACHINERY CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2023051424
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-03-28
Publication Date
2024-10-10
Estimated Expiration
2043-03-28

AI Technical Summary

Technical Problem

Conventional construction machinery diagnostic tools rely on audio signals and require accurate user input of machine weight class, leading to potential measurement inaccuracies and incorrect diagnoses.

Method used

A device that determines the health of construction machinery by measuring vibrations using an accelerometer, classifying the machine's weight, and analyzing mechanical operations to provide accurate diagnostic results without audio signals.

Benefits of technology

The solution provides more accurate diagnostic results by classifying the machine's weight and operations based on vibration analysis, reducing reliance on user input and improving measurement precision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024140330000001_ABST
    Figure 2024140330000001_ABST
Patent Text Reader

Abstract

To propose a device that obtains a more accurate diagnostic result without depending on a voice signal in determining the soundness of construction machinery.SOLUTION: A device determining the soundness of construction machinery comprises an operation unit. The operation unit measures vibration of the construction machinery through an accelerometer, determines a weight class of the construction machinery on the basis of the vibration, measures a result of a machine operation of the construction machinery, and on the basis of the weight class and the result of the machine operation, determines the soundness of the construction machinery.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to an apparatus for determining the soundness of a construction machine. [Background technology]

[0002] With regard to construction machinery, it is important to measure its basic performance, diagnose and predict potential failures in advance, and perform maintenance before a failure occurs to avoid interruptions to construction work. Basic performance refers to the inherent performance and standard specifications of the construction machinery. In this regard, the market demands that tools for automatic self-diagnosis of failures (automatic self-diagnosis tools) be easy to use even for unskilled personnel, inexpensive, and easy to use.

[0003] For example, Patent Document 1 discloses an automatic self-diagnosis technology that, in order to shorten diagnosis time, diagnoses the presence or absence of abnormalities in each part of a construction machine based on the operating sounds of the machine, and when an abnormality is diagnosed, identifies the cause of the abnormality based on information from the part diagnosed as abnormal, and displays the identification result. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent Publication No. 2021-67614 Summary of the Invention [Problem to be solved by the invention]

[0005] Some conventional techniques use audio signals, but the measurement accuracy of such techniques depends on the placement of the audio sensor (such as a microphone).

[0006] Furthermore, in the conventional technology, the user is required to correctly input the weight class of the construction machine, and if this input is incorrect, a correct diagnosis cannot be made.

[0007] In view of such circumstances, the present disclosure proposes a technique for obtaining more accurate diagnostic results without relying on audio signals. [Means for solving the problem]

[0008] In order to solve the above problem, an example of the present disclosure includes: A device for determining the soundness of a construction machine, comprising: The device includes a computing unit, The calculation unit is - measuring the vibrations of said construction machine via an accelerometer, - determining a weight class of the construction machine based on the vibration; - measuring the results of mechanical movements of said construction machine, - Determining the health of the construction machine based on the weight class and the results of the machine operation.

[0009] Further features related to the present disclosure will become apparent from the description of the present specification and the accompanying drawings. Also, aspects of the present disclosure may be realized and realized by the elements and combinations of various elements and aspects of the following detailed description and the appended claims.

[0010] The descriptions herein are exemplary and illustrative only and are not intended to limit the scope or application of the present disclosure in any way. Effect of the Invention

[0011] The technology disclosed herein does not rely on audio signals and can obtain more accurate diagnostic results. [Brief description of the drawings]

[0012] [Figure 1] 1 is a diagram showing a schematic configuration example of a construction machine diagnosis system according to an embodiment of the present disclosure. [Diagram 2] 1 is a block diagram showing an example of a schematic functional configuration of a processor 10 according to the present embodiment. [Diagram 3] FIG. 2 is a diagram showing an example of the internal functional configuration of an information acquisition unit 101 of the performance measurement device 1. [Figure 4]FIG. 2 is a diagram showing an example of the internal functional configuration of a weight class classification unit 102 of the performance measurement device 1. [Diagram 5] An example of the scale of noise vibration. [Figure 6] 2 is a diagram showing an example of the internal functional configuration of an operation classification unit 103 of the performance measurement device 1. [Figure 7] Example waveforms of acceleration signals corresponding to different operations of the same construction machine. [Figure 8] 4 is a flowchart for explaining the processing of a health diagnostic unit 104. [Figure 9] 9 is a flowchart for explaining detailed processing of step S110 in FIG. 8. [Figure 10] Example of an acceleration signal containing false peaks. [Figure 11] FIG. 2 is a diagram showing an example of the internal functional configuration of a basic performance reporting unit 105 of the performance measuring device 1. [Figure 12] 12 is a diagram showing an example of the configuration of a history log list 1201, which is an example of information held by a data storage unit 207 included in a storage device 20 of the performance measuring apparatus 1. FIG. [Figure 13] 1 shows an example of the configuration of performance reference value information 1301 held by a performance reference value holding unit 203 included in a storage device 20 of a performance measuring apparatus 1. [Figure 14] 1 shows an example of the configuration of operating range reference value information 1401 held by an operating range reference value holding unit 204 included in the storage device 20 of the performance measuring apparatus 1. FIG. [Figure 15] 1 is a diagram showing an example of the configuration of action-specific representative waveform information 1501 stored in an action-specific representative waveform storage unit 202 included in a storage device 20 of the performance measuring apparatus 1. FIG. [Figure 16] 16 is a diagram showing an example of the configuration of recommendation information 1601 stored in a recommendation information storage unit 205 included in a storage device 20 of a performance measurement device 1. FIG. [Figure 17] 17 is a diagram showing an example of the configuration of action list information 1701 (table) held by an action list holding unit 206 included in the storage device 20 of the performance measurement device 1. FIG. [Figure 18] 18A and 18B are diagrams showing, in comparison, an example of input information 1801 to a performance measuring device 1 and an example of output information 1802 from the device 1. [Figure 19] 2 shows an example of a user interface displayed on the display screen of the performance measuring device 1 or the display screen of the user terminal 4. [Figure 20] 4 is a flowchart for explaining a performance measurement diagnosis process according to the present embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0013] <System configuration example> FIG. 1 is a diagram showing an example of a schematic configuration of a construction machine diagnosis system (a device for determining the soundness of a construction machine) according to one embodiment.

[0014] The construction machinery diagnostic system includes a performance measuring device 1, a sensor group 2, and a user terminal 4, and targets a construction machinery 3 for diagnosis. In the system configuration example of FIG. 1, the user terminal 4 and the performance measuring device 1 are shown as separate devices, but the functions of the performance measuring device 1 and the data holding / storage units may be implemented in the user terminal 4. Also, in the system configuration example of FIG. 1, the user terminal 4 and the sensor group 2 are shown as separate devices, but some or all of the sensor group 2 may be implemented in the user terminal 4.

[0015] The performance measuring device 1 includes, for example, a processor 10, a storage device 20, and a communication device 30.

[0016] The sensor group 2 is composed of a plurality of different sensors that can be used in the application of diagnosis of the condition of the construction machine, and includes, for example, an accelerometer 21. Furthermore, the sensor group 2 can include, but is not limited to, a microphone 22 and a camera 23. The accelerometer 21 is a microelectromechanical system (MEMS)-scale sensor that can be incorporated into a device and measures acceleration with the ability to detect gravity and vibration. The microphone 22 can be an independent microphone or a small microphone built into the performance measurement device 1. The camera 23 can be, for example, an independent small camera or a small camera built into the performance measurement device 1 or the user terminal 4.

[0017] The construction machine 3 is, for example, various types of construction machine such as a hydraulic excavator, a wheel loader, a bulldozer, etc. The construction machine 3 includes an angle sensor 13 that detects the current angle of a moving part of the construction machine 3 (for example, a boom, an arm, a bucket, etc. in the case of a hydraulic excavator) in real time.

[0018] The user terminal 4 can be configured with a computer device such as a smartphone, a microcontroller, or a personal computer (PC). The microcontroller may be called a portable controller, a control board, or the like. In particular, the use of a smartphone or a microcontroller improves the convenience of the operator.

[0019] The processor 10, storage device 20, and communication device 30 of the performance measuring device 1, the various sensors of the sensor group 2, and the angle sensor 13 of the construction machine 3 are connected, for example, via a communication device. In addition, the communication device 30 is configured to be able to wirelessly transmit, for example, diagnostic results to the user terminal 4.

[0020] The processor 10 functions as a calculation unit. The processor 10 is composed of a calculation device such as a CPU, and generates each processing unit by reading various related programs from the storage device 20 and expanding them in an internal memory (not shown). Each processing unit includes an information acquisition unit 101, a weight class classification unit 102, an operation classification unit 103, a health diagnosis unit 104, and a basic performance reporting unit 105. The operation of each process will be described in detail later.

[0021] The memory device 20 includes a weight reference value holding section 201, a representative waveform by action holding section 202, a performance reference value holding section 203, an action range reference value holding section 204, a recommendation information holding section 205, an action list holding section 206, and a data storage section 207.

[0022] The weight reference value storage unit 201 stores, for example, reference values ​​of the magnitude of noise and vibration for each weight class, which serve as the basis for classifying a construction machine to be newly diagnosed (inspected) into a weight class.

[0023] The operation-specific representative waveform storage unit 202 stores, for example, representative sensor waveform patterns for each machine operation, which serve as a standard for classifying a machine operation to be newly diagnosed (inspected).

[0024] The performance reference value holding unit 203 holds (stores) information on the reference value (standard value) of the soundness state of the machine operation to be inspected, which is set by the manufacturer, for example. One example of the information on the standard value of the soundness state is information that the arm pulling operation of a specific construction machine ideally takes 3.9 seconds (or within a range of 3.9 seconds ±0.4 seconds).

[0025] The operation range reference value storage unit 204 holds (stores), for example, a reference value (standard value) of the operation range of the construction machine. An example of operation range reference value information is information that the boom raising angle is from 0 degrees to 90 degrees.

[0026] The recommendation information storage unit 205 stores recommendation information to be presented to the operator according to the health status of the construction machine. For example, recommendation information such as "The arm cylinder seems to be in poor condition. Please show this report to the maintenance department so that they can take measures."

[0027] The operation list storage unit 206 stores information on all related operations related to a specific diagnosis (test) type. Examples of the operations to be diagnosed include (a) arm pulling, (b) arm pushing, (c) boom raising, (d) boom lowering, (e) bucket digging, and (f) bucket dumping.

[0028] The data storage unit 207 is configured by a storage device, and stores various data handled by the performance measuring device 1 (including the aggregated sensor data from the information acquisition unit 101).

[0029] <Example of performance measurement device configuration> 2 is a block diagram showing an example of a schematic functional configuration of the processor 10 according to this embodiment. The main functions of the performance measurement device 1 are realized by an information acquisition unit 101, a weight class classification unit 102, an operation classification unit 103, a health diagnosis unit 104, and a basic performance reporting unit 105.

[0030] The information acquisition unit 101 collects the sensor data in a predetermined format and makes it ready for processing. Note that an example of the sensor data is accelerometer data that detects load vibrations of a construction machine, and an example of the load is an arm.

[0031] The weight class classification unit 102 processes the data acquired from the information acquisition unit 101, and detects, for example, the magnitude of vibration (noise vibration) when the construction machine is not operating (i.e., when the construction machine is on standby). Generally, heavier construction machines exhibit smaller noise vibrations and lighter construction machines exhibit larger noise vibrations, so a reference value is stored for each weight class, and the weight class of the construction machine can be classified by comparing the measured noise vibrations with the reference values ​​(threshold values, standard values, etc.) stored in a database or the like.

[0032] In this way, the vibration of the construction machine (particularly the part used to determine the weight class) is measured while the construction machine is in a standby state, which makes it possible to determine the weight class efficiently without requiring any specific operation.

[0033] The motion classification unit 103 processes data acquired from, for example, the information acquisition unit 101 and the weight class classification unit 102, and outputs information on the type of motion performed during diagnosis. One example of the processing by the motion classification unit 103 is classifying a machine motion as an arm pull using a waveform detected by an accelerometer.

[0034] The health diagnostic unit 104 processes data acquired from, for example, the information acquisition unit 101, the weight class classification unit 102, and the operation classification unit 103, and outputs a diagnostic result indicating the health of a particular construction machine (for example, whether it is in a healthy state or not). Also, for example, the health diagnostic unit 104 processes vibrations acquired from an operation inspection of the arm of the construction machine using an accelerometer, and outputs information indicating how long it took for the machine to perform arm retraction based on the peak level of the vibration.

[0035] The basic performance reporting unit 105 reports (outputs) the results to the operator based on the calculation results of the soundness diagnosis unit 104. For example, the basic performance reporting unit 105 requests data on the operating range reference value corresponding to the current construction machine from the operating range reference value storage unit 204 in order to verify the correct operating range. Then, the basic performance reporting unit 105 transfers information on the operating range reference value to, for example, a user terminal 4 (such as a mobile terminal (smartphone) or a computer (PC)) and displays the information on its output screen. Note that, if the performance measuring device 1 is implemented in the user terminal 4, information on the operating range reference value and the like will be directly output to the display screen. This allows the operator to confirm whether the operation of the construction machine in the diagnosis was within the correct operating range or not, and to grasp whether the construction machine is in a sound state or not.

[0036] <Example of internal functional configuration of information acquisition unit 101> FIG. 3 is a diagram showing an example of the internal functional configuration of the information acquisition unit 101 of the performance measurement device 1. As shown in FIG.

[0037] The information acquisition unit 101 includes a sensor sampling frequency setting unit 1011 , a data format setting unit 1012 , and a data acquisition time setting unit 1013 .

[0038] The sensor sampling frequency setting unit 1011 has a function of setting a sampling frequency for acquiring data from any one of the sensors 2 (e.g., an accelerometer). The sampling frequency may be determined in advance, or may be determined by an operator or another user. For example, the sampling frequency for acquiring data from the accelerometer may be set to 100 samples / second.

[0039] The data format setting unit 1012 has a function of setting the format in which acquired sensor data is to be processed. For example, the data format may be CSV.

[0040] The data acquisition time setting unit 1013 has the function of setting a time limit for data acquisition. The time limit can be set manually (such as collecting data for 20 seconds regardless of the length of the test itself) or automatically (asking the operator to start data acquisition, perform a diagnosis (examination), and then stop data acquisition).

[0041] <Example of Internal Functional Configuration of Weight Classification Unit 102> FIG. 4 is a diagram showing an example of the internal functional configuration of the weight class classification unit 102 of the performance measurement device 1. As shown in FIG.

[0042] The weight class classification unit 102 includes a bias removal unit 1021 , an absolute value acquisition unit 1022 , a noise magnitude extraction unit 1023 , and a weight class determination unit 1024 .

[0043] The bias removal unit 1021 removes the bias component (DC component) in the acceleration signal. By removing the bias, the signal can be normalized.

[0044] The absolute value acquisition unit 1022 acquires the absolute value of the acceleration signal, i.e., discards the sign indicating positive or negative. Although acceleration is a vector quantity and can include both positive and negative values, only the magnitude of the signal is referenced in subsequent processing.

[0045] The noise scale extraction unit 1023 extracts the scale of noise in the signal during the period when the operation of the construction machine has not yet started. After the operator issues an instruction to start operation to the performance measuring device 1, it takes a certain amount of time (for example, 2 to 5 seconds) before the actual operation of the construction machine starts. Therefore, the scale of noise vibration can be measured within a short predetermined time period (for example, 0.5 to 1 second) immediately after the instruction to start operation. The scale of noise vibration can be obtained, for example, by averaging the signal values ​​within the period.

[0046] The weight class determination unit 1024 compares the magnitude of the noise vibration acquired by the noise magnitude extraction unit 1023 with a reference value of the magnitude of the noise vibration pre-stored in the weight reference value storage unit 201, and determines the weight class accordingly. The weight reference value storage unit 201 stores different reference values ​​for each weight class, and the weight class can be determined based on the magnitude of the measured noise vibration.

[0047] Figure 5 shows an example of the magnitude of noise vibration. Figure 5(a) shows the acceleration signal during arm pulling motion of a construction machine belonging to a 20-ton weight class. Figure 5(b) shows the acceleration signal during arm pulling motion of a construction machine belonging to a 40-ton weight class.

[0048] The arm pulling operation in Fig. 5(a) is initiated at 13.4 seconds, and period 51 shows the noise vibration of a 20 ton construction machine in a standby state (i.e., before the arm pulling operation starts). The arm pulling operation in Fig. 5(b) is initiated at 9.1 seconds, and period 52 shows the noise vibration of a 40 ton construction machine in a standby state (i.e., before the arm pulling operation starts). Thus, the magnitude of the noise vibration corresponding to 40 tons is less than the magnitude of the noise vibration corresponding to 20 tons.

[0049] Therefore, 20-ton construction machines and 40-ton construction machines can be correctly classified by storing the minimum value of the magnitude of noise vibration for 20 tons as the reference value in the weight reference value storage unit 201. The reference value may be the maximum value of the magnitude of noise vibration for 40 tons, or an intermediate value between the magnitude of noise vibration for 20 tons and the magnitude of noise vibration for 40 tons.

[0050] Although the example of FIG. 5 shows only two weight classes, more than two weight classes may be defined.

[0051] In this way, the weight reference value storage unit 201 may store vibration thresholds associated with a plurality of weight classes, and the weight class of the construction machine may be determined based on these vibration thresholds. In this way, appropriate classification can be performed based on the actual vibration.

[0052] <Example of Internal Functional Configuration of Action Classification Unit 103> FIG. 6 is a diagram showing an example of the internal functional configuration of the operation classification unit 103 of the performance measurement device 1. As shown in FIG.

[0053] The action classification unit 103 includes a feature analysis unit 1031 , a pattern matching unit 1032 , and a classification unit 1033 .

[0054] The feature analyzer 1031 analyzes various features to gather further information about the operation of the construction machine. One example of feature analysis is analysis of the shape of the peak amplitude and decay (referred to herein as roll-off) of the accelerometer 21 signal.

[0055] The pattern matching section 1032 compares the information acquired from the feature analysis section 1031 with the patterns stored in the action-specific representative waveform storage section 202, and extracts a matching pattern (for example, within a predetermined error range).

[0056] The classification unit 1033 determines (specifies) the type of action being performed based on the result of the comparison by the pattern matching unit.

[0057] Figure 7 shows examples of waveforms of acceleration signals corresponding to various operations of the same construction machine. Six types of operations are shown: arm pull, arm push, bucket digging, bucket dumping, boom up, and boom down. The start and end points of each operation have unique waveform patterns, and it is possible to determine which operation the measured acceleration signal corresponds to based on the measured waveform pattern. It is also possible to identify the start and end points of each operation.

[0058] Pattern features for distinguishing between motions include, for example, the following amplitude magnitude and decay: The roll-off portion of the signal has a different shape for each motion and occurs at a different period for each motion. Both amplitude features (e.g., peak value and / or peak amplitude) and roll-off portion features can be used for pattern matching.

[0059] The patterns that are the basis for pattern matching are stored in advance in the motion representative waveform storage unit 202. The patterns are stored for each motion. Furthermore, the patterns may be stored for each weight class.

[0060] The patterns may be used for classifying the weight classes. For example, the motion-specific representative waveform storage unit 202 may store vibration patterns associated with a plurality of weight classes, and the weight class of the construction machine may be determined based on these vibration patterns. In this way, appropriate classification can be performed based on the actual vibration patterns.

[0061] <Health diagnosis process> 8 is a flowchart for explaining the processing of the health diagnosis unit 104. First, in step S101, the health diagnosis unit 104 removes the bias of the acceleration signal. This processing can be executed in the same manner as the bias removal unit 1021 of the weight class classification unit 102, for example.

[0062] Next, in step S102, the health diagnosis unit 104 acquires the absolute value of the acceleration signal. This process can be executed in the same manner as the absolute value acquisition unit 1022 of the weight class classification unit 102, for example.

[0063] Next, in step S103, the health diagnostic unit 104 removes noise components from the acceleration signal. A specific calculation process for removing the noise components can be appropriately designed by a person skilled in the art based on known techniques.

[0064] Next, in step S104, the health diagnostic unit 104 applies a low-pass filter to the acceleration signal, which smooths the signal and makes the peaks clearer.

[0065] Next, in step S105, the health diagnostic unit 104 detects the first peak of the peaks of the acceleration signal. A specific calculation process for detecting the peak can be appropriately designed by a person skilled in the art based on known techniques, etc. For example, a scan for peak detection is performed based on the envelope of the acceleration signal, and a peak exceeding a predetermined threshold is detected. This threshold may be adaptively calculated, or may be calculated based on the average value and / or variance of the acceleration. A specific content of the process related to the envelope can be appropriately designed by a person skilled in the art based on known techniques, etc.

[0066] Next, in step S106, the health diagnostic unit 104 checks the energy of the peak. If the energy of the peak is greater than a predetermined criterion (for example, if an amplitude exceeding a predetermined threshold continues for a predetermined time or more), the peak is determined to be a true peak, and if not, the peak is determined to be not a true peak (a spike). For this determination, the health diagnostic unit 104 may include an integrator.

[0067] Next, in step S107, the process branches based on the result of step S106: if the peak is a spike, the process proceeds to step S108, and if the peak is a true peak, the process proceeds to step S109.

[0068] In step S108, the health diagnostic unit 104 removes the spike from the acceleration signal. After that, the health diagnostic unit 104 returns the process to step S105 and repeats peak detection based on the acceleration signal from which the spike has been removed.

[0069] In step S109, the health diagnostic unit 104 determines whether the peak is the first peak. If it is the first peak, the process proceeds to step S110. If not (for example, if it is the second peak), the process proceeds to step S114.

[0070] In step S110, the health diagnostic unit 104 checks for false peaks. After issuing an instruction to start operation of the performance measuring device 1 via the user terminal 4, the operator may accidentally shake the sensor group 2 or the user terminal 4 with his / her hand before placing the sensor group 2 or the user terminal 4 in a specified placement location (for example, placing it in a specified cup holder), in which case a peak not related to the operation of the construction machine (false peak) is detected. The health diagnostic unit 104 judges whether or not the peak is such a false peak. A specific example of the judgment process will be described later with reference to Figs. 9 and 10.

[0071] Next, in step S111, the process branches based on the result of step S110. If the peak is a false peak, the process proceeds to step S113, and if the peak is a true peak, the process proceeds to step S112.

[0072] In step S112, the health diagnostic unit 104 extracts the peak as the first peak and stores the time of occurrence of the peak. This first peak corresponds to the time when the operation of the construction machine is started.

[0073] In step S113, the health diagnostic unit 104 removes the peak (the false peak or the first peak) from the acceleration signal, and returns the process to step S105.

[0074] In the above-mentioned step S109, if the peak is not the first peak (for example, if it is the second peak), the process proceeds to step S114. In step S114, the soundness diagnosis unit 104 extracts the peak as the second peak and stores the occurrence time of the peak. This second peak corresponds to the time when the operation of the construction machine ends.

[0075] Next, in step S115, the health diagnosis unit 104 subtracts the occurrence time of the first peak from the occurrence time of the second peak, thereby calculating the duration of the operation of the construction machine. In other words, the health diagnosis unit 104 measures the start time and end time of the mechanical operation, and calculates the duration of the mechanical operation based on the start time and end time. In this way, the health diagnosis unit 104 measures the result of the mechanical operation of the construction machine. The health of the construction machine is judged based on this duration.

[0076] In this way, by determining the soundness based on the duration of the operation, the actual operation of the construction machine can be evaluated, allowing for a more accurate determination.

[0077] Fig. 9 is a flowchart for explaining the detailed process of step S110 in Fig. 8. Also, Fig. 10 is an example of an acceleration signal including a false peak. It is assumed that in step S110, the false peak 61 in Fig. 10 is being processed.

[0078] First, in step S110a, the health diagnostic unit 104 detects the maximum value 62 of the acceleration signal.

[0079] Next, in step S110b, the soundness diagnostic unit 104 calculates the time difference between the occurrence time of the false peak 61 currently being processed and the occurrence time of the maximum value 62.

[0080] Next, in step S110c, the health diagnostic unit 104 judges whether the time difference exceeds a threshold value. Usually, a certain amount of time is required from the time when the operator places the sensor group 2 or the user terminal 4 to the time when the operator starts operating the construction machine (this time exceeds 10 seconds, for example). Therefore, if the threshold value is set to, for example, 10 seconds, and this time difference exceeds the threshold value, the peak can be judged to be a false peak. If the time difference is below the threshold value, the process proceeds to step S110d. The health diagnostic unit 104 determines and stores the judgment result. This judgment result is used in the subsequent step S111.

[0081] 10, the time difference is 16 seconds, which exceeds the threshold, so the false peak 61 can be correctly determined to be a false peak and can be removed. In this way, the correct duration 63 is measured.

[0082] It is preferable that the threshold value be set to a time longer than the time required for each operation of the construction machine to be diagnosed, and more preferably set to a time longer than the time required for each operation when the construction machine is not in good condition.

[0083] If the time difference exceeds the threshold in step S110c, the process proceeds to step S110e, where it is determined to be a false peak and the process returns to step S110a for detecting the maximum value of the velocity signal.

[0084] <Example of internal function configuration of basic performance reporting unit 105> FIG. 11 is a diagram showing an example of the internal functional configuration of the basic performance reporting unit 105 of the performance measuring device 1. As shown in FIG.

[0085] The basic performance reporting unit 105 includes a reference comparing unit 1051 , a result reporting unit 1052 , an operating range checking unit 1053 , and a recommendation information acquiring unit 1054 .

[0086] The reference comparison unit 1051 selects performance reference values ​​corresponding to the determined weight class and operation from among various performance reference values ​​stored in the performance reference value storage unit 203, based on the classification results by the weight class classification unit 102 and the classification results by the operation classification unit 103. Then, the reference comparison unit 1051 compares the diagnosis (determination) result by the soundness diagnosis unit 104 with the selected performance reference value, and judges whether the construction machine to be diagnosed (specific operation: for example, arm pulling operation) is in a sound condition.

[0087] The result reporting unit 1052 creates a report on the soundness of the construction machine, and transmits it together with the raw data (measurement data) to the data saving unit 207 of the storage device 20. This makes it possible to generate a history log on the soundness of the construction machine.

[0088] In order to confirm whether the operator of the construction machine to be diagnosed has performed the diagnosis within the correct operating range, the operating range confirmation unit 1053 acquires an operating range reference value corresponding to the classification result of the operation classification unit 103 from the operating range reference value storage unit 204 and outputs the information (displays it on the display screen). For example, in the case of arm pulling, the information on the reference operating range stored in the operating range reference value storage unit 204 is a start angle position of 170 degrees and an end angle position of 15 degrees, which the operator can confirm with the angle sensor 13 built into the construction machine after performing the diagnosis.

[0089] In this way, the motion range reference value storage unit 204 may store the reference start position and reference end position of the machine motion, the information acquisition unit 101 may measure the actual start position and actual end position of the machine motion, and the user terminal 4 may display the reference start position, the reference end position, the actual start position, and the actual end position. In this way, the operator can easily check the result of the motion.

[0090] Based on the comparison result by the reference comparison unit 1051, the recommendation information acquisition unit 1054 acquires appropriate recommendation information corresponding to the current diagnosis content from an information set previously stored in the recommendation information storage unit 205.

[0091] <Examples of information stored in data storage unit 207> FIG. 12 is a diagram showing an example of the configuration of a history log list 1201, which is an example of information held by the data storage unit 207 included in the storage device 20 of the performance measurement apparatus 1. As shown in FIG.

[0092] The history log list 1201 is made up of multiple history files for each operation and sample of each construction machine (by weight class). For example, if you select any history file 12012 (history log file) from the files shown in the list in the upper part of Fig. 12, you can view the file contents shown in the lower part of Fig. 12.

[0093] The history file is saved, for example, as a CSV file, and the title of the history file includes the date (automatically assigned by the device's OS), the weight class of the construction machine (obtained from the weight class classification unit 102), operation information (obtained from the operation classification unit 103), sample number (if the experiment needs to be repeated, excluding the diagnosis result for an operation due to an improper operation by the operator), and diagnosis result (information reported from the basic performance reporting unit 105).

[0094] In this way, the data storage unit 207 stores, in particular, the weight class, the machine operation, and the health in CSV format, so that the performance measuring device 1 can output this information in CSV format, which makes it easier to analyze the data in the subsequent stages.

[0095] An example of a history file is shown in the lower diagram of Fig. 12. History file 12012 includes, as configuration items, data acquisition time 120121, raw data 120122 which is measurement data, operation 120123 indicating the operation content, sample number 120124, and result 120125 indicating the diagnosis result.

[0096] <Example of information held by performance reference value holding unit 203> FIG. 13 is a diagram showing an example of the configuration of performance reference value information 1301 held by the performance reference value holding unit 203 included in the storage device 20 of the performance measuring apparatus 1. As shown in FIG.

[0097] The performance reference value information 1301 is management information including, for each weight class 13011, an operation 13012, a standard 13013, and an allowable error 13014.

[0098] The weight class 13011 is information indicating the weight class of the construction machine, for example, 20 tons or 40 tons. The operation 13012 is an operation of the construction machine, for example, arm pulling, bucket digging, etc. The criterion 13013 is, for example, a reference duration (for example, 3.5 seconds) required for the corresponding operation. The allowable error 13014 indicates a range (tolerance: for example, ±0.4 seconds) within which the operation can be determined to be normal even if it does not match the criterion 13013.

[0099] The performance reference value storage unit 203 may store a reference duration associated with each of a plurality of weight classes, and the soundness of the construction machine may be determined based on the reference duration for each weight class. In this way, appropriate determination can be made specific to each weight class.

[0100] The motion of the diagnostic target can be estimated by using the performance reference value information 1301. For example, if the diagnostic result of the health diagnostic unit 104 is 3.6 seconds, and the reference value of the performance reference value information for the motion arm pull in the corresponding weight class is 3.5 seconds with an allowable error range of ±0.4 seconds, the motion of the diagnostic target can be estimated as arm pull.

[0101] <Example of Information Stored in the Operating Range Reference Value Storage Unit 204> FIG. 14 is a diagram showing an example of the configuration of operating range threshold value information 1401 held by the operating range threshold value holding unit 204 included in the storage device 20 of the performance measurement apparatus 1. As shown in FIG.

[0102] The motion range reference value information 1401 is management information including, for each weight class 14011, a motion 14012, a start angle 14013, and an end angle 14014.

[0103] The weight class 14011 is information indicating the weight class of the construction machine, for example, 20 tons or 40 tons. The operation 14012 is an operation of the construction machine, for example, arm pulling, bucket digging, etc. The start angle 14013 is information indicating the start angle of the corresponding operation. The end angle 14014 is information indicating the end angle of the corresponding operation. For example, for a boom raising operation, the start angle is 0 degrees and the end angle is 90 degrees.

[0104] <Example of information stored in the action-specific representative waveform storage unit 202> FIG. 15 is a diagram showing an example of the configuration of the action-specific representative waveform information 1501 stored in the action-specific representative waveform storage unit 202 included in the storage device 20 of the performance measurement apparatus 1. As shown in FIG.

[0105] Representative waveform information by action 1501 is composed of acquisition time information at which a representative waveform was acquired and the corresponding waveform for each action (150111, 150112) for each weight class 15011. It is assumed that the representative waveform information by action 1501 stores different waveforms for all actions available for each weight class.

[0106] <Examples of Information Stored in the Recommendation Information Storage Unit 205> FIG. 16 is a diagram showing an example of the configuration of recommendation information 1601 stored in the recommendation information storage unit 205 included in the storage device 20 of the performance measurement device 1. As shown in FIG.

[0107] The recommendation information 1601 is made up of a drift value 16011 and recommendation content 16012 (recommended information) of a countermeasure corresponding to the drift value.

[0108] The drift value 16011 is information indicating how far the measurement result is from the reference value, and is displayed as a percentage. For example, the ideal arm pulling duration for a certain weight class is 3.2 seconds, with a tolerance of ±0.3 seconds, which corresponds to (0.3 / 3.2)×100=9.4%. If the measurement time is 3.4 seconds, D1 is ((3.4-3.2) / 3.2)×100, which is 6.25%. In this case, since D1 is lower than 9.4% indicated by the drift value 16011, the recommendation content 16012 in this case is "The target part of the construction machine is in a sound state. No action is required." On the other hand, for example, if the drift D2% of the measurement time is higher than 9.4% indicated by the drift value 16011, the recommendation content 16012 is "The target part of the construction machine has a soundness problem. If possible, contact the maintenance staff and show them this report."

[0109] In this way, it is possible to present recommended information in various forms, such as by setting the importance (importance of action) according to the degree of deviation from the reference value. In this way, the performance measuring device 1 outputs information regarding measures to be taken for the construction machine based on the soundness (or the results of the judgment regarding the soundness). This enables the operator to take the necessary measures for the construction machine.

[0110] <Example of Information Held by Action List Holding Unit 206> FIG. 17 is a diagram showing an example of the configuration of action list information 1701 (table) held by the action list holding unit 206 included in the storage device 20 of the performance measurement device 1. As shown in FIG.

[0111] The action list information 1701 is made up of a state 17011 and an action 17012 for each weight class.

[0112] Status 17011 is information indicating whether or not the diagnosis of the operation has been completed. If the operation has been diagnosed, it is indicated with a "○" mark, and if the operation diagnosis has not been completed, it is indicated with an "×" mark, thereby making it possible to indicate the diagnosis state of the corresponding operation. In this manner, the operation list holding unit 206 stores a list including information indicating each of a plurality of machine operations.

[0113] Additionally, result 17013 (diagnosis result), criteria 17014 (reference value), tolerance 17015 (tolerance range relative to the reference value), and other columns (not shown) may be added to allow the user to visualize the overall condition of the machine.

[0114] The operation list information 1701 can indicate whether a health diagnosis has been completed for a construction machine of a particular weight class, allowing the user to check available operations and to track which operations have been diagnosed and which have not yet been diagnosed.

[0115] The storage device 20 of the performance measuring device 1 may be configured to previously store in the operation list holding unit 206 operation list information 1701 in which the status 17011 is blank (or the status of all operations is incomplete (X)) for each weight class of all construction machines. Also, when the operator starts diagnosing the target construction machine 3, all operations of the construction machine 3 may be registered in the operation list holding unit 206 as operation list information 1701. If there is a construction machine of the same weight class that has been diagnosed in the past, it is possible to reuse the operation list information 1701 from the previous use (the information on the previous result 17013 and status 17011 is reset).

[0116] <Input and output information> FIG. 18 is a diagram showing a comparison between an example of input information 1801 to a performance measuring device 1 and an example of output information 1802 from the device 1. In FIG.

[0117] Examples of input information 1801 include a start instruction (pressing a start button) for starting data collection before diagnosis and a stop instruction 18011 (pressing a stop button) for stopping / ending diagnosis. However, input information 1801 is not limited to these. It is also possible to automatically stop when a predetermined criterion is met or after a certain time has elapsed since the start.

[0118] The output information 1802 may include, for example, an operation list 18021 (with completion status mark), a construction machine weight class 18022, construction machine operations 18023, operation range reference values ​​18024, health 18025, reference values ​​18026 (including allowable error), recommendations 18027, a report 18028, and a history log 18029.

[0119] Outputting the operation list 18021 allows the user to keep track of which machine operations have already been diagnosed and which operations have not yet been diagnosed. As shown in Figure 17, operations that have been diagnosed can include a mark ("O") indicating that diagnosis is complete.

[0120] By outputting the construction machinery weight class 18022, it becomes possible to confirm the weight class of the construction machinery (e.g. 20 tons) that was automatically classified in the diagnosis performed this time.

[0121] By outputting the construction machine operation 18023, it becomes possible to confirm the construction machine operation (e.g., arm pulling) that was automatically classified in the currently performed diagnosis.

[0122] Outputting the motion range reference value 18024 can provide information for the operator of the construction machine to confirm whether the operation has been performed correctly. For example, by outputting the reference start angle and reference end angle, the operator can compare them with the angle of the angle sensor 13 built into the construction machine 3 and confirm whether the motion range matches the reference value.

[0123] By outputting the soundness 18025, it is possible to provide information for confirming whether the part (for example, the arm) that performs the operation is in a sound state through the target operation diagnosis. As information indicating the soundness 18025, for example, it is conceivable to output the results of the recently performed test.

[0124] By outputting the information of the reference value 18026, it is possible to provide information for confirming the reference value (including the allowable error) for diagnosis of a specific operation of a specific construction machine.

[0125] By outputting the recommendation 18027, it is possible to provide information (recommendations) for the operator (user) to interpret the information of the soundness 18025 and determine whether it is necessary to contact for maintenance.

[0126] The report 18028 can be output as information with raw data added to all the above outputs (for example, the operation list 18021, the weight class 18022 of the construction machine, the operation 18023 of the construction machine, the operation range reference value 18024, the soundness 18025, the reference value 18026, the recommendation 18027).

[0127] By outputting the history log 18029, it is possible to provide information useful for the user to track all past diagnosis contents.

[0128] <Configuration example of GUI> FIG. 19 is an example of a user interface displayed on the display screen of the performance measuring device 1 or the display screen of the user terminal 4. The user interface is configured as, for example, a GUI (Graphical User Interface). The GUI constitutes a display unit, and examples include an input GUI G1 (input screen), an in-execution GUI G2 (execution screen), and a diagnosis result display GUI G3 (result screen).

[0129] In the input GUI G1, it is possible to check operations that have been diagnosed and operations that have not yet been diagnosed. In the example of FIG. 19, six operations are prepared, and it is shown that only the first two have been diagnosed. Note that in the input GUI G1, a method for starting the diagnosis may be displayed, or the diagnosis may be started simply by pressing a start button. In this way, the input GUI G1 includes a start button as an operation unit for commanding the start of a soundness judgment. This allows the operator to easily command the start.

[0130] The in-progress GUI G2 shows that the operation of the construction machine selected by the user (or operator) is in progress. In this example, the operator presses the stop button after the operation is completed. However, it is also possible to omit the stop button and automatically determine the end of the operation.

[0131] The GUI G3 for displaying diagnostic results displays the classified weight classes, the classified actions, and the reference range for the operator to confirm, and may display an instruction to the operator to confirm the action range. The diagnostic results are also displayed with the reference and the acceptable range for reference, and the drift value and recommendations are also displayed. In addition, a list of actions (table: see FIG. 17) is displayed with information on actions marked as completed (○) or incomplete (×). In the example of FIG. 19, action O13 is marked as completed (○), and the diagnostic results are entered in the list of actions.

[0132] In this way, the performance measurement device 1 or the user terminal 4 displays, for each machine operation included in the list, information indicating whether or not the measurement for that machine operation has already been performed. In this way, the user can perform each operation without omission or duplication.

[0133] The GUI G3 for displaying diagnosis results does not need to display all of the above information, and may display, for example, at least one of the weight class and the machine operation (classified operations). With at least such a display, the operator can properly check the weight class of the construction machine or the operation that he or she performed.

[0134] The diagnostic result display GUI G3 can include a save button and a repeat execution instruction button. When the operator (user) presses the save button, the report and raw data are saved in a history log. If the measurement was not performed correctly, the operating range was incorrect, or other problems occurred, the display screen can be configured to transition to the input GUI G1 by the operator (user) pressing the repeat button, without recording the erroneous measurement results, etc.

[0135] <Performance measurement and diagnosis process> FIG. 20 is a flowchart for explaining the performance measurement diagnosis process according to this embodiment.

[0136] (i) Step S201 The performance measuring device 1 starts operating.

[0137] (ii) Step S202 When the operator places the performance measuring device 1 (or a terminal on which the functions of the device are implemented (such as a smartphone with an accelerometer)) in a predetermined location on the construction machine to be diagnosed (for example, in a cup holder of a cabinet or in a box on the floor) so that it can detect (pick up) vibrations during operation of the construction machine, and instructs the performance measuring device 1 to start diagnosis (for example, by pressing a diagnosis start button), the processor 10 accepts the instruction. Note that the placement location may differ depending on the type of sensor.

[0138] (iii) Step S203 The operator checks the undiagnosed operations of the target construction machine from the operation list information 1701 (see FIG. 17), and selects the next operation to be diagnosed. The operation list information 1701 lists all operations to be diagnosed, with diagnosed operations marked with a completed (◯) and undiagnosed operations marked with an incomplete (×) mark. Examples of construction machine operations that the operator can select include arm retraction, arm push, boom raising, boom lowering, bucket digging, and bucket dumping.

[0139] It should be noted that the operator does not need to input which operation has been selected as the operation to be diagnosed, but as a modified example, the user may input the selected operation and the processor 10 may accept the selection.

[0140] (iv) Step S204 The information acquisition unit 101 of the processor 10 starts acquiring related data. For example, the information acquisition unit 101 operates at least one of the sensor group 2 (e.g., the accelerometer 21) and collects data acquired by the sensor. In this manner, the processor 10 measures vibrations of the construction machine via the accelerometer 21.

[0141] (v) Step S205 When the operator operates the construction machine and performs the operation selected in step S204 (e.g., pulling the arm), the health diagnosis unit 104 collects data acquired by at least one of the sensor group 2 during the operation and stores it in the data storage unit 207.

[0142] (vi) Step S206 The processor 10 analyzes the data collected in step S205 and generates some analysis results.

[0143] For example, the health diagnosis unit 104 calculates the time taken for an action from data acquired by a sensor (e.g., the peak value of a vibration waveform acquired by an accelerometer), stores the analysis data (vibration waveform and inter-peak time) in the data storage unit 207, and also passes it to the action classification unit 103.

[0144] The weight class classification unit 102 acquires the analysis data acquired by the health diagnosis unit 104, and identifies the weight class of the construction machine based on the analysis data. In this manner, the processor 10 determines the weight class of the construction machine based on the vibration.

[0145] The motion classification unit 103 acquires the analysis data acquired by the health diagnosis unit 104, and compares and matches the analysis data (e.g., vibration waveform) with waveforms previously stored in the motion representative waveform storage unit 202 to identify the motion to be diagnosed. At this time, the weight class may be referenced.

[0146] The basic performance reporting unit 105 acquires data on the operation range reference value corresponding to the operation identified by the operation classification unit 103 from the operation range reference value storage unit 204, compares the operation range reference value with the analysis data, and judges whether the construction machine to be diagnosed is in a sound state with respect to the operation (how much it deviates from a sound state). At this time, the weight class may be referenced. In this way, the processor 10 judges the soundness of the construction machine based on the weight class and the result of the machine operation.

[0147] (vii) Step S207 The processor 10 transfers the weight class identified by the weight class classification unit 102, the operation identified by the operation classification unit 103, the health determined by the basic performance reporting unit 105, and the operating range (including information on the operating range standard value) to, for example, a user terminal 4 (a mobile terminal (smartphone) or a computer (PC)) and displays the information on the output screen.

[0148] More specifically, it outputs which operation the operator (user) selected, the range of operation (start and stop positions) to check if the operator performed the operation correctly, and the results of comparing the soundness of the construction machine (the execution time of the operation) with a reference value (the reference value at the time of manufacture).This information can be used as a reference for determining what conditions are sound and what conditions are not sound.

[0149] (viii) Step S208 The processor 10 obtains recommendation content 16012 (see Figure 16) corresponding to the diagnosis result of the basic performance reporting unit 105 from the recommendation information storage unit 205, and displays it, for example, on the screen of the user terminal 4 (see GUI G3 for displaying diagnosis results (Figure 19)).

[0150] As explained in Fig. 16, the recommendation contents 16012 are generated (selected) based on the degree to which the soundness of the relevant operation of the construction machine deviates from the reference value (the reference value at the time of manufacture). For example, if the soundness of the construction machine deviates by D% from the manufacturing reference value, a recommendation such as "There is a problem with the soundness of the relevant part of the construction machine. If possible, contact the maintenance staff and show them this report" can be made.

[0151] (ix) Step S209 The operator determines whether the sensor data has been properly collected, and if so, presses the Save button, or if not, presses the Repeat button. The processor 10 determines which button has been pressed. If the Save button has been pressed (Yes in step S209), the process proceeds to step S210. If the Repeat button has been pressed (No in step S209), the process proceeds to step S204.

[0152] (x) Step S210 The processor 10 stores the report (operation type of the construction machine, diagnosis result, and recommendation information) and the raw data in a storage device as a history log. These reports and raw data can be referenced when further analysis is required.

[0153] (xi) Step S211 The processor 10 gives a completion (diagnosed) mark (◯) to the diagnosed operation in the operation list of the construction machine to be diagnosed.

[0154] (xii) Step S212 The processor 10 determines whether diagnosis has been completed for all operations of the construction machine to be diagnosed. If diagnosis has been completed for all operations (Yes in step S212), the process proceeds to step S213, i.e., the performance measurement diagnosis process ends. If undiagnosed operations remain (No in step S212), the process proceeds to step S204.

[0155] <Example> Example A: (1) Examples of devices that implement the functions of the performance measurement device 1 As described above, a smartphone can be used as an example of a main device that implements the functions of the performance measuring device 1. A MEMS (Micro Electro Mechanical System) sensor (such as an accelerometer) built into the smartphone can be used as the main sensor for acquiring data. The data acquired by the sensor (accelerometer) can be processed and analyzed by the smartphone's CPU.

[0156] The smartphone's memory can be used to store the raw data and the results. In this embodiment, the functionality of the performance measurement diagnostic process is implemented in the form of an application on the smartphone.

[0157] (2) Use Cases Examples of anticipated use cases (including operator actions) are as follows:

[0158] (i) The operator presses the start button on the smartphone and places it in the cup holder of the cabinet of the construction machine.

[0159] (ii) The operator starts an application relating to the performance measurement and diagnosis process of the smartphone.

[0160] (iii) The operator selects the operation of the construction machine to be diagnosed (for example, pulling the arm) from the list of operations and executes it.

[0161] (iv) The operator may press a start button, and the sensor (e.g., an accelerometer) may start acquiring data in response. Note that the start button may be omitted, in which case the sensor may start acquiring data at the point in time (i) above.

[0162] (v) The operator operates the construction machine and performs an action (e.g., pulling the arm).

[0163] (vi) While the action is being performed, the smartphone's accelerometer detects vibrations inside the smartphone housing.

[0164] (vii) After completing the arm pulling motion, the operator may press a stop button to stop the data acquisition process.

[0165] (viii) The smartphone then begins analyzing the aggregated accelerometer data, which indicates vibration levels and the start and stop times of the arm-pulling motion.

[0166] (ix) Algorithm structure (the following does not limit the order of execution) (ix-1) Automatic measurement of operation time of construction machinery The data from the accelerometer 21 makes it possible to automatically detect the start and stop times of construction machine operation. (ix-2) Automatic classification of construction machinery operations With regard to the operation of the construction machine to be diagnosed, by performing peak analysis of the waveform data from the accelerometer 21, it is possible to automatically detect which operation has been performed. (ix-3) Automatic classification of construction machinery weight classes The weight class of the construction machine being diagnosed is automatically identified.

[0167] (x) Screen Output

[0168] The smartphone screen (GUI G3 for displaying diagnosis results) displays the weight class of the construction machinery (e.g., 20 tons), the type of construction machinery operation (e.g., arm pull), the operation standard range (e.g., start angle 170 degrees, end angle 10 degrees), operation time, standard duration and tolerance, recommendation comments (including drift value), a completion mark (◯) for the recently diagnosed operation (e.g., arm pull), an operation list (updated version) including the result display, a save button for saving the report and raw data, and a repeat button for repeating the test in case of an error (e.g., an operator's operating error) (e.g., if the operator performs the operation within a different operation range from the standard) (see Figure 19).

[0169] B: Example 2 As a modification of the first embodiment, a microcontroller such as Arduino (registered trademark) with a built-in accelerometer can be used. The microcontroller may be called a portable controller, a control board, or the like. The same process described in the first embodiment can be repeated (wirelessly or wired) by a microcomputer connected to a computer to perform control and visualization of output. Some microcomputers have a built-in CPU and memory, and can function as long as a display device is connected.

[0170] <Summary> (i) According to this embodiment, the construction machinery diagnostic system (a device for determining the soundness of a construction machinery) includes a performance measuring device 1, a sensor group 2, and a user terminal 4, and executes the following processes: a process for identifying the weight class of the construction machinery based on sensor waveform data obtained by detecting an actually performed operation (e.g., pulling the arm) of a construction machinery 3 (e.g., a hydraulic excavator) using a sensor (e.g., an accelerometer 21); a process for identifying the actually performed operation; and a process for acquiring a performance standard value and an allowable error value (see FIG. 13) corresponding to the identified operation from a storage device, comparing the performance standard value (standard duration required for the operation) and the allowable error value with a characteristic value of the actually performed operation (e.g., the time between peaks in the sensor waveform: the actual time required for one operation (operation time)), and determining the soundness of the construction machinery.

[0171] In other words, if the characteristic value of the operation (operation time) is within the allowable error range of the reference value, the operation of the construction machine is judged to be in a sound state, and if not, it is judged that there is a problem with the soundness. Then, this soundness judgment result is output to the display unit of a user terminal 4 such as a smartphone equipped with the performance measuring device 1, or to the display unit of a user terminal 4 such as a smartphone independent of the performance measuring device 1. This allows the operator to see the soundness judgment result and judge the necessity of maintenance of the construction machine.

[0172] (ii) The performance measuring device 1 may output values ​​detected by the angle sensor 13 of the angle of a specific part of the construction machine (e.g., an arm or a boom) at the start position and the angle of a specific part at the end position when an operation of the construction machine is actually performed, together with the judgment result of the soundness of the construction machine, to the display unit. This allows the operator to judge whether the operation was performed correctly. If it was not correct, the diagnosis result for that operation can be discarded (reset) and the diagnosis for the same operation can be performed again.

[0173] (iii) The performance measuring device 1 may further store in the storage device 20 a number of types of recommendation information regarding measures to be taken according to the degree of deviation from the performance reference value, and may output the recommendation information corresponding to the soundness judgment result together with the judgment result to the display unit. When there is a problem with the soundness of the construction machine, even an inexperienced operator will be able to recognize what measures should be taken.

[0174] (iv) The performance measuring device 1 further holds in the storage device 20 operation list information indicating the diagnostic status (whether diagnosis is complete or not) and the diagnostic results for each of the multiple operations of the construction machine, and updates the operation list information by inputting information indicating that the diagnostic status is complete and the judgment result for operations for which the soundness judgment process has been completed in the operation list information, and outputs the updated operation list information to the display unit. In this way, it becomes possible to immediately recognize to what extent the diagnosis of the entire operation has been completed for the construction machine to be diagnosed.

[0175] (v) Upon detecting a save instruction from an operator (pressing the save button displayed on the diagnostic result display GUI G3), the performance measuring device 1 saves the judgment results and the detection data of the actually performed operations as a diagnostic history log (see FIG. 12) in the storage device 20. By referring to the diagnostic history log, it is possible to confirm whether the construction machine has periodically performed a soundness diagnosis of each operation, and also to confirm whether deterioration is gradually progressing even if there is no problem with the soundness.

[0176] On the other hand, when a repeat instruction from the operator (pressing the repeat button displayed on the diagnosis result display GUI G3) is detected, the performance measuring device 1 resets the judgment result and the sensor detection data of the identified operation, and performs diagnosis again for the same operation. This makes it easier to verify the diagnosis result, since data on the operation does not need to be left in the diagnosis history log when the operator fails to properly perform the operation of a part of the construction machine that is to be diagnosed (for example, an arm, etc.).

[0177] (vi) As shown in FIG. 18, the information that the operator should input to the performance measuring device 1 is only an instruction to start diagnosis (an instruction to stop diagnosis may also be input). On the other hand, the output information of the performance measuring device 1 includes the judgment result regarding soundness, information on the identified weight class and type of operation, information on the operation range reference value of the identified operation, the performance reference value of the identified operation, recommendation information corresponding to the judgment result, and the sensor detection data of the identified operation. In this way, the operator only needs to input the minimum information to obtain an appropriate diagnosis result (the number of input items can be reduced to an extreme extent), so that the burden on the operator can be reduced. Also, even an operator with little experience can obtain an appropriate diagnosis result. As a result, the possibility of human error can be reduced.

[0178] Furthermore, since it does not depend on audio signals, more accurate diagnosis is possible.

[0179] (vii) In the above example, the history log is stored on a storage device, but by transferring it to a server / cloud server and managing it, data can be unified and centralized, and updateability can be improved.

[0180] (viii) The functions of the embodiments of the present disclosure can also be realized by software program code. In this case, a storage medium on which the program code is recorded is provided to a system or device, and the computer (or CPU or MPU) of the system or device reads the program code stored in the storage medium. In this case, the program code itself read from the storage medium realizes the functions of the above-mentioned embodiments, and the program code itself and the storage medium on which it is stored constitute the present disclosure. Examples of storage media for supplying such program code include flexible disks, CD-ROMs, DVD-ROMs, hard disks, optical disks, magneto-optical disks, CD-Rs, magnetic tapes, non-volatile memory cards, and ROMs.

[0181] Also, an operating system (OS) running on a computer may perform all or a part of the actual processing based on the instructions of the program code, and the functions of the above-mentioned embodiments may be realized by the processing. Furthermore, after the program code read from a storage medium is written into a memory on a computer, a CPU of the computer may perform all or a part of the actual processing based on the instructions of the program code, and the functions of the above-mentioned embodiments may be realized by the processing.

[0182] Furthermore, the program code of the software that realizes the functions of the embodiments may be distributed over a network and stored in a storage means such as a hard disk or memory of the system or device, or in a storage medium such as a CD-RW or CD-R, so that when used, the computer (or CPU or MPU) of the system or device reads out and executes the program code stored in the storage means or storage medium.

[0183] Finally, it should be understood that the processes and techniques described herein are not inherently related to any particular apparatus, but may be implemented by any suitable combination of components. Moreover, various types of general purpose devices may be used in accordance with the teachings described herein. It may prove beneficial to construct a dedicated apparatus to perform the steps of the methods described herein. Also, various inventions may be formed by suitable combinations of multiple components disclosed in the embodiments. For example, some components may be omitted from all components shown in the embodiments. Furthermore, components across different embodiments may be combined as appropriate. Although the present disclosure has been described with reference to specific examples, these are intended in all respects to be illustrative and not limiting. Those skilled in the art will recognize that there are numerous combinations of hardware, software, and firmware suitable for implementing the present disclosure. For example, the described software may be implemented in a wide range of programming or scripting languages, such as assembler, C / C++, perl, Shell, PHP, Java, and the like.

[0184] Furthermore, in the above-described embodiment, the control lines and information lines are those that are considered necessary for the explanation, and not all of the control lines and information lines in the product are necessarily shown. All of the components may be connected to each other. [Explanation of symbols]

[0185] 1. Performance measuring device (device to judge the soundness of construction machinery) 2. Sensor group (devices for determining the soundness of construction machinery) 3. Construction machinery 4. User terminal (device for determining the soundness of construction machinery) 10 Processor (arithmetic unit) 20 Storage Devices 30 Communication Devices 21 Accelerometer 22 Microphone 23 Camera 101 Information acquisition department 102 Weight Classification Division 103 Motion classification section 104 Health Diagnosis Department 105 Basic performance report section 201 Weight reference value holding unit 202 Representative waveform holding section for each operation 203 Performance standard value storage unit 204 Operating range reference value storage unit 205 Recommendation information storage unit 206 Action List Holder 207 Data Storage Department

Claims

1. A device for determining the soundness of a construction machine, comprising: The device includes a computing unit, The calculation unit is - measuring the vibrations of said construction machine via an accelerometer, - determining a weight class of the construction machine based on the vibration; - measuring the results of mechanical movements of said construction machine, - determining the health of the construction machine based on the weight class and the results of the machine operation; Device.

2. The apparatus of claim 1 , wherein the vibrations are measured while the construction machine is in an idle state.

3. The device of claim 1 , wherein the device comprises a smartphone or a microcontroller.

4. The calculation unit measures a start time and an end time of the mechanical operation, and calculates a duration of the mechanical operation based on the start time and the end time; The health of the construction machine is further determined based on the duration.

2. The apparatus of claim 1.

5. the device stores a reference duration associated with each of a plurality of the weight classes; The health of the construction machine is further determined based on the reference duration.

5. The apparatus of claim 4.

6. the device stores vibration thresholds and vibration patterns associated with a plurality of the weight classes, respectively; The weight class of the construction machine is further determined based on the vibration threshold and the vibration pattern.

2. The apparatus of claim 1.

7. the apparatus stores a reference start position and a reference end position for the machine operation; The computing unit measures a start position and an end position of the machine operation; The device displays the reference start position, the reference end position, the start position, and the end position.

2. The apparatus of claim 1.

8. The apparatus of claim 1 , wherein the apparatus outputs information regarding a course of action for the construction machine based on the health status.

9. the apparatus stores a list including information representative of each of a plurality of the machine operations; the device displays, for each machine operation included in the list, information indicating whether a measurement has already been performed on that machine operation.

2. The apparatus of claim 1.

10. the apparatus comprises a user interface; The user interface includes: an operation unit for instructing the start of a soundness determination; A display unit that displays at least one of the weight class and the machine operation; The apparatus of claim 1 , comprising:

11. The apparatus of claim 1 , wherein the apparatus outputs the weight class, the machine operation, and the health in a CSV format.

Citation Information

Patent Citations

  • Operational state detection method, operational state detection system and operational state detection program

    JP2018001282A

  • Construction machinery and construction machinery management device

    JP2019159841A

  • Construction equipment utilization state management system and management method

    JP2020052592A

  • Display method for construction machine and assistance device for construction machine

    WO2020013252A1

  • Construction machine

    WO2022163388A1